{{#Wiki_filter:ACCESSION NHR FAC IL: 50-259'0-260 50-296 AUTH.NAME GRIDLEY>R.RECIP.NAME REGULATORY IFORMATION DISTRIBUTION SY M<BIDS)8709210423 DOC.DATE: 87/09/14 NOTARIZED:
{{#Wiki_filter:REGULATORY       IFORMATION DISTRIBUTION SY                         M <BIDS)
NO DOCKET 0 Hrowns Ferry Nuclear Power Stations Unit ii Tennessee 05000259 Drowns Ferry Nuclear Power Stationi Unit 2i Tennessee 05000260 Browns Ferry Nuclear Power Stations Unit Si Tennessee 05000296 AUTHOR AFFILIATION Tennessee Valley Authority RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)1 Sr 05000259 NOTES: Zwolinski 3 cg.1 cg ea to:*xelradi Ebneteri S.Richardsoni Liawi G.Zechi Oli OIA.Zwolinski 3 cg.icy ea to: Axelradi Ebneteri S.Richardson'iaw>
ACCESSION NHR 8709210423                 DOC. DATE: 87/09/14       NOTARIZED: NO                         DOCKET 0 FAC IL: 50-259'0-260 Hrowns Ferry     Nuclear     Power Stations   Unit ii Tennessee                 05000259 Drowns Ferry Nuclear Power Stationi Unit 2i Tennessee                             05000260 50-296 Browns Ferry Nuclear Power Stations Unit Si Tennessee                                     05000296 AUTH. NAME                  AUTHOR AFFILIATION GRIDLEY> R.                Tennessee   Valley Authority RECIP. NAME                  RECIPIENT AFFILIATION Document Control Branch         (Document                 Control Desk) 1
G.Zechi Oli OIA.Zwolinski 3 cg.icy ea to: Axelradi Ebneter.S.Richardson'iawi G.Zechi Oli OIA.05000260 05000296


==SUBJECT:==
==SUBJECT:==
Forwards status of*pp R exemption showing withdTawal of Exemptions G 5 J per 861121 request.Util will undertake necessary mod or technical evaluations to eliminate need for exemptions.
Forwards status of *pp R exemption showing withdTawal of Exemptions G 5 J per 861121 request. Util will undertake necessary mod or technical evaluations to eliminate need for exemptions.
DISTRIBUTION CODE: A006D COPIES RECEIVED: LTR ENCL SIZE: TITLE: OR/Licensing Submittal:
Sr DISTRIBUTION CODE: A006D               COPIES RECEIVED: LTR         ENCL                     SIZE:
Fire Protection REC IP IENT ID CODE/NAME JAMERSON C GEARS'INTERNAL: ACRS NRR WERMEIL~J PSB REG FILE 01 EXTERNAL: LPDR NSIC NOTES: COPIES LTTR ENCL 1 0 1 1 3 3 1 0 1 1 1 1 1 1 1 1 12 12 RECIPIENT ID CODE/NAME PD STANGs J ARM/DAF/LFMH NRR/DEST/ADS OGC/HDS2 NRC PDR COPIES LTTR ENCL 5 5 1 1 0 1 1 0 TOTAL NUMBER OF COPIES REQUIRED: LTTR 32 ENCL 28 h I h 1 i'C II 1~i A II I'I t,:1 l~, 1 e II Kl l'~~(l r  
TITLE: OR/Licensing Submittal:                 Fire Protection NOTES:  Zwolinski          3 cg. 1  cg ea    to: *xelradi Ebneteri  S.                Richardsoni      05000259 Liawi G. Zechi Oli OIA.
~'ENNESSEE VALLEY AUTHORITY CHATTANOOGA.
Zwolinski 3 cg. icy ea to: Axelradi Ebneteri                S.                                  05000260 G. Zechi Oli OIA.
TENNESSEE 3I401 5N 157B Lookout Place U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
Richardson'iaw>
In the Matter of Tennessee Valley Authority Docket Nos.50-259 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN)-APPENDIX R EXEMPTIONS (TAC NOS.61124, 61125, AND 61126)In letters to NRC dated January 31, 1986, November 21, 1986, and May 26, 1987, TVA provided or amended exemption requests that are part of the 10 CFR-50 Appendix R compliance program.The requested exemptions have been designated (a)through (1)in the above correspondence.
Zwolinski 3 cg. icy ea to: Axelradi Ebneter.                S.                                  05000296 Zechi Oli OIA.
Additionally, an exemption dealing with the fire barriers in and around the Reactor Mater Cleanup rooms has been discussed in detail with the staff.After further consideration, TVA has chosen to withdraw the following exemptions:
Richardson'iawi G.
'(g)Exemption for Intake Pumping Station and (j)Exemption for Cable Tunnel.Also, we have decided not to pursue the Reactor Water Cleanup room exemption discussed above.TVA will undertake the necessary modifications or technical evaluations to eliminate the need for these exemptions.
REC IP IENT         COPIES              RECIPIENT                          COPIES ID CODE/NAME          LTTR ENCL          ID CODE/NAME                       LTTR ENCL JAMERSON       C             1    0      PD                                    5    5 GEARS'                         1    1      STANGs  J                              1 INTERNAL: ACRS                             3     3       ARM/DAF/LFMH                           1    0 NRR WERMEIL~ J                1    0      NRR/DEST/ADS                           1 PSB            1    1      OGC/HDS2                               1    0 REG    FILE        01        1    1 EXTERNAL: LPDR                              1    1      NRC PDR NSIC                          1     1 NOTES:                                      12    12 I
Therefore, TVA hereby withdraws exemptions (g)and (j)that were requested in our letter of November 21, 1986.Enclosure 1 is a status list of the exemptions that have been discussed.
h 1
In meetings with the staff on Appendix R, we have discussed the issue of NFPA Code compliance for fire protection features used to protect Appendix R safe shutdown equipment.
i'C II 1
Browns Ferry has some fire protection features which were previously approved by NRC as part of the Browns Ferry Fire Recovery Plan which do not meet NFPA Code.TVA recognizes the need to enhance these systems and is developing a plan for achieving overall Code compliance.
TOTAL NUMBER OF COPIES REQUIRED: LTTR                     32   ENCL                   28                           ~ i h
As stated in the BFN Nuclear Performance Plan (NPP)Volume 3, Revision 1, this plan will be completed before the restart of unit 2 from the present.refueling outage (cycle 5).Specifically, however, the automatic sprinkler systems in the unit 2 reactor building will be upgraded before the end of the next unit 2 refueling outage (cycle 6).The sprinkler systems in units 1 and 3 reactor buildings will be upgraded before the end of their current outages.8709210423 870901+259 pDR ADQCK 05000 R F An Equal Opportunity Employer 4.I U.S.Nuclear Regulatory Commission  lists the commitments made in this letter.Please refer any questions regarding this matter to J.D.Wolcott at (205)729-2689.Very truly yours, TENNESSEE VALLEY AUTHORITY R.Gridley, irector Nuclear Safety and Licensing Enclosures cc (Enclosures):
 
Mr.G.G.Zech, Assistant Director Regional Inspections Division of TVA Projects Office of Special Projects U.S.Nuclear Regulatory Commission Region II 101 Marietta St., NW, Suite 2900 Atlanta, Georgia 30323 Mr.J.A.Zwolinski, Assistant Director for Projects Division of TVA Projects Office of Special Projects U.S.Nuclear Regulatory Commission 4350 East-West Highway EWW 322 Bethesda, Maryland 20814 Browns Ferry Resident Inspector Browns Ferry Nuclear Plant Route 2, P.O.Box 311 Athens, Alabama 35611 II (lf<~ll il, ENCLOSURE 1 Status of A endix R Exem tions a.Schedule Exem tion b.Exem tion from No Core Uncover-Withdrawn June 26, 1986-As requested November 21, 1986 c.Exem tion from Fixed Su ression in the Main Control Rooms d.Exem tion for RHR Pum Rooms e.Exem tion for Fire Doors-As requested November 21, 1986-As requested November 21, 1986-As requested November 21, 1986 f.Exem tion for Intervenin Combustibles
A I'I II t,
-As requested November 21, 1986 Exe tion for Intake Pu in Station h.Exem tion for Reactor Buildin s and Refuel Floor-Withdrawn herein-As requested November 21, 1986 i.Exem tion for Fixed Su ression and Detection of III.G.3 j.Exem tion for Cable Tunnel k.Exem tion for Lack of Fire Dam ers in HVAC Ducts in 3-Hour Fire Barriers-As requested November 21, 1986-Withdrawn herein-As requested November 21, 1986 l.Exem tion for Use of Water Curtains in Reactor Buildin s-As requested November 21, 1986 m.Planned Exem tion for Reactor Water Cleanu Rooms-No longer being pursued  
:1 l~,
~'EM%e ENCLOSURE 2 Summar of Commitments 1.perform necessary modifications or evaluations to eliminate the need for exemptions (g)and (j)that were requested on November 21, 1986.2.Upgrade automatic sprinkler systems in,the unit 2 reactor building prior to the end of the next refueling outage (cycle 6)and in the units 1 and 3 reactor buildings prior to the end of their current outages.
1 e
0 l I}}
II Kl l'~
~(
l r
 
                                                                              ~
VALLEY AUTHORITY                    'ENNESSEE CHATTANOOGA. TENNESSEE 3I401 5N 157B   Lookout Place U.S. Nuclear Regulatory Commission Attn:   Document   Control Desk Washington, D.C.       20555 Gentlemen:
In the Matter of                                                       Docket Nos. 50-259 Tennessee    Valley Authority                                                                50-260 50-296 BROWNS FERRY NUCLEAR PLANT         (BFN) APPENDIX R EXEMPTIONS (TAC NOS. 61124, 61125,   AND 61126)
In letters to     NRC   dated January 31, 1986, November 21, 1986, and May 26, 1987, TVA provided or amended exemption requests that are part of the 10 CFR-50 Appendix R compliance program. The requested exemptions have been designated (a) through (1) in the above correspondence.               Additionally, an exemption dealing with the fire barriers in and             around   the Reactor Mater Cleanup rooms has been discussed in detail with the             staff.
After further consideration,         TVA has chosen to withdraw the following exemptions:     '(g) Exemption for Intake Pumping Station and (j) Exemption for Cable   Tunnel. Also,   we have decided not to pursue the Reactor Water Cleanup room exemption discussed       above. TVA   will undertake     the necessary modifications or technical evaluations to eliminate the need for these exemptions. Therefore, TVA hereby withdraws exemptions (g) and (j) that were requested in our letter of November 21, 1986. Enclosure 1 is a status list of the exemptions that have been discussed.
In meetings with the staff on Appendix R, we               have discussed the issue of NFPA Code compliance for fire protection features               used to protect Appendix R safe shutdown equipment.       Browns Ferry   has   some fire   protection features which were previously approved by       NRC as   part of   the Browns   Ferry Fire Recovery Plan which   do not meet   NFPA Code. TVA recognizes     the need   to enhance these systems and is developing     a plan for achieving overall Code compliance.                         As stated in the BFN   Nuclear   Performance   Plan   (NPP)   Volume   3, Revision   1, this           plan will be completed   before   the restart   of unit   2 from the   present. refueling             outage (cycle 5). Specifically,         however,   the   automatic   sprinkler   systems           in the unit 2   reactor   building   will   be upgraded     before   the   end of the           next unit 2 refueling outage (cycle       6). The   sprinkler     systems   in units 1 and           3 reactor buildings will be upgraded before the end of their current outages.
8709210423 870901+259 pDR ADQCK 05000         R F
An Equal Opportunity Employer
 
4
.I
 
U.S. Nuclear Regulatory Commission Enclosure  2 lists the commitments made in this   letter.
Please refer any questions regarding     this matter to J. D. Wolcott at (205) 729-2689.
Very truly yours, TENNESSEE VALLEY AUTHORITY R. Gridley,   irector Nuclear Safety and Licensing Enclosures cc (Enclosures):
Mr. G. G. Zech, Assistant   Director Regional Inspections Division of TVA Projects Office of Special Projects U.S. Nuclear Regulatory Commission Region   II 101 Marietta St.,   NW, Suite 2900 Atlanta, Georgia     30323 Mr. J. A. Zwolinski, Assistant   Director for Projects Division of TVA Projects Office of Special Projects U.S. Nuclear Regulatory Commission 4350 East-West Highway EWW 322 Bethesda,   Maryland   20814 Browns   Ferry Resident Inspector Browns   Ferry Nuclear Plant Route 2, P.O. Box 311 Athens, Alabama 35611
 
II (lf <
      ~
ll il,
 
ENCLOSURE 1 Status of   A endix R Exem tions
: a. Schedule Exem   tion                           Withdrawn June 26, 1986
: b. Exem tion from No Core Uncover             As requested   November 21, 1986
: c. Exem tion from Fixed   Su   ression in the Main Control   Rooms                   As requested  November 21, 1986
: d. Exem tion for RHR Pum   Rooms               As requested  November 21, 1986
: e. Exem tion for Fire   Doors                   As requested November 21, 1986
: f. Exem tion for Intervenin Combustibles         As requested November 21, 1986 Exe   tion for Intake   Pu   in Station       Withdrawn  herein
: h. Exem tion for Reactor Buildin     s and Refuel   Floor                             As requested November 21, 1986
: i. Exem tion for Fixed Su ression and Detection of III.G.3                     As  requested November 21, 1986 j . Exem tion for Cable Tunnel                   Withdrawn  herein
: k. Exem tion for Lack of Fire Dam ers in HVAC Ducts in 3-Hour Fire Barriers         As requested November 21, 1986
: l. Exem tion for Use of   Water Curtains in Reactor Buildin s                           As requested November 21, 1986
: m. Planned Exem   tion for Reactor Water Cleanu   Rooms                           No longer being pursued
 
~'EM% e ENCLOSURE 2 Summar   of Commitments
: 1. perform necessary modifications or evaluations to eliminate the need for exemptions (g) and (j) that were requested on November 21, 1986.
: 2. Upgrade automatic sprinkler systems in,the unit 2 reactor building prior to the end of the next refueling outage (cycle 6) and in the units 1 and 3 reactor buildings prior to the end of their current outages.
 
0 l
I}}

Revision as of 00:01, 22 October 2019

Forwards Status of App R Exemption Showing Withdrawal of Exemptions G & J.Necessary Mods or Technical Evaluations to Eliminate Need for Withdrawn Exemptions Will Be Undertaken
ML18032A557
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 09/14/1987
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
TAC-61124, TAC-61125, TAC-61126, NUDOCS 8709210423
Download: ML18032A557 (10)


Text

REGULATORY IFORMATION DISTRIBUTION SY M <BIDS)

ACCESSION NHR 8709210423 DOC. DATE: 87/09/14 NOTARIZED: NO DOCKET 0 FAC IL: 50-259'0-260 Hrowns Ferry Nuclear Power Stations Unit ii Tennessee 05000259 Drowns Ferry Nuclear Power Stationi Unit 2i Tennessee 05000260 50-296 Browns Ferry Nuclear Power Stations Unit Si Tennessee 05000296 AUTH. NAME AUTHOR AFFILIATION GRIDLEY> R. Tennessee Valley Authority RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) 1

SUBJECT:

Forwards status of *pp R exemption showing withdTawal of Exemptions G 5 J per 861121 request. Util will undertake necessary mod or technical evaluations to eliminate need for exemptions.

Sr DISTRIBUTION CODE: A006D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: OR/Licensing Submittal: Fire Protection NOTES: Zwolinski 3 cg. 1 cg ea to: *xelradi Ebneteri S. Richardsoni 05000259 Liawi G. Zechi Oli OIA.

Zwolinski 3 cg. icy ea to: Axelradi Ebneteri S. 05000260 G. Zechi Oli OIA.

Richardson'iaw>

Zwolinski 3 cg. icy ea to: Axelradi Ebneter. S. 05000296 Zechi Oli OIA.

Richardson'iawi G.

REC IP IENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL JAMERSON C 1 0 PD 5 5 GEARS' 1 1 STANGs J 1 INTERNAL: ACRS 3 3 ARM/DAF/LFMH 1 0 NRR WERMEIL~ J 1 0 NRR/DEST/ADS 1 PSB 1 1 OGC/HDS2 1 0 REG FILE 01 1 1 EXTERNAL: LPDR 1 1 NRC PDR NSIC 1 1 NOTES: 12 12 I

h 1

i'C II 1

TOTAL NUMBER OF COPIES REQUIRED: LTTR 32 ENCL 28 ~ i h

A I'I II t,

1 l~,

1 e

II Kl l'~

~(

l r

~

VALLEY AUTHORITY 'ENNESSEE CHATTANOOGA. TENNESSEE 3I401 5N 157B Lookout Place U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of Docket Nos. 50-259 Tennessee Valley Authority 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) APPENDIX R EXEMPTIONS (TAC NOS. 61124, 61125, AND 61126)

In letters to NRC dated January 31, 1986, November 21, 1986, and May 26, 1987, TVA provided or amended exemption requests that are part of the 10 CFR-50 Appendix R compliance program. The requested exemptions have been designated (a) through (1) in the above correspondence. Additionally, an exemption dealing with the fire barriers in and around the Reactor Mater Cleanup rooms has been discussed in detail with the staff.

After further consideration, TVA has chosen to withdraw the following exemptions: '(g) Exemption for Intake Pumping Station and (j) Exemption for Cable Tunnel. Also, we have decided not to pursue the Reactor Water Cleanup room exemption discussed above. TVA will undertake the necessary modifications or technical evaluations to eliminate the need for these exemptions. Therefore, TVA hereby withdraws exemptions (g) and (j) that were requested in our letter of November 21, 1986. Enclosure 1 is a status list of the exemptions that have been discussed.

In meetings with the staff on Appendix R, we have discussed the issue of NFPA Code compliance for fire protection features used to protect Appendix R safe shutdown equipment. Browns Ferry has some fire protection features which were previously approved by NRC as part of the Browns Ferry Fire Recovery Plan which do not meet NFPA Code. TVA recognizes the need to enhance these systems and is developing a plan for achieving overall Code compliance. As stated in the BFN Nuclear Performance Plan (NPP) Volume 3, Revision 1, this plan will be completed before the restart of unit 2 from the present. refueling outage (cycle 5). Specifically, however, the automatic sprinkler systems in the unit 2 reactor building will be upgraded before the end of the next unit 2 refueling outage (cycle 6). The sprinkler systems in units 1 and 3 reactor buildings will be upgraded before the end of their current outages.

8709210423 870901+259 pDR ADQCK 05000 R F

An Equal Opportunity Employer

4

.I

U.S. Nuclear Regulatory Commission Enclosure 2 lists the commitments made in this letter.

Please refer any questions regarding this matter to J. D. Wolcott at (205) 729-2689.

Very truly yours, TENNESSEE VALLEY AUTHORITY R. Gridley, irector Nuclear Safety and Licensing Enclosures cc (Enclosures):

Mr. G. G. Zech, Assistant Director Regional Inspections Division of TVA Projects Office of Special Projects U.S. Nuclear Regulatory Commission Region II 101 Marietta St., NW, Suite 2900 Atlanta, Georgia 30323 Mr. J. A. Zwolinski, Assistant Director for Projects Division of TVA Projects Office of Special Projects U.S. Nuclear Regulatory Commission 4350 East-West Highway EWW 322 Bethesda, Maryland 20814 Browns Ferry Resident Inspector Browns Ferry Nuclear Plant Route 2, P.O. Box 311 Athens, Alabama 35611

II (lf <

~

ll il,

ENCLOSURE 1 Status of A endix R Exem tions

a. Schedule Exem tion Withdrawn June 26, 1986
b. Exem tion from No Core Uncover As requested November 21, 1986
c. Exem tion from Fixed Su ression in the Main Control Rooms As requested November 21, 1986
d. Exem tion for RHR Pum Rooms As requested November 21, 1986
e. Exem tion for Fire Doors As requested November 21, 1986
f. Exem tion for Intervenin Combustibles As requested November 21, 1986 Exe tion for Intake Pu in Station Withdrawn herein
h. Exem tion for Reactor Buildin s and Refuel Floor As requested November 21, 1986
i. Exem tion for Fixed Su ression and Detection of III.G.3 As requested November 21, 1986 j . Exem tion for Cable Tunnel Withdrawn herein
k. Exem tion for Lack of Fire Dam ers in HVAC Ducts in 3-Hour Fire Barriers As requested November 21, 1986
l. Exem tion for Use of Water Curtains in Reactor Buildin s As requested November 21, 1986
m. Planned Exem tion for Reactor Water Cleanu Rooms No longer being pursued

~'EM% e ENCLOSURE 2 Summar of Commitments

1. perform necessary modifications or evaluations to eliminate the need for exemptions (g) and (j) that were requested on November 21, 1986.
2. Upgrade automatic sprinkler systems in,the unit 2 reactor building prior to the end of the next refueling outage (cycle 6) and in the units 1 and 3 reactor buildings prior to the end of their current outages.