{{#Wiki_filter:* NRC FORM 591M PART 1 U.S. NUCLEAR REGULATORY COMMISSION (07-2012)'
{{#Wiki_filter:*
10 CFR 2.201 SAFETY INSPECTION REPORT AND COMPLIANCE INSPECTION 1. LICENSEE/LOCATION INSPECTED:
NRC FORM 591M PART 1     U.S. NUCLEAR REGULATORY COMMISSION (07-2012)'
JPC Nuclear Technologies, LLC 120 Speer Road, Suite 2 Chestertown, MD 21620 2. NRG/REGIONAL OFFICE REPORT NUMBER(S)
10 CFR 2.201 SAFETY INSPECTION REPORT AND COMPLIANCE INSPECTION 1. LICENSEE/LOCATION INSPECTED:   2. NRG/REGIONAL OFFICE JPC Nuclear Technologies, LLC 120 Speer Road, Suite 2   U.S. Nuclear Regulatory Commission Chestertown, MD 21620    Region I, 2100 Renaissance Blvd, Suite 100 King of Prussia, Pennsylvania 19406-2713 REPORT NUMBER(S)  2018001 3. DOCKET NUMBER(S)   4. LICENSE NUMBER(S)   5. DATE(S) OF INSPECTION 15000019  1 MD-29-005-01  1June 12, 2018 LICENSEE:
2018001 U.S. Nuclear Regulatory Commission Region I, 2100 Renaissance Blvd, Suite 100 King of Prussia, Pennsylvania 19406-2713 3. DOCKET NUMBER(S)
The inspection was an examination of the activities conducted under your license as they relate to radiation safety and to compliance with the Nuclear Regulatory Commission (NRC) rules and regulations and the conditions of your license. The inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector. The inspection findings are as follows:
15000019 LICENSEE:
iX i 1. Based on the inspection findings, no violations were identifie I 2. Previous violation(s) close . The violation(s), specifically described to you by the inspector as non-cited violations, are not being cited because they were self-identified, non-repetitive, and corrective action was or is being taken, and the remaining criteria in the NRC Enforcement Policy, to exercise discretion, were satisfie Non-cited violation(s) were discussed involving the following requirement(s) and corrective action(s):
1 4. LICENSE NUMBER(S)
4. During this inspection, certain of your activities, as described below and/or attached, were in violation of NRC requirements and are being cited in accordance with the NRC Enforcement Policy. This form is a NOTICE OF VIOLATION, which may be subject to posting in accordance with 10 CFR 19.11. (Violations and Corrective Actions)
MD-29-005-01 1 5. DATE(S) OF INSPECTION June 12, 2018 The inspection was an examination of the activities conducted under your license as they relate to radiation safety and to compliance with the Nuclear Regulatory Commission (NRC) rules and regulations and the conditions of your license. The inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspecto The inspection findings are as follows: i X i 1. Based on the inspection findings, no violations were identifie I 2. Previous violation(s)
Statement of Corrective Actions I hereby state that, within 30 days, the actions described by me to the Inspector will be taken to correct the violations identified. This statement of corrective actions is made in accordance with the requirements of 10 CFR 2.201 (corrective steps already taken, corrective steps which will be taken, date when full compliance will be achieved). I understand that no further written response to NRC will be required, unless specifically requeste Title   Printed Name   Signature Date LICENSEE'S REPRESENTATIVE NRCINSPECTOR 6/12/18 Robin Elliott BRANCH CHIEF
closed. 3. The violation(s), specifically described to you by the inspector as non-cited violations, are not being cited because they were identified, non-repetitive, and corrective action was or is being taken, and the remaining criteria in the NRC Enforcement Policy, to exercise discretion, were satisfie Non-cited violation(s)
*NRC FORM 591M PART 1 07-2012) (RI Rev. 09/12/2013 G:\WordDocs\Current\lnsp Record\RMD-~005-01.2018001.591 M-Part1 .doc SUNSI Review Completed By: IRA/ RElliott   Q Public Q Non-Sensitive This document becomes an NRC Official Agency Record once it is signed by the Branch Chief
were discussed involving the following requirement(s)
and corrective action(s):
4. During this inspection, certain of your activities, as described below and/or attached, were in violation of NRC requirements and are being cited in accordance with the NRC Enforcement Policy. This form is a NOTICE OF VIOLATION, which may be subject to posting in accordance with 10 CFR 19.11. (Violations and Corrective Actions) Statement of Corrective Actions I hereby state that, within 30 days, the actions described by me to the Inspector will be taken to correct the violations identifie This statement of corrective actions is made in accordance with the requirements of 10 CFR 2.201 (corrective steps already taken, corrective steps which will be taken, date when full compliance will be achieved).
 
I understand that no further written response to NRC will be required, unless specifically requeste Title Printed Name Signature Date LICENSEE'S REPRESENTATIVE Robin Elliott 6/12/18 NRCINSPECTOR BRANCH CHIEF *NRC FORM 591M PART 1 07-2012) (RI Rev. 09/12/2013 G:\WordDocs\Current\lnsp Record\RMD-~005-01.2018001.591 M-Part1 .doc SUNSI Review Completed By: IRA/ RElliott Q Public Q Non-Sensitive This document becomes an NRC Official Agency Record once it is signed by the Branch Chief
}}
}}

Revision as of 20:09, 20 October 2019

Jpc Nuclear Technologies, LLC, NRC Form 591M Part 1, Inspection Report 15000019/2018001
ML18197A386
Person / Time
Site: 15000019, 015000019
Issue date: 06/12/2018
From: Robert Elliott
NRC Region 1
To:
JPC Nuclear Technologies LLC
References
IR 2018001
Download: ML18197A386 (1)


Text

NRC FORM 591M PART 1 U.S. NUCLEAR REGULATORY COMMISSION (07-2012)'

10 CFR 2.201 SAFETY INSPECTION REPORT AND COMPLIANCE INSPECTION 1. LICENSEE/LOCATION INSPECTED: 2. NRG/REGIONAL OFFICE JPC Nuclear Technologies, LLC 120 Speer Road, Suite 2 U.S. Nuclear Regulatory Commission Chestertown, MD 21620 Region I, 2100 Renaissance Blvd, Suite 100 King of Prussia, Pennsylvania 19406-2713 REPORT NUMBER(S) 2018001 3. DOCKET NUMBER(S) 4. LICENSE NUMBER(S) 5. DATE(S) OF INSPECTION 15000019 1 MD-29-005-01 1June 12, 2018 LICENSEE:

The inspection was an examination of the activities conducted under your license as they relate to radiation safety and to compliance with the Nuclear Regulatory Commission (NRC) rules and regulations and the conditions of your license. The inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector. The inspection findings are as follows:

iX i 1. Based on the inspection findings, no violations were identifie I 2. Previous violation(s) close . The violation(s), specifically described to you by the inspector as non-cited violations, are not being cited because they were self-identified, non-repetitive, and corrective action was or is being taken, and the remaining criteria in the NRC Enforcement Policy, to exercise discretion, were satisfie Non-cited violation(s) were discussed involving the following requirement(s) and corrective action(s):

4. During this inspection, certain of your activities, as described below and/or attached, were in violation of NRC requirements and are being cited in accordance with the NRC Enforcement Policy. This form is a NOTICE OF VIOLATION, which may be subject to posting in accordance with 10 CFR 19.11. (Violations and Corrective Actions)

Statement of Corrective Actions I hereby state that, within 30 days, the actions described by me to the Inspector will be taken to correct the violations identified. This statement of corrective actions is made in accordance with the requirements of 10 CFR 2.201 (corrective steps already taken, corrective steps which will be taken, date when full compliance will be achieved). I understand that no further written response to NRC will be required, unless specifically requeste Title Printed Name Signature Date LICENSEE'S REPRESENTATIVE NRCINSPECTOR 6/12/18 Robin Elliott BRANCH CHIEF

  • NRC FORM 591M PART 1 07-2012) (RI Rev. 09/12/2013 G:\WordDocs\Current\lnsp Record\RMD-~005-01.2018001.591 M-Part1 .doc SUNSI Review Completed By: IRA/ RElliott Q Public Q Non-Sensitive This document becomes an NRC Official Agency Record once it is signed by the Branch Chief