ML18010A064: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Integrated Action Plan for the Modernization of the | {{#Wiki_filter:Integrated Action Plan for the Modernization of the NRCs Digital I&C Regulatory Infrastructure | ||
*Key Messages | -Revision 2 Update-Public Meeting January 10, 2017 | ||
*Integrated Action Plan (IAP) Strategy for Digital Instrumentation and Controls (I&C) | |||
*IAP Revision 2 Overview | Discussion Topics | ||
*IAP Revision Schedule | * Key Messages | ||
*Modernization Plan Updates (IAP Review) 2 Key Messages | * Integrated Action Plan (IAP) Strategy for Digital Instrumentation and Controls (I&C) | ||
*IAP activities are ongoing and are focused on tactical and strategic outcomes with near term products expected | * IAP Revision 2 Overview | ||
*Industry is concerned that activities to date have not enabled implementable results | * IAP Revision Schedule | ||
*Staff is working with industry to produce guidance for implementable results | * Modernization Plan Updates (IAP Review) 2 | ||
*Frequent public meetings and workshops | |||
*Staff evaluated industry feedback to the IAP and incorporated applicable changes 3 | Key Messages | ||
* IAP activities are ongoing and are focused on tactical and strategic outcomes with near term products expected | |||
* Industry is concerned that activities to date have not enabled implementable results | |||
* Staff is working with industry to produce guidance for implementable results | |||
* Frequent public meetings and workshops | |||
* Staff evaluated industry feedback to the IAP and incorporated applicable changes 3 | |||
IAP Strategy for DI&C Modernization | IAP Strategy for DI&C Modernization | ||
*Objective: Modernize the digital I&C regulatory infrastructure to enhance the | * Objective: Modernize the digital I&C regulatory infrastructure to enhance the NRCs capability to be more timely, efficient, and effective in ensuring safety, and provide a consistent and predictable regulatory process | ||
-Tactical -Continue to prioritize and implement the regulatory activities needed to provide regulatory clarity and support industry confidence to perform digital I&C upgrades (MPs #1-4A) | - Tactical - Continue to prioritize and implement the regulatory activities needed to provide regulatory clarity and support industry confidence to perform digital I&C upgrades (MPs #1-4A) | ||
-Strategic -Assess and implement broader modernization of regulatory infrastructure (MP #4B) 4 IAP Revision 2 Overview | - Strategic - Assess and implement broader modernization of regulatory infrastructure (MP #4B) 4 | ||
*Summary: | |||
*Sections 1-3: Editorial changes | IAP Revision 2 Overview | ||
*Section 4: Removed | * Summary: Updated to list the specific key topics that have resulted in corresponding detailed modernization programs | ||
*Section 5: Modernization Plans updated to reflect current strategies and implementation schedules 5 | * Sections 1-3: Editorial changes | ||
IAP Revision Schedule | * Section 4: Removed | ||
*MP #1 -Protection Against Common Cause Failure (CCF) [IAP, Page 10] | * Section 5: Modernization Plans updated to reflect current strategies and implementation schedules 5 | ||
-MP#1A -Guidance for developing and documenting acceptable qualitative assessments crediting the proposed design attributes, quality measures, operating history in support of 10 CFR 50.59 evaluations of proposed digital I&C modifications [RIS 2002-22, Supplement 1] | |||
-MP #1B -Evaluation of NEI 16-16. | IAP Revision Schedule ACTION DATE Receive Preliminary Stakeholder Input Fall 2017 Issue Draft IAP Rev 2 for Stakeholder January 2018 Review Public Meeting - Category 2 January 2018 Issue IAP Rev 2 End of January 2018 ACRS Brief April/May 2018 6 | ||
-MP #1C -Evaluate | |||
Modernization Plans Updates ( | Modernization Plans Updates | ||
*MP#2 -Considering Digital Instrumentation & Controls in Accordance with 10 CFR 50.59 [IAP, Page 16] | * MP #1 - Protection Against Common Cause Failure (CCF) [IAP, Page 10] | ||
*MP #3 -Acceptance of Digital Equipment [IAP, Page 19] | - MP#1A - Guidance for developing and documenting acceptable qualitative assessments crediting the proposed design attributes, quality measures, operating history in support of 10 CFR 50.59 evaluations of proposed digital I&C modifications [RIS 2002-22, Supplement 1] | ||
-Commercial Grade Dedication 8 | - MP #1B - Evaluation of NEI 16-16. | ||
Modernization Plans Updates ( | - MP #1C - Evaluate NRCs current position on defense against CCF in digital I&C systems and components 7 | ||
*MP #4 -Assessment for Modernization of the Instrumentation & Controls Regulatory Infrastructure | |||
[IAP, Page 23] | Modernization Plans Updates (contd) | ||
-MP #4A: | * MP#2 - Considering Digital Instrumentation & Controls in Accordance with 10 CFR 50.59 [IAP, Page 16] | ||
*Tactical Activity (i): | * MP #3 - Acceptance of Digital Equipment [IAP, Page 19] | ||
*Tactical Activity (ii): | - Commercial Grade Dedication 8 | ||
-MP #4B: | |||
9 Questions? | Modernization Plans Updates (contd) | ||
* MP #4 - Assessment for Modernization of the Instrumentation & Controls Regulatory Infrastructure | |||
[IAP, Page 23] | |||
- MP #4A: Evaluation and Identification of Tactical Activities | |||
* Tactical Activity (i): Streamline the licensing process guidance - | |||
Update to DI&C-ISG-06 | |||
* Tactical Activity (ii): 10 CFR 50.59 Inspection Training and Guidance | |||
- MP #4B: Develop Strategic activities for long-term improvements to the regulatory infrastructure. | |||
9 | |||
Questions? | |||
10}} | 10}} | ||
Revision as of 05:31, 22 October 2019
| ML18010A064 | |
| Person / Time | |
|---|---|
| Issue date: | 01/10/2018 |
| From: | Lynnea Wilkins NRC/NRR/DLP/PLPB |
| To: | |
| Wilkins L | |
| References | |
| Download: ML18010A064 (10) | |
Text
Integrated Action Plan for the Modernization of the NRCs Digital I&C Regulatory Infrastructure
-Revision 2 Update-Public Meeting January 10, 2017
Discussion Topics
- Key Messages
- IAP Revision 2 Overview
- IAP Revision Schedule
- Modernization Plan Updates (IAP Review) 2
Key Messages
- IAP activities are ongoing and are focused on tactical and strategic outcomes with near term products expected
- Industry is concerned that activities to date have not enabled implementable results
- Staff is working with industry to produce guidance for implementable results
- Frequent public meetings and workshops
- Staff evaluated industry feedback to the IAP and incorporated applicable changes 3
IAP Strategy for DI&C Modernization
- Objective: Modernize the digital I&C regulatory infrastructure to enhance the NRCs capability to be more timely, efficient, and effective in ensuring safety, and provide a consistent and predictable regulatory process
- Tactical - Continue to prioritize and implement the regulatory activities needed to provide regulatory clarity and support industry confidence to perform digital I&C upgrades (MPs #1-4A)
- Strategic - Assess and implement broader modernization of regulatory infrastructure (MP #4B) 4
IAP Revision 2 Overview
- Summary: Updated to list the specific key topics that have resulted in corresponding detailed modernization programs
- Sections 1-3: Editorial changes
- Section 4: Removed
- Section 5: Modernization Plans updated to reflect current strategies and implementation schedules 5
IAP Revision Schedule ACTION DATE Receive Preliminary Stakeholder Input Fall 2017 Issue Draft IAP Rev 2 for Stakeholder January 2018 Review Public Meeting - Category 2 January 2018 Issue IAP Rev 2 End of January 2018 ACRS Brief April/May 2018 6
Modernization Plans Updates
- MP#1A - Guidance for developing and documenting acceptable qualitative assessments crediting the proposed design attributes, quality measures, operating history in support of 10 CFR 50.59 evaluations of proposed digital I&C modifications [RIS 2002-22, Supplement 1]
- MP #1B - Evaluation of NEI 16-16.
- MP #1C - Evaluate NRCs current position on defense against CCF in digital I&C systems and components 7
Modernization Plans Updates (contd)
- MP#2 - Considering Digital Instrumentation & Controls in Accordance with 10 CFR 50.59 [IAP, Page 16]
- MP #3 - Acceptance of Digital Equipment [IAP, Page 19]
- Commercial Grade Dedication 8
Modernization Plans Updates (contd)
- MP #4 - Assessment for Modernization of the Instrumentation & Controls Regulatory Infrastructure
[IAP, Page 23]
- MP #4A: Evaluation and Identification of Tactical Activities
- Tactical Activity (i): Streamline the licensing process guidance -
Update to DI&C-ISG-06
- Tactical Activity (ii): 10 CFR 50.59 Inspection Training and Guidance
- MP #4B: Develop Strategic activities for long-term improvements to the regulatory infrastructure.
9
Questions?
10