ML17249A826: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 September 5, 2017 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2NOTIFICATION OF NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION REQUEST FOR INFORMATION 05000373/2017010; 05000374/2017010 Dear Mr. Hanson: On October 30, 2017, the U.S. Nuclear Regulatory Commission (NRC) will begin a Triennial Fire Protection Baseline Inspection at your LaSalle County Station, Units 1 and 2. This inspection will be performed in accordance with Inspection Procedure (IP) 71111.05T, the Baseline Fire Protection IP.   Changes were made to the IP 71111.05T which now requires the Fire Protection Inspection to review your actions to mitigate postulated events that could potentially cause loss of large areas of power reactor facilities due to explosions or fires. This requirement was implemented by the issuance of the Interim Compensatory Measures Order EA-02-026, Section B.5.b, and the subsequent requirements of Title 10 of the Code of Federal Regulations (CFR), Part 50.54(hh)(2), which are collectively referred to as B.5.b requirements. During this inspection, the B.5.b requirements review will be performed during the first onsite week of the inspection starting on November 1, 2017. The schedule for the onsite inspection activity is as follows: Information Gathering Visit: October 30, 2017; B.5.b Requirements: November 13, 2017; and Fire Protection Inspection: November 1317, 2017, and November 27December 1, 2017. The purpose of the information gathering visit is: (1) to obtain information and documentation needed to support the inspection; (2) to become familiar with the LaSalle Fire Protection Programs, fire protection features, post-fire safe shutdown capabilities, and plant layout; and (3) to arrange administrative details, such as office space, availability of knowledgeable office personnel and to ensure unescorted site access privileges.  
{{#Wiki_filter:UNITED STATES
B. Hanson -2- Experience has shown that the Baseline Fire Protection Inspections are extremely resource intensive both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both organizations, we have enclosed a request for documents needed for the inspection. These documents have been divided into four groups. The first group lists information necessary to aid the inspection team in choosing specific focus areas for the inspection. It is requested that this information be provided to the lead inspector via mail or electronically no later than October 20, 2017.   The second group also lists information and areas for discussion necessary to aid the inspection team in choosing specific fire protection focus areas for the inspection and to ensure that the inspection team is adequately prepared for the inspection. It is requested this information be available during the information gathering visit on October 30, 2017.   The third group of requested documents consists of those items that the team will review, or need access to, during the inspection. Please have this information available by the first day of the second onsite inspection week of November 13, 2017.   The fourth group lists the information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection.   It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. The lead inspector for this inspection is Mr. Alan Dahbur. We understand that our regulatory contact for this inspection is Mr. Terry Lanc of your organization. If there are and questions about the inspection or the material requested, please contact the lead inspector at 630-829-9810, or via e-mail at Alan.Dahbur@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.    
                            NUCLEAR REGULATORY COMMISSION
B. Hanson -3- This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR Sincerely, /RA/   Alan Dahbur, Senior Reactor Inspector Engineering Branch 3 Division of Reactor Safety Docket Nos. 50373; 50374 License Nos. NPF11; NPF18 Enclosure: Triennial Fire Protection Baseline   Inspection Document Request cc: Distribution via LISTSERV
                                              REGION III
B. Hanson -4- Letter to Bryan C. Hanson from Alan Dahbur dated September 5, 2017 SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2NOTIFICATION OF NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION REQUEST FOR INFORMATION 05000373/2017010; 05000374/2017010 DISTRIBUTION: Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMLaSalle RidsNrrDirsIrib Resource Cynthia Pederson James Trapp Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII                         ADAMS Accession Number ML17249A826 OFFICE RIII RIII RIII RIII NAME ADahbur:cl   DATE 09/05/17   OFFICIAL RECORD COPY
                                    2443 WARRENVILLE RD. SUITE 210
TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST Enclosure Inspection Report: 05000373/2017010 AND 05000374/2017010 Onsite Inspection Dates: October 30, 2017 (Information Gathering Visit) November 13, 2017 (B.5.b Requirements) November 1317, 2017 (Fire Protection Inspection) November 27December 1, 2017 (Fire Protection Inspection) Inspection Procedures: IP 71111.05T IP 71152, Identification and Resolution of Problems Inspectors: Alan Dahbur Senior Reactor Inspector (Lead) 630-829-9810 Alan.Dahbur@nrc.gov Atif Shaikh Jasmine Gilliam Senior Reactor Inspector Reactor Inspector 630-829-9824 630-829-9831 Atif.Shaikh@nrc.gov Jasmine.Gilliam@nrc.gov I. Information Requested Prior To the Information Gathering Visit: The following information is requested by October 20, 2017. If you have any questions regarding this request, please call the lead inspector as soon as possible. All information should be sent to Mr. Alan Dahbur (e-mail address Alan.Dahbur@nrc.gov). Electronic media is preferred. The preferrecompact disk (CD). The CD should be indexed and hyper-linked to facilitate ease of use, if possible. Please provide four copies of each CD submitted (one for each inspector). 1. The most risk-significant fire areas as determined by probabilistic risk analyses, if available. Otherwise, the reactor plant's Individual Plant Examination for External Events for fire and results of any post-Individual Plant Examination for External Events reviews for fire. 2. A copy of the current version of the Fire Protection Program, fire hazards analysis, safe shutdown analysis, Updated Safety Analysis Report, technical specifications, license (including the fire protection license condition), and technical requirements manual or equivalent for fire protection structures, systems, and components. 3. A list of fire areas requiring alternative shutdown capability, (i.e., those areas for which Title 10 of the Code of Federal Regulations (CFR), Part 50, Appendix R, Section III G, requirements are satisfied under Section III.G.3), or where both safe shutdown trains can be affected.
                                          LISLE, IL 60532-4352
TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST 2 4. Plant operating procedures which would be used and describe shutdown for a postulated fire (for both areas requiring alternative shutdown and areas which do not require alternative shutdown). Only those procedures with actions specific to shutdown in the event of a fire need be included. In addition, please include those procedures which operators would use for initial response to a fire, such as annunciator or alarm response procedures, the procedure used for activating the fire brigade, and the procedure which directs operators to the applicable safe shutdown procedure. 5. Analysis performed in support of plant evaluation regarding multiple spurious operation (MSO), which includes the following: a. List of identified multiple spurious fire-induced circuit failure configurations. b. List of the generic and plant specific MSOs. c. Results of expert panel process and associated review/evaluation of the generic and plant specific MSOs and existing safe shutdown analysis. d. Evaluations and corrective actions taken for resolution of MSO issues. II. Information Requested During the Information Gathering Visit (October 30, 2017): The following information is requested to be provided to the inspection team during the onsite information gathering visit. Except for Item 8, it is requested that the following information be provided on four sets of CDs (searchable, if possible) with the B.5.b Mitigating Strategies information (Items 8.a through 8.h) provided on one separate CD. In addition, one set of hard copy drawings are requested for Items 4.a. through 4.d. 1. One set of hard-copy documents for facility layout drawings which identify plant fire area delineation; areas protected by automatic fire suppression and detection; and locations of fire protection equipment. 2. Licensing Information: a. All Nuclear Regulatory Commission (NRC) Safety Evaluation Reports (SERs) applicable to fire protection (specifically including those SERs referenced by the plant fire protection license condition) and all licensing correspondence referenced by the SERs; b. All licensing correspondence associated with the comparison to Standard Review Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing purposes; c. Exemptions from 10 CFR 50.48 and 10 CFR Part 50, Appendix R, and associated licensing correspondence; d. All licensing correspondence associated with those sections of 10 CFR Part 50, Appendix R, that are not applicable to the plant under 10 CFR 50.48(b)(1). Specifically, the licensing correspondence associated with those fire protection features proposed or implemented by the licensee that have been accepted by the NRC staff as satisfying the provisions of
                                        September 5, 2017
TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST 3 Appendix A to Branch Technical Position APCSB 9.5-1 reflected in the NRC fire protection SERs issued before February 19, 1981, (10 CFR 50.48(b)(1)(i)); or those fire protection features, which were accepted by the NRC staff in comprehensive fire protection SERs issued before Appendix A to Branch Technical Position APCSB 9.5-1 was published in August 1976 (10 CFR 50.48(b)(1)(ii)); and e. The Final Safety Analysis Report sections applicable to fire protection, fire hazards analysis, and safe shutdown analysis in effect at the time of original licensing. 3. Fire Protection Program: a. A listing of changes made to the Fire Protection Program since the last Triennial Fire Protection Inspection; b. A listing of the protection methodologies identified under 10 CFR Part 50, Appendix R, Section III.G used to achieve compliance for selected fire zones/areas (to be determined during information gathering visit). That is, please specify whether 3-hour rated fire barriers; (Section III.G.2.a), 20 foot separation along with detection and suppression; (Section III.G.2.b), 1-hour rated fire barriers with detection and suppression; (Section III.G.2.c), or alternative shutdown capability; (Section III.G.3) is used as a strategy for each selected fire zone/area; c. A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to safe-shutdown evaluations); d. A list of applicable codes and standards related to the design of plant fire protection features. The list should include National Fire Protection Association code versions committed to (i.e., the National Fire Protection Association Codes of Record); and e. List of plant deviations from code commitments and associated evaluations. 4. Facility Information: a. Piping and instrumentation (flow) diagrams showing the components used to achieve and maintain hot standby and cold shutdown for fires outside the control room, those components used for those areas requiring alternative shutdown capability, and systems relied upon for B.5.b mitigation strategies. These can be of the type that are used for training; b. One-line schematic drawings of the electrical distribution system for 4160 Volts alternating current (Vac) down to 480Vac; c. One-line schematic drawings of the electrical distribution system for 250 Volts direct current and 125 Volts direct current systems as applicable; d. Logic diagrams showing the components used to achieve and maintain hot standby and cold shutdown; and
Mr. Bryan C. Hanson
TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST 4 e. Safe shutdown cable routing database (requested electronically, such as on compact disc, if available). 5. Operations Response for Fire Protection: a. Pre-fire plans for selected fire zones/areas (to be determined during information gathering visit); b. Plant operating procedures which specify the initial operations response to a fire alarm or annunciator; and c. Procedure for calling out the fire brigade and requesting off-site assistance. 6. Corrective Actions: a. Listing of open and closed Fire Protection Condition Reports (i.e., problem identification forms and their resolution reports) since the date of the last Triennial Fire Protection Inspection; and b. List of current fire impairments, including duration. 7. General Information: a. A listing of abbreviations and/or designators for plant systems; b. Organization charts of site personnel down to the level of fire protection staff personnel; and c. A phone list for onsite licensee personnel. 8. B.5.b Mitigating Strategies: a. A list of all modifications to regulatory commitments made to meet the requirements of Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002, the subsequently imposed license conditions, and 10 CFR 50.54(hh)(2); b. Copies of procedures/guidelines that were revised or generated to implement the mitigation strategies. These could be extensive damage mitigation guidelines, severe accident management guidelines, emergency operating procedures, abnormal operating procedures, etc.; c. A matrix that shows the correlation between the mitigation strategies identified in Nuclear Energy Institute 06-12 and the site-specific procedures or guidelines that are used to implement each strategy; d. A listing of engineering evaluations/calculations that were used to verify engineering bases for the mitigation strategies; e. Copies of procedures used to inventory equipment (hoses, fittings, pumps, etc.) required to be used to implement the mitigation strategies;
Senior VP, Exelon Generation Company, LLC
TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST 5 f. A list of B.5.b mitigating strategies, if any, which have implementing details that differ from that documented in the submittals and the SER; g. Copies of Memoranda of Understanding (e.g., with local fire departments) required to implement any mitigating strategies; and h. A list of changes made to B.5.b mitigating strategies and associated procedures since the previous NRC inspection of B.5.b mitigating strategies (June 16, 2014). 9. Onsite Discussions: In addition, during the information gathering visit, it is requested that licensee staff be available for the following: a. Informal discussion on plant procedures operators would use in the event of fire or explosion (including B.5.b mitigation strategies) and under what conditions would the plant be shutdown using alternative shutdown methodology; b. Isafe shutdown cable routing database and the plant-wide cable routing database, as applicable; and c. A tour of alternative shutdown and risk-significant fire areas. d. A discussion of scheduling of fire drills which may occur during the inspection so that the inspectors may be able to observe a fire drill, if possible. III. Information Requested to be Available on first Day of the Second Onsite Inspection Week (November 13, 2017): The following information is requested to be provided on the first day of inspection. It is requested that this information be provided on four sets of CDs (searchable, if possible). 1. Program Procedures: a. Procedures for: i. Administrative controls (such as allowed out of service times and compensatory measures) for fire protection systems and components ii. Control of transient combustibles iii. Control of hot work b. List of maintenance and surveillance testing procedures for alternative shutdown capability and fire barriers, detectors, pumps, and suppression systems; and c. List of maintenance procedures which routinely verify fuse breaker coordination in accordance with the post-fire safe shutdown coordination analysis.
President and CNO, Exelon Nuclear
TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST 6 2. Design and Equipment Information: a. Coordination calculations and/or justifications that verify fuse/breaker coordination for selected fire zones/areas (to be determined during information gathering visit) that are fed off of the same electrical buses as components in the protected safe shutdown train; b. Copies of significant fire protection and post-fire safe shutdown related design change package descriptions (including their associated 10 CFR 50.59 evaluations) and Generic Letter 86-10 (or adverse to safe shutdown) evaluations; c. Gaseous suppression system pre-operational testing, if applicable, for selected fire zones/areas (to be determined during information gathering visit); d. Hydraulic calculations and supporting test data which demonstrate operability for water suppression systems, if applicable, for selected fire zones/areas (to be determined during information gathering visit); e. Alternating current coordination calculations for 4160Vac down to 480Vac electrical systems; and f. List of all fire protection or Appendix R calculations. 3. Assessment and Corrective Actions: The three most recent fire protection Quality Assurance audits and/or fire protection self-assessments. IV. Information Requested to Be Provided Throughout the Inspection: 1. Copies of any corrective action documents generated as a result of the 2. Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provided daily during the inspection to each inspection team member).
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2NOTIFICATION OF NRC
            TRIENNIAL FIRE PROTECTION BASELINE INSPECTION REQUEST FOR
            INFORMATION 05000373/2017010; 05000374/2017010
Dear Mr. Hanson:
On October 30, 2017, the U.S. Nuclear Regulatory Commission (NRC) will begin a Triennial
Fire Protection Baseline Inspection at your LaSalle County Station, Units 1 and 2. This
inspection will be performed in accordance with Inspection Procedure (IP) 71111.05T,
the NRCs Baseline Fire Protection IP.
Changes were made to the IP 71111.05T which now requires the Fire Protection Inspection
to review your actions to mitigate postulated events that could potentially cause loss of large
areas of power reactor facilities due to explosions or fires. This requirement was implemented
by the issuance of the Interim Compensatory Measures Order EA-02-026, Section B.5.b,
and the subsequent requirements of Title 10 of the Code of Federal Regulations (CFR),
Part 50.54(hh)(2), which are collectively referred to as B.5.b requirements. During this
inspection, the B.5.b requirements review will be performed during the first onsite week of
the inspection starting on November 1, 2017.
The schedule for the onsite inspection activity is as follows:
          Information Gathering Visit: October 30, 2017;
          B.5.b Requirements: November 1-3, 2017; and
          Fire Protection Inspection: November 13-17, 2017, and
                                        November 27-December 1, 2017.
The purpose of the information gathering visit is: (1) to obtain information and documentation
needed to support the inspection; (2) to become familiar with the LaSalle Fire Protection
Programs, fire protection features, post-fire safe shutdown capabilities, and plant layout; and
(3) to arrange administrative details, such as office space, availability of knowledgeable office
personnel and to ensure unescorted site access privileges.
 
B. Hanson                                     -2-
Experience has shown that the Baseline Fire Protection Inspections are extremely resource
intensive both for the NRC inspectors and the licensee staff. In order to minimize the inspection
impact on the site and to ensure a productive inspection for both organizations, we have
enclosed a request for documents needed for the inspection. These documents have been
divided into four groups.
            The first group lists information necessary to aid the inspection team in
            choosing specific focus areas for the inspection. It is requested that this
            information be provided to the lead inspector via mail or electronically no
            later than October 20, 2017.
            The second group also lists information and areas for discussion necessary to
            aid the inspection team in choosing specific fire protection focus areas for the
            inspection and to ensure that the inspection team is adequately prepared for the
            inspection. It is requested this information be available during the information
            gathering visit on October 30, 2017.
            The third group of requested documents consists of those items that the
            team will review, or need access to, during the inspection. Please have this
            information available by the first day of the second onsite inspection week of
            November 13, 2017.
            The fourth group lists the information necessary to aid the inspection team in
            tracking issues identified as a result of the inspection. It is requested that this
            information be provided to the lead inspector as the information is generated
            during the inspection.
It is important that all of these documents are up to date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection.
The lead inspector for this inspection is Mr. Alan Dahbur. We understand that our
regulatory contact for this inspection is Mr. Terry Lanc of your organization. If there are
and questions about the inspection or the material requested, please contact the lead
inspector at 630-829-9810, or via e-mail at Alan.Dahbur@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.
 
B. Hanson                                   -3-
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
                                            Sincerely,
                                            /RA/
                                            Alan Dahbur, Senior Reactor Inspector
                                            Engineering Branch 3
                                            Division of Reactor Safety
Docket Nos. 50-373; 50-374
License Nos. NPF-11; NPF-18
Enclosure:
Triennial Fire Protection Baseline
Inspection Document Request
cc: Distribution via LISTSERV
 
B. Hanson                               -4-
Letter to Bryan C. Hanson from Alan Dahbur dated September 5, 2017
SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2NOTIFICATION OF NRC
            TRIENNIAL FIRE PROTECTION BASELINE INSPECTION REQUEST FOR
            INFORMATION 05000373/2017010; 05000374/2017010
DISTRIBUTION:
Jeremy Bowen
RidsNrrDorlLpl3
RidsNrrPMLaSalle
RidsNrrDirsIrib Resource
Cynthia Pederson
James Trapp
Richard Skokowski
Allan Barker
Carole Ariano
Linda Linn
DRPIII
DRSIII
ADAMS Accession Number ML17249A826
  OFFICE RIII                     RIII             RIII           RIII
  NAME       ADahbur:cl
  DATE       09/05/17
                                OFFICIAL RECORD COPY
 
    TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST
Inspection Report:               05000373/2017010 AND 05000374/2017010
Onsite Inspection Dates:         October 30, 2017                       (Information Gathering Visit)
                                  November 1-3, 2017                     (B.5.b Requirements)
                                  November 13-17, 2017                   (Fire Protection Inspection)
                                  November 27-December 1, 2017           (Fire Protection Inspection)
Inspection Procedures:           IP 71111.05T, Fire Protection (Triennial)
                                  IP 71152, Identification and Resolution of Problems
Inspectors:                       Alan Dahbur
                                  Senior Reactor Inspector (Lead)
                                  630-829-9810
                                  Alan.Dahbur@nrc.gov
                                  Atif Shaikh                       Jasmine Gilliam
                                  Senior Reactor Inspector         Reactor Inspector
                                  630-829-9824                     630-829-9831
                                  Atif.Shaikh@nrc.gov               Jasmine.Gilliam@nrc.gov
I.     Information Requested Prior To the Information Gathering Visit:
      The following information is requested by October 20, 2017. If you have any
      questions regarding this request, please call the lead inspector as soon as possible. All
      information should be sent to Mr. Alan Dahbur (e-mail address Alan.Dahbur@nrc.gov).
      Electronic media is preferred. The preferred file format is a searchable pdf file on a
      compact disk (CD). The CD should be indexed and hyper-linked to facilitate ease of
      use, if possible. Please provide four copies of each CD submitted (one for each
      inspector).
      1.       The most risk-significant fire areas as determined by probabilistic risk analyses, if
                available. Otherwise, the reactor plant's Individual Plant Examination for External
                Events for fire and results of any post-Individual Plant Examination for External
                Events reviews for fire.
      2.       A copy of the current version of the Fire Protection Program, fire hazards
                analysis, safe shutdown analysis, Updated Safety Analysis Report, technical
                specifications, license (including the fire protection license condition), and
                technical requirements manual or equivalent for fire protection structures,
                systems, and components.
      3.       A list of fire areas requiring alternative shutdown capability, (i.e., those areas for
                which Title 10 of the Code of Federal Regulations (CFR), Part 50, Appendix R,
                Section III G, requirements are satisfied under Section III.G.3), or where both
                safe shutdown trains can be affected.
                                                                                            Enclosure
 
    TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST
    4.     Plant operating procedures which would be used and describe shutdown for a
            postulated fire (for both areas requiring alternative shutdown and areas which do
            not require alternative shutdown). Only those procedures with actions specific to
            shutdown in the event of a fire need be included. In addition, please include
            those procedures which operators would use for initial response to a fire, such as
            annunciator or alarm response procedures, the procedure used for activating the
            fire brigade, and the procedure which directs operators to the applicable safe
            shutdown procedure.
    5.     Analysis performed in support of plant evaluation regarding multiple spurious
            operation (MSO), which includes the following:
            a. List of identified multiple spurious fire-induced circuit failure configurations.
            b. List of the generic and plant specific MSOs.
            c. Results of expert panel process and associated review/evaluation of the
                  generic and plant specific MSOs and existing safe shutdown analysis.
            d. Evaluations and corrective actions taken for resolution of MSO issues.
II. Information Requested During the Information Gathering Visit (October 30, 2017):
    The following information is requested to be provided to the inspection team during the
    onsite information gathering visit. Except for Item 8, it is requested that the following
    information be provided on four sets of CDs (searchable, if possible) with the B.5.b
    Mitigating Strategies information (Items 8.a through 8.h) provided on one separate CD.
    In addition, one set of hard copy drawings are requested for Items 4.a. through 4.d.
    1.     One set of hard-copy documents for facility layout drawings which identify plant
            fire area delineation; areas protected by automatic fire suppression and
            detection; and locations of fire protection equipment.
    2.     Licensing Information:
            a. All Nuclear Regulatory Commission (NRC) Safety Evaluation Reports (SERs)
                  applicable to fire protection (specifically including those SERs referenced by
                  the plant fire protection license condition) and all licensing correspondence
                  referenced by the SERs;
            b. All licensing correspondence associated with the comparison to Standard
                  Review Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing
                  purposes;
            c. Exemptions from 10 CFR 50.48 and 10 CFR Part 50, Appendix R, and
                  associated licensing correspondence;
            d. All licensing correspondence associated with those sections of
                  10 CFR Part 50, Appendix R, that are not applicable to the plant under
                  10 CFR 50.48(b)(1). Specifically, the licensing correspondence associated
                  with those fire protection features proposed or implemented by the licensee
                  that have been accepted by the NRC staff as satisfying the provisions of
                                                  2
 
TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST
          Appendix A to Branch Technical Position APCSB 9.5-1 reflected in
          the NRC fire protection SERs issued before February 19, 1981,
          (10 CFR 50.48(b)(1)(i)); or those fire protection features, which were
          accepted by the NRC staff in comprehensive fire protection SERs issued
          before Appendix A to Branch Technical Position APCSB 9.5-1 was published
          in August 1976 (10 CFR 50.48(b)(1)(ii)); and
      e. The Final Safety Analysis Report sections applicable to fire protection, fire
          hazards analysis, and safe shutdown analysis in effect at the time of original
          licensing.
3.   Fire Protection Program:
      a. A listing of changes made to the Fire Protection Program since the last
          Triennial Fire Protection Inspection;
      b. A listing of the protection methodologies identified under 10 CFR Part 50,
          Appendix R, Section III.G used to achieve compliance for selected fire
          zones/areas (to be determined during information gathering visit). That is,
          please specify whether 3-hour rated fire barriers; (Section III.G.2.a), 20 foot
          separation along with detection and suppression; (Section III.G.2.b), 1-hour
          rated fire barriers with detection and suppression; (Section III.G.2.c), or
          alternative shutdown capability; (Section III.G.3) is used as a strategy for
          each selected fire zone/area;
      c. A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to safe-
          shutdown evaluations);
      d. A list of applicable codes and standards related to the design of plant fire
          protection features. The list should include National Fire Protection
          Association code versions committed to (i.e., the National Fire Protection
          Association Codes of Record); and
      e. List of plant deviations from code commitments and associated evaluations.
4.   Facility Information:
      a. Piping and instrumentation (flow) diagrams showing the components used to
          achieve and maintain hot standby and cold shutdown for fires outside the
          control room, those components used for those areas requiring alternative
          shutdown capability, and systems relied upon for B.5.b mitigation strategies.
          These can be of the type that are used for training;
      b. One-line schematic drawings of the electrical distribution system for 4160
          Volts alternating current (Vac) down to 480Vac;
      c. One-line schematic drawings of the electrical distribution system for 250 Volts
          direct current and 125 Volts direct current systems as applicable;
      d. Logic diagrams showing the components used to achieve and maintain hot
          standby and cold shutdown; and
                                          3
 
TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST
      e. Safe shutdown cable routing database (requested electronically, such as on
          compact disc, if available).
5.   Operations Response for Fire Protection:
      a. Pre-fire plans for selected fire zones/areas (to be determined during
          information gathering visit);
      b. Plant operating procedures which specify the initial operations response to a
          fire alarm or annunciator; and
      c. Procedure for calling out the fire brigade and requesting off-site assistance.
6.   Corrective Actions:
      a. Listing of open and closed Fire Protection Condition Reports (i.e., problem
          identification forms and their resolution reports) since the date of the last
          Triennial Fire Protection Inspection; and
      b. List of current fire impairments, including duration.
7.   General Information:
      a. A listing of abbreviations and/or designators for plant systems;
      b. Organization charts of site personnel down to the level of fire protection staff
          personnel; and
      c. A phone list for onsite licensee personnel.
8.   B.5.b Mitigating Strategies:
      a. A list of all modifications to regulatory commitments made to meet the
          requirements of Section B.5.b of the ICM Order, EA-02-026, dated
          February 25, 2002, the subsequently imposed license conditions, and
          10 CFR 50.54(hh)(2);
      b. Copies of procedures/guidelines that were revised or generated to implement
          the mitigation strategies. These could be extensive damage mitigation
          guidelines, severe accident management guidelines, emergency operating
          procedures, abnormal operating procedures, etc.;
      c. A matrix that shows the correlation between the mitigation strategies
          identified in Nuclear Energy Institute 06-12 and the site-specific procedures
          or guidelines that are used to implement each strategy;
      d. A listing of engineering evaluations/calculations that were used to verify
          engineering bases for the mitigation strategies;
      e. Copies of procedures used to inventory equipment (hoses, fittings, pumps,
          etc.) required to be used to implement the mitigation strategies;
                                          4
 
    TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST
              f. A list of B.5.b mitigating strategies, if any, which have implementing details
                  that differ from that documented in the submittals and the SER;
              g. Copies of Memoranda of Understanding (e.g., with local fire departments)
                  required to implement any mitigating strategies; and
              h. A list of changes made to B.5.b mitigating strategies and associated
                  procedures since the previous NRC inspection of B.5.b mitigating strategies
                  (June 16, 2014).
      9.     Onsite Discussions:
              In addition, during the information gathering visit, it is requested that licensee
              staff be available for the following:
              a. Informal discussion on plant procedures operators would use in the event of
                  fire or explosion (including B.5.b mitigation strategies) and under what
                  conditions would the plant be shutdown using alternative shutdown
                  methodology;
              b. Informal discussion on the plants safe shutdown cable routing database and
                  the plant-wide cable routing database, as applicable; and
              c. A tour of alternative shutdown and risk-significant fire areas.
              d. A discussion of scheduling of fire drills which may occur during the inspection
                  so that the inspectors may be able to observe a fire drill, if possible.
III. Information Requested to be Available on first Day of the Second Onsite
      Inspection Week (November 13, 2017):
      The following information is requested to be provided on the first day of inspection. It is
      requested that this information be provided on four sets of CDs (searchable, if possible).
      1.     Program Procedures:
              a. Procedures for:
                      i. Administrative controls (such as allowed out of service times and
                          compensatory measures) for fire protection systems and components
                      ii. Control of transient combustibles
                    iii. Control of hot work
              b. List of maintenance and surveillance testing procedures for alternative
                  shutdown capability and fire barriers, detectors, pumps, and suppression
                  systems; and
              c. List of maintenance procedures which routinely verify fuse breaker
                  coordination in accordance with the post-fire safe shutdown coordination
                  analysis.
                                                  5
 
      TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST
        2.   Design and Equipment Information:
              a. Coordination calculations and/or justifications that verify fuse/breaker
                  coordination for selected fire zones/areas (to be determined during
                  information gathering visit) that are fed off of the same electrical buses as
                  components in the protected safe shutdown train;
              b. Copies of significant fire protection and post-fire safe shutdown related
                  design change package descriptions (including their associated 10 CFR
                  50.59 evaluations) and Generic Letter 86-10 (or adverse to safe shutdown)
                  evaluations;
              c. Gaseous suppression system pre-operational testing, if applicable, for
                  selected fire zones/areas (to be determined during information gathering
                  visit);
              d. Hydraulic calculations and supporting test data which demonstrate operability
                  for water suppression systems, if applicable, for selected fire zones/areas (to
                  be determined during information gathering visit);
              e. Alternating current coordination calculations for 4160Vac down to 480Vac
                  electrical systems; and
              f.   List of all fire protection or Appendix R calculations.
        3.   Assessment and Corrective Actions:
              The three most recent fire protection Quality Assurance audits and/or fire
              protection self-assessments.
IV.     Information Requested to Be Provided Throughout the Inspection:
        1.   Copies of any corrective action documents generated as a result of the
              inspection teams questions or queries during this inspection.
        2.   Copies of the list of questions submitted by the inspection team members and
              the status/resolution of the information requested (provided daily during the
              inspection to each inspection team member).
If you have questions regarding the information requested, please contact the lead inspector.
                                                    6
}}
}}

Revision as of 19:57, 29 October 2019

Ltr 09/05/17 LaSalle County Station, Units 1 and 2 - Notification of NRC Triennial Fire Protection Baseline Inspection Request for Information 05000373/2017010; 05000374/2017010 (Akd)
ML17249A826
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 09/05/2017
From: Alan Dahbur
Engineering Branch 3
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2017010
Download: ML17249A826 (10)


See also: IR 05000373/2017010

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

September 5, 2017

Mr. Bryan C. Hanson

Senior VP, Exelon Generation Company, LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2NOTIFICATION OF NRC

TRIENNIAL FIRE PROTECTION BASELINE INSPECTION REQUEST FOR

INFORMATION 05000373/2017010; 05000374/2017010

Dear Mr. Hanson:

On October 30, 2017, the U.S. Nuclear Regulatory Commission (NRC) will begin a Triennial

Fire Protection Baseline Inspection at your LaSalle County Station, Units 1 and 2. This

inspection will be performed in accordance with Inspection Procedure (IP) 71111.05T,

the NRCs Baseline Fire Protection IP.

Changes were made to the IP 71111.05T which now requires the Fire Protection Inspection

to review your actions to mitigate postulated events that could potentially cause loss of large

areas of power reactor facilities due to explosions or fires. This requirement was implemented

by the issuance of the Interim Compensatory Measures Order EA-02-026, Section B.5.b,

and the subsequent requirements of Title 10 of the Code of Federal Regulations (CFR),

Part 50.54(hh)(2), which are collectively referred to as B.5.b requirements. During this

inspection, the B.5.b requirements review will be performed during the first onsite week of

the inspection starting on November 1, 2017.

The schedule for the onsite inspection activity is as follows:

Information Gathering Visit: October 30, 2017;

B.5.b Requirements: November 1-3, 2017; and

Fire Protection Inspection: November 13-17, 2017, and

November 27-December 1, 2017.

The purpose of the information gathering visit is: (1) to obtain information and documentation

needed to support the inspection; (2) to become familiar with the LaSalle Fire Protection

Programs, fire protection features, post-fire safe shutdown capabilities, and plant layout; and

(3) to arrange administrative details, such as office space, availability of knowledgeable office

personnel and to ensure unescorted site access privileges.

B. Hanson -2-

Experience has shown that the Baseline Fire Protection Inspections are extremely resource

intensive both for the NRC inspectors and the licensee staff. In order to minimize the inspection

impact on the site and to ensure a productive inspection for both organizations, we have

enclosed a request for documents needed for the inspection. These documents have been

divided into four groups.

The first group lists information necessary to aid the inspection team in

choosing specific focus areas for the inspection. It is requested that this

information be provided to the lead inspector via mail or electronically no

later than October 20, 2017.

The second group also lists information and areas for discussion necessary to

aid the inspection team in choosing specific fire protection focus areas for the

inspection and to ensure that the inspection team is adequately prepared for the

inspection. It is requested this information be available during the information

gathering visit on October 30, 2017.

The third group of requested documents consists of those items that the

team will review, or need access to, during the inspection. Please have this

information available by the first day of the second onsite inspection week of

November 13, 2017.

The fourth group lists the information necessary to aid the inspection team in

tracking issues identified as a result of the inspection. It is requested that this

information be provided to the lead inspector as the information is generated

during the inspection.

It is important that all of these documents are up to date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection.

The lead inspector for this inspection is Mr. Alan Dahbur. We understand that our

regulatory contact for this inspection is Mr. Terry Lanc of your organization. If there are

and questions about the inspection or the material requested, please contact the lead

inspector at 630-829-9810, or via e-mail at Alan.Dahbur@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

B. Hanson -3-

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Alan Dahbur, Senior Reactor Inspector

Engineering Branch 3

Division of Reactor Safety

Docket Nos. 50-373; 50-374

License Nos. NPF-11; NPF-18

Enclosure:

Triennial Fire Protection Baseline

Inspection Document Request

cc: Distribution via LISTSERV

B. Hanson -4-

Letter to Bryan C. Hanson from Alan Dahbur dated September 5, 2017

SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2NOTIFICATION OF NRC

TRIENNIAL FIRE PROTECTION BASELINE INSPECTION REQUEST FOR

INFORMATION 05000373/2017010; 05000374/2017010

DISTRIBUTION:

Jeremy Bowen

RidsNrrDorlLpl3

RidsNrrPMLaSalle

RidsNrrDirsIrib Resource

Cynthia Pederson

James Trapp

Richard Skokowski

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

ADAMS Accession Number ML17249A826

OFFICE RIII RIII RIII RIII

NAME ADahbur:cl

DATE 09/05/17

OFFICIAL RECORD COPY

TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST

Inspection Report: 05000373/2017010 AND 05000374/2017010

Onsite Inspection Dates: October 30, 2017 (Information Gathering Visit)

November 1-3, 2017 (B.5.b Requirements)

November 13-17, 2017 (Fire Protection Inspection)

November 27-December 1, 2017 (Fire Protection Inspection)

Inspection Procedures: IP 71111.05T, Fire Protection (Triennial)

IP 71152, Identification and Resolution of Problems

Inspectors: Alan Dahbur

Senior Reactor Inspector (Lead)

630-829-9810

Alan.Dahbur@nrc.gov

Atif Shaikh Jasmine Gilliam

Senior Reactor Inspector Reactor Inspector

630-829-9824 630-829-9831

Atif.Shaikh@nrc.gov Jasmine.Gilliam@nrc.gov

I. Information Requested Prior To the Information Gathering Visit:

The following information is requested by October 20, 2017. If you have any

questions regarding this request, please call the lead inspector as soon as possible. All

information should be sent to Mr. Alan Dahbur (e-mail address Alan.Dahbur@nrc.gov).

Electronic media is preferred. The preferred file format is a searchable pdf file on a

compact disk (CD). The CD should be indexed and hyper-linked to facilitate ease of

use, if possible. Please provide four copies of each CD submitted (one for each

inspector).

1. The most risk-significant fire areas as determined by probabilistic risk analyses, if

available. Otherwise, the reactor plant's Individual Plant Examination for External

Events for fire and results of any post-Individual Plant Examination for External

Events reviews for fire.

2. A copy of the current version of the Fire Protection Program, fire hazards

analysis, safe shutdown analysis, Updated Safety Analysis Report, technical

specifications, license (including the fire protection license condition), and

technical requirements manual or equivalent for fire protection structures,

systems, and components.

3. A list of fire areas requiring alternative shutdown capability, (i.e., those areas for

which Title 10 of the Code of Federal Regulations (CFR), Part 50, Appendix R,

Section III G, requirements are satisfied under Section III.G.3), or where both

safe shutdown trains can be affected.

Enclosure

TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST

4. Plant operating procedures which would be used and describe shutdown for a

postulated fire (for both areas requiring alternative shutdown and areas which do

not require alternative shutdown). Only those procedures with actions specific to

shutdown in the event of a fire need be included. In addition, please include

those procedures which operators would use for initial response to a fire, such as

annunciator or alarm response procedures, the procedure used for activating the

fire brigade, and the procedure which directs operators to the applicable safe

shutdown procedure.

5. Analysis performed in support of plant evaluation regarding multiple spurious

operation (MSO), which includes the following:

a. List of identified multiple spurious fire-induced circuit failure configurations.

b. List of the generic and plant specific MSOs.

c. Results of expert panel process and associated review/evaluation of the

generic and plant specific MSOs and existing safe shutdown analysis.

d. Evaluations and corrective actions taken for resolution of MSO issues.

II. Information Requested During the Information Gathering Visit (October 30, 2017):

The following information is requested to be provided to the inspection team during the

onsite information gathering visit. Except for Item 8, it is requested that the following

information be provided on four sets of CDs (searchable, if possible) with the B.5.b

Mitigating Strategies information (Items 8.a through 8.h) provided on one separate CD.

In addition, one set of hard copy drawings are requested for Items 4.a. through 4.d.

1. One set of hard-copy documents for facility layout drawings which identify plant

fire area delineation; areas protected by automatic fire suppression and

detection; and locations of fire protection equipment.

2. Licensing Information:

a. All Nuclear Regulatory Commission (NRC) Safety Evaluation Reports (SERs)

applicable to fire protection (specifically including those SERs referenced by

the plant fire protection license condition) and all licensing correspondence

referenced by the SERs;

b. All licensing correspondence associated with the comparison to Standard

Review Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing

purposes;

c. Exemptions from 10 CFR 50.48 and 10 CFR Part 50, Appendix R, and

associated licensing correspondence;

d. All licensing correspondence associated with those sections of

10 CFR Part 50, Appendix R, that are not applicable to the plant under

10 CFR 50.48(b)(1). Specifically, the licensing correspondence associated

with those fire protection features proposed or implemented by the licensee

that have been accepted by the NRC staff as satisfying the provisions of

2

TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST

Appendix A to Branch Technical Position APCSB 9.5-1 reflected in

the NRC fire protection SERs issued before February 19, 1981,

(10 CFR 50.48(b)(1)(i)); or those fire protection features, which were

accepted by the NRC staff in comprehensive fire protection SERs issued

before Appendix A to Branch Technical Position APCSB 9.5-1 was published

in August 1976 (10 CFR 50.48(b)(1)(ii)); and

e. The Final Safety Analysis Report sections applicable to fire protection, fire

hazards analysis, and safe shutdown analysis in effect at the time of original

licensing.

3. Fire Protection Program:

a. A listing of changes made to the Fire Protection Program since the last

Triennial Fire Protection Inspection;

b. A listing of the protection methodologies identified under 10 CFR Part 50,

Appendix R,Section III.G used to achieve compliance for selected fire

zones/areas (to be determined during information gathering visit). That is,

please specify whether 3-hour rated fire barriers; (Section III.G.2.a), 20 foot

separation along with detection and suppression; (Section III.G.2.b), 1-hour

rated fire barriers with detection and suppression; (Section III.G.2.c), or

alternative shutdown capability; (Section III.G.3) is used as a strategy for

each selected fire zone/area;

c. A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to safe-

shutdown evaluations);

d. A list of applicable codes and standards related to the design of plant fire

protection features. The list should include National Fire Protection

Association code versions committed to (i.e., the National Fire Protection

Association Codes of Record); and

e. List of plant deviations from code commitments and associated evaluations.

4. Facility Information:

a. Piping and instrumentation (flow) diagrams showing the components used to

achieve and maintain hot standby and cold shutdown for fires outside the

control room, those components used for those areas requiring alternative

shutdown capability, and systems relied upon for B.5.b mitigation strategies.

These can be of the type that are used for training;

b. One-line schematic drawings of the electrical distribution system for 4160

Volts alternating current (Vac) down to 480Vac;

c. One-line schematic drawings of the electrical distribution system for 250 Volts

direct current and 125 Volts direct current systems as applicable;

d. Logic diagrams showing the components used to achieve and maintain hot

standby and cold shutdown; and

3

TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST

e. Safe shutdown cable routing database (requested electronically, such as on

compact disc, if available).

5. Operations Response for Fire Protection:

a. Pre-fire plans for selected fire zones/areas (to be determined during

information gathering visit);

b. Plant operating procedures which specify the initial operations response to a

fire alarm or annunciator; and

c. Procedure for calling out the fire brigade and requesting off-site assistance.

6. Corrective Actions:

a. Listing of open and closed Fire Protection Condition Reports (i.e., problem

identification forms and their resolution reports) since the date of the last

Triennial Fire Protection Inspection; and

b. List of current fire impairments, including duration.

7. General Information:

a. A listing of abbreviations and/or designators for plant systems;

b. Organization charts of site personnel down to the level of fire protection staff

personnel; and

c. A phone list for onsite licensee personnel.

8. B.5.b Mitigating Strategies:

a. A list of all modifications to regulatory commitments made to meet the

requirements of Section B.5.b of the ICM Order, EA-02-026, dated

February 25, 2002, the subsequently imposed license conditions, and

10 CFR 50.54(hh)(2);

b. Copies of procedures/guidelines that were revised or generated to implement

the mitigation strategies. These could be extensive damage mitigation

guidelines, severe accident management guidelines, emergency operating

procedures, abnormal operating procedures, etc.;

c. A matrix that shows the correlation between the mitigation strategies

identified in Nuclear Energy Institute 06-12 and the site-specific procedures

or guidelines that are used to implement each strategy;

d. A listing of engineering evaluations/calculations that were used to verify

engineering bases for the mitigation strategies;

e. Copies of procedures used to inventory equipment (hoses, fittings, pumps,

etc.) required to be used to implement the mitigation strategies;

4

TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST

f. A list of B.5.b mitigating strategies, if any, which have implementing details

that differ from that documented in the submittals and the SER;

g. Copies of Memoranda of Understanding (e.g., with local fire departments)

required to implement any mitigating strategies; and

h. A list of changes made to B.5.b mitigating strategies and associated

procedures since the previous NRC inspection of B.5.b mitigating strategies

(June 16, 2014).

9. Onsite Discussions:

In addition, during the information gathering visit, it is requested that licensee

staff be available for the following:

a. Informal discussion on plant procedures operators would use in the event of

fire or explosion (including B.5.b mitigation strategies) and under what

conditions would the plant be shutdown using alternative shutdown

methodology;

b. Informal discussion on the plants safe shutdown cable routing database and

the plant-wide cable routing database, as applicable; and

c. A tour of alternative shutdown and risk-significant fire areas.

d. A discussion of scheduling of fire drills which may occur during the inspection

so that the inspectors may be able to observe a fire drill, if possible.

III. Information Requested to be Available on first Day of the Second Onsite

Inspection Week (November 13, 2017):

The following information is requested to be provided on the first day of inspection. It is

requested that this information be provided on four sets of CDs (searchable, if possible).

1. Program Procedures:

a. Procedures for:

i. Administrative controls (such as allowed out of service times and

compensatory measures) for fire protection systems and components

ii. Control of transient combustibles

iii. Control of hot work

b. List of maintenance and surveillance testing procedures for alternative

shutdown capability and fire barriers, detectors, pumps, and suppression

systems; and

c. List of maintenance procedures which routinely verify fuse breaker

coordination in accordance with the post-fire safe shutdown coordination

analysis.

5

TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST

2. Design and Equipment Information:

a. Coordination calculations and/or justifications that verify fuse/breaker

coordination for selected fire zones/areas (to be determined during

information gathering visit) that are fed off of the same electrical buses as

components in the protected safe shutdown train;

b. Copies of significant fire protection and post-fire safe shutdown related

design change package descriptions (including their associated 10 CFR

50.59 evaluations) and Generic Letter 86-10 (or adverse to safe shutdown)

evaluations;

c. Gaseous suppression system pre-operational testing, if applicable, for

selected fire zones/areas (to be determined during information gathering

visit);

d. Hydraulic calculations and supporting test data which demonstrate operability

for water suppression systems, if applicable, for selected fire zones/areas (to

be determined during information gathering visit);

e. Alternating current coordination calculations for 4160Vac down to 480Vac

electrical systems; and

f. List of all fire protection or Appendix R calculations.

3. Assessment and Corrective Actions:

The three most recent fire protection Quality Assurance audits and/or fire

protection self-assessments.

IV. Information Requested to Be Provided Throughout the Inspection:

1. Copies of any corrective action documents generated as a result of the

inspection teams questions or queries during this inspection.

2. Copies of the list of questions submitted by the inspection team members and

the status/resolution of the information requested (provided daily during the

inspection to each inspection team member).

If you have questions regarding the information requested, please contact the lead inspector.

6