RA-12-035, Transmittal of Fleet Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 5: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 1: | Line 1: | ||
# | {{Adams | ||
| number = ML12216A319 | |||
| issue date = 08/02/2012 | |||
| title = Transmittal of Fleet Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 5 | |||
| author name = Alexander D | |||
| author affiliation = Carolina Power & Light Co, Florida Power Corp, Progress Energy, Inc | |||
| addressee name = | |||
| addressee affiliation = NRC/Document Control Desk, NRC/NRR, NRC/NMSS | |||
| docket = 05000261, 05000302, 05000324, 05000325, 05000400, 07200003, 07200006, 07200060 | |||
| license number = DPR-023, DPR-062, DPR-071, NPF-063, SNM-2502, DPR-072 | |||
| contact person = | |||
| case reference number = RA-12-035 | |||
| document type = Letter type:RA | |||
| page count = 3 | |||
}} | |||
=Text= | |||
{{#Wiki_filter:SAFEGUARDS INFORMATION When separated, this page is decontrolled. | |||
..Progress Energy 10 CFR 50.54(p)10 CFR 72.44(e)PO Box 1551 10 CFR 72.186(b)411 Fayetteville Street Mall Raleigh NC 27602 Serial: RA-12-035 August 2, 2012 United States Nuclear Regulatory Commission ATTENTION: | |||
Document Control Desk Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. I AND 2 DOCKET NOS. 50-325 AND 50-324 / RENEWED LICENSE NOS. DPR-71 AND DPR-62 BRUNSWICK STEAM ELECTRIC PLANT INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-6 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT DOCKET NO. 50-302 / LICENSE NO. DPR-72 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400 / RENEWED LICENSE NO. NPF-63 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 / RENEWED LICENSE NO. DPR-23 H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-3 / RENEWED LICENSE NO. SNM-2502 H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-60 | |||
==SUBJECT:== | |||
TRANSMITTAL OF FLEET PHYSICAL SECURITY PLAN, SECURITY TRAINING AND QUALIFICATION PLAN, SAFEGUARDS CONTINGENCY PLAN, AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY PROGRAM, REVISION 5 Ladies and Gentlemen: | |||
In accordance with 10 CFR 50.5 4 (p)(2), 10 CFR 72.44(e), and 10 CFR 72.186(b), this letter, from Carolina Power & Light Company (CP&L) and Florida Power Corporation (FPC)provides notification that the consolidated fleet Carolina Power and Light Company and Florida Power Corporation Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, has been revised. Revision 5 of the consolidated fleet Carolina Power and Light Company and Florida Power Corporation Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, was effective on August 2, 2012..1 When separated, this page is decontrolled. | |||
I SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION When separated, this page is decontrolled. | |||
United States Nuclear Regulatory Commission RA-12-035 Page 2 The plan revision incorporates changes to conform to NEI 03-12, Security Plan Template, Revision 7. In addition to the changes to conform with NEI 03-12, Revision 7, this plan revision also includes changes that increase the number of Armed Responders or Armed Security Officers at the Brunswick Steam Electric Plant, Unit Nos. 1 and 2, and at the Crystal River Unit 3 Nuclear Generating Plant; aligns the format and content (licensee specific text) in the descriptions of the site protective strategies described in appendices D, E, F, and G; and corrects an administrative error that was discovered in Appendix F. Changes to conform to NEI 03-12, Revision 7, are specifically identified in the Summary Description of Changes in Enclosure 1.An evaluation of the plan revision in accordance with 10 CFR 50.54(p)(2), 10 CFR 72.44(e), and 10 CFR 72.186(b) has determined that the changes incorporated do not reduce the effectiveness of the plan and that the consolidated fleet plan continues to meet the standards of 10 CFR 73.51 and 10 CFR 73.55, as applicable, for the facilities listed above.This letter includes two enclosures which contain Safeguards Information as defined in 10 CFR 73.2. Enclosure 1 contains a Summary Description of Changes. Enclosure 2 contains a copy of the Carolina Power and Light Company and Florida Power Corporation Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 5.No new regulatory commitments have been made in this letter.If you have questions regarding this submittal, please contact Brian Bernard, Manager -Nuclear Security Services and Emergency Preparedness, at (919) 546-5650.Sincerely, j Donna Alexander Manager -Nuclear Regulatory Affairs (Interim)DBM | |||
==Enclosures:== | |||
: 1. Summary Description of Changes ISA FEG UA RDS IN FORM ATI ONJ 2. Carolina Power and Light Company and Florida Power Corporation Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 5.ISAFEGUARI)S INFORMATIONJ When separated, this page is decontrolled. | |||
SAFEGUARDS INFORMATION C SAFEGUARDS INFORMATION When separated, this page is decontrolled. | |||
United States Nuclear Regulatory Commission RA-12-035 Page 3 cc (with Enclosures): | |||
USNRC Regional Administrator | |||
-Region II USNRC Director, Division of Spent Fuel Storage and Transportation, Office of Nuclear Material Safety and Safeguards cc (without Enclosures): | |||
USNRC Resident Inspector | |||
-BSEP, Unit Nos. 1 and 2 USNRC Resident Inspector | |||
-CR3 USNRC Resident Inspector | |||
-SHNPP, Unit No. 1 USNRC Resident Inspector | |||
-HBRSEP, Unit No. 2 F. Saba, NRR Project Manager -BSEP, Unit Nos. I and 2; CR3 A. T. Billoch Col6n, NRR Project Manager -SHNPP, Unit No. 1; HBRSEP, Unit No. 2 When separated, this page is decontrolled. | |||
SAFEGUARDS INFORMATION}} | |||
Revision as of 17:13, 19 August 2019
| ML12216A319 | |
| Person / Time | |
|---|---|
| Site: | Harris, Brunswick, Crystal River, Robinson, 07200006, 07200003, 07200060 |
| Issue date: | 08/02/2012 |
| From: | Alexander D Carolina Power & Light Co, Florida Power Corp, Progress Energy |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation, Office of Nuclear Material Safety and Safeguards |
| References | |
| RA-12-035 | |
| Download: ML12216A319 (3) | |
Text
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
..Progress Energy 10 CFR 50.54(p)10 CFR 72.44(e)PO Box 1551 10 CFR 72.186(b)411 Fayetteville Street Mall Raleigh NC 27602 Serial: RA-12-035 August 2, 2012 United States Nuclear Regulatory Commission ATTENTION:
Document Control Desk Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. I AND 2 DOCKET NOS. 50-325 AND 50-324 / RENEWED LICENSE NOS. DPR-71 AND DPR-62 BRUNSWICK STEAM ELECTRIC PLANT INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-6 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT DOCKET NO. 50-302 / LICENSE NO. DPR-72 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400 / RENEWED LICENSE NO. NPF-63 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 / RENEWED LICENSE NO. DPR-23 H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-3 / RENEWED LICENSE NO. SNM-2502 H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-60
SUBJECT:
TRANSMITTAL OF FLEET PHYSICAL SECURITY PLAN, SECURITY TRAINING AND QUALIFICATION PLAN, SAFEGUARDS CONTINGENCY PLAN, AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY PROGRAM, REVISION 5 Ladies and Gentlemen:
In accordance with 10 CFR 50.5 4 (p)(2), 10 CFR 72.44(e), and 10 CFR 72.186(b), this letter, from Carolina Power & Light Company (CP&L) and Florida Power Corporation (FPC)provides notification that the consolidated fleet Carolina Power and Light Company and Florida Power Corporation Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, has been revised. Revision 5 of the consolidated fleet Carolina Power and Light Company and Florida Power Corporation Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, was effective on August 2, 2012..1 When separated, this page is decontrolled.
I SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION When separated, this page is decontrolled.
United States Nuclear Regulatory Commission RA-12-035 Page 2 The plan revision incorporates changes to conform to NEI 03-12, Security Plan Template, Revision 7. In addition to the changes to conform with NEI 03-12, Revision 7, this plan revision also includes changes that increase the number of Armed Responders or Armed Security Officers at the Brunswick Steam Electric Plant, Unit Nos. 1 and 2, and at the Crystal River Unit 3 Nuclear Generating Plant; aligns the format and content (licensee specific text) in the descriptions of the site protective strategies described in appendices D, E, F, and G; and corrects an administrative error that was discovered in Appendix F. Changes to conform to NEI 03-12, Revision 7, are specifically identified in the Summary Description of Changes in Enclosure 1.An evaluation of the plan revision in accordance with 10 CFR 50.54(p)(2), 10 CFR 72.44(e), and 10 CFR 72.186(b) has determined that the changes incorporated do not reduce the effectiveness of the plan and that the consolidated fleet plan continues to meet the standards of 10 CFR 73.51 and 10 CFR 73.55, as applicable, for the facilities listed above.This letter includes two enclosures which contain Safeguards Information as defined in 10 CFR 73.2. Enclosure 1 contains a Summary Description of Changes. Enclosure 2 contains a copy of the Carolina Power and Light Company and Florida Power Corporation Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 5.No new regulatory commitments have been made in this letter.If you have questions regarding this submittal, please contact Brian Bernard, Manager -Nuclear Security Services and Emergency Preparedness, at (919) 546-5650.Sincerely, j Donna Alexander Manager -Nuclear Regulatory Affairs (Interim)DBM
Enclosures:
- 1. Summary Description of Changes ISA FEG UA RDS IN FORM ATI ONJ 2. Carolina Power and Light Company and Florida Power Corporation Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 5.ISAFEGUARI)S INFORMATIONJ When separated, this page is decontrolled.
SAFEGUARDS INFORMATION C SAFEGUARDS INFORMATION When separated, this page is decontrolled.
United States Nuclear Regulatory Commission RA-12-035 Page 3 cc (with Enclosures):
USNRC Regional Administrator
-Region II USNRC Director, Division of Spent Fuel Storage and Transportation, Office of Nuclear Material Safety and Safeguards cc (without Enclosures):
USNRC Resident Inspector
-BSEP, Unit Nos. 1 and 2 USNRC Resident Inspector
-CR3 USNRC Resident Inspector
-SHNPP, Unit No. 1 USNRC Resident Inspector
-HBRSEP, Unit No. 2 F. Saba, NRR Project Manager -BSEP, Unit Nos. I and 2; CR3 A. T. Billoch Col6n, NRR Project Manager -SHNPP, Unit No. 1; HBRSEP, Unit No. 2 When separated, this page is decontrolled.
SAFEGUARDS INFORMATION