{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 June 2, 2017 MEETING | ||
==SUMMARY== | ==SUMMARY== | ||
LICENSEE: EXELON GENERATION CO., LLC | LICENSEE: EXELON GENERATION CO., LLC FACILITY: PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 | ||
FACILITY: PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 | |||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF PUBLIC MEETING | OF PUBLIC MEETING On May 3, 2017, at 5:00 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Peach Bottom Inn in Delta, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 for 2016. | ||
A notice of the open house was issued on April 5, 2017, and was posted on the NRCs external (public) Webpage. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML17090A128. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html. | |||
On May 3, 2017, at 5:00 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Peach Bottom Inn in Delta, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 for 2016. | The NRC presented poster boards and handouts and met with members of the public to discuss its assessment of the safety performance of PBAPS Units 2 and 3 for the period of January 1 through December 31, 2016, as documented in our letter dated March 1, 2017 (ADAMS Accession No. ML17055B661). The NRC poster boards presented included background on the Reactor Oversight Process and PBAPS performance highlights. Additional information relative to the NRC's Annual Assessment Process and the safety performance of PBAPS Units 2 and 3 can be found on the NRC's web site at: | ||
https://www.nrc.gov/reactors/operating/oversight.html. | |||
A notice of the open house was issued on April 5, 2017, and was posted on the | Members of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding PBAPSs performance and the role of the agency in ensuring safe plant operations. | ||
________/RA/______________ | |||
https://www.nrc.gov/reactors/operating/oversight.html. Members of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding | Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects | ||
________ | |||
/RA/______________ | |||
Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects | |||
==Enclosure:== | ==Enclosure:== | ||
Attendee List (ML17128A016) | Attendee List (ML17128A016) | ||
ML17153A105 | ML17153A105 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ATurilin DSchroeder DATE 6/1/17 6/2/17}} | ||
Revision as of 02:33, 30 October 2019
| ML17153A105 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 06/02/2017 |
| From: | Daniel Schroeder Reactor Projects Region 1 Branch 4 |
| To: | |
| Schroeder D | |
| References | |
| Download: ML17153A105 (2) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 June 2, 2017 MEETING
SUMMARY
LICENSEE: EXELON GENERATION CO., LLC FACILITY: PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3
SUBJECT:
SUMMARY
OF PUBLIC MEETING On May 3, 2017, at 5:00 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Peach Bottom Inn in Delta, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 for 2016.
A notice of the open house was issued on April 5, 2017, and was posted on the NRCs external (public) Webpage. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML17090A128. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.
The NRC presented poster boards and handouts and met with members of the public to discuss its assessment of the safety performance of PBAPS Units 2 and 3 for the period of January 1 through December 31, 2016, as documented in our letter dated March 1, 2017 (ADAMS Accession No. ML17055B661). The NRC poster boards presented included background on the Reactor Oversight Process and PBAPS performance highlights. Additional information relative to the NRC's Annual Assessment Process and the safety performance of PBAPS Units 2 and 3 can be found on the NRC's web site at:
https://www.nrc.gov/reactors/operating/oversight.html.
Members of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding PBAPSs performance and the role of the agency in ensuring safe plant operations.
________/RA/______________
Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects
Enclosure:
Attendee List (ML17128A016)