{{#Wiki_filter:'pi DONAI.O B.KARNER EXECUTIVE VICE PRESIDENT PiFQJQI(gr Arizona Nuclear Power Project P.O.BOX 52034~PHOENIX.ARIZONA I5072-%34~0 (.l.f t 102-01069-DBK/TDS7kf!
{{#Wiki_filter:'pi DONAI.O B.KARNER EXECUTIVE VICE PRESIDENT PiFQJQI(gr Arizona Nuclear Power Project P.O.BOX 52034~PHOENIX.ARIZONA I5072-%34~0 (.l.f t 102-01069-DBK/TDS7kf!
kC December 19, 1988 U.S.Nuclear Regulatory
kC December 19, 1988 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555  
Commission
 
ATTN: Document Control Desk Washington, DC 20555 Reference:
==Reference:==
Letter from G.P.Yuhas, Chief, Emergency Preparedness
 
and Radiological
Letter from G.P.Yuhas, Chief, Emergency Preparedness and Radiological Protection Branch, U.S.Nuclear Regulatory Commission to Arizona Nuclear Power Project, Attn.D.B.Karner, Executive Vice President, dated December 2, 1988.
Protection
 
Branch, U.S.Nuclear Regulatory
==Dear Sir:==
Commission
 
to Arizona Nuclear Power Project, Attn.D.B.Karner, Executive Vice President, dated December 2, 1988.Dear Sir: Subject: Palo Verde Nuclear Generating
==Subject:==
Station Units 1, 2 and 3 Docket No.STN 50-528 (License No.NPF-41)STN 50-529 (License No.NPF-51 STN 50-530 (License No.NPF-74)Reply to a Notice of.Violation-528/88-40-01
Palo Verde Nuclear Generating Station Units 1, 2 and 3 Docket No.STN 50-528 (License No.NPF-41)STN 50-529 (License No.NPF-51 STN 50-530 (License No.NPF-74)Reply to a Notice of.Violation-528/88-40-01 File: 88-056-026 S This letter is provided in response to the routine inspection conducted by Hr.G.Cicotte from October 31 through November 4, 19&8.Based upon the results of this inspection a violation of NRC requirements was identified.
File: 88-056-026
The violation is discussed in Appendix A of the referenced letter.The violation and ANPP's response are provided.in the attachment to this letter.If you should have any questions regarding this response, contact Hr.Timothy Shriver of my staff at (602)393-2521.DBK/TDS/KLHC/kj Attachments CC: J.G.J.B.T.J.M.J.T.L.A.C.Haynes (all w/attachments)
S This letter is provided in response to the routine inspection
Martin Polich Davis Chan Gehr t
conducted by Hr.G.Cicotte from October 31 through November 4, 19&8.Based upon the results of this inspection
NRC Document Control Desk Page 1 of 2 102-01069-DBK/TDS/KLHC December 19, 1988 APPENDIX A NOTICE OF VIOLATION Arizona Public Service Company Palo Verde Nuclear Generating Station Units 12;and 3.-Docket Hos.50-528, 50-529, 50-530 License Nos.NPF-41, 51, 74 During an inspection conducted October 31-November 4, 1988, a violation of NRC requirements was:identified.
a violation of NRC requirements
In accordance with the"General Statement of Policy and Procedure for,4RC.-Enforcement Actions," 10 CFR Part 2, Appendix C (1988), as modified by 53 Fed.Reg.40019 (October 13, 1988), the violation is listed below: A.Technical Specification 6.8,"Procedures and Programs," states in part: Written procedures shall be established, implemented, and pa.i,ntained covering the...""i.Offsite Dose Calculation Manual tODCM]...." Licensee Procedure 75RP-OZ108,"Radiological Environmental Air Sample Collection," Revision 0, dated 3-4-88, states in part:  
was identified.
 
The violation is discussed in Appendix A of the referenced
NRC Document Control Desk Page 2 of 2 102-01069-DBK/TDS/KLHC December 19, 1988 APPENDIX A NOTICE OF VIOLATION (Continued)
letter.The violation and ANPP's response are provided.in the attachment
"1.0~Per ose 1.1 This procedure provides the requirements for the weekly issue and exchange of particulate air filters and charcoal cartridges as required by the ODCH and the REHP[Radiological Environmental Honitoring Program]....""6.1.3.4 Flowmeter reading (If reading is 1.5 CFH no adjustments are necessary, otherwise adjust to 1.5 CFH)." Contrary to the above, at approximately 12:45 p.m.HST, on November 2, l 1988, the flowmeter for environmental sampling station Nos.15 and 14a was returned to service without having been adjusted to 1.5 CFH.I This is a Severity Level IV Violation (Supplement IV).  
to this letter.If you should have any questions regarding this response, contact Hr.Timothy Shriver of my staff at (602)393-2521.DBK/TDS/KLHC/kj
 
Attachments
NRC Document Control Desk Page 1 of 5 102-01069-DBK/TDS/KLHC December 19, 1988 REPLY TO NOTICE OF VIOLATION 528/88-40-01 I.REASON FOR VIOLATION On November 2, 1988, the weekly environmental air sampling was performed by an ANPP contract employee.The air sampling was performed using procedure 75RP-OZZ08,"Radiological Environmental Air Sample Collection", Revision 0, dated Harch 4, 1988.During the performance of the air sampling at predetermined sites 14a and 15a, the inspector observed that the flowmeter reading recorded prior to adjustments was 2.1 CFH and 2.0 CFH respectively.
CC: J.G.J.B.T.J.M.J.T.L.A.C.Haynes (all w/attachments)
The individual then adjusted the flowrate to obtain a flowmeter reading at site 14a of 2.0 CFH.As discussed in the inspection report, procedure 75RP-OZZ08 paragraph 6.1.3.3 states;"Flowmeter reading (If reading is 1.5 CFH no adjustments are necessary; otherwise adjust to 1.5 CFH).A preliminary evaluation conducted by ANPP confirmed the inspector's observations that the sample station flowrate was adjusted to obtain a flowmeter reading of 2.0 CFH or was left in the as found condition of 2.0 CFH.As a result, ANPP initiated an evaluation to determine the root cause of the deficiency and to identify the necessary corrective actions.The results of that evaluation are discussed in the following paragraphs.  
Martin Polich Davis Chan Gehr  
 
t  
NRC Document Control Desk 102-01069-DBK/TDS/KLHC December 19, 1988 REPLY TO NOTICE OF VIOLATION 528/88-40-01
NRC Document Control Desk Page 1 of 2 102-01069-DBK/TDS/KLHC
December 19, 1988 APPENDIX A NOTICE OF VIOLATION Arizona Public Service Company Palo Verde Nuclear Generating
Station Units 12;and 3.-Docket Hos.50-528, 50-529, 50-530 License Nos.NPF-41, 51, 74 During an inspection
conducted October 31-November 4, 1988, a violation of NRC requirements
was:identified.
In accordance
with the"General Statement of Policy and Procedure for,4RC.-Enforcement
Actions," 10 CFR Part 2, Appendix C (1988), as modified by 53 Fed.Reg.40019 (October 13, 1988), the violation is listed below: A.Technical Specification
6.8,"Procedures
and Programs," states in part: Written procedures
shall be established, implemented, and pa.i,ntained
covering the...""i.Offsite Dose Calculation
Manual tODCM]...." Licensee Procedure 75RP-OZ108,"Radiological
Environmental
Air Sample Collection," Revision 0, dated 3-4-88, states in part:  
NRC Document Control Desk Page 2 of 2 102-01069-DBK/TDS/KLHC
December 19, 1988 APPENDIX A NOTICE OF VIOLATION (Continued)
"1.0~Per ose 1.1 This procedure provides the requirements
for the weekly issue and exchange of particulate
air filters and charcoal cartridges
as required by the ODCH and the REHP[Radiological
Environmental
Honitoring
Program]....""6.1.3.4 Flowmeter reading (If reading is 1.5 CFH no adjustments
are necessary, otherwise adjust to 1.5 CFH)." Contrary to the above, at approximately
12:45 p.m.HST, on November 2, l 1988, the flowmeter for environmental
sampling station Nos.15 and 14a was returned to service without having been adjusted to 1.5 CFH.I This is a Severity Level IV Violation (Supplement
IV).  
NRC Document Control Desk Page 1 of 5 102-01069-
DBK/TDS/KLHC
December 19, 1988 REPLY TO NOTICE OF VIOLATION 528/88-40-01
I.REASON FOR VIOLATION On November 2, 1988, the weekly environmental
air sampling was performed by an ANPP contract employee.The air sampling was performed using procedure 75RP-OZZ08,"Radiological
Environmental
Air Sample Collection", Revision 0, dated Harch 4, 1988.During the performance
of the air sampling at predetermined
sites 14a and 15a, the inspector observed that the flowmeter reading recorded prior to adjustments
was 2.1 CFH and 2.0 CFH respectively.
The individual
then adjusted the flowrate to obtain a flowmeter reading at site 14a of 2.0 CFH.As discussed in the inspection
report, procedure 75RP-OZZ08
paragraph 6.1.3.3 states;"Flowmeter
reading (If reading is 1.5 CFH no adjustments
are necessary;
otherwise adjust to 1.5 CFH).A preliminary
evaluation
conducted by ANPP confirmed the inspector's
observations
that the sample station flowrate was adjusted to obtain a flowmeter reading of 2.0 CFH or was left in the as found condition of 2.0 CFH.As a result, ANPP initiated an evaluation
to determine the root cause of the deficiency
and to identify the necessary corrective
actions.The results of that evaluation
are discussed in the following paragraphs.  
NRC Document Control Desk 102-01069-DBK/TDS/KLHC
December 19, 1988 REPLY TO NOTICE OF VIOLATION 528/88-40-01
.....Prior.
.....Prior.
to November, 1987 the contractor
to November, 1987 the contractor had been supplied flowmeters, used to verify/adjust the flowrates at the various sampling sites, which measured air flow on a percentage scale.The scale range is 0-100%with 100%equaling 2.5 CFH+5%.In November;1987 the contractor was supplied replacement meters which could be permanently installed at the collection sites.The replacement meters measured air flow on a scale ranging from 0-6 CFH+10%.The contractor independently evaluated the two devices and determined that a reading of 2.0 CFH on the replacement meter equated to a reading of 60%on the original meter and would therefore provide a true measurement of 1.5 CFH.The procedural controls, as previously discussed, were revised to address the~replacement:
had been supplied flowmeters, used to verify/adjust
meters and-required, the air flow to be adjusted to obtain a meter reading of 1.5 CFH.The intent of the procedure was to ensure a sample flow rate through the'collection equipment'I of 1.5 CFH.Therefore, based upon the unapproved evaluation, the contractor utilized a flowmeter reading of 2.0 to adjust the sampling site flowrates.
the flowrates at the various sampling sites, which measured air flow on a percentage
scale.The scale range is 0-100%with 100%equaling 2.5 CFH+5%.In November;1987 the contractor
was supplied replacement
meters which could be permanently
installed at the collection
sites.The replacement
meters measured air flow on a scale ranging from 0-6 CFH+10%.The contractor
independently
evaluated the two devices and determined
that a reading of 2.0 CFH on the replacement
meter equated to a reading of 60%on the original meter and would therefore provide a true measurement
of 1.5 CFH.The procedural
controls, as previously
discussed, were revised to address the~replacement:
meters and-required, the air flow to be adjusted to obtain a meter reading of 1.5 CFH.The intent of the procedure was to ensure a sample flow rate through the'collection
equipment'I of 1.5 CFH.Therefore, based upon the unapproved
evaluation, the contractor
utilized a flowmeter reading of 2.0 to adjust the sampling site flowrates.
This decision was discussed with and , concurred with by an ANPP representative.
This decision was discussed with and , concurred with by an ANPP representative.
Based upon these events, the"root causes" of the identified
Based upon these events, the"root causes" of the identified violation are the failure of the contract organization to adhere to established procedural controls and the failure of the ANPP representative to initiate the required evaluations and procedural changes that would have authorized the contractor's actions.  
violation are the failure of the contract organization
 
to adhere to established
NRC Document Control Desk 102-01069-DBK/TDS/KLHC December 19, 1988 REPLY TO NOTICE OF VIOLATION 528/88-40>>01 II.CORRECTIVE ACTIONS TAKEN AND RESULTS ACHIEVED As an immediate corrective action, an evaluation was performed to determine the effect of using 2.0 CFH vice the required 1.5 CFH flowrate.The difference in the calculated activity results is approximately 25 percent in the conservative direction.
procedural
Additionally, the original flowmeters which were utilized by the contractor have been returned to the contractor for use.The meters'alibration stickers have been specifically annotated that a 100%scale reading equates to a 2.5 CFH flowrate.A change has been approved to the governing procedure, 75RP-OZZ08, clarifying the readings required to obtain the appropriate flowrate.I I I.CORRECTIVE ACTIONS TAKEN TO AVOID FURTHER VIOLATIONS To address the fact that the contract individual believed he could deviate from established procedural controls based upon an unapproved technical justification, a letter was issued to the contractor from-ANPP on November 10, 1988.The letter informed the contractor of this event and emphasized that any deviation from procedural controls was unacceptable.
controls and the failure of the ANPP representative
The letter also provided instructions that whenever an individual performing a procedure has a question or concern regarding the procedure's adequacy, technical accuracy, or requirements he shall stop the activity and resolve the matter with ANPP management prior to  
to initiate the required evaluations
 
and procedural
NRC Document Control Desk 102-01069-DBK/TDS/KLMC December 19, 1988 REPLY TO NOTICE OF VIOLATION 528/88-40-0l proceeding, ANPP has requested that the contractor brief the responsible personnel to ensure they understand and comply with these instructions.
changes that would have authorized
In addition, a meeting was held by ANPP on December 1, 1988 with the re'sponsible contract personnel to reinforce the ANPP requirements for procedural compliance.
the contractor's
As an additional corrective action, ANPP has evaluated the other ANPP procedures utilized by the contractor to implement the REHP.The evaluation identified no technical deficiencies.
actions.  
The ANPP representative who was made aware of the procedural deviation by the contractor and failed to..take appropriate action has been counseled.
Based upon the individual's previous performance, no additional actions are deemed necessary at this time.However, the Radiation Protection Standards section responsible for the Radiological Environmental Monitoring Program (REHP)will be briefed on the necessity to properly overview a contractor's performance and to conduct a careful review of the documentation submitted by the contractor placing particular emphasis on ensuring procedural compliance.
NRC Document Control Desk 102-01069-DBK/TDS/KLHC
IV.DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED All the corrective actions stated in Sections II and III have been implemented with the exception of the briefings to be given to the contract personnel and the Radiation Protection Standards section t!'1 NRC Document Control Desk Page 5 of 5 102-01069-DBK/TDS/KLHC December 19, 1988 REPLY TO NOTICE OF VIOLATION 528/88-40-01 personnel responsible for the implementation of the RENP.ANPP estimates the completion of these briefings by February 1989.
December 19, 1988 REPLY TO NOTICE OF VIOLATION 528/88-40>>01
II.CORRECTIVE
ACTIONS TAKEN AND RESULTS ACHIEVED As an immediate corrective
action, an evaluation
was performed to determine the effect of using 2.0 CFH vice the required 1.5 CFH flowrate.The difference
in the calculated
activity results is approximately
25 percent in the conservative
direction.
Additionally, the original flowmeters
which were utilized by the contractor
have been returned to the contractor
for use.The meters'alibration
stickers have been specifically
annotated that a 100%scale reading equates to a 2.5 CFH flowrate.A change has been approved to the governing procedure, 75RP-OZZ08, clarifying
the readings required to obtain the appropriate
flowrate.I I I.CORRECTIVE
ACTIONS TAKEN TO AVOID FURTHER VIOLATIONS
To address the fact that the contract individual
believed he could deviate from established
procedural
controls based upon an unapproved
technical justification, a letter was issued to the contractor
from-ANPP on November 10, 1988.The letter informed the contractor
of this event and emphasized
that any deviation from procedural
controls was unacceptable.
The letter also provided instructions
that whenever an individual
performing
a procedure has a question or concern regarding the procedure's
adequacy, technical accuracy, or requirements
he shall stop the activity and resolve the matter with ANPP management
prior to  
NRC Document Control Desk 102-01069-DBK/TDS/KLMC
December 19, 1988 REPLY TO NOTICE OF VIOLATION 528/88-40-0l
proceeding, ANPP has requested that the contractor
brief the responsible
personnel to ensure they understand
and comply with these instructions.
In addition, a meeting was held by ANPP on December 1, 1988 with the re'sponsible
contract personnel to reinforce the ANPP requirements
for procedural
compliance.
As an additional
corrective
action, ANPP has evaluated the other ANPP procedures
utilized by the contractor
to implement the REHP.The evaluation
identified
no technical deficiencies.
The ANPP representative
who was made aware of the procedural
deviation by the contractor
and failed to..take appropriate
action has been counseled.
Based upon the individual's
previous performance, no additional
actions are deemed necessary at this time.However, the Radiation Protection
Standards section responsible
for the Radiological
Environmental
Monitoring
Program (REHP)will be briefed on the necessity to properly overview a contractor's
performance
and to conduct a careful review of the documentation
submitted by the contractor
placing particular
emphasis on ensuring procedural
compliance.
IV.DATE WHEN FULL COMPLIANCE
WILL BE ACHIEVED All the corrective
actions stated in Sections II and III have been implemented
with the exception of the briefings to be given to the contract personnel and the Radiation Protection
Standards section  
t!'1  
NRC Document Control Desk Page 5 of 5 102-01069-DBK/TDS/KLHC
December 19, 1988 REPLY TO NOTICE OF VIOLATION 528/88-40-01
personnel responsible
for the implementation
of the RENP.ANPP estimates the completion
of these briefings by February 1989.  
C (L Qj H r t f,  
C (L Qj H r t f,  
.;gCcp~~TH)DISTRIBUTION.DEMOYSTRXTION
.;gCcp~~TH)DISTRIBUTION.DEMOYSTRXTION SYSTEM>j I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ESSION NBR:8901050059 DOC.DATE: 88/12/19 NOTARIZED:
SYSTEM>j I REGULATORY
NO DOCKET CIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 AUTH.NAME AUTHOR AFFILIATION KARNER,D.B.
INFORMATION
Arizona Nuclear Power Project (formerly Arizona Public Serv RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)R  
DISTRIBUTION
 
SYSTEM (RIDS)ESSION NBR:8901050059
==SUBJECT:==
DOC.DATE: 88/12/19 NOTARIZED:
Responds to violations noted in Insp Rept 50-528/88-40 on 881031-1104.
NO DOCKET CIL:STN-50-528
I DISTRIBUTION CODE: IE06D COPIES RECEIVED:LTR ENCL SIZE: D TITLE: Environ&Radiological (50 DKT)-Znsp Rept/Notice of Violation Respons NOTES:Standardized plant.05000528 8 RECIPIENT ID CODE/NAME PD5 LA CHAN,T INTERNAL: ACRS NMSS/LLOB 5E4 NRR/DLPQ/PEB 11 NRR/DREP/EPB 10'RR/PMAS/ILRB12 OGC/HDS 1 RES RGN2/DRSS/EPRPB E ERNAL: LPDR NSIC NOTES: COPIES LTTR ENCL 1 0 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD DAVIS,M AEOD/DSP NMSS/SGOB 4E4 NRR/DOEA/EAB 11 NRR/DREP/RPB 10 NUDO~S=A TRACT~ERGŽ02 KGE5 FILE 01 RGN4 MURRAY, B NRC PDR RESL MARTIN,D COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 2 2.1 1 1 1 1 1 1 1 1 1 1 1 NOXE TO ALL''RZDS" RECZPZENIS PIZASE HELP US TO REDUCE TQLSTH CONIACT IHE DOCUMENI CONIBOL DESKF RXM.Pl-37 (EXT.20079)1O ELZK2VLER YOUR NAME PRQH DZSTIKBVTZGN LISTS H)R DOCUMENIS YOU DONFT HEEDs D S TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL 26 gt OONALO B.KARNER EXECUTIVE VICE PRESIDENT Arizona Nuclear Power Project P.O.BOX 52034~PHOENIX.ARIZONA 85072-2034 102-01069-DBK/TDS/KL'HC December 19, 1988 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555  
Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 AUTH.NAME AUTHOR AFFILIATION
 
KARNER,D.B.
==Reference:==
Arizona Nuclear Power Project (formerly Arizona Public Serv RECIP.NAME
 
RECIPIENT AFFILIATION
Letter from G.P.Yuhas, Chief, Emergency Preparedness and Radiological Protection Branch, U.S.Nuclear Regulatory Commission to Arizona Nuclear Power Project, Attn.D.B.Karner, Executive Vice President, dated December 2, 1988.
Document Control Branch (Document Control Desk)R SUBJECT: Responds to violations
 
noted in Insp Rept 50-528/88-40
==Dear Sir:==
on 881031-1104.
0  
I DISTRIBUTION
 
CODE: IE06D COPIES RECEIVED:LTR
==Subject:==
ENCL SIZE: D TITLE: Environ&Radiological
Palo Verde Nuclear Generating Station Units 1, 2 and 3 Docket No.STN 50-528 (License No.NPF-41)STN 50-529 (License No.NPF-51)STN 50-530 (License No.NPF-74)Reply to a Notice of Violation-528/88-40-01 File: 88-056-026 This letter is provided in response to the routine inspection conducted by Hr.G..Cicotte from October 31 through November 4, 1988.Based upon the results of this inspection a violation of NRC requirements was identified.
(50 DKT)-Znsp Rept/Notice
The violation is discussed in Appendix A of the referenced letter.The violation and ANPP's response are provided in the attachment to this letter.If you should have any questions regarding this response, contact Hr.Timothy Shriver of my staff at (602)393-2521.DBK/TDS/KLHC/kj Attachments CC: J.G.Haynes J.B.Hartin T.J.Polich H.J.'Davis T.L.Chan A.C.Gehr (all w/attachments)
of Violation Respons NOTES:Standardized
~Ho pqoi050~5 0'500052~a:="1219 QQQCK poc 0 1 i NRC Document Control Desk Page 1 of 2 102-01069-DBK/TDS/KLMC December.19, 1988 APPENDIX A NOTICE OF VIOLATION Arizona Public Service Company Palo Verde Nuclear Generating Station Units 1, 2, and 3 Docket Nos.50-528, 50-529, 50-530 License Nos.NPF-41, 51, 74 During an inspection conducted October 31-November 4, 1988, a violation of NRC requirements was identified.
plant.05000528 8 RECIPIENT ID CODE/NAME PD5 LA CHAN,T INTERNAL: ACRS NMSS/LLOB 5E4 NRR/DLPQ/PEB
In accordance with the"General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1988), as modified by 53 Fed.Reg.40019 (October 13, 1988), the violation is listed below: A.Technical Specification 6.8,"Procedures and Programs," states in part: "6.8.1 Written procedures shall be established, implemented, and maintained covering the...""i.Offsite Dose Calculation Manual[ODCM]...." Licensee Procedure 75RP-OZZ08,"Radiological Environmental Air Sample Collection," Revision 0, dated 3-4-88, states in part:
11 NRR/DREP/EPB
i l I I NRC Document Control Desk Page 2 of 2 102-01069-DBK/TDS/KLMC December 19, 1988 APPENDIX A NOTICE OF VIOLATION (Continued)
10'RR/PMAS/ILRB12
"1.0~Por ose 1.1 This procedure provides the requirements for the weekly issue and exchange of particulate air filters and charcoal cartridges as required by the ODCM and the REHP I'Radiological Environmental Monitoring Program]....""6.1.3.4 Flowmeter reading (If reading is 1.5 CFH no adjustments are necessary, otherwise'adjust to 1.5 CFH).." Contrary to the above, at approximately 12:45 p.m.HST, on November 2, 1988, the flowmeter for environmental sampling station Nos.15 and 14a was returned to service without having been adjusted to 1.5 CFH.This is a Severity Level IV Violation (Supplement IV).f 4'I''I~f'lo s'', y r PAN A Q'H le~
OGC/HDS 1 RES RGN2/DRSS/EPRPB
i NRC Document Control Desk Page 1 of 5 102-01069-DBK/TDS/KLHC December 19, 1988 REPLY TO NOTICE OF VIOLATION 528/88-40-01 I.REASON FOR VIOLATION On November 2, 1988, the weekly environmental air sampling was performed by an ANPP contract employee.The air sampling was performed using procedure 75RP-OZZ08,"Radiological Environmental Air Sample Collection", Revision 0, dated March 4, 1988.During the performance of the air sampling at predetermined sites 14a and 15a, the inspector observed that the flowmeter reading recorded prior to adjustments was 2.1 CFH and 2.0 CFH respectively.
E ERNAL: LPDR NSIC NOTES: COPIES LTTR ENCL 1 0 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD DAVIS,M AEOD/DSP NMSS/SGOB 4E4 NRR/DOEA/EAB
The individual then adjusted the flowrate to obtain a flowmeter reading at site 14a of 2.0 CFH.As discussed in the inspection report, procedure 75RP-OZZ08 paragraph 6.1.3.3 states;"Flowmeter reading (If reading is 1.5 CFH no adjustments are necessary; otherwise adjust to 1.5 CFH).A preliminary evaluation conducted by ANPP confirmed the inspector's observations that the sample station flowrate was adjusted to obtain a flowmeter reading of 2.0 CFM or was left in the as found condition of 2.0 CFM.As a result>ANPP initiated an evaluation to determine the root cause of the deficiency and to identify the necessary corrective actions.The results of that evaluation are discussed in the'following paragraphs.  
11 NRR/DREP/RPB
 
10 NUDO~S=A TRACT~ERGŽ02 KGE5 FILE 01 RGN4 MURRAY, B NRC PDR RESL MARTIN,D COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 2 2.1 1 1 1 1 1 1 1 1 1 1 1 NOXE TO ALL''RZDS" RECZPZENIS
(l'RC Document Control Desk Page 2 of 5 ,102-01069-DBK/TDS/KLHC December 19, 1988 e REPLY TO NOTICE OF VIOLATION 528/88-40-01 Prior to November, 1987 the contractor had been supplied flowmeters, used to verify/adjust the flowrates at the various sampling sites, which measured air flow on a percentage scale.The scale range is 0-100%with 100%equaling 2.5 CFH+5%.In November, 1987 the contractor was supplied replacement meters which could be permanently installed at the collection sites.The replacement meters measured air flow on a'cale ranging from 0-6 CFH+10%.The contractor independently evaluated the two devices and determined that a reading of 2.0 CFH on the replacement meter equated'o a reading of 60%on the original meter.and would therefore provide a true measurement of 1.5 CFH.The procedural controls, as previously discussed, were revised to address the replacement meters and required the air flow to be adjusted to obtain a meter reading of 1.5 CFH.The intent of the procedure was to ensure a sample flow rate through the collection equipment of 1.5 CFH.Therefore, based upon the unapproved evaluation, the contractor utilized a flowmeter reading of.2.0 to adjust the sampling site flowrates.
PIZASE HELP US TO REDUCE TQLSTH CONIACT IHE DOCUMENI CONIBOL DESKF RXM.Pl-37 (EXT.20079)1O ELZK2VLER YOUR NAME PRQH DZSTIKBVTZGN
LISTS H)R DOCUMENIS YOU DONFT HEEDs D S TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL 26  
gt  
OONALO B.KARNER EXECUTIVE VICE PRESIDENT Arizona Nuclear Power Project P.O.BOX 52034~PHOENIX.ARIZONA 85072-2034
102-01069-DBK/TDS/KL'HC
December 19, 1988 U.S.Nuclear Regulatory
Commission
ATTN: Document Control Desk Washington, DC 20555 Reference:
Letter from G.P.Yuhas, Chief, Emergency Preparedness
and Radiological
Protection
Branch, U.S.Nuclear Regulatory
Commission
to Arizona Nuclear Power Project, Attn.D.B.Karner, Executive Vice President, dated December 2, 1988.Dear Sir: 0 Subject: Palo Verde Nuclear Generating
Station Units 1, 2 and 3 Docket No.STN 50-528 (License No.NPF-41)STN 50-529 (License No.NPF-51)STN 50-530 (License No.NPF-74)Reply to a Notice of Violation-528/88-40-01
File: 88-056-026
This letter is provided in response to the routine inspection
conducted by Hr.G..Cicotte from October 31 through November 4, 1988.Based upon the results of this inspection
a violation of NRC requirements
was identified.
The violation is discussed in Appendix A of the referenced
letter.The violation and ANPP's response are provided in the attachment
to this letter.If you should have any questions regarding this response, contact Hr.Timothy Shriver of my staff at (602)393-2521.DBK/TDS/KLHC/kj
Attachments
CC: J.G.Haynes J.B.Hartin T.J.Polich H.J.'Davis T.L.Chan A.C.Gehr (all w/attachments)
~Ho pqoi050~5 0'500052~a:="1219 QQQCK poc 0  
1 i  
NRC Document Control Desk Page 1 of 2 102-01069-DBK/TDS/KLMC
December.19, 1988 APPENDIX A NOTICE OF VIOLATION Arizona Public Service Company Palo Verde Nuclear Generating
Station Units 1, 2, and 3 Docket Nos.50-528, 50-529, 50-530 License Nos.NPF-41, 51, 74 During an inspection
conducted October 31-November 4, 1988, a violation of NRC requirements
was identified.
In accordance
with the"General Statement of Policy and Procedure for NRC Enforcement
Actions," 10 CFR Part 2, Appendix C (1988), as modified by 53 Fed.Reg.40019 (October 13, 1988), the violation is listed below: A.Technical Specification
6.8,"Procedures
and Programs," states in part: "6.8.1 Written procedures
shall be established, implemented, and maintained
covering the...""i.Offsite Dose Calculation
Manual[ODCM]...." Licensee Procedure 75RP-OZZ08,"Radiological
Environmental
Air Sample Collection," Revision 0, dated 3-4-88, states in part:  
i l I I  
NRC Document Control Desk Page 2 of 2 102-01069-DBK/TDS/KLMC
December 19, 1988 APPENDIX A NOTICE OF VIOLATION (Continued)
"1.0~Por ose 1.1 This procedure provides the requirements
for the weekly issue and exchange of particulate
air filters and charcoal cartridges
as required by the ODCM and the REHP I'Radiological
Environmental
Monitoring
Program]....""6.1.3.4 Flowmeter reading (If reading is 1.5 CFH no adjustments
are necessary, otherwise'adjust to 1.5 CFH).." Contrary to the above, at approximately
12:45 p.m.HST, on November 2, 1988, the flowmeter for environmental
sampling station Nos.15 and 14a was returned to service without having been adjusted to 1.5 CFH.This is a Severity Level IV Violation (Supplement
IV).f 4'I''I~f'lo s'', y r PAN A Q'H le~  
i  
NRC Document Control Desk Page 1 of 5 102-01069-DBK/TDS/KLHC
December 19, 1988 REPLY TO NOTICE OF VIOLATION 528/88-40-01
I.REASON FOR VIOLATION On November 2, 1988, the weekly environmental
air sampling was performed by an ANPP contract employee.The air sampling was performed using procedure 75RP-OZZ08,"Radiological
Environmental
Air Sample Collection", Revision 0, dated March 4, 1988.During the performance
of the air sampling at predetermined
sites 14a and 15a, the inspector observed that the flowmeter reading recorded prior to adjustments
was 2.1 CFH and 2.0 CFH respectively.
The individual
then adjusted the flowrate to obtain a flowmeter reading at site 14a of 2.0 CFH.As discussed in the inspection
report, procedure 75RP-OZZ08
paragraph 6.1.3.3 states;"Flowmeter
reading (If reading is 1.5 CFH no adjustments
are necessary;
otherwise adjust to 1.5 CFH).A preliminary
evaluation
conducted by ANPP confirmed the inspector's
observations
that the sample station flowrate was adjusted to obtain a flowmeter reading of 2.0 CFM or was left in the as found condition of 2.0 CFM.As a result>ANPP initiated an evaluation
to determine the root cause of the deficiency
and to identify the necessary corrective
actions.The results of that evaluation
are discussed in the'following
paragraphs.  
(l'RC Document Control Desk Page 2 of 5 ,102-01069-DBK/TDS/KLHC
December 19, 1988 e REPLY TO NOTICE OF VIOLATION 528/88-40-01
Prior to November, 1987 the contractor
had been supplied flowmeters, used to verify/adjust
the flowrates at the various sampling sites, which measured air flow on a percentage
scale.The scale range is 0-100%with 100%equaling 2.5 CFH+5%.In November, 1987 the contractor
was supplied replacement
meters which could be permanently
installed at the collection
sites.The replacement
meters measured air flow on a'cale ranging from 0-6 CFH+10%.The contractor
independently
evaluated the two devices and determined
that a reading of 2.0 CFH on the replacement
meter equated'o a reading of 60%on the original meter.and would therefore provide a true measurement
of 1.5 CFH.The procedural
controls, as previously
discussed, were revised to address the replacement
meters and required the air flow to be adjusted to obtain a meter reading of 1.5 CFH.The intent of the procedure was to ensure a sample flow rate through the collection
equipment of 1.5 CFH.Therefore, based upon the unapproved
evaluation, the contractor
utilized a flowmeter reading of.2.0 to adjust the sampling site flowrates.
This decision was discussed with and concurred with by an ANPP representative.
This decision was discussed with and concurred with by an ANPP representative.
Based upon these events, the"root causes" of the identified
Based upon these events, the"root causes" of the identified violation are the failure of the contract organization to adhere to established procedural controls and the failure of the ANPP representative to initiate the required evaluations and procedural changes that would have authorized the contractor's actions.  
violation are the failure of the contract organization
 
to adhere to established
NRC Document Control Desk Page 3 of 5 102-01069-DBK/TDS/KLHC December 19, 1988 REPLY TO NOTICE OF VIOLATION 528/88-40-01 II.CORRECTIVE ACTIONS TAKEN AND RESULTS ACHIEVED As an immediate corrective action, an evaluation was performed to determine the effect of using 2.0 CFH vice the required 1.5 CFH flowrate.The difference in the calculated activity results is approximately 25 percent in the conservative direction.
procedural
Additionally, the original flowmeters which were utilized by the contractor have been returned to the contractor for use.The meters'calibration stickers have been specifically annotated that a 100%scale reading equates to a 2.5 CFH flowrate.A change has been ap>roved to the governing procedure, 75RP-OZZ08, clarifying the readings required to obtain tPe appropriate flowrate.I I I.CORRECTIVE ACTIONS TAKEN TO AVOID FURTHER VIOLATIONS To address the fact that the contract individual believed he could 0 deviate from established procedural controls based upon an unapproved technical justification, a letter was issued to the contractor from ANPP on November 10, 1988.The letter informed the contractor of this event and emphasized that any deviation from procedural controls was unacceptable.
controls and the failure of the ANPP representative
The letter also provided instructions that whenever an individual performing a procedure has a question or concern regarding the procedure's adequacy, technical accuracy, or requirements he shall stop the activity and resolve the matter with ANPP management prior to  
to initiate the required evaluations
 
and procedural
HRC Document Control Desk Page 4 of 5 102-01069-DBK/TDS/KLMC December 19, 1988 REPLY T'0 NOTICE OF VIOLATION 528/88-40-01 proceeding.
changes that would have authorized
ANPP has requested that the contractor brief the responsible personnel to ensure they understand and comply with these instructions.
the contractor's
In addition, a meeting was held by ANPP on December 1, 1988 with the responsible contract personnel to reinforce the ANPP requirements for procedural compliance.
actions.  
As an additional corrective action, ANPP has evaluated the other ANPP procedures utilized by the contractor to implement the REMP.'The evaluation identified no technical deficiencies.
The ANPP representative who was made aware of the procedural deviation I by the contractor and fai'led to take appropriate action has been counseled.
NRC Document Control Desk Page 3 of 5 102-01069-DBK/TDS/KLHC
Based upon the individual's previous performance, no additional actions are deemed necessary at this time.However, the Radiation Protection Standards section responsible for the Radiological Environmental Monitoring Program (REMP)will be briefed on the necessity to properly overview a contractor's performance and to conduct a careful review of the documentation submitted by the contractor placing particular emphas'is on ensuring procedural compliance.
December 19, 1988 REPLY TO NOTICE OF VIOLATION 528/88-40-01
IV.DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED All the'corrective actions stated in Sections II and III have been implemented with the exception of the briefings to be given to the contract personnel and the Radiation Protection Standards section IJ~
II.CORRECTIVE
5RC Document Control Desk Page 5 of 5 102-01069-DBK/TDS/KLHC December 19, 1988 REPLY TO NOTICE OF VIOLATION 528/88-40-01 personnel responsible for the implementation of the REHP.ANPP estimates the completion of these briefings by February 1989.}}
ACTIONS TAKEN AND RESULTS ACHIEVED As an immediate corrective
action, an evaluation
was performed to determine the effect of using 2.0 CFH vice the required 1.5 CFH flowrate.The difference
in the calculated
activity results is approximately
25 percent in the conservative
direction.
Additionally, the original flowmeters
which were utilized by the contractor
have been returned to the contractor
for use.The meters'calibration
stickers have been specifically
annotated that a 100%scale reading equates to a 2.5 CFH flowrate.A change has been ap>roved to the governing procedure, 75RP-OZZ08, clarifying
the readings required to obtain tPe appropriate
flowrate.I I I.CORRECTIVE
ACTIONS TAKEN TO AVOID FURTHER VIOLATIONS
To address the fact that the contract individual
believed he could 0 deviate from established
procedural
controls based upon an unapproved
technical justification, a letter was issued to the contractor
from ANPP on November 10, 1988.The letter informed the contractor
of this event and emphasized
that any deviation from procedural
controls was unacceptable.
The letter also provided instructions
that whenever an individual
performing
a procedure has a question or concern regarding the procedure's
adequacy, technical accuracy, or requirements
he shall stop the activity and resolve the matter with ANPP management
prior to  
HRC Document Control Desk Page 4 of 5 102-01069-DBK/TDS/KLMC
December 19, 1988 REPLY T'0 NOTICE OF VIOLATION 528/88-40-01
proceeding.
ANPP has requested that the contractor
brief the responsible
personnel to ensure they understand
and comply with these instructions.
In addition, a meeting was held by ANPP on December 1, 1988 with the responsible
contract personnel to reinforce the ANPP requirements
for procedural
compliance.
As an additional
corrective
action, ANPP has evaluated the other ANPP procedures
utilized by the contractor
to implement the REMP.'The evaluation
identified
no technical deficiencies.
The ANPP representative
who was made aware of the procedural
deviation I by the contractor
and fai'led to take appropriate
action has been counseled.
Based upon the individual's
previous performance, no additional
actions are deemed necessary at this time.However, the Radiation Protection
Standards section responsible
for the Radiological
Environmental
Monitoring
Program (REMP)will be briefed on the necessity to properly overview a contractor's
performance
and to conduct a careful review of the documentation
submitted by the contractor
placing particular
emphas'is on ensuring procedural
compliance.
IV.DATE WHEN FULL COMPLIANCE
WILL BE ACHIEVED All the'corrective
actions stated in Sections II and III have been implemented
with the exception of the briefings to be given to the contract personnel and the Radiation Protection
Standards section  
IJ~  
5RC Document Control Desk Page 5 of 5 102-01069-DBK/TDS/KLHC
December 19, 1988 REPLY TO NOTICE OF VIOLATION 528/88-40-01
personnel responsible
for the implementation
of the REHP.ANPP estimates the completion
of these briefings by February 1989.
}}

Revision as of 10:08, 17 August 2019

Responds to Violations Noted in Insp Rept 50-528/88-40 on 881031-1104.Corrective Actions:Original Flowmeters Returned to Contractor for Use & Ltr Sent to Contractor Informing of Employee Deviation from Procedural Controls
ML17304A839
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/19/1988
From: Karner D
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
102-01069-DBK-T, 102-1069-DBK-T, NUDOCS 8901050059
Download: ML17304A839 (34)


Text

'pi DONAI.O B.KARNER EXECUTIVE VICE PRESIDENT PiFQJQI(gr Arizona Nuclear Power Project P.O.BOX 52034~PHOENIX.ARIZONA I5072-%34~0 (.l.f t 102-01069-DBK/TDS7kf!

kC December 19, 1988 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Reference:

Letter from G.P.Yuhas, Chief, Emergency Preparedness and Radiological Protection Branch, U.S.Nuclear Regulatory Commission to Arizona Nuclear Power Project, Attn.D.B.Karner, Executive Vice President, dated December 2, 1988.

Dear Sir:

Subject:

Palo Verde Nuclear Generating Station Units 1, 2 and 3 Docket No.STN 50-528 (License No.NPF-41)STN 50-529 (License No.NPF-51 STN 50-530 (License No.NPF-74)Reply to a Notice of.Violation-528/88-40-01 File: 88-056-026 S This letter is provided in response to the routine inspection conducted by Hr.G.Cicotte from October 31 through November 4, 19&8.Based upon the results of this inspection a violation of NRC requirements was identified.

The violation is discussed in Appendix A of the referenced letter.The violation and ANPP's response are provided.in the attachment to this letter.If you should have any questions regarding this response, contact Hr.Timothy Shriver of my staff at (602)393-2521.DBK/TDS/KLHC/kj Attachments CC: J.G.J.B.T.J.M.J.T.L.A.C.Haynes (all w/attachments)

Martin Polich Davis Chan Gehr t

NRC Document Control Desk Page 1 of 2 102-01069-DBK/TDS/KLHC December 19, 1988 APPENDIX A NOTICE OF VIOLATION Arizona Public Service Company Palo Verde Nuclear Generating Station Units 12;and 3.-Docket Hos.50-528, 50-529, 50-530 License Nos.NPF-41, 51, 74 During an inspection conducted October 31-November 4, 1988, a violation of NRC requirements was:identified.

In accordance with the"General Statement of Policy and Procedure for,4RC.-Enforcement Actions," 10 CFR Part 2, Appendix C (1988), as modified by 53 Fed.Reg.40019 (October 13, 1988), the violation is listed below: A.Technical Specification 6.8,"Procedures and Programs," states in part: Written procedures shall be established, implemented, and pa.i,ntained covering the...""i.Offsite Dose Calculation Manual tODCM]...." Licensee Procedure 75RP-OZ108,"Radiological Environmental Air Sample Collection," Revision 0, dated 3-4-88, states in part:

NRC Document Control Desk Page 2 of 2 102-01069-DBK/TDS/KLHC December 19, 1988 APPENDIX A NOTICE OF VIOLATION (Continued)

"1.0~Per ose 1.1 This procedure provides the requirements for the weekly issue and exchange of particulate air filters and charcoal cartridges as required by the ODCH and the REHP[Radiological Environmental Honitoring Program]....""6.1.3.4 Flowmeter reading (If reading is 1.5 CFH no adjustments are necessary, otherwise adjust to 1.5 CFH)." Contrary to the above, at approximately 12:45 p.m.HST, on November 2, l 1988, the flowmeter for environmental sampling station Nos.15 and 14a was returned to service without having been adjusted to 1.5 CFH.I This is a Severity Level IV Violation (Supplement IV).

NRC Document Control Desk Page 1 of 5 102-01069-DBK/TDS/KLHC December 19, 1988 REPLY TO NOTICE OF VIOLATION 528/88-40-01 I.REASON FOR VIOLATION On November 2, 1988, the weekly environmental air sampling was performed by an ANPP contract employee.The air sampling was performed using procedure 75RP-OZZ08,"Radiological Environmental Air Sample Collection", Revision 0, dated Harch 4, 1988.During the performance of the air sampling at predetermined sites 14a and 15a, the inspector observed that the flowmeter reading recorded prior to adjustments was 2.1 CFH and 2.0 CFH respectively.

The individual then adjusted the flowrate to obtain a flowmeter reading at site 14a of 2.0 CFH.As discussed in the inspection report, procedure 75RP-OZZ08 paragraph 6.1.3.3 states;"Flowmeter reading (If reading is 1.5 CFH no adjustments are necessary; otherwise adjust to 1.5 CFH).A preliminary evaluation conducted by ANPP confirmed the inspector's observations that the sample station flowrate was adjusted to obtain a flowmeter reading of 2.0 CFH or was left in the as found condition of 2.0 CFH.As a result, ANPP initiated an evaluation to determine the root cause of the deficiency and to identify the necessary corrective actions.The results of that evaluation are discussed in the following paragraphs.

NRC Document Control Desk 102-01069-DBK/TDS/KLHC December 19, 1988 REPLY TO NOTICE OF VIOLATION 528/88-40-01

.....Prior.

to November, 1987 the contractor had been supplied flowmeters, used to verify/adjust the flowrates at the various sampling sites, which measured air flow on a percentage scale.The scale range is 0-100%with 100%equaling 2.5 CFH+5%.In November;1987 the contractor was supplied replacement meters which could be permanently installed at the collection sites.The replacement meters measured air flow on a scale ranging from 0-6 CFH+10%.The contractor independently evaluated the two devices and determined that a reading of 2.0 CFH on the replacement meter equated to a reading of 60%on the original meter and would therefore provide a true measurement of 1.5 CFH.The procedural controls, as previously discussed, were revised to address the~replacement:

meters and-required, the air flow to be adjusted to obtain a meter reading of 1.5 CFH.The intent of the procedure was to ensure a sample flow rate through the'collection equipment'I of 1.5 CFH.Therefore, based upon the unapproved evaluation, the contractor utilized a flowmeter reading of 2.0 to adjust the sampling site flowrates.

This decision was discussed with and , concurred with by an ANPP representative.

Based upon these events, the"root causes" of the identified violation are the failure of the contract organization to adhere to established procedural controls and the failure of the ANPP representative to initiate the required evaluations and procedural changes that would have authorized the contractor's actions.

NRC Document Control Desk 102-01069-DBK/TDS/KLHC December 19, 1988 REPLY TO NOTICE OF VIOLATION 528/88-40>>01 II.CORRECTIVE ACTIONS TAKEN AND RESULTS ACHIEVED As an immediate corrective action, an evaluation was performed to determine the effect of using 2.0 CFH vice the required 1.5 CFH flowrate.The difference in the calculated activity results is approximately 25 percent in the conservative direction.

Additionally, the original flowmeters which were utilized by the contractor have been returned to the contractor for use.The meters'alibration stickers have been specifically annotated that a 100%scale reading equates to a 2.5 CFH flowrate.A change has been approved to the governing procedure, 75RP-OZZ08, clarifying the readings required to obtain the appropriate flowrate.I I I.CORRECTIVE ACTIONS TAKEN TO AVOID FURTHER VIOLATIONS To address the fact that the contract individual believed he could deviate from established procedural controls based upon an unapproved technical justification, a letter was issued to the contractor from-ANPP on November 10, 1988.The letter informed the contractor of this event and emphasized that any deviation from procedural controls was unacceptable.

The letter also provided instructions that whenever an individual performing a procedure has a question or concern regarding the procedure's adequacy, technical accuracy, or requirements he shall stop the activity and resolve the matter with ANPP management prior to

NRC Document Control Desk 102-01069-DBK/TDS/KLMC December 19, 1988 REPLY TO NOTICE OF VIOLATION 528/88-40-0l proceeding, ANPP has requested that the contractor brief the responsible personnel to ensure they understand and comply with these instructions.

In addition, a meeting was held by ANPP on December 1, 1988 with the re'sponsible contract personnel to reinforce the ANPP requirements for procedural compliance.

As an additional corrective action, ANPP has evaluated the other ANPP procedures utilized by the contractor to implement the REHP.The evaluation identified no technical deficiencies.

The ANPP representative who was made aware of the procedural deviation by the contractor and failed to..take appropriate action has been counseled.

Based upon the individual's previous performance, no additional actions are deemed necessary at this time.However, the Radiation Protection Standards section responsible for the Radiological Environmental Monitoring Program (REHP)will be briefed on the necessity to properly overview a contractor's performance and to conduct a careful review of the documentation submitted by the contractor placing particular emphasis on ensuring procedural compliance.

IV.DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED All the corrective actions stated in Sections II and III have been implemented with the exception of the briefings to be given to the contract personnel and the Radiation Protection Standards section t!'1 NRC Document Control Desk Page 5 of 5 102-01069-DBK/TDS/KLHC December 19, 1988 REPLY TO NOTICE OF VIOLATION 528/88-40-01 personnel responsible for the implementation of the RENP.ANPP estimates the completion of these briefings by February 1989.

C (L Qj H r t f,

.;gCcp~~TH)DISTRIBUTION.DEMOYSTRXTION SYSTEM>j I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ESSION NBR:8901050059 DOC.DATE: 88/12/19 NOTARIZED:

NO DOCKET CIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 AUTH.NAME AUTHOR AFFILIATION KARNER,D.B.

Arizona Nuclear Power Project (formerly Arizona Public Serv RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)R

SUBJECT:

Responds to violations noted in Insp Rept 50-528/88-40 on 881031-1104.

I DISTRIBUTION CODE: IE06D COPIES RECEIVED:LTR ENCL SIZE: D TITLE: Environ&Radiological (50 DKT)-Znsp Rept/Notice of Violation Respons NOTES:Standardized plant.05000528 8 RECIPIENT ID CODE/NAME PD5 LA CHAN,T INTERNAL: ACRS NMSS/LLOB 5E4 NRR/DLPQ/PEB 11 NRR/DREP/EPB 10'RR/PMAS/ILRB12 OGC/HDS 1 RES RGN2/DRSS/EPRPB E ERNAL: LPDR NSIC NOTES: COPIES LTTR ENCL 1 0 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD DAVIS,M AEOD/DSP NMSS/SGOB 4E4 NRR/DOEA/EAB 11 NRR/DREP/RPB 10 NUDO~S=A TRACT~ERGŽ02 KGE5 FILE 01 RGN4 MURRAY, B NRC PDR RESL MARTIN,D COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 2 2.1 1 1 1 1 1 1 1 1 1 1 1 NOXE TO ALLRZDS" RECZPZENIS PIZASE HELP US TO REDUCE TQLSTH CONIACT IHE DOCUMENI CONIBOL DESKF RXM.Pl-37 (EXT.20079)1O ELZK2VLER YOUR NAME PRQH DZSTIKBVTZGN LISTS H)R DOCUMENIS YOU DONFT HEEDs D S TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL 26 gt OONALO B.KARNER EXECUTIVE VICE PRESIDENT Arizona Nuclear Power Project P.O.BOX 52034~PHOENIX.ARIZONA 85072-2034 102-01069-DBK/TDS/KL'HC December 19, 1988 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Reference:

Letter from G.P.Yuhas, Chief, Emergency Preparedness and Radiological Protection Branch, U.S.Nuclear Regulatory Commission to Arizona Nuclear Power Project, Attn.D.B.Karner, Executive Vice President, dated December 2, 1988.

Dear Sir:

0

Subject:

Palo Verde Nuclear Generating Station Units 1, 2 and 3 Docket No.STN 50-528 (License No.NPF-41)STN 50-529 (License No.NPF-51)STN 50-530 (License No.NPF-74)Reply to a Notice of Violation-528/88-40-01 File: 88-056-026 This letter is provided in response to the routine inspection conducted by Hr.G..Cicotte from October 31 through November 4, 1988.Based upon the results of this inspection a violation of NRC requirements was identified.

The violation is discussed in Appendix A of the referenced letter.The violation and ANPP's response are provided in the attachment to this letter.If you should have any questions regarding this response, contact Hr.Timothy Shriver of my staff at (602)393-2521.DBK/TDS/KLHC/kj Attachments CC: J.G.Haynes J.B.Hartin T.J.Polich H.J.'Davis T.L.Chan A.C.Gehr (all w/attachments)

~Ho pqoi050~5 0'500052~a:="1219 QQQCK poc 0 1 i NRC Document Control Desk Page 1 of 2 102-01069-DBK/TDS/KLMC December.19, 1988 APPENDIX A NOTICE OF VIOLATION Arizona Public Service Company Palo Verde Nuclear Generating Station Units 1, 2, and 3 Docket Nos.50-528, 50-529, 50-530 License Nos.NPF-41, 51, 74 During an inspection conducted October 31-November 4, 1988, a violation of NRC requirements was identified.

In accordance with the"General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1988), as modified by 53 Fed.Reg.40019 (October 13, 1988), the violation is listed below: A.Technical Specification 6.8,"Procedures and Programs," states in part: "6.8.1 Written procedures shall be established, implemented, and maintained covering the...""i.Offsite Dose Calculation Manual[ODCM]...." Licensee Procedure 75RP-OZZ08,"Radiological Environmental Air Sample Collection," Revision 0, dated 3-4-88, states in part:

i l I I NRC Document Control Desk Page 2 of 2 102-01069-DBK/TDS/KLMC December 19, 1988 APPENDIX A NOTICE OF VIOLATION (Continued)

"1.0~Por ose 1.1 This procedure provides the requirements for the weekly issue and exchange of particulate air filters and charcoal cartridges as required by the ODCM and the REHP I'Radiological Environmental Monitoring Program]....""6.1.3.4 Flowmeter reading (If reading is 1.5 CFH no adjustments are necessary, otherwise'adjust to 1.5 CFH).." Contrary to the above, at approximately 12:45 p.m.HST, on November 2, 1988, the flowmeter for environmental sampling station Nos.15 and 14a was returned to service without having been adjusted to 1.5 CFH.This is a Severity Level IV Violation (Supplement IV).f 4'II~f'lo s, y r PAN A Q'H le~

i NRC Document Control Desk Page 1 of 5 102-01069-DBK/TDS/KLHC December 19, 1988 REPLY TO NOTICE OF VIOLATION 528/88-40-01 I.REASON FOR VIOLATION On November 2, 1988, the weekly environmental air sampling was performed by an ANPP contract employee.The air sampling was performed using procedure 75RP-OZZ08,"Radiological Environmental Air Sample Collection", Revision 0, dated March 4, 1988.During the performance of the air sampling at predetermined sites 14a and 15a, the inspector observed that the flowmeter reading recorded prior to adjustments was 2.1 CFH and 2.0 CFH respectively.

The individual then adjusted the flowrate to obtain a flowmeter reading at site 14a of 2.0 CFH.As discussed in the inspection report, procedure 75RP-OZZ08 paragraph 6.1.3.3 states;"Flowmeter reading (If reading is 1.5 CFH no adjustments are necessary; otherwise adjust to 1.5 CFH).A preliminary evaluation conducted by ANPP confirmed the inspector's observations that the sample station flowrate was adjusted to obtain a flowmeter reading of 2.0 CFM or was left in the as found condition of 2.0 CFM.As a result>ANPP initiated an evaluation to determine the root cause of the deficiency and to identify the necessary corrective actions.The results of that evaluation are discussed in the'following paragraphs.

(l'RC Document Control Desk Page 2 of 5 ,102-01069-DBK/TDS/KLHC December 19, 1988 e REPLY TO NOTICE OF VIOLATION 528/88-40-01 Prior to November, 1987 the contractor had been supplied flowmeters, used to verify/adjust the flowrates at the various sampling sites, which measured air flow on a percentage scale.The scale range is 0-100%with 100%equaling 2.5 CFH+5%.In November, 1987 the contractor was supplied replacement meters which could be permanently installed at the collection sites.The replacement meters measured air flow on a'cale ranging from 0-6 CFH+10%.The contractor independently evaluated the two devices and determined that a reading of 2.0 CFH on the replacement meter equated'o a reading of 60%on the original meter.and would therefore provide a true measurement of 1.5 CFH.The procedural controls, as previously discussed, were revised to address the replacement meters and required the air flow to be adjusted to obtain a meter reading of 1.5 CFH.The intent of the procedure was to ensure a sample flow rate through the collection equipment of 1.5 CFH.Therefore, based upon the unapproved evaluation, the contractor utilized a flowmeter reading of.2.0 to adjust the sampling site flowrates.

This decision was discussed with and concurred with by an ANPP representative.

Based upon these events, the"root causes" of the identified violation are the failure of the contract organization to adhere to established procedural controls and the failure of the ANPP representative to initiate the required evaluations and procedural changes that would have authorized the contractor's actions.

NRC Document Control Desk Page 3 of 5 102-01069-DBK/TDS/KLHC December 19, 1988 REPLY TO NOTICE OF VIOLATION 528/88-40-01 II.CORRECTIVE ACTIONS TAKEN AND RESULTS ACHIEVED As an immediate corrective action, an evaluation was performed to determine the effect of using 2.0 CFH vice the required 1.5 CFH flowrate.The difference in the calculated activity results is approximately 25 percent in the conservative direction.

Additionally, the original flowmeters which were utilized by the contractor have been returned to the contractor for use.The meters'calibration stickers have been specifically annotated that a 100%scale reading equates to a 2.5 CFH flowrate.A change has been ap>roved to the governing procedure, 75RP-OZZ08, clarifying the readings required to obtain tPe appropriate flowrate.I I I.CORRECTIVE ACTIONS TAKEN TO AVOID FURTHER VIOLATIONS To address the fact that the contract individual believed he could 0 deviate from established procedural controls based upon an unapproved technical justification, a letter was issued to the contractor from ANPP on November 10, 1988.The letter informed the contractor of this event and emphasized that any deviation from procedural controls was unacceptable.

The letter also provided instructions that whenever an individual performing a procedure has a question or concern regarding the procedure's adequacy, technical accuracy, or requirements he shall stop the activity and resolve the matter with ANPP management prior to

HRC Document Control Desk Page 4 of 5 102-01069-DBK/TDS/KLMC December 19, 1988 REPLY T'0 NOTICE OF VIOLATION 528/88-40-01 proceeding.

ANPP has requested that the contractor brief the responsible personnel to ensure they understand and comply with these instructions.

In addition, a meeting was held by ANPP on December 1, 1988 with the responsible contract personnel to reinforce the ANPP requirements for procedural compliance.

As an additional corrective action, ANPP has evaluated the other ANPP procedures utilized by the contractor to implement the REMP.'The evaluation identified no technical deficiencies.

The ANPP representative who was made aware of the procedural deviation I by the contractor and fai'led to take appropriate action has been counseled.

Based upon the individual's previous performance, no additional actions are deemed necessary at this time.However, the Radiation Protection Standards section responsible for the Radiological Environmental Monitoring Program (REMP)will be briefed on the necessity to properly overview a contractor's performance and to conduct a careful review of the documentation submitted by the contractor placing particular emphas'is on ensuring procedural compliance.

IV.DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED All the'corrective actions stated in Sections II and III have been implemented with the exception of the briefings to be given to the contract personnel and the Radiation Protection Standards section IJ~

5RC Document Control Desk Page 5 of 5 102-01069-DBK/TDS/KLHC December 19, 1988 REPLY TO NOTICE OF VIOLATION 528/88-40-01 personnel responsible for the implementation of the REHP.ANPP estimates the completion of these briefings by February 1989.