ML17228B066: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:~~P H.l C)R.I MY'ACCELERATED RIDS PROCESSING)
{{#Wiki_filter:~ ~
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCEBBION NBR:9503210065 DOC.DATE: 95/02/28 NOTARIZED:
H.l C) R.I MY' PACCELERATED    RIDS PROCESSING)
NO FACIL:50-3'35 St.Lucie Plant, Unit 1, Florida Power 6 Light Co.50-389 St.Lucie Plant, Unit 2, Florida Power 6 Light Co.AUTH.NAME AUTHOR AFFXLXATXON ROGERS,J.A.
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
Florida Power&Light Co.SAGER,D.A.
ACCEBBION NBR:9503210065               DOC.DATE:   95/02/28   NOTARIZED: NO         DOCKET g FACIL:50-3'35 St. Lucie Plant,             Unit 1, Florida   Power 6 Light   Co. 05000335 50-389 St. Lucie Plant,             Unit 2, Florida   Power 6 Light   Co. 05000389 AUTH. NAME           AUTHOR AFFXLXATXON ROGERS,J.A.           Florida Power & Light Co.
Florida Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET g 05000335 05000389
SAGER,D.A.           Florida Power 6 Light Co.
RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating repts for Feb 1995 for St Lucie.W/950315 ltr.DXSTRXBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: A~C kT.LE CENTER 01 NRR/DOPS/OECB EXTERNAL LITCO BRYCE i J H NRC PDR COPIES LTTR ENCL 1 1 10 10 1 1 1 1 1 1 1 1 RECXPIENT ID CODE/NAME NORRIS,J AEOD/SPD/RRAB NRR/DISP/PIPB RGN2 NOAC COPIES LTTR ENCL 1 1 1 1 1'1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating repts             for Feb 1995 for St   Lucie.W/950315 ltr.
PLEASE HELP US TO REDUCE iVASTE!CONTACTTHE DOCUMENT CONTROL DESK, ROOM P!-37 (EXT.504-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS I'OR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20 Florida Power 5 Light Company, P.O.Box128, Fort Pierce, FL 34954-0128 PIPING'arch 15, 1995 L-95-86 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Monthl 0 eratin Re ort Attached are the February, 1995, Operating Status and Summary of Operating Experience Reports for St.Lucie Units 1 and 2.Should there be any questions on this information, please contact US~Very truly yours, D.A.a er Vice sident St.L'e Plant DAS/GRM cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant Attachments I HNKODENFEDENACMlIO ENDSScaIbst JRW 95032i0065 950228 PDR ADOt K 05000335 R PDR an FPL Group company I\I OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50-335 DATE 3/14/95 FPL LICENSING GROUP-JUNO TELEPHONE 407/694/4432 1.UNIT NAME: ST.LUCIE UNIT 1 2.REPORTIHG PERIOD: FEBRUARY 1995 3.LICENSED THERMAL POWER (MWT): 2700 4.NAMEPLATE RATING (GROSS MWE): 850 5.DESIGN ELECTRICAL RATING (NET MWE): 830 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEHS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR IGRIRG OER RETT 23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS: 672 624.9 0.0 624.1 0.0 1679431 559240 530480 92.9 92.9 94.1 95.1 0.0 1416 1368.9 0.0 1368 F 1 0.0 3688385 1228580 1166517 96.6 96.6 98.2 99.3 0.0 159456.0 124692.7 205.3 123325.0 39.3 319422126 105378590 99603420 77.3 77.4 76.7 76.1 6.9 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 3/6/95, AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: UNIT: DATE COMPLETED BY: TELEPHONE:
DXSTRXBUTION CODE: IE24D             COPIES RECEIVED:LTR         ENCL       SIZE:
50-335 St.Lucre 51 03/14/95 Z.A.ROGERS (407)468-4157 DAY 2/1/95 2/2/95 2/3/95 2/4/95 2/5/95 2/6/95 2/7/95 2/8/95 2/9/95 2/10/95 2/11/95 2/12/95 2/13/95 2/14/95 2/15/95 2/16/95 2/17/95 2/18/95 2/19/95 2/20/95 2/21/95 2/22/95 2/23/95 2/24/95 2/25/95 2/26/95 2/27/95 2/28/95 MONTH AVERAGE DAILY POWER LEVEL (MWe-Net)855 855 853 853 853 853 854 854 855 858 856 854 854 856 856 856 853 853 852 852 855 855 856 856 855 776-26-7 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: UNIT NAME: DATE: COMPLETED BY TELEPHONE:
TITLE: Monthly Operating Report (per Tech Specs)
50-335 ST LUCIE UNIT 1-03/14/95 J.A.ROGERS (407)468-4157 REPORT MONTH No.Date Type Duration (Hours)Reason'ethod of Shutting Down Reactor Licensee Event Report System Code'omponent Codes Cause&Corrective Action to Prevent Recurrence 950227 47.8 N/A CB VALVEXX Unit 1 removed from service to repair quench tank leak.F Forced S Scheduled Reason A-Equipment failure (explain)B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training gc License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Shccts Liccnsec Event Rcport (LER)File (NUREG4)I6l)Exhibit I-Sane Source 09 l sar FPt.  
NOTES RECIPIENT               COPIES            RECXPIENT          COPIES ID CODE/NAME             LTTR ENCL        ID CODE/NAME        LTTR ENCL PD2-2 PD                       1    1      NORRIS,J                1    1 INTERNAL:   A~C                           10    10      AEOD/SPD/RRAB          1  '  1 kT.LE CENTER 01                1    1      NRR/DISP/PIPB          1 NRR/ DOPS/OECB                 1    1      RGN2                    1    1 EXTERNAL   LITCO BRYCE i J H               1     1     NOAC                   1     1 NRC PDR                        1     1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE! CONTACTTHE DOCUMENT CONTROL DESK, ROOM P!-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAME FROM DISTRIBUTIONLISTS I'OR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                 20   ENCL   20
 
Florida Power 5 Light Company, P.O. Box128, Fort Pierce, FL 34954-0128 PIPING'arch                                   15, 1995                 L-95-86 10 CFR       50.36 U. S. Nuclear Regulatory Commission Attn:     Document Control Desk Washington, DC 20555 Re:     St. Lucie Units         1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the February, 1995, Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.
Should there be any questions on                 this information, please contact US   ~
Very     truly     yours, D. A.       a er Vice           sident St. L         'e Plant DAS/GRM cc:     Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC Attachments I
HNKODENFEDENACMlIO ENDSScaIbst JRW 95032i0065 950228 PDR     ADOt K   05000335 R                     PDR an FPL Group company
 
I
  \
I
 
OPERATING DATA REPORT DOCKET NO           50 - 335 DATE                 3/14/95 FPL LICENSING GROUP     - JUNO TELEPHONE       407/694/4432 OPERATING STATUS
: 1. UNIT NAME:   ST. LUCIE     UNIT 1
: 2. REPORTIHG PERIOD: FEBRUARY 1995
: 3. LICENSED THERMAL POWER (MWT):                 2700
: 4. NAMEPLATE RATING (GROSS MWE):                   850
: 5. DESIGN ELECTRICAL RATING (NET MWE):             830
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):       872
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):         839
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEHS NUMBER 3   THROUGH   7)
SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
: 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY   -YTD-     CUMULATIVE
: 11. HOURS IN REPORT PERIOD:                        672      1416        159456.0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL           624.9    1368.9      124692.7
: 13. REACTOR RESERVE SHUTDOWN HOURS                   0.0        0.0          205.3
: 14. HOURS GENERATOR ON-LINE                         624.1    1368 F 1    123325.0
: 15. UNIT RESERVE SHUTDOWN HOURS                       0.0        0.0          39.3
: 16. GROSS THERMAL ENERGY GENERATED (MWH)         1679431    3688385      319422126
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)       559240  1228580      105378590
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)         530480  1166517      99603420
: 19. UNIT SERVICE FACTOR                             92.9      96.6          77.3
: 20. UNIT AVAILABILITYFACTOR                          92.9      96.6          77.4
: 21. CAPACITY FACTOR (USING MDC NET)                 94.1      98.2          76.7
: 22. CAPACITY FACTOR IGRIRG OER RETT                 95.1      99.3          76.1
: 23. UNIT FORCED OUTAGE RATE                           0.0       0.0           6.9
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:     3/6/95,
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:   50-335 UNIT:          St. Lucre 51 DATE            03/14/95 COMPLETED BY:  Z.A.ROGERS TELEPHONE:      (407) 468-4157 MONTH DAY       AVERAGE  DAILY POWER LEVEL (MWe-Net) 2/1/95           855 2/2/95           855 2/3/95           853 2/4/95           853 2/5/95           853 2/6/95           853 2/7/95           854 2/8/95           854 2/9/95           855 2/10/95         858 2/11/95         856 2/12/95         854 2/13/95         854 2/14/95         856 2/15/95         856 2/16/95         856 2/17/95         853 2/18/95         853 2/19/95         852 2/20/95         852 2/21/95         855 2/22/95         855 2/23/95         856 2/24/95         856 2/25/95         855 2/26/95         776 2/27/95         -26 2/28/95           -7
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:                   50-335 UNIT NAME:                   ST LUCIE UNIT 1-DATE:                          03/14/95 COMPLETED BY                  J.A.ROGERS TELEPHONE:                    (407) 468-4157 REPORT MONTH No.         Date Type Duration   Reason'ethod of                   Licensee     System Code'omponent                         Cause   & Corrective (Hours)                      Shutting      Event Report                    Codes                      Action to Down                                                                Prevent Recurrence Reactor 950227       47.8                                           N/A         CB         VALVEXX   Unit 1 removed from service to repair quench tank leak.
F Forced                         Reason                                        Method                                  Exhibit G - Instructions for S Scheduled                     A - Equipment failure (explain)                 I - Manual                              Preparation of Data Entry B - Maintenance or Test                         2 - Manual Scram                        Shccts Liccnsec Event Rcport C - Refueling                                   3 - Automatic Scram                      (LER) File (NUREG4) I6l)
D - Regulatory restriction                     4 - Continued E - Operator Training gc License Examination   5 - Load Reduction F - Administrative                             9 - Other (Explain)                     Exhibit I - Sane Source G - Operational Error (Explain)
H - Other (Explain) 09 lsar FPt.


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO~.UNIT DATE COMPLETED BY%TELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO ~ . 50-335 UNIT          St. Lucie gi DATE          3/14/95 COMPLETED BY%  Judy Rogers TELEPHONE:    (407) 468-4157 REPORT MONTH   Februar   1995 Unit 1 operated at greater than 80 percent power until February 27, 1997 when the Unit was shutdown to repair pressurizer code safety valve seat leakage. The Unit remained off-line for the remainder of the month.
50-335 St.Lucie gi 3/14/95 Judy Rogers (407)468-4157 REPORT MONTH Februar 1995 Unit 1 operated at greater than 80 percent power until February 27, 1997 when the Unit was shutdown to repair pressurizer code safety valve seat leakage.The Unit remained off-line for the remainder of the month.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50-389 DATE 3/14/95 FPL LICENSING GROUP-JUNO TELEPHONE 407/694/4432 1.UNIT NAME: ST.LUCIE UNIT 2 2.REPORTING PERIOD: FEBRUARY 1995 3.LICENSED THERMAL POWER (MWT): 2700 4.NAHEPLATE RATING (GROSS MWE): 850 5.DESIGN ELECTRICAL RATING (NET MWE): 830 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 882 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14'OURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS: 672 59?.4 0.0 594.7 0.0 1551360 513000 483376 88.5 88.5 85.7 86.7 9.3 1416 134'1.4 0.0 1338.7 0.0 3559881 1180380 1116480 94.5 94.5 94.0 95.0 4.3 101353.0 85609.1 0.0 84205.6 0.0 218717422 72634090 68622360 83.1 83.1 81.6 82'6.9 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:
OPERATING DATA REPORT DOCKET NO           50 - 389 DATE                 3/14/95 FPL LICENSING GROUP   - JUNO TELEPHONE       407/694/4432 OPERATING STATUS
50-389 St.Luci.e¹2 03/14/95 aT.A.ROGERS (407)468-4157 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)2/01/94 2/02/94 2/03/94 2/04/94 2/05/94 2/06/94 2/07/94 2/08/94 2/09/94 2/10/94 2/11/94 2/12/94 2/13/94 2/14/94 2/15/94 2/16/94 2/17/94 2/18/94 2/19/94 2/20/94 2/21/94 2/22/94 2/23/94 2/24/94 2/25/94 2/26/94 2/27/94 2/28/94 851 850 848 848 848 848 850 850 853 853 850 848 849 850 851 850 838 727 726 791 445-30-30 6 517 851 852 852  
: 1. UNIT NAME: ST. LUCIE       UNIT 2
: 2. REPORTING PERIOD: FEBRUARY 1995
: 3. LICENSED THERMAL POWER (MWT):                   2700
: 4. NAHEPLATE RATING (GROSS MWE):                   850
: 5. DESIGN ELECTRICAL RATING (NET MWE):             830
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):         882
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):           839
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS   NUMBER 3 THROUGH   7)
SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
: 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY   -YTD-   CUMULATIVE
: 11. HOURS IN REPORT PERIOD:                        672      1416        101353.0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL           59?.4    134'1.4      85609.1
: 13. REACTOR RESERVE SHUTDOWN HOURS                   0.0        0.0            0.0 14 'OURS GENERATOR ON-LINE                           594.7    1338.7      84205.6
: 15. UNIT RESERVE SHUTDOWN HOURS                       0.0        0.0            0.0
: 16. GROSS THERMAL ENERGY GENERATED (MWH)         1551360    3559881    218717422
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)       513000    1180380      72634090
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)         483376    1116480      68622360
: 19. UNIT SERVICE FACTOR                             88.5      94.5          83.1
: 20. UNIT AVAILABILITYFACTOR                          88.5      94.5          83.1
: 21. CAPACITY FACTOR (USING MDC NET)                 85.7      94.0          81.6
: 22. CAPACITY FACTOR (USING DER NET)                 86.7      95.0          82 '
: 23. UNIT FORCED OUTAGE RATE                           9.3       4.3           6.9
: 24. SHUTDOWNS SCHEDULED OVER NEXT  6 MONTHS :
: 25. IF SHUT DOWN AT END OF REPORT PERIOD,   ESTIMATED DATE OF STARTUP:
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:   50-389 UNIT:          St. Luci.e ¹2 DATE:          03/14/95 COMPLETED BY:  aT.A. ROGERS TELEPHONE:    (407) 468-4157 DAY       AVERAGE   DAILY POWER LEVEL (MWe-Net) 2/01/94 851 2/02/94   850 2/03/94   848 2/04/94   848 2/05/94   848 2/06/94   848 2/07/94   850 2/08/94   850 2/09/94   853 2/10/94   853 2/11/94   850 2/12/94   848 2/13/94   849 2/14/94   850 2/15/94   851 2/16/94   850 2/17/94   838 2/18/94   727 2/19/94   726 2/20/94   791 2/21/94   445 2/22/94   -30 2/23/94   -30 2/24/94     6 2/25/94   517 2/26/94   851 2/27/94   852 2/28/94   852


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.: UNIT DATE COMPLETED BY~TELEPHONE0 50-389 St.Lucie g2 3/14/95 Judy Rogers (407)468-4157 REPORT MONTH Februar 1995 Unit 2 operated at greater than 80 percent power until February 21, 1995, when the unit tripped due to a failed steam generator level transmitter.
OF OPERATING EXPERIENCE DOCKET NO.:   50-389 UNIT          St. Lucie g2 DATE          3/14/95 COMPLETED BY~  Judy Rogers TELEPHONE0    (407) 468-4157 REPORT MONTH   Februar   1995 Unit 2 operated at greater than   80 percent power until February 21, 1995, when the unit tripped   due to a failed steam generator level transmitter. The Unit returned to service on February 24, 1995, and operated at reduced power to repair the 2B main feed water pump. On February 26, 1995, the maintenance was complete and power was increased to greater than 80 percent power. The Unit remained at greater than 80 percent power for the remainder of the month.
The Unit returned to service on February 24, 1995, and operated at reduced power to repair the 2B main feed water pump.On February 26, 1995, the maintenance was complete and power was increased to greater than 80 percent power.The Unit remained at greater than 80 percent power for the remainder of the month.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.NOTE This report corrects line 16 of the Operating Data Report to add 3107 MWt to the Cumulative Total value.The error was introduced in the March 1994 report.  
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
~V'T P UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
NOTE This report corrects line 16 of the Operating Data Report to add 3107 MWt to the Cumulative Total value. The error was introduced in the March 1994 report.
50-389 ST LUCIE UNIT 2'.03/14/95 J.A.ROGERS (407)468-4157 REPORT MONTH No.Date Type Duration (Hours)Reason'ethod of Shutting Down Reactor'icensee Event Report System Code'omponent Codes Cause&Corrective Action to Prevent Recurrence 950221 F 78.4 954)2 CB INSTRUXX Unit 2 Rx trip due to failed steam generator level transmitter.
 
950224 0.0 N/A HH PUMPXX Unit 2 experienced problems with 2B feedwater pump.F Forced S Scheduled Reason A-Equipment failure (explain)B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method l-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Enny Sheets Licensee Event Rcport (LER)Hc (NUREG416t)
    ~ V
Exhibit l-Same Source 09lsst FPL}}
'T P
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:                   50-389 UNIT NAME:                   ST LUCIE UNIT 2'.
DATE:                          03/14/95 COMPLETED BY: J.A. ROGERS TELEPHONE:                    (407) 468-4157 REPORT MONTH No.         Date Type Duration   Reason'ethod of                             System Code'omponent                           Cause   & Corrective (Hours)                    Shutting      Event Report                    Codes                        Action to Reactor'icensee Down                                                                  Prevent Recurrence 950221   F   78.4                                         954)2         CB         INSTRUXX     Unit 2 Rx trip due to failed steam generator level transmitter.
950224       0.0                                         N/A         HH         PUMPXX       Unit 2 experienced problems with 2B feedwater pump.
F Forced                         Reason                                        Method                                    Exhibit G - Instructions for S Scheduled                       A - Equipment failure (explain)               l - Manual                                Preparation of Data Enny B - Maintenance or Test                       2 - Manual Scram                          Sheets Licensee Event Rcport C - Refueling                                 3 - Automatic Scram                        (LER) Hc (NUREG416t)
D - Regulatory restriction                   4 - Continued E - Operator Training & License Examination   5 - Load Reduction F - Administrative                           9 - Other (Explain)                       Exhibit  l - Same Source G - Operational Error (Explain)
H - Other (Explain) 09lsst FPL}}

Revision as of 21:06, 29 October 2019

Monthly Operating Repts for Feb 1995 for St Lucie.W/950315 Ltr
ML17228B066
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/28/1995
From: Rogers J, Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-95-86, NUDOCS 9503210065
Download: ML17228B066 (12)


Text

~ ~

H.l C) R.I MY' PACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCEBBION NBR:9503210065 DOC.DATE: 95/02/28 NOTARIZED: NO DOCKET g FACIL:50-3'35 St. Lucie Plant, Unit 1, Florida Power 6 Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power 6 Light Co. 05000389 AUTH. NAME AUTHOR AFFXLXATXON ROGERS,J.A. Florida Power & Light Co.

SAGER,D.A. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Feb 1995 for St Lucie.W/950315 ltr.

DXSTRXBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES RECIPIENT COPIES RECXPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 PD 1 1 NORRIS,J 1 1 INTERNAL: A~C 10 10 AEOD/SPD/RRAB 1 ' 1 kT.LE CENTER 01 1 1 NRR/DISP/PIPB 1 NRR/ DOPS/OECB 1 1 RGN2 1 1 EXTERNAL LITCO BRYCE i J H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACTTHE DOCUMENT CONTROL DESK, ROOM P!-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAME FROM DISTRIBUTIONLISTS I'OR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20

Florida Power 5 Light Company, P.O. Box128, Fort Pierce, FL 34954-0128 PIPING'arch 15, 1995 L-95-86 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the February, 1995, Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.

Should there be any questions on this information, please contact US ~

Very truly yours, D. A. a er Vice sident St. L 'e Plant DAS/GRM cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC Attachments I

HNKODENFEDENACMlIO ENDSScaIbst JRW 95032i0065 950228 PDR ADOt K 05000335 R PDR an FPL Group company

I

\

I

OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 3/14/95 FPL LICENSING GROUP - JUNO TELEPHONE 407/694/4432 OPERATING STATUS

1. UNIT NAME: ST. LUCIE UNIT 1
2. REPORTIHG PERIOD: FEBRUARY 1995
3. LICENSED THERMAL POWER (MWT): 2700
4. NAMEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEHS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 672 1416 159456.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 624.9 1368.9 124692.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 205.3
14. HOURS GENERATOR ON-LINE 624.1 1368 F 1 123325.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 39.3
16. GROSS THERMAL ENERGY GENERATED (MWH) 1679431 3688385 319422126
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 559240 1228580 105378590
18. NET ELECTRICAL ENERGY GENERATED (MWH) 530480 1166517 99603420
19. UNIT SERVICE FACTOR 92.9 96.6 77.3
20. UNIT AVAILABILITYFACTOR 92.9 96.6 77.4
21. CAPACITY FACTOR (USING MDC NET) 94.1 98.2 76.7
22. CAPACITY FACTOR IGRIRG OER RETT 95.1 99.3 76.1
23. UNIT FORCED OUTAGE RATE 0.0 0.0 6.9
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 3/6/95,

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-335 UNIT: St. Lucre 51 DATE 03/14/95 COMPLETED BY: Z.A.ROGERS TELEPHONE: (407) 468-4157 MONTH DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 2/1/95 855 2/2/95 855 2/3/95 853 2/4/95 853 2/5/95 853 2/6/95 853 2/7/95 854 2/8/95 854 2/9/95 855 2/10/95 858 2/11/95 856 2/12/95 854 2/13/95 854 2/14/95 856 2/15/95 856 2/16/95 856 2/17/95 853 2/18/95 853 2/19/95 852 2/20/95 852 2/21/95 855 2/22/95 855 2/23/95 856 2/24/95 856 2/25/95 855 2/26/95 776 2/27/95 -26 2/28/95 -7

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT 1-DATE: 03/14/95 COMPLETED BY J.A.ROGERS TELEPHONE: (407) 468-4157 REPORT MONTH No. Date Type Duration Reason'ethod of Licensee System Code'omponent Cause & Corrective (Hours) Shutting Event Report Codes Action to Down Prevent Recurrence Reactor 950227 47.8 N/A CB VALVEXX Unit 1 removed from service to repair quench tank leak.

F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) I - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Shccts Liccnsec Event Rcport C - Refueling 3 - Automatic Scram (LER) File (NUREG4) I6l)

D - Regulatory restriction 4 - Continued E - Operator Training gc License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit I - Sane Source G - Operational Error (Explain)

H - Other (Explain) 09 lsar FPt.

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO ~ . 50-335 UNIT St. Lucie gi DATE 3/14/95 COMPLETED BY% Judy Rogers TELEPHONE: (407) 468-4157 REPORT MONTH Februar 1995 Unit 1 operated at greater than 80 percent power until February 27, 1997 when the Unit was shutdown to repair pressurizer code safety valve seat leakage. The Unit remained off-line for the remainder of the month.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 3/14/95 FPL LICENSING GROUP - JUNO TELEPHONE 407/694/4432 OPERATING STATUS

1. UNIT NAME: ST. LUCIE UNIT 2
2. REPORTING PERIOD: FEBRUARY 1995
3. LICENSED THERMAL POWER (MWT): 2700
4. NAHEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 882
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 672 1416 101353.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 59?.4 134'1.4 85609.1
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 'OURS GENERATOR ON-LINE 594.7 1338.7 84205.6
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1551360 3559881 218717422
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 513000 1180380 72634090
18. NET ELECTRICAL ENERGY GENERATED (MWH) 483376 1116480 68622360
19. UNIT SERVICE FACTOR 88.5 94.5 83.1
20. UNIT AVAILABILITYFACTOR 88.5 94.5 83.1
21. CAPACITY FACTOR (USING MDC NET) 85.7 94.0 81.6
22. CAPACITY FACTOR (USING DER NET) 86.7 95.0 82 '
23. UNIT FORCED OUTAGE RATE 9.3 4.3 6.9
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-389 UNIT: St. Luci.e ¹2 DATE: 03/14/95 COMPLETED BY: aT.A. ROGERS TELEPHONE: (407) 468-4157 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 2/01/94 851 2/02/94 850 2/03/94 848 2/04/94 848 2/05/94 848 2/06/94 848 2/07/94 850 2/08/94 850 2/09/94 853 2/10/94 853 2/11/94 850 2/12/94 848 2/13/94 849 2/14/94 850 2/15/94 851 2/16/94 850 2/17/94 838 2/18/94 727 2/19/94 726 2/20/94 791 2/21/94 445 2/22/94 -30 2/23/94 -30 2/24/94 6 2/25/94 517 2/26/94 851 2/27/94 852 2/28/94 852

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT St. Lucie g2 DATE 3/14/95 COMPLETED BY~ Judy Rogers TELEPHONE0 (407) 468-4157 REPORT MONTH Februar 1995 Unit 2 operated at greater than 80 percent power until February 21, 1995, when the unit tripped due to a failed steam generator level transmitter. The Unit returned to service on February 24, 1995, and operated at reduced power to repair the 2B main feed water pump. On February 26, 1995, the maintenance was complete and power was increased to greater than 80 percent power. The Unit remained at greater than 80 percent power for the remainder of the month.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

NOTE This report corrects line 16 of the Operating Data Report to add 3107 MWt to the Cumulative Total value. The error was introduced in the March 1994 report.

~ V

'T P

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT NAME: ST LUCIE UNIT 2'.

DATE: 03/14/95 COMPLETED BY: J.A. ROGERS TELEPHONE: (407) 468-4157 REPORT MONTH No. Date Type Duration Reason'ethod of System Code'omponent Cause & Corrective (Hours) Shutting Event Report Codes Action to Reactor'icensee Down Prevent Recurrence 950221 F 78.4 954)2 CB INSTRUXX Unit 2 Rx trip due to failed steam generator level transmitter.

950224 0.0 N/A HH PUMPXX Unit 2 experienced problems with 2B feedwater pump.

F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) l - Manual Preparation of Data Enny B - Maintenance or Test 2 - Manual Scram Sheets Licensee Event Rcport C - Refueling 3 - Automatic Scram (LER) Hc (NUREG416t)

D - Regulatory restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit l - Same Source G - Operational Error (Explain)

H - Other (Explain) 09lsst FPL