ML17229A611: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:CATEGORY 3.JBA INFORMATION DISTRIBUTI SYSTEM (RIDS)l~N NBR.:9802090240 DOC,DATE: 98/02/02 NOTARIZED:
{{#Wiki_filter:CATEGORY             3.
NO IL:50.--335 St.Lucie Plant, Unit 1, Florida Power 6 Light Co.AUTH.NAME AUTHOR AFFILIATION STALL,J.A.
JBA     INFORMATION DISTRIBUTI             SYSTEM (RIDS) l     ~N NBR.:9802090240 IL:50.--335 St. Lucie DOC,DATE:     98/02/02     NOTARIZED: NO Plant, Unit 1, Florida Power 6 Light Co.
Florida Power 5 Light Co..RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)DOCKET 05000335
DOCKET 05000335 AUTH.NAME             AUTHOR AFFILIATION STALL,J.A.           Florida Power 5 Light Co..
RECIP.NAME             RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Informs that third 10-Yr ISI interval for St Lucie Unit 1 begins on 980211&.ends on Feb 10,2008.Encl program outlines ISI plan&schedule for St Lucie Unit 1&based on requirements of Section ZI of ASME Boiler.DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR J ENCL (SIZE: l 4 TITLE: OR Submittal:
Informs that third 10-Yr ISI interval for St Lucie Unit 1 begins on 980211 &. ends on Feb 10,2008.Encl program outlines ISI plan & schedule for St Lucie Unit 1 & based on requirements of Section ZI of ASME Boiler.
Inservice/Testing/Relief from ASME Code-GL-89-04 NOTES: RECIPIENT ID CODE/NAME PD2-3 LA WIENS,L.COPIES RECIPIENT LTTR ENCL 7 ID CODE/NAME 1 1 PD2-3 PD 1 1 COPIES LTTR ENCL 1 1 0 INTERNAL: A 0 OCS-ABSTRA RES/DET/EIB 1'1 1 1 1 1 1 AEOD/SPD/RAB NRR/DE/EMEB OGC/HDS3 RES/DET/EMMEB 1 1'1 1 0 1 1 Y ERNAL: LITCO ANDERSON NRC,PDR 1 1 1 1 NOAC 1 1 D M E~N NOTE TO ALL"RIDS" RECIPIENTS:
DISTRIBUTION CODE: A047D         COPIES RECEIVED:LTR       J   ENCL (     SIZE: l 4 TITLE:   OR Submittal: Inservice/Testing/Relief from             ASME Code - GL-89-04 NOTES:
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13 1 l t 1 4 l 0 Florida Power&Light Company,6351 S.Ocean Drive, Jensen Beach, FL34957 February 2, 1998 L-98-14 10 CFR 50.4 10 CFR 50.55a U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 RE: St.Lucie Unit 1 Docket No.50-335 Third Ten-Year In-Service-Inspection Interval The third ten-year in-service-inspection (ISI)interval for St.Lucie Unit 1 begins on February 11, 1998, and ends on February 10, 2008.Pursuant to 10 CFR 50.55a(g)(4)(ii), the enclosed program outlines the ISI plan and schedule for St.Lucie Unit 1 and is based on the requirements of Section XI of the ASME Boiler and Pressure Vessel Code, 1989 Edition.Enclosed is one (1)copy of the Third Interval ISI Program (Document No.ISI-PSI 1-Program, Revision 0), one (1)copy of the Unit 1 ISI sketches (Document No.ISI-PSL-1-Sketches, Revision 1), and one (1)copy of the Unit 1 ISI plan (Document No.ISI-PSL-1-Plan, Revision 0).Please contact us if there are any questions about this submittal.
RECIPIENT           COPIES              RECIPIENT            COPIES ID CODE/NAME         LTTR ENCL     7   ID CODE/NAME         LTTR ENCL              0 PD2-3 LA                  1     1       PD2-3 PD                   1     1 WIENS,L.                  1     1 INTERNAL: A                           1
Very truly yours, J.A.Stall'ice President St.Lucie Plant JAS/GRM U"'r'9 cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant'F8020'&240 980202 j PDR ADQCK 05000335 8 PDR H!II!III!IIIIIII,Illllllllllwl an FPL Group company e 4}}
                                          '
AEOD/SPD/RAB               1    1' Y
0        1    1      NRR/DE/EMEB                     1 OCS-ABSTRA            1    1      OGC/HDS3                   1    0 RES/DET/EIB                1     1       RES/DET/EMMEB              1     1 ERNAL: LITCO ANDERSON               1     1       NOAC                      1     1 NRC,PDR                    1     1 D
M E~
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               14   ENCL     13
 
1 l
t 1
4 l 0
 
Florida Power & Light Company,6351 S. Ocean Drive, Jensen Beach, FL34957 February 2, 1998 L-98-14 10 CFR 50.4 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 RE:       St. Lucie Unit 1 Docket No. 50-335 Third Ten- Year In-Service-Inspection Interval The third ten-year in-service-inspection (ISI) interval for St. Lucie Unit 1 begins on February 11, 1998, and ends on February 10, 2008. Pursuant to 10 CFR 50.55a(g)(4)(ii), the enclosed program outlines the ISI plan and schedule for St. Lucie Unit 1 and is based on the requirements of Section XI of the ASME Boiler and Pressure Vessel Code, 1989 Edition.
Enclosed is one (1) copy of the Third Interval ISI Program (Document No. ISI-PSI 1-Program, Revision 0), one (1) copy of the Unit 1 ISI sketches (Document No. ISI-PSL-1-Sketches, Revision 1), and one (1) copy of the Unit 1 ISI plan (Document No. ISI-PSL-1-Plan, Revision 0).
Please contact us   if there are any questions   about this submittal.
Very truly yours, J. A. Stall President
                'ice St. Lucie Plant U " 'r'   9 JAS/GRM cc:     Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant
      'F8020'&240 980202 PDR     ADQCK 05000335       j 8                                                                             H!II!III!IIIIIII,Illllllllllwl PDR an FPL Group company
 
e 4}}

Revision as of 20:51, 29 October 2019

Informs That Third 10-yr ISI Interval for St Lucie Unit 1 Begins on 980211 & Ends on 080210.Encl Program Outlines ISI Plan & Schedule for Facility & Based on Requirements of Section XI of ASME B&PV Code,1989 Edition
ML17229A611
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/02/1998
From: Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17229A612 List:
References
L-98-14, NUDOCS 9802090240
Download: ML17229A611 (4)


Text

CATEGORY 3.

JBA INFORMATION DISTRIBUTI SYSTEM (RIDS) l ~N NBR.:9802090240 IL:50.--335 St. Lucie DOC,DATE: 98/02/02 NOTARIZED: NO Plant, Unit 1, Florida Power 6 Light Co.

DOCKET 05000335 AUTH.NAME AUTHOR AFFILIATION STALL,J.A. Florida Power 5 Light Co..

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Informs that third 10-Yr ISI interval for St Lucie Unit 1 begins on 980211 &. ends on Feb 10,2008.Encl program outlines ISI plan & schedule for St Lucie Unit 1 & based on requirements of Section ZI of ASME Boiler.

DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR J ENCL ( SIZE: l 4 TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code - GL-89-04 NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL 7 ID CODE/NAME LTTR ENCL 0 PD2-3 LA 1 1 PD2-3 PD 1 1 WIENS,L. 1 1 INTERNAL: A 1

'

AEOD/SPD/RAB 1 1' Y

0 1 1 NRR/DE/EMEB 1 OCS-ABSTRA 1 1 OGC/HDS3 1 0 RES/DET/EIB 1 1 RES/DET/EMMEB 1 1 ERNAL: LITCO ANDERSON 1 1 NOAC 1 1 NRC,PDR 1 1 D

M E~

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13

1 l

t 1

4 l 0

Florida Power & Light Company,6351 S. Ocean Drive, Jensen Beach, FL34957 February 2, 1998 L-98-14 10 CFR 50.4 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 RE: St. Lucie Unit 1 Docket No. 50-335 Third Ten- Year In-Service-Inspection Interval The third ten-year in-service-inspection (ISI) interval for St. Lucie Unit 1 begins on February 11, 1998, and ends on February 10, 2008. Pursuant to 10 CFR 50.55a(g)(4)(ii), the enclosed program outlines the ISI plan and schedule for St. Lucie Unit 1 and is based on the requirements of Section XI of the ASME Boiler and Pressure Vessel Code, 1989 Edition.

Enclosed is one (1) copy of the Third Interval ISI Program (Document No. ISI-PSI 1-Program, Revision 0), one (1) copy of the Unit 1 ISI sketches (Document No. ISI-PSL-1-Sketches, Revision 1), and one (1) copy of the Unit 1 ISI plan (Document No. ISI-PSL-1-Plan, Revision 0).

Please contact us if there are any questions about this submittal.

Very truly yours, J. A. Stall President

'ice St. Lucie Plant U " 'r' 9 JAS/GRM cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant

'F8020'&240 980202 PDR ADQCK 05000335 j 8 H!II!III!IIIIIII,Illllllllllwl PDR an FPL Group company

e 4