{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION
                            NUCLEAR REGULATORY COMMISSION
REGION I 2100 RENAISSANCE BLVD., SUITE 100
                                                REGION I
KING OF PRUSSIA, PA 19406
                                    2100 RENAISSANCE BLVD., SUITE 100
-2713   January 16, 2018
                                      KING OF PRUSSIA, PA 19406-2713
  Mr. Peter P. Sena, III
                                          January 16, 2018
President and Chief Nuclear Officer
Mr. Peter P. Sena, III
PSEG Nuclear LLC  
President and Chief Nuclear Officer
- N09 P.O. Box 236
PSEG Nuclear LLC - N09
Hancocks Bridge, NJ 08038
P.O. Box 236
  SUBJECT: SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2  
Hancocks Bridge, NJ 08038
- INFORMATION REQUEST FOR THE "CYBER-SECURITY" INSPECTION , NOTIFICATION TO PERFORM INSPECTION 05000 272/2018 40 3 AND 0 5000311/201 8403  Dear Mr. Sena: On June 4, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin  
SUBJECT:         SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 -
a team inspection in accordance with Inspection Procedure (IP)
                INFORMATION REQUEST FOR THE CYBER-SECURITY INSPECTION,
71130.10 P , "Cyber-Security ," issued May 15, 2017 , at your Salem Nuclear Generating Stations, Units 1 and 2
                NOTIFICATION TO PERFORM INSPECTION 05000272/2018403 AND
(Salem). Th e inspection will be performed to evaluate and verify your ability to meet full implementation
                05000311/2018403
requirements of the  
Dear Mr. Sena:
NRC's Cyber
On June 4, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin a team inspection
-Security Rule, Title
in accordance with Inspection Procedure (IP) 71130.10P, Cyber-Security, issued May 15,
10 of the Code of Federal Regulations
2017, at your Salem Nuclear Generating Stations, Units 1 and 2 (Salem). The inspection will be
(CFR), Part
performed to evaluate and verify your ability to meet full implementation requirements of the
73, Section 54, "Protection of Digital Computer and Communication Systems and Networks."
NRCs Cyber-Security Rule, Title 10 of the Code of Federal Regulations (CFR), Part 73,
  The onsite portion of the inspection will take place during the weeks of
Section 54, Protection of Digital Computer and Communication Systems and Networks. The
June 4-8, 2018, and June 18-22, 2018. Experience has shown that team inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have b
onsite portion of the inspection will take place during the weeks of June 4-8, 2018, and
een divided into four groups. The first group specifies information necessary to assist the inspection team in choosing the focus areas (i.e., "sample set"
June 18-22, 2018. Experience has shown that team inspections are extremely resource
) to be inspected by the cyber
intensive, both for the NRC inspectors and the licensee staff. In order to minimize the
security inspection  
inspection impact on the site and to ensure a productive inspection for both parties, we have
procedure. This information should be made available via compact disc and delivered to the regional office no later than March 12, 2018. The inspection team will review this information and, by April 9 , 2018, will request the specific items that should be provided for review
enclosed a request for documents needed for the inspection. These documents have been
The second group of additional requested documents will assist the inspection team in the evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture, and the areas of your plant's Cyber
divided into four groups.
Security Program
The first group specifies information necessary to assist the inspection team in choosing the
selected for the cyber
focus areas (i.e., sample set) to be inspected by the cyber security inspection procedure. This
security inspection. This information will be requested for review in the regional office prior to the inspection by
information should be made available via compact disc and delivered to the regional office no
May 7, 2018. The third group of
later than March 12, 2018. The inspection team will review this information and, by April 9,
requested documents consists of those items that the
2018, will request the specific items that should be provided for review.
inspection team will review, or need access to, during the inspection. Please have this information available by the first day of the onsite inspection, June 4, 2018.  
The second group of additional requested documents will assist the inspection team in the
P. Sena 2 The four th group of information is necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the
evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture,
lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
and the areas of your plants Cyber Security Program selected for the cyber security inspection.
  The lead inspector for this inspection is Mr. David Werkheiser. We understand that our regulatory contact for this inspection
This information will be requested for review in the regional office prior to the inspection by
is Mr. Thomas Cachaza of your organization, at Salem. If there are any questions about the inspection or the material requested, please contact the lead inspector at  
May 7, 2018.
610-337-5316 or via e-mail at David.Werkheiser@nrc.gov
The third group of requested documents consists of those items that the inspection team will
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995
review, or need access to, during the inspection. Please have this information available by the
(44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150
first day of the onsite inspection, June 4, 2018.
-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
 
  This letter and its enclosure will be available
P. Sena                                             2
for public inspection and copying at
The fourth group of information is necessary to aid the inspection team in tracking issues
http://www.nrc.gov/reading
identified as a result of the inspection. It is requested that this information be provided to the
-rm/adams.html
lead inspector as the information is generated during the inspection. It is important that all of
and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exe
these documents are up to date and complete in order to minimize the number of additional
mptions, Requests for Withholding."
documents requested during the preparation and/or the onsite portions of the inspection.
  Sincerely,         /RA/     Glenn T. Dentel , Chief Engineering Branch
The lead inspector for this inspection is Mr. David Werkheiser. We understand that our
2 Division of Reactor Safety
regulatory contact for this inspection is Mr. Thomas Cachaza of your organization, at Salem. If
  Docket No s. 50-272 and 50-311 License No
there are any questions about the inspection or the material requested, please contact the lead
s. DPR-70 and DPR
inspector at 610-337-5316 or via e-mail at David.Werkheiser@nrc.gov.
-75 Enclosure: Salem Nuclear Generating Stations, Units 1 and 2
This letter does not contain new or amended information collection requirements subject to the
Cyber-Security     Inspection Document Request
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
  cc w/encl:
requirements were approved by the Office of Management and Budget, control number 3150-
  Distribution via ListServ
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
 
request for information or an information collection requirement unless the requesting document
P. Sena 3 SUBJECT: SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND
displays a currently valid Office of Management and Budget control number.
- INFORMATION REQUEST FOR THE "CYBER SECURITY" INSPECTION, NOTIFICATION TO PERFORM INSPECTION 05000244/
This letter and its enclosure will be available for public inspection and copying at
2018403 DATED JANUARY 16, 2018  DISTRIBUTION: (via email)
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
DLew, ORA  DCollins, ORA
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
   DPelton, DRP
                                                Sincerely,
MGray, DRP
                                                /RA/
    JYerokun, DRS
                                                Glenn T. Dentel, Chief
  BWelling, DRS
                                                Engineering Branch 2
  FBower, DRP
                                                Division of Reactor Safety
RBarkley, DRP
Docket Nos. 50-272 and 50-311
MDraxton, DRP
License Nos. DPR-70 and DPR-75
PFinney, DRP, SRI 
Enclosure:
AZiedonis, DRP, RI
Salem Nuclear Generating Stations, Units 1 and 2 Cyber-Security
COtt, DRP, AA
  Inspection Document Request
JBowen, RI, OEDO 
cc w/encl: Distribution via ListServ
RidsNrrPMSalem Resource
 
RidsNrrDorlLpl1 Resource
 
ROPreports Resource    DOCUMENT NAME:
  ML18016A433
G:\DRS\Engineering Branch 2
                                            Non-Sensitive                            Publicly Available
\Werkheiser
      SUNSI Review
\2-Cyber\2018-Salem 2018403
                                            Sensitive                                Non-Publicly Available
\Salem-CyberFI_120d RFI Letter.docx
  OFFICE        RI/DRS              RI/DRS
ADAMS ACCESSION NUMBER:
  NAME          DWerkheiser        GDentel
  ML18016A433  SUNSI Review
   DATE          1/16/18            1/16/18
  Non-Sensitive  Sensitive  Publicly Available
                                         
  Non-Publicly Available
              SALEM NUCLEAR GENERATING STATIONS, UNITS 1 AND 2
  OFFICE RI/DRS RI/DRS    NAME DWerkheiser
                  CYBER-SECURITY INSPECTION DOCUMENT REQUEST
GDentel    DATE 1/16/18 1/16/18    OFFICIAL RECORD CO
Inspection Report:            05000272/2018403 and 05000311/2018403
PY     
Inspection Dates:              June 4 - 8, 2018, and June 18 - 22, 2018
SALEM NUCLEAR GENERATING STATIONS, UNITS
Inspection Procedure:          IP 71130.10P, Cyber-Security, Issue Date May 15, 2017
1 AND 2 CYBER-SECURITY INSPECTION DOCUMENT REQUEST
Reference:                    Guidance Document for Development of the Request for
   1  Enclosure  Inspection Report
                              Information (RFI) and Notification Letter for Full-Implementation of
: 05000272/2018403 and 05000311/2018403
                              the Cyber Security Inspection, Issue Date May 25, 2017
  Inspection Dates
NRC Inspectors:               David Werkheiser, Lead                  Eugene DiPaolo
: June 4 - 8, 2018, and June 18 - 22, 2018  Inspection Procedure
                              610-337-5316                            610-337-6959
: IP 71130.10 P , "Cyber-Security ," Issue Date May 15, 2017
                              David.Werkheiser@nrc.gov                Eugene.DiPaolo@nrc.gov
  Reference: Guidance Document for Development of the Request for Information (RFI) and Notification Letter for Full
NRC Contractors:              Fredrick Priester                      Cynthia DeBisschop
-Implementation of the Cyber Security Inspection , Issue Date May 25, 2017
                              301-230-4590                            301-287-3710
  NRC Inspector s: David Werkheiser, Lead Eugene DiPaolo
                              Fredrick.Priester@nrc.gov              Cynthia.DeBisschop
610-337-5316 610-337-6959 David.Werkheiser@nrc.gov
                                                                      @nrc.gov
Eugene.DiPaolo@nrc.gov  NRC Contractors
NRC Observers:                Michael Brown
: Fredrick Priester
                              301-287-3679
Cynthia DeBisschop
                              Michael.Brown@nrc.gov
301-230-4590 301-287-3710 Fredrick.Priester@nrc.gov Cynthia.DeBisschop
I.   Information Requested for In-Office Preparation
                                                            @nrc.gov  NRC Observers: Michael Brown
      The initial request for information (i.e., first RFI) concentrates on providing the inspection
301-287-3679 Michael.Brown@nrc.gov  I. Information Requested for In
      team with the general information necessary to select appropriate components and
-Office Preparation
      Cyber Security Program (CSP) elements to develop a site-specific inspection plan.
The initial request for information (i.e., first RFI) concentrates on providing the inspection team with the general information necessary to select appropriate components and Cyber Security Program (CSP) elements to develop a site
      The first RFI is used to identify the list of critical systems and critical digital assets
-specific inspection plan. 
      (CSs/CDAs) plus operational and management (O&M) security control portions of the
The first RFI is used to identify the list of critical systems and critical digital assets
      CSP to be chosen as the sample set required to be inspected by the cyber security IP.
(CSs/CDAs) plus operational and management (O&M) security control portions of the CSP to be chosen as the "sample set" required to be inspected
      The first RFIs requested information is specified below in Table RFI #1. The
by the cyber security IP. The first RFI
      Table RFI #1 information is requested to be provided to the regional office by March 12,
's requested information is specified below in Table RFI #1.  The Table RFI #1 information is requested to be provided
      2018, or sooner, to facilitate the selection of the specific items that will be reviewed
to the regional office
      during the onsite inspection weeks.
by March 12 , 2018, or sooner, to facilitate the selection of the specific items that will be reviewed during the onsite inspection weeks
      The inspection team will examine the returned documentation from the first RFI and
. The inspection team
      identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more
will examin e the returned documentation from the first RFI
      focused follow-up request to develop the second RFI. The inspection team will submit
and identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more focused follow
      the specific systems and equipment list to your staff by April 9, 2018, which will identify
-up request to develop the second RFI. The inspection team will submit
      the specific systems and equipment that will be utilized to evaluate the CSs/CDAs,
the specific systems and equipment
      defensive architecture, and the areas of the licensees CSP selected for the cyber
list to your staff by April 9, 2018, which will identify the specific systems and equipment that
      security inspection. We request that the additional information provided from the second
will be utilized to evaluate the CSs/CDAs, defensive architecture, and the areas of the licensee's CSP selected for the cyber
      RFI be made available to the regional office by May 7, 2018.
security inspection.  We request that the additional information provided from the second RFI be made available to the regional office by May 7, 2018
                                                  1                                        Enclosure
.   
 
SALEM NUCLEAR GENERATING STATIONS, UNITS 1 AN
          SALEM NUCLEAR GENERATING STATIONS, UNITS 1 AND 2
D 2 CYBER-SECURITY INSPECTION DOCUMENT REQUEST
            CYBER-SECURITY INSPECTION DOCUMENT REQUEST
  2  The information requested for the first RFI is identified in Table
The information requested for the first RFI is identified in Table RFI #1. All requested
RFI #1.  All requested information shall follow the Table RFI #
information shall follow the Table RFI #1 and the guidance document referenced above.
1 and the guidance document referenced above.      The required Table RFI #1 information shall be provided on compact disc (CD) to the lead inspector by March 12, 2018.  Please provide four copies of each CD submitted (i.e., one for each inspector/cont
The required Table RFI #1 information shall be provided on compact disc (CD) to the
ractor).  The preferred file format for all lists is a searchable Excel spreadsheet file on a
lead inspector by March 12, 2018. Please provide four copies of each CD submitted
CD.  The se CDs should be indexed and hyper
(i.e., one for each inspector/contractor). The preferred file format for all lists is a
-linked to facilitate ease of use.  If you have any questions regarding this information, please call the inspection team leader as soon as possible.
searchable Excel spreadsheet file on a CD. These CDs should be indexed and hyper-
  Table RFI #1 Reference Section 3, Paragraph Number/Title:
linked to facilitate ease of use. If you have any questions regarding this information,
Items 1 List All Identified Critical Systems and Critical Digital Assets
please call the inspection team leader as soon as possible.
All 2 List CDA Facility and Site Ethernet
                                        Table RFI #1
- Transmission Control Protocol/Internet Protocol (TCP/IP)  
  Reference Section 3,
Based Local Area Networks (LANs) and
  Paragraph Number/Title:                                                              Items
Identify Those LAN's
    1 List All Identified Critical Systems and Critical Digital Assets                    All
That Have N on-CDAs O n Them All 3 List CDA Facility and  
        List CDA Facility and Site Ethernet - Transmission Control
Site N on-Ethernet TCP/IP
    2 Protocol/Internet Protocol (TCP/IP) Based Local Area Networks                      All
Based LANs
        (LANs) and Identify Those LANs That Have Non-CDAs On Them
Including Those Industrial
        List CDA Facility and Site Non-Ethernet TCP/IP Based LANs Including
Networks and
    3 Those Industrial Networks and Identify LANs That Have Non-CDAs On                  All
Identify LANs
        Them
That Have N on-CDAs O n Them All 4 Network Topology Diagrams (Be Sure To Include all Network Intrusion Detection Systems (NIDS) and Security Information and Event Management (SIEMs) for Emergency Preparedness (EP) networks and Security Level 3 and 4 Networks)
        Network Topology Diagrams (Be Sure To Include all Network Intrusion
All 8 List All Network Security Boundary Devices for EP Networks and All Network Security Boundary Devices for Levels 3 and 4
        Detection Systems (NIDS) and Security Information and Event
All 9 List CDA Wireless Industrial
    4                                                                                    All
Networks All 11 NIDS Documentation for Critical Systems That Have CDAs Associated with Them 11.a.1) 11.a.2) 12 SIEM Documentation for Critical systems That Have CDAs Associated with Them 12.a.1) 12.a.2) 14 List EP and Security Onsite and Offsite Digital Communication
        Management (SIEMs) for Emergency Preparedness (EP) networks
Systems All 25 Cyber Security Assessment and Cyber
        and Security Level 3 and 4 Networks)
Security Incident Response Teams All  In addition to the above information
        List All Network Security Boundary Devices for EP Networks and All
please provide the following:
    8                                                                                    All
  (1) Electronic copy of your current Cyber Security Plan.
        Network Security Boundary Devices for Levels 3 and 4
  (2) Electronic copy of summary of changes (if any), including any 10 CFR 50.54p analysis to support those changes, made to the originally approved Cyber Security Plan.
    9 List CDA Wireless Industrial Networks                                              All
  (3) Electronic copy of a matrix that summarizes what controls are in place to satisfy the controls required by Policies and Procedures.
        NIDS Documentation for Critical Systems That Have CDAs Associated              11.a.1)
(4) Electronic copy of the Updated Final Safety Analysis Report and technical specifications.
  11
 
        with Them                                                                      11.a.2)
SALEM NUCLEAR GENERATING STATIONS, UNITS 1 AN
        SIEM Documentation for Critical systems That Have CDAs Associated              12.a.1)
D 2 CYBER-SECURITY INSPECTION DOCUMENT REQUEST
  12
  3 (5) Name(s) and phone numbers for the regulatory and technical contact
        with Them                                                                      12.a.2)
s. (6) Current management and engineering organizational chart
        List EP and Security Onsite and Offsite Digital Communication
s. Based on th is information
  14                                                                                    All
, the inspection team will identify and select specific systems and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and will submit a list of specific systems and equipment
        Systems
to your staff by April 9, 2018
        Cyber Security Assessment and Cyber Security Incident Response
, for the second RFI
  25                                                                                    All
(i.e., Table RFI #2).  II. Additional Information Requested to be Available Prior to Inspection.
        Teams
  As stated above, in Section I. of this enclosure , th e inspection team
In addition to the above information please provide the following:
will examin e the returned documentation requested from Table RFI #1 and will submit the list of specific systems and equipment
    (1) Electronic copy of your current Cyber Security Plan.
to your staff by April 9, 2018
    (2) Electronic copy of summary of changes (if any), including any 10 CFR 50.54p
, for the second RFI (i.e., RFI #2).  The second RFI will request additional information required to evaluate the CSs
        analysis to support those changes, made to the originally approved Cyber
/CDAs, defensive architecture, and the areas of your station's
        Security Plan.
CSP selected for the cyber
    (3) Electronic copy of a matrix that summarizes what controls are in place to satisfy
-security inspection.  The additional information requested for the specific systems and equipment is identified in Table
        the controls required by Policies and Procedures.
RFI #2.  All requested information shall follow the Table RFI #2 and the guidance document referenced above.
    (4) Electronic copy of the Updated Final Safety Analysis Report and technical
  The Table RFI #2 information shall be provided on CD to the lead inspector by
        specifications.
May 7, 2018.  Please provide four copies of each CD submitted (i.e., one for each inspector/contractor). The preferred file format for all lists is a searchable Excel spreadsheet file on a CD. These CDs should be indexed and hyper
                                          2
-linked to facilitate
 
ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.
              SALEM NUCLEAR GENERATING STATIONS, UNITS 1 AND 2
  Table RFI #2 Section 3, Paragraph Number/Title:
                CYBER-SECURITY INSPECTION DOCUMENT REQUEST
Items 5 Plant Computer System Block Diagram (If Plant Computer System Is Selected for Inspection)
        (5) Name(s) and phone numbers for the regulatory and technical contacts.
All 6 Plant Security System Block Diagram (If Security Computer System Is Selected for Inspection)
        (6) Current management and engineering organizational charts.
All 7 Systems That Are Distributed Block Diagrams (For Systems Selected For Inspection)
    Based on this information, the inspection team will identify and select specific systems
All 10 Host-Based Intrusion Detection System Documentation (For
    and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and
CDAs for Systems Selected for Inspection)
    will submit a list of specific systems and equipment to your staff by April 9, 2018, for the
10.a.1) 10.a.2) 13 List all Maintenance and Test Equipment Used On CDAs for Systems Selected for Inspection All 15 Configuration Management
    second RFI (i.e., Table RFI #2).
All 16 Supply Chain Management
II. Additional Information Requested to be Available Prior to Inspection.
16.a. 16.b.1) 16.b.5) 16.b.6) 17 Portable Media and Mobile Device Control
    As stated above, in Section I. of this enclosure, the inspection team will examine the
All 18 Software Management
    returned documentation requested from Table RFI #1 and will submit the list of specific
All 20 Vendor Access and Monitoring
    systems and equipment to your staff by April 9, 2018, for the second RFI (i.e., RFI #2).
All
    The second RFI will request additional information required to evaluate the CSs/CDAs,
SALEM NUCLEAR GENERATING STATIONS, UNITS 1 AN
    defensive architecture, and the areas of your stations CSP selected for the cyber-
D 2 CYBER-SECURITY INSPECTION DOCUMENT REQUEST
    security inspection. The additional information requested for the specific systems and
  4 Table RFI #2 Section 3, Paragraph Number/Title:
    equipment is identified in Table RFI #2. All requested information shall follow the Table
Items 21 Work Control
    RFI #2 and the guidance document referenced above.
All 22 Device Access and Key Control
    The Table RFI #2 information shall be provided on CD to the lead inspector by
All 23 Password/Authenticator Policy
    May 7, 2018. Please provide four copies of each CD submitted (i.e., one for each
All 24 User Account/Credential Policy
    inspector/contractor). The preferred file format for all lists is a searchable Excel
All 26 Corrective Actions Since Last NRC Inspection  
    spreadsheet file on a CD. These CDs should be indexed and hyper-linked to facilitate
All  In addition to the above information please provide the following:
    ease of use. If you have any questions regarding this information, please call the
  (1) The documented CSP assessment and analysis for each CDA in each of the selected system
    inspection team leader as soon as possible.
s. III. Information Requested to be Available on First Day of Inspection
                                            Table RFI #2
  For the specific systems and equipment identi fied in this enclosure's Section I I., provide the following RFI (i.e., Table 1 ST Week Onsite
    Section 3,
) on a CD by June 4, 2018 , the first day of the inspection
    Paragraph Number/Title:                                                              Items
. All request
            Plant Computer System Block Diagram (If Plant Computer System Is
ed information shall follow the Table 1 ST Week Onsite and the guidance document
        5                                                                                  All
referenced above.
            Selected for Inspection)
  Please provide four copies of each CD submitted (i.e., one for each inspector/contractor). The preferred file format for all lists is a searchable Excel spreadsheet file on a CD. The se CDs should be indexed and hyper
            Plant Security System Block Diagram (If Security Computer System Is
-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.
        6                                                                                  All
  Table 1 ST Week Onsite
            Selected for Inspection)
Section 3, Paragraph Number/Title:
            Systems That Are Distributed Block Diagrams (For Systems Selected
Items 10 Host-Based Intrusion Detection System Documentation
        7                                                                                   All
for CDAs for systems selected for inspection
            For Inspection)
10.a.3) thru 10.a.12) 11 NIDS Documentation
            Host-Based Intrusion Detection System Documentation (For CDAs for            10.a.1)
for Critical Systems That Have CDAs Associated with T
      10
hem 11.a.3) thru 11.a.15) 12 SIEM Documentation
            Systems Selected for Inspection)                                            10.a.2)
for Critical Systems That Have CDAs Associated with T
            List all Maintenance and Test Equipment Used On CDAs for Systems
hem 12.a.3) thru 12.a.14) 16 Supply Chain Management
      13                                                                                    All
16.b.2) 16.b.3) 16.b.4) 19 Cyber Security Event Notifications
            Selected for Inspection
All  In addition to the above information
      15 Configuration Management                                                          All
please provide the following:
                                                                                        16.a.
 
                                                                                        16.b.1)
SALEM NUCLEAR GENERATING STATIONS, UNITS 1 AN
      16 Supply Chain Management
D 2 CYBER-SECURITY INSPECTION DOCUMENT REQUEST
                                                                                        16.b.5)
  5 (1) Copies of the following documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access  
                                                                                        16.b.6)
to them: a. Original Final Safety Analysis Report Volumes;
      17 Portable Media and Mobile Device Control                                          All
  b. Original Safety Evaluation Report and Supplements;
      18 Software Management                                                                All
  c. Final Safety Analysis Report Question and Answers;
      20 Vendor Access and Monitoring                                                      All
  d. Quality Assurance (QA) Plan;
                                              3
  e. Latest Individual Plant Examination for External Events / Probabilistic Risk Assessment Report; and
 
  f. Vendor Manuals.
              SALEM NUCLEAR GENERATING STATIONS, UNITS 1 AND 2
  (2) Assessment
                  CYBER-SECURITY INSPECTION DOCUMENT REQUEST
and Corrective Actions:
                                            Table RFI #2
  a. The most recent Cyber Security QA audit and/or self
      Section 3,
-assessment; and
      Paragraph Number/Title:                                                              Items
  b. Corrective action documents (e.g., condition reports, including status of corrective actions) generate
      21 Work Control                                                                       All
d as a result of the most recent Cyber Security QA audit and/or self
      22 Device Access and Key Control                                                      All
-assessment.
      23 Password/Authenticator Policy                                                      All
  I V. Information Requested
      24 User Account/Credential Policy                                                    All
To Be Provided Throughout the Inspection
      26 Corrective Actions Since Last NRC Inspection                                      All
  (1) Copies of any corrective action documents generated as a result of the inspection team's questions or queries during th
    In addition to the above information please provide the following:
e inspection.
        (1) The documented CSP assessment and analysis for each CDA in each of the
  (2) Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provide
              selected systems.
d daily during the inspection to each inspection team member).
III. Information Requested to be Available on First Day of Inspection
  If you have any questions regarding the information requested, please contact the inspection team leader.
    For the specific systems and equipment identified in this enclosures Section II., provide
    the following RFI (i.e., Table 1ST Week Onsite) on a CD by June 4, 2018, the first day of
    the inspection. All requested information shall follow the Table 1ST Week Onsite and the
    guidance document referenced above.
    Please provide four copies of each CD submitted (i.e., one for each
    inspector/contractor). The preferred file format for all lists is a searchable Excel
    spreadsheet file on a CD. These CDs should be indexed and hyper-linked to facilitate
    ease of use. If you have any questions regarding this information, please call the
    inspection team leader as soon as possible.
                                        Table 1ST Week Onsite
      Section 3,
      Paragraph Number/Title:                                                           Items
                                                                                        10.a.3)
            Host-Based Intrusion Detection System Documentation for CDAs
      10                                                                                  thru
            for systems selected for inspection
                                                                                      10.a.12)
                                                                                        11.a.3)
            NIDS Documentation for Critical Systems That Have CDAs
      11                                                                                  thru
            Associated with Them
                                                                                      11.a.15)
                                                                                        12.a.3)
            SIEM Documentation for Critical Systems That Have CDAs
      12                                                                                  thru
            Associated with Them
                                                                                      12.a.14)
                                                                                        16.b.2)
      16 Supply Chain Management                                                      16.b.3)
                                                                                        16.b.4)
      19 Cyber Security Event Notifications                                               All
    In addition to the above information please provide the following:
                                              4
 
                SALEM NUCLEAR GENERATING STATIONS, UNITS 1 AND 2
                    CYBER-SECURITY INSPECTION DOCUMENT REQUEST
            (1) Copies of the following documents do not need to be solely available to the
                inspection team as long as the inspectors have easy and unrestrained access
                to them:
                a. Original Final Safety Analysis Report Volumes;
                b. Original Safety Evaluation Report and Supplements;
                c. Final Safety Analysis Report Question and Answers;
                d. Quality Assurance (QA) Plan;
                e. Latest Individual Plant Examination for External Events / Probabilistic Risk
                    Assessment Report; and
                f. Vendor Manuals.
            (2) Assessment and Corrective Actions:
                a. The most recent Cyber Security QA audit and/or self-assessment; and
                b. Corrective action documents (e.g., condition reports, including status of
                    corrective actions) generated as a result of the most recent Cyber Security
                    QA audit and/or self-assessment.
IV.     Information Requested To Be Provided Throughout the Inspection
            (1) Copies of any corrective action documents generated as a result of the
                inspection teams questions or queries during the inspection.
            (2) Copies of the list of questions submitted by the inspection team members and
                the status/resolution of the information requested (provided daily during the
                inspection to each inspection team member).
If you have any questions regarding the information requested, please contact the inspection
team leader.
                                                  5
}}
}}

Revision as of 04:44, 22 October 2019

Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000272/2018403 and 05000311/2018403
ML18016A433
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/16/2018
From: Glenn Dentel
Engineering Region 1 Branch 2
To: Sena P
Public Service Enterprise Group
References
IR 2018403
Preceding documents:
Download: ML18016A433 (8)


See also: IR 05000272/2018403

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

2100 RENAISSANCE BLVD., SUITE 100

KING OF PRUSSIA, PA 19406-2713

January 16, 2018

Mr. Peter P. Sena, III

President and Chief Nuclear Officer

PSEG Nuclear LLC - N09

P.O. Box 236

Hancocks Bridge, NJ 08038

SUBJECT: SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 -

INFORMATION REQUEST FOR THE CYBER-SECURITY INSPECTION,

NOTIFICATION TO PERFORM INSPECTION 05000272/2018403 AND

05000311/2018403

Dear Mr. Sena:

On June 4, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin a team inspection

in accordance with Inspection Procedure (IP) 71130.10P, Cyber-Security, issued May 15,

2017, at your Salem Nuclear Generating Stations, Units 1 and 2 (Salem). The inspection will be

performed to evaluate and verify your ability to meet full implementation requirements of the

NRCs Cyber-Security Rule, Title 10 of the Code of Federal Regulations (CFR), Part 73,

Section 54, Protection of Digital Computer and Communication Systems and Networks. The

onsite portion of the inspection will take place during the weeks of June 4-8, 2018, and

June 18-22, 2018. Experience has shown that team inspections are extremely resource

intensive, both for the NRC inspectors and the licensee staff. In order to minimize the

inspection impact on the site and to ensure a productive inspection for both parties, we have

enclosed a request for documents needed for the inspection. These documents have been

divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the

focus areas (i.e., sample set) to be inspected by the cyber security inspection procedure. This

information should be made available via compact disc and delivered to the regional office no

later than March 12, 2018. The inspection team will review this information and, by April 9,

2018, will request the specific items that should be provided for review.

The second group of additional requested documents will assist the inspection team in the

evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture,

and the areas of your plants Cyber Security Program selected for the cyber security inspection.

This information will be requested for review in the regional office prior to the inspection by

May 7, 2018.

The third group of requested documents consists of those items that the inspection team will

review, or need access to, during the inspection. Please have this information available by the

first day of the onsite inspection, June 4, 2018.

P. Sena 2

The fourth group of information is necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to the

lead inspector as the information is generated during the inspection. It is important that all of

these documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is Mr. David Werkheiser. We understand that our

regulatory contact for this inspection is Mr. Thomas Cachaza of your organization, at Salem. If

there are any questions about the inspection or the material requested, please contact the lead

inspector at 610-337-5316 or via e-mail at David.Werkheiser@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

This letter and its enclosure will be available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Glenn T. Dentel, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-272 and 50-311

License Nos. DPR-70 and DPR-75

Enclosure:

Salem Nuclear Generating Stations, Units 1 and 2 Cyber-Security

Inspection Document Request

cc w/encl: Distribution via ListServ

ML18016A433

Non-Sensitive Publicly Available

SUNSI Review

Sensitive Non-Publicly Available

OFFICE RI/DRS RI/DRS

NAME DWerkheiser GDentel

DATE 1/16/18 1/16/18

SALEM NUCLEAR GENERATING STATIONS, UNITS 1 AND 2

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Inspection Report: 05000272/2018403 and 05000311/2018403

Inspection Dates: June 4 - 8, 2018, and June 18 - 22, 2018

Inspection Procedure: IP 71130.10P, Cyber-Security, Issue Date May 15, 2017

Reference: Guidance Document for Development of the Request for

Information (RFI) and Notification Letter for Full-Implementation of

the Cyber Security Inspection, Issue Date May 25, 2017

NRC Inspectors: David Werkheiser, Lead Eugene DiPaolo

610-337-5316 610-337-6959

David.Werkheiser@nrc.gov Eugene.DiPaolo@nrc.gov

NRC Contractors: Fredrick Priester Cynthia DeBisschop

301-230-4590 301-287-3710

Fredrick.Priester@nrc.gov Cynthia.DeBisschop

@nrc.gov

NRC Observers: Michael Brown

301-287-3679

Michael.Brown@nrc.gov

I. Information Requested for In-Office Preparation

The initial request for information (i.e., first RFI) concentrates on providing the inspection

team with the general information necessary to select appropriate components and

Cyber Security Program (CSP) elements to develop a site-specific inspection plan.

The first RFI is used to identify the list of critical systems and critical digital assets

(CSs/CDAs) plus operational and management (O&M) security control portions of the

CSP to be chosen as the sample set required to be inspected by the cyber security IP.

The first RFIs requested information is specified below in Table RFI #1. The

Table RFI #1 information is requested to be provided to the regional office by March 12,

2018, or sooner, to facilitate the selection of the specific items that will be reviewed

during the onsite inspection weeks.

The inspection team will examine the returned documentation from the first RFI and

identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more

focused follow-up request to develop the second RFI. The inspection team will submit

the specific systems and equipment list to your staff by April 9, 2018, which will identify

the specific systems and equipment that will be utilized to evaluate the CSs/CDAs,

defensive architecture, and the areas of the licensees CSP selected for the cyber

security inspection. We request that the additional information provided from the second

RFI be made available to the regional office by May 7, 2018.

1 Enclosure

SALEM NUCLEAR GENERATING STATIONS, UNITS 1 AND 2

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

The information requested for the first RFI is identified in Table RFI #1. All requested

information shall follow the Table RFI #1 and the guidance document referenced above.

The required Table RFI #1 information shall be provided on compact disc (CD) to the

lead inspector by March 12, 2018. Please provide four copies of each CD submitted

(i.e., one for each inspector/contractor). The preferred file format for all lists is a

searchable Excel spreadsheet file on a CD. These CDs should be indexed and hyper-

linked to facilitate ease of use. If you have any questions regarding this information,

please call the inspection team leader as soon as possible.

Table RFI #1

Reference Section 3,

Paragraph Number/Title: Items

1 List All Identified Critical Systems and Critical Digital Assets All

List CDA Facility and Site Ethernet - Transmission Control

2 Protocol/Internet Protocol (TCP/IP) Based Local Area Networks All

(LANs) and Identify Those LANs That Have Non-CDAs On Them

List CDA Facility and Site Non-Ethernet TCP/IP Based LANs Including

3 Those Industrial Networks and Identify LANs That Have Non-CDAs On All

Them

Network Topology Diagrams (Be Sure To Include all Network Intrusion

Detection Systems (NIDS) and Security Information and Event

4 All

Management (SIEMs) for Emergency Preparedness (EP) networks

and Security Level 3 and 4 Networks)

List All Network Security Boundary Devices for EP Networks and All

8 All

Network Security Boundary Devices for Levels 3 and 4

9 List CDA Wireless Industrial Networks All

NIDS Documentation for Critical Systems That Have CDAs Associated 11.a.1)

11

with Them 11.a.2)

SIEM Documentation for Critical systems That Have CDAs Associated 12.a.1)

12

with Them 12.a.2)

List EP and Security Onsite and Offsite Digital Communication

14 All

Systems

Cyber Security Assessment and Cyber Security Incident Response

25 All

Teams

In addition to the above information please provide the following:

(1) Electronic copy of your current Cyber Security Plan.

(2) Electronic copy of summary of changes (if any), including any 10 CFR 50.54p

analysis to support those changes, made to the originally approved Cyber

Security Plan.

(3) Electronic copy of a matrix that summarizes what controls are in place to satisfy

the controls required by Policies and Procedures.

(4) Electronic copy of the Updated Final Safety Analysis Report and technical

specifications.

2

SALEM NUCLEAR GENERATING STATIONS, UNITS 1 AND 2

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

(5) Name(s) and phone numbers for the regulatory and technical contacts.

(6) Current management and engineering organizational charts.

Based on this information, the inspection team will identify and select specific systems

and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and

will submit a list of specific systems and equipment to your staff by April 9, 2018, for the

second RFI (i.e., Table RFI #2).

II. Additional Information Requested to be Available Prior to Inspection.

As stated above, in Section I. of this enclosure, the inspection team will examine the

returned documentation requested from Table RFI #1 and will submit the list of specific

systems and equipment to your staff by April 9, 2018, for the second RFI (i.e., RFI #2).

The second RFI will request additional information required to evaluate the CSs/CDAs,

defensive architecture, and the areas of your stations CSP selected for the cyber-

security inspection. The additional information requested for the specific systems and

equipment is identified in Table RFI #2. All requested information shall follow the Table

RFI #2 and the guidance document referenced above.

The Table RFI #2 information shall be provided on CD to the lead inspector by

May 7, 2018. Please provide four copies of each CD submitted (i.e., one for each

inspector/contractor). The preferred file format for all lists is a searchable Excel

spreadsheet file on a CD. These CDs should be indexed and hyper-linked to facilitate

ease of use. If you have any questions regarding this information, please call the

inspection team leader as soon as possible.

Table RFI #2

Section 3,

Paragraph Number/Title: Items

Plant Computer System Block Diagram (If Plant Computer System Is

5 All

Selected for Inspection)

Plant Security System Block Diagram (If Security Computer System Is

6 All

Selected for Inspection)

Systems That Are Distributed Block Diagrams (For Systems Selected

7 All

For Inspection)

Host-Based Intrusion Detection System Documentation (For CDAs for 10.a.1)

10

Systems Selected for Inspection) 10.a.2)

List all Maintenance and Test Equipment Used On CDAs for Systems

13 All

Selected for Inspection

15 Configuration Management All

16.a.

16.b.1)

16 Supply Chain Management

16.b.5)

16.b.6)

17 Portable Media and Mobile Device Control All

18 Software Management All

20 Vendor Access and Monitoring All

3

SALEM NUCLEAR GENERATING STATIONS, UNITS 1 AND 2

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Table RFI #2

Section 3,

Paragraph Number/Title: Items

21 Work Control All

22 Device Access and Key Control All

23 Password/Authenticator Policy All

24 User Account/Credential Policy All

26 Corrective Actions Since Last NRC Inspection All

In addition to the above information please provide the following:

(1) The documented CSP assessment and analysis for each CDA in each of the

selected systems.

III. Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in this enclosuresSection II., provide

the following RFI (i.e., Table 1ST Week Onsite) on a CD by June 4, 2018, the first day of

the inspection. All requested information shall follow the Table 1ST Week Onsite and the

guidance document referenced above.

Please provide four copies of each CD submitted (i.e., one for each

inspector/contractor). The preferred file format for all lists is a searchable Excel

spreadsheet file on a CD. These CDs should be indexed and hyper-linked to facilitate

ease of use. If you have any questions regarding this information, please call the

inspection team leader as soon as possible.

Table 1ST Week Onsite

Section 3,

Paragraph Number/Title: Items

10.a.3)

Host-Based Intrusion Detection System Documentation for CDAs

10 thru

for systems selected for inspection

10.a.12)

11.a.3)

NIDS Documentation for Critical Systems That Have CDAs

11 thru

Associated with Them

11.a.15)

12.a.3)

SIEM Documentation for Critical Systems That Have CDAs

12 thru

Associated with Them

12.a.14)

16.b.2)

16 Supply Chain Management 16.b.3)

16.b.4)

19 Cyber Security Event Notifications All

In addition to the above information please provide the following:

4

SALEM NUCLEAR GENERATING STATIONS, UNITS 1 AND 2

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

(1) Copies of the following documents do not need to be solely available to the

inspection team as long as the inspectors have easy and unrestrained access

to them:

a. Original Final Safety Analysis Report Volumes;

b. Original Safety Evaluation Report and Supplements;

c. Final Safety Analysis Report Question and Answers;

d. Quality Assurance (QA) Plan;

e. Latest Individual Plant Examination for External Events / Probabilistic Risk

Assessment Report; and

f. Vendor Manuals.

(2) Assessment and Corrective Actions:

a. The most recent Cyber Security QA audit and/or self-assessment; and

b. Corrective action documents (e.g., condition reports, including status of

corrective actions) generated as a result of the most recent Cyber Security

QA audit and/or self-assessment.

IV. Information Requested To Be Provided Throughout the Inspection

(1) Copies of any corrective action documents generated as a result of the

inspection teams questions or queries during the inspection.

(2) Copies of the list of questions submitted by the inspection team members and

the status/resolution of the information requested (provided daily during the

inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the inspection

team leader.

5