{{#Wiki_filter:ACCELERATED DISTRIBUTION DEMONSTjRATION SYSTEM I~REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G AUTH.NAME AUTHOR AFFILIATION DODGE,R.E.
{{#Wiki_filter:ACCELERATED DISTRIBUTION DEMONSTjRATION SYSTEM I   ~
Rochester Gas&Electric Corp.MECREDY,R.C.
REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)
Rochester Gas 6 Electric Corp.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000244 R  
DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester               G 05000244 AUTH. NAME           AUTHOR AFFILIATION DODGE,R.E.           Rochester Gas & Electric Corp.
MECREDY,R.C.         Rochester Gas 6 Electric Corp.
RECIP.NAME           RECIPIENT AFFILIATION                                                 R for          for


==SUBJECT:==
==SUBJECT:==
Mo rating, rept for Apr 1991 for R.E.Ginna Station./910515 l DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR i ENCL/SIZE: TXTLE: Monthly Operating Report (per Tech Specs)NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
Mo
05000244 D RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: AEOD/DOA NRR/DLgQ/B1 0.5 01 EXTERNAL EGGG BRYCE T J~H NSIC COPXES LTTR ENCL 3 3 1 1 1 1 1 1 1 1 1 1 1 1 RECXPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGN1 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:
              /910515    l rating, rept         Apr 1991       R.E.Ginna Station.
D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISIRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14 1$~I~A C/////////////I
D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR i ENCL TXTLE: Monthly Operating Report (per Tech Specs)
/////////////
                                                                      /  SIZE:
I/////////////////////
NOTES:License Exp date       in accordance with 10CFR2,2.109(9/19/72).           05000244 RECIPIENT             COPXES          RECXPIENT          COPIES ID   CODE/NAME           LTTR ENCL      ID CODE/NAME        LTTR ENCL          D PD1-3 LA                   3    3    PD1-3 PD                1    1 JOHNSON,A                   1    1                                              D INTERNAL: AEOD/DOA                     1    1    AEOD/DSP/TPAB          1    1 NRR/DLgQ/       B1 0       1    1    NRR/DOEA/OEAB          1    1
////////I/I//////////
                  .5         01        1    1    RGN1                    1    1 EXTERNAL   EGGG BRYCE T J ~ H         1     1     NRC PDR                 1   1 NSIC                        1     1 D
ROCHESTER GAS AND ELECTRIC CORPORATION ROBERT G MECREDY Vice Presisient Cinna Nuclear Production o 89 EAST AVENUE, ROCHESTER N.Y.1464g-0001 TELEPHONE AREA CODE 7 le 546-2700 GONNA STATXON May 15, 1991 US Nuclear Regulatory Commission Document Control'esk Washington, DC 20555  
D D
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISIRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR             14   ENCL   14
 
1 $ ~
I   ~
A
 
C
              /////////////I     /////////////
I///// ///   /////////////
              ////////I     /I//////////
ROCHESTER GAS AND ELECTRIC CORPORATION                           o 89 EAST AVENUE, ROCHESTER N.Y. 1464g-0001 ROBERT G MECREDY                                                                                  TELEPHONE Vice Presisient                                                                            AREA CODE 7 le 546-2700 Cinna Nuclear Production GONNA STATXON May 15, 1991 US     Nuclear Regulatory Commission Document                       Control'esk Washington,                                 DC 20555


==Subject:==
==Subject:==
Monthly Report for April, 1991 Operating Status information R.E.Ginna Nuclear Power Plant Docket No.50-244  
Monthly Report for April, 1991 Operating Status information R. E. Ginna Nuclear Power Plant Docket No. 50-244
 
==Dear            Sir:==
 
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of April, 1991.
Ver  truly  yours, Robert C. Mecred R    M/eeh Attachments cc:            Mr. Thomas T. Martin                      NRC  (1) 9 1 052 30i25                      910430 PDR        A          CK p5ppp244 PDR R
V~


==Dear Sir:==
C g
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of April, 1991.Ver truly yours, Robert C.Mecred R M/eeh Attachments cc: Mr.Thomas T.Martin NRC (1)9 1 052 CK p5ppp244 30i25 910430 PDR A PDR R V~
l I
C g l I f%I 4 OPERATING DATA REPORT DOCKET NO.50-244 DATE Ha 15 1991 COMPLETED BY obert E.Dodge OPERATING STATUS TELEPHONE 315 524-4446 ext.396 1.2.3.4.5.6.7.8.Unit Name: R.E.GINNA NUCLEAR POWER PLANT Reporting Period: A ril 1991 Licensed Thermal Power (MWt): Nameplate Rating (Gross HWe): Design Electrical Rating (Net HWe): Haxiaun Dependable Capacity (Gross HWe): Haxinun Dependable Capacity (Net HWe): If Changes Occur in Capacity Ratings (Items I Notes: The unit was shutdown for the 1991 Annual Refueling and Haintenance Outage.1520 490 470 490 470 Nunber 3 Through 7)Since Last Report, Give Reasons: 9.Power Level to Which Restricted, If Any (Net MWe): 10'easons For Restrictions, If Any: This Honth Yr.-to-Date Cwuiative 11.12.13.14.15.16.17.18.19.20.21.22.23.Hours In Report Period Nunber of Hours Reactor Was Critical Reactor Reserve Shutdown Kours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (HWN)Gross Electrical Energy Generated (MWN)Net Electrical Energy Generated (HWN)Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)Unit Capacity Factor (Using DER Net)Unit Forced Outage Rate 719~+2 879 1 933.23 1 932.75 0 a 2 753 088 938 665 891 990 67.13/, 67.13/.65.92K 65.92K 0/188 225.45 147 672.54 1 687.55*145 101.13 8.5*205 103 785 67 601 139 64 161 283 77.25K 77.26/73.95K 73 95'.25K 24.Shutdowns Scheduled Over Next 6 Honths (Type, Date and Duration of Each): 25.If Shut Down At End Of Report Period, Estimated Date of Startup: 05'0-91 26.Units In Test Status (Prior to Comnerciai Operation):
f%
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION*CUMULATIVE TOTAL CCHHENCING JANUARY 1, 1975**EASTERN STANDARD TIME TO EASTERN DAYLIGHT SAVINGS TIME  
I
~1'e Am AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-244 UNIT R.E.Ginna Nuclear Power Plant DATE Ma 15 1991 COMPLETED BY Robert E.D dge MONTH A ril 1991 TELEPHONE 1 315 524-4446 ext.396 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)DAY AVERAGE DAILY POWER LEVEL (MWe-Net)17.2~18.3~19.4~20.5.21~6.22.7~23'.24.9~25.10.26'7.12'8.13'9.14.30.15.31.16.INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.Compute to the nearest whole megawatt..
 
UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH DOCKET NO.~0 24" 4 UNlTNAhlE R E.GINNA NUCLEAR POWER PLANT DATE Ma 5, 1991 CohtPLETED BY Robert E.Dodge 1ELEPHONF 315-524-4446 x-396 Gonna a ion Ho.Date 0 0 I 0 0 a 0 0&n C 0 0 Pl 4 eo 0 C 0 0~>tt'.0IA C 0 n l.icensee Event Report lt Ew 0 Vl C>a 0 Ill C 0 Lrl C 0 0 E 0 O Cause 8L Corrective Action to Prevent Recurrence 4-91 S 719 The unit was shutdown for Annual Refueling and Maintenance Outage.The unit remained shutdown at the end of the report-period.1 F: Forced S: Scheduled REV.4/SS 494I9 Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction Eperator Training gc License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)3 hfethod: 1-hlanua1 2-Manual Scram.3-Automatic Scram.=4-Other (Explain)Exhibit G-instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-0161)Exhibit 1-Same Source 4 I, NARRATIVE  
4 OPERATING DATA REPORT DOCKET NO.       50-244 DATE     Ha   15   1991 COMPLETED BY obert E. Dodge TELEPHONE       315   524-4446 ext. 396 OPERATING STATUS I
: 1.     Unit Name: R.E. GINNA NUCLEAR POWER PLANT                               Notes: The unit was shutdown for
: 2.      Reporting Period:       A ril 1991                                                   the 1991 Annual Refueling
: 3.      Licensed Thermal Power (MWt):                 1520                                and Haintenance Outage.
: 4.      Nameplate Rating (Gross HWe):                   490
: 5.      Design Electrical Rating (Net HWe):             470
: 6.      Haxiaun Dependable Capacity (Gross HWe):       490
: 7.      Haxinun Dependable Capacity (Net HWe):         470
: 8.      If Changes Occur in Capacity Ratings (Items Nunber 3 Through 7) Since Last Report, Give Reasons:
: 9.     Power Level   to Which Restricted, If Any (Net MWe):
10 'easons       For Restrictions, If Any:
This Honth         Yr.-to-Date               Cwuiative
: 11. Hours In Report Period                                   719~+                2 879                    188 225.45
: 12. Nunber of Hours Reactor Was Critical                                         1 933.23                  147 672.54
: 13. Reactor Reserve Shutdown Kours                                                                           1 687.55      *
: 14. Hours Generator On-Line                                                       1 932.75                  145 101.13
: 15. Unit Reserve Shutdown Hours                                                       0    a 8.5      *
: 16. Gross Thermal Energy Generated (HWN)                                     2 753 088                205 103 785
: 17. Gross Electrical Energy Generated (MWN)                                     938 665                67 601 139
: 18. Net Electrical Energy Generated (HWN)                                       891 990                64 161 283
: 19. Unit Service Factor                                                             67.13/,                    77.25K
: 20. Unit Availability Factor                                                       67.13/.                    77.26/
: 21. Unit Capacity Factor (Using MDC Net)                                         65.92K                      73.95K
: 22. Unit Capacity Factor (Using DER Net)                                         65.92K                      73
: 23. Unit Forced Outage Rate                                                         0     /                     95'.25K
: 24. Shutdowns Scheduled Over Next 6 Honths (Type, Date and Duration of Each):
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup: 05 '0-91
: 26. Units In Test Status (Prior to Comnerciai Operation):                       Forecast                 Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
*CUMULATIVE TOTAL CCHHENCING JANUARY 1, 1975
**EASTERN STANDARD TIME TO EASTERN DAYLIGHT SAVINGS TIME
 
    ~   1
      '
e Am
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.       50-244 UNIT R.E. Ginna Nuclear Power     Plant DATE Ma 15       1991 COMPLETED BY Robert E. D dge TELEPHONE 1   315     524-4446   ext. 396 MONTH      A ril  1991 DAY AVERAGE    DAILY POWER LEVEL        DAY AVERAGE     DAILY POWER LEVEL (MWe-Net)                               (MWe-Net) 17.
2 ~                                     18.
3 ~                                     19.
4 ~                                     20.
    '8.
: 5.                                       21 ~
    '9.
: 6.                                       22.
7 ~                                     23
                                            '.
24.
9 ~                                     25.
: 10.                                     26
                                            '7.
12 13
: 14.                                     30.
: 15.                                     31.
16.
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt..
 
DOCKET NO.         ~0 24"               4 UNlTNAhlE   R E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS                          DATE Ma           5, 1991 CohtPLETED BY Robert E. Dodge REPORT MONTH                              1ELEPHONF     315-524-4446     x-396 Gonna       a ion Pl 4  eo0                                    C 0        C          C 0      l.icensee          Ew        0 Lrl            Cause  8L Corrective Ho.           Date     0             0       0 ~                                      C 0     0 0               > tt'.     Event              0      0 0                    Action to 0                                      Vl C n0&                                                        E 0 a
0IA        Report lt         >a 0                         Prevent Recurrence I                            C                        Ill O
n0 4-91   S     719                                                               The unit was shutdown       for Annual Refueling and Maintenance Outage.
The unit remained shutdown at the end of the report -period.
1 3
F: Forced           Reason:                                            hfethod:                          Exhibit G - instructions S:   Scheduled     A-Equipment Failure (Explain)                       1-hlanua1                        for Preparation of Data B-Maintenance or Test                               2-Manual Scram.                  Entry Sheets for Licensee C-Refueling                                         3-Automatic Scram.                Event Report (LER) File (NUREG-D-Regulatory Restriction                         = 4-Other (Explain)                0161)
Eperator Training   gc License Examination F-Administrative G-Operational Error (Explain)
REV. 4/SS 494I9        H-Other (Explain)                                                                     Exhibit 1 - Same Source
 
4 I,
 
NARRATIVE  


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.50-244 UNIT R.E.Ginna Nuclear Power Plant DATE Ma 5 1 91 COMPLETED BY Robert E.odge TELEPHONE 1 315 524-4446 ext.396 MONTH A ril 1991 The unit was shutdown for the Annual Refueling and Maintenance Outage.The unit remained shutdown at the end of the report period.
OF OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power   Plant DATE Ma   5   1 91 COMPLETED BY Robert E. odge TELEPHONE 1 315   524-4446   ext. 396 MONTH   A ril 1991 The unit was shutdown for the Annual Refueling and Maintenance Outage. The unit remained shutdown at the end of the report period.
T C 1}}
 
T C
1}}

Revision as of 17:40, 29 October 2019

Monthly Operating Rept for Apr 1991 for Re Ginna Station. W/910515 Ltr
ML17262A487
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/30/1991
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9105230125
Download: ML17262A487 (11)


Text

ACCELERATED DISTRIBUTION DEMONSTjRATION SYSTEM I ~

REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION DODGE,R.E. Rochester Gas & Electric Corp.

MECREDY,R.C. Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION R for for

SUBJECT:

Mo

/910515 l rating, rept Apr 1991 R.E.Ginna Station.

D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR i ENCL TXTLE: Monthly Operating Report (per Tech Specs)

/ SIZE:

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT COPXES RECXPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD1-3 LA 3 3 PD1-3 PD 1 1 JOHNSON,A 1 1 D INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR/DLgQ/ B1 0 1 1 NRR/DOEA/OEAB 1 1

.5 01 1 1 RGN1 1 1 EXTERNAL EGGG BRYCE T J ~ H 1 1 NRC PDR 1 1 NSIC 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISIRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14

1 $ ~

I ~

A

C

/////////////I /////////////

I///// /// /////////////

////////I /I//////////

ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER N.Y. 1464g-0001 ROBERT G MECREDY TELEPHONE Vice Presisient AREA CODE 7 le 546-2700 Cinna Nuclear Production GONNA STATXON May 15, 1991 US Nuclear Regulatory Commission Document Control'esk Washington, DC 20555

Subject:

Monthly Report for April, 1991 Operating Status information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of April, 1991.

Ver truly yours, Robert C. Mecred R M/eeh Attachments cc: Mr. Thomas T. Martin NRC (1) 9 1 052 30i25 910430 PDR A CK p5ppp244 PDR R

V~

C g

l I

f%

I

4 OPERATING DATA REPORT DOCKET NO. 50-244 DATE Ha 15 1991 COMPLETED BY obert E. Dodge TELEPHONE 315 524-4446 ext. 396 OPERATING STATUS I

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes: The unit was shutdown for
2. Reporting Period: A ril 1991 the 1991 Annual Refueling
3. Licensed Thermal Power (MWt): 1520 and Haintenance Outage.
4. Nameplate Rating (Gross HWe): 490
5. Design Electrical Rating (Net HWe): 470
6. Haxiaun Dependable Capacity (Gross HWe): 490
7. Haxinun Dependable Capacity (Net HWe): 470
8. If Changes Occur in Capacity Ratings (Items Nunber 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):

10 'easons For Restrictions, If Any:

This Honth Yr.-to-Date Cwuiative

11. Hours In Report Period 719~+ 2 879 188 225.45
12. Nunber of Hours Reactor Was Critical 1 933.23 147 672.54
13. Reactor Reserve Shutdown Kours 1 687.55 *
14. Hours Generator On-Line 1 932.75 145 101.13
15. Unit Reserve Shutdown Hours 0 a 8.5 *
16. Gross Thermal Energy Generated (HWN) 2 753 088 205 103 785
17. Gross Electrical Energy Generated (MWN) 938 665 67 601 139
18. Net Electrical Energy Generated (HWN) 891 990 64 161 283
19. Unit Service Factor 67.13/, 77.25K
20. Unit Availability Factor 67.13/. 77.26/
21. Unit Capacity Factor (Using MDC Net) 65.92K 73.95K
22. Unit Capacity Factor (Using DER Net) 65.92K 73
23. Unit Forced Outage Rate 0 / 95'.25K
24. Shutdowns Scheduled Over Next 6 Honths (Type, Date and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup: 05 '0-91
26. Units In Test Status (Prior to Comnerciai Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
  • CUMULATIVE TOTAL CCHHENCING JANUARY 1, 1975
    • EASTERN STANDARD TIME TO EASTERN DAYLIGHT SAVINGS TIME

~ 1

'

e Am

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Ma 15 1991 COMPLETED BY Robert E. D dge TELEPHONE 1 315 524-4446 ext. 396 MONTH A ril 1991 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 17.

2 ~ 18.

3 ~ 19.

4 ~ 20.

'8.

5. 21 ~

'9.

6. 22.

7 ~ 23

'.

24.

9 ~ 25.

10. 26

'7.

12 13

14. 30.
15. 31.

16.

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt..

DOCKET NO. ~0 24" 4 UNlTNAhlE R E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS DATE Ma 5, 1991 CohtPLETED BY Robert E. Dodge REPORT MONTH 1ELEPHONF 315-524-4446 x-396 Gonna a ion Pl 4 eo0 C 0 C C 0 l.icensee Ew 0 Lrl Cause 8L Corrective Ho. Date 0 0 0 ~ C 0 0 0 > tt'. Event 0 0 0 Action to 0 Vl C n0& E 0 a

0IA Report lt >a 0 Prevent Recurrence I C Ill O

n0 4-91 S 719 The unit was shutdown for Annual Refueling and Maintenance Outage.

The unit remained shutdown at the end of the report -period.

1 3

F: Forced Reason: hfethod: Exhibit G - instructions S: Scheduled A-Equipment Failure (Explain) 1-hlanua1 for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction = 4-Other (Explain) 0161)

Eperator Training gc License Examination F-Administrative G-Operational Error (Explain)

REV. 4/SS 494I9 H-Other (Explain) Exhibit 1 - Same Source

4 I,

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Ma 5 1 91 COMPLETED BY Robert E. odge TELEPHONE 1 315 524-4446 ext. 396 MONTH A ril 1991 The unit was shutdown for the Annual Refueling and Maintenance Outage. The unit remained shutdown at the end of the report period.

T C

1