{{#Wiki_filter:F a.roarWv (AC(.ELI'.RATED | {{#Wiki_filter:F a.roarWv (AC(.ELI'.RATED I'll)(i I'l<OC:I:.SSli('3 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)CCESSION NBR:9505020298 DOC.DATE: 95/04/27 NOTARIZED: | ||
I'll)(i I'l<OC:I:.SSli('3 | NO DOCKET N FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION F STEWART,W.L. | ||
REGULATORY | Arizona Public Service Co.(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)F | ||
INFORMATION | |||
DISTRIBUTION | ==SUBJECT:== | ||
SYSTEM (RIDS)CCESSION NBR:9505020298 | Forwards response to NRC 950410 ltr re violations noted in insp repts 50-528/95-07-01,50-529/95-07-01 | ||
DOC.DATE: 95/04/27 NOTARIZED: | &50-530/95-07-01 on 950306-10.Corrective actions:surveyed area&posted as high contamination area.DISTRIBUTION CODE: IEOID COPIES RECEIVED:LTR I ENCL I SIZE:/TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:STANDARDIZED PLANT Standardized plant.Standardized plant.05000528 I 05000529 05000530 RECIPIENT ID CODE/NAME PD4-2 PD TRAN,L ERNAL: ACRS AEOD/SPD/RAB AEOD/TTC gZM CENTER P NRR/DORS/OEAB'UDOCS-ABSTRACT OGC/HDS2 EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME HOLIAN, B THOMAS, C AEOD/DEIB AEOD/SPD/RRAB DEDRO NRR/DIS P/PI PB NRR/DRCH/HHFB OE DIR RGN4 FILE 01 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 D U iO'I'I I 0 Al.l."Rl DS" Rl:.Cll'I I'.i'I'S PI.L:XSI: I II I.P I'S'I'0 ICFDL'CI:.(i';X&'I'I.! | ||
NO DOCKET N FACIL:STN-50-528 | |||
Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 | |||
Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 | |||
Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION | |||
F STEWART,W.L. | |||
Arizona Public Service Co.(formerly Arizona Nuclear Power RECIP.NAME | |||
RECIPIENT AFFILIATION | |||
Document Control Branch (Document Control Desk)F SUBJECT: Forwards response to NRC 950410 ltr re violations | |||
noted in insp repts 50-528/95-07-01,50-529/95-07-01 | |||
&50-530/95-07-01 | |||
on 950306-10.Corrective | |||
actions:surveyed | |||
area&posted as high contamination | |||
area.DISTRIBUTION | |||
CODE: IEOID COPIES RECEIVED:LTR | |||
I ENCL I SIZE:/TITLE: General (50 Dkt)-Insp Rept/Notice | |||
of Violation Response NOTES:STANDARDIZED | |||
PLANT Standardized | |||
plant.Standardized | |||
plant.05000528 I 05000529 05000530 RECIPIENT ID CODE/NAME PD4-2 PD TRAN,L ERNAL: ACRS AEOD/SPD/RAB | |||
AEOD/TTC gZM CENTER P NRR/DORS/OEAB'UDOCS-ABSTRACT | |||
OGC/HDS2 EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME HOLIAN, B THOMAS, C AEOD/DEIB AEOD/SPD/RRAB | |||
DEDRO NRR/DIS P/PI PB NRR/DRCH/HHFB | |||
OE DIR RGN4 FILE 01 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 D U iO'I'I I 0 Al.l."Rl DS" Rl:.Cll'I I'.i'I'S PI.L:XSI: I II I.P I'S'I'0 ICFDL'CI:.(i';X&'I'I.! | |||
CONT%(I" I'I II: DOC('),Ilii"I'OiTIZOI. | CONT%(I" I'I II: DOC('),Ilii"I'OiTIZOI. | ||
DESK.IZOOil I'I 37 (I".Xl: 5&4.'(h33 ('I'0 I:I.I!1lli:X'I'I'. | DESK.IZOOil I'I 37 (I".Xl: 5&4.'(h33 ('I'0 I:I.I!1lli:X'I'I'. | ||
YOl'li X'Aill I'ROTI DIS'I'RI IIL" I'ION I.IS'I'S I'OR D()('.I'ill'.i'I'S | YOl'li X'Aill I'ROTI DIS'I'RI IIL" I'ION I.IS'I'S I'OR D()('.I'ill'.i'I'S 5 ()(')ON"I'l;I'.I)' | ||
5 ()(')ON"I'l;I'.I)' | TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 22 Arizona Public Service Companv 10CFR2.201 102-03335-WLS/AKK/R JH April 27, 1995 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001 | ||
TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 22 | |||
Arizona Public Service Companv 10CFR2.201 | ==Dear Sirs:== | ||
102-03335-WLS/AKK/R | SubJect: Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Docket Nos.STN 50-528/529/530 Reply to Notice of Violation 50-528/529/530/9&071 Arizona Public Service Company (APS)has reviewed NRC Inspection Report 50-528/529/530/95-07 and the Notice of Violation (NOV)dated April 10, 1995.Pursuant to the provisions of 10 CFR 2.201, APS'esponse is enclosed.Enclosure 1 to this letter is a restatement of the NOV.APS'esponse is provided in Enclosure 2.This NRC inspection focused on radiation protection activities associated with the Unit 2 Refueling Outage.The NRC inspectors noted that the APS Radiation Protection program was satisfactory overall to support outage related activities and noted improvements in establishment of more challenging ALARA goals and more detailed pre-job briefings. | ||
JH April 27, 1995 U.S.Nuclear Regulatory | However, a need exists for additional improvement in radioactive material and contamination control.As stated by the NRC, although general housekeeping was adequate, improvements are necessary in staging and control of outage equipment and tools.Minor problems were observed in the control of trash and extra protective clothing items.The inspectors concluded that this area of the program needs additional attention and that Radiation Protection Technicians should be more aggressive in their efforts to identify problems.ln an effort to improve radioactive material control, Radiation Protection and Maintenance Management are forming a group to address contaminated tool issues.The current guidelines are under evaluation to include necessary enhancements identified by the Palo Verde corrective action program.Radiation Protection Management has increased monitoring of this area to ensure improvements are effective. | ||
Commission | t 9505020298 950427 PDR ADOCK 05000528 9 PDR U.S.Nuclear Regulatory Commission | ||
ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001 | ~~ATlN: Document Control Desk Reply to NOV 50-528/95-07-01 Page 3 bcc: J.M.Levine (7602)M.D.Shea (7297)J.B.Steward (7902)J.P.Gaffney (7397)A.K.Krainik (7636)B.A.Grabo (7636)G.R.Overbeck (7602)J.C.Velotta (6156)C.K.Seaman (7992)C.E.Williams (7992)J.A.Scott (7295)J.H.Thompson (7602)R.E.Younger (7997)T.R.Bradish (7962)N.E.Meador (7636)P.M.Myers (7636)Source Document Library (7747) | ||
Dear Sirs: SubJect: Palo Verde Nuclear Generating | U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Reply to NOV 50-528/95-07-01 Page 2 Should you have any questions, please contact Angela Krainik at (602)393-5421.Sincerely,/I'/~RI5 WLS/AKK/R JH/pv | ||
Station (PVNGS)Units 1, 2, and 3 Docket Nos.STN 50-528/529/530 | |||
Reply to Notice of Violation 50-528/529/530/9&071 | ==Enclosures:== | ||
Arizona Public Service Company (APS)has reviewed NRC Inspection | |||
Report 50-528/529/530/95-07 | Restatement of Notice of Violation 2.Reply to Notice of Violation CC: L.J.Callan K.E.Perkins B.E.Holian K.E, Johnston ENCLOSURE 1 RESTATEMENT OF NOTICE OF VIOLATION 50-529/95%71 NRC INSPECTION CONDUCTED MARCH 6 THROUGH MARCH 10, 1995 INSPECTION REPORT NOs.50-528/529/530/957 Restatement of Notice of Violation 50-529 9&47%1 During an NRC inspection conducted on March 6 through March 10, 1995, one vio'lation of NRC requirements was identwed.ln accordance with the"General Statement of Policy and Procedures for NRC Enforcement Actions," 10 CFR Part 2, Appendix C, the violation is listed below: Section 6.8.1 of the Palo Verde, Unit 2, Technical Specifications states in part, that written procedures shall be established, implemented, and maintained covering the activities referenced in Regulatory Guide 1.33, Revision 2, February 1978.Appendix A, Section 7.e.(4)of Regulatory Guide 1.33 references contamination control.Palo Verde Radiation Protection procedure 75RP-ORP01,"Radiological Posting," Revision 7, Section 3.5, requires that areas identified as having contamination levels greater than 100,000 disintegrations per minute per 100 square centimeters be posted with radiation warning sign(s)bearing the words: "Caution or Danger, High Contamination Area." Where practical, radiological hazard tape should be used to further define area boundaries. | ||
and the Notice of Violation (NOV)dated April 10, 1995.Pursuant to the provisions | Contrary to the above, on March 8, 1995, the inspectors identified an unposted area on the 80-foot elevation of the Unit 2 containment building where contamination levels were as high as 150,000 disintegrations per minute per 100 square centimeters, This is a Severity Level IV violation, applicable to Unit 2 (Supplement IV)(529/95-07-01). | ||
of 10 CFR 2.201, APS'esponse | Page1 of1 ENCLOSURE 2 REPLY TO NOTICE OF VIOLATION 50-529/95%7%1 NRC INSPECTION CONDUCTED MARCH 6 THROUGH MARCH 10, 4995 INSPECTION REPORT NOs.50-528/529/530/95%7 Re I to Notice of Violation 50-529 9&0MB Reason for the Violation APS admits the violation. | ||
is enclosed.Enclosure 1 to this letter is a restatement | |||
of the NOV.APS'esponse | |||
is provided in Enclosure 2.This NRC inspection | |||
focused on radiation protection | |||
activities | |||
associated | |||
with the Unit 2 Refueling Outage.The NRC inspectors | |||
noted that the APS Radiation Protection | |||
program was satisfactory | |||
overall to support outage related activities | |||
and noted improvements | |||
in establishment | |||
of more challenging | |||
ALARA goals and more detailed pre-job briefings. | |||
However, a need exists for additional | |||
improvement | |||
in radioactive | |||
material and contamination | |||
control.As stated by the NRC, although general housekeeping | |||
was adequate, improvements | |||
are necessary in staging and control of outage equipment and tools.Minor problems were observed in the control of trash and extra protective | |||
clothing items.The inspectors | |||
concluded that this area of the program needs additional | |||
attention and that Radiation Protection | |||
Technicians | |||
should be more aggressive | |||
in their efforts to identify problems.ln an effort to improve radioactive | |||
material control, Radiation Protection | |||
and Maintenance | |||
Management | |||
are forming a group to address contaminated | |||
tool issues.The current guidelines | |||
are under evaluation | |||
to include necessary enhancements | |||
identified | |||
by the Palo Verde corrective | |||
action program.Radiation Protection | |||
Management | |||
has increased monitoring | |||
of this area to ensure improvements | |||
are effective. | |||
t 9505020298 | |||
950427 PDR ADOCK 05000528 9 PDR | |||
U.S.Nuclear Regulatory | |||
Commission | |||
~~ATlN: Document Control Desk Reply to NOV 50-528/95-07-01 | |||
Page 3 bcc: J.M.Levine (7602)M.D.Shea (7297)J.B.Steward (7902)J.P.Gaffney (7397)A.K.Krainik (7636)B.A.Grabo (7636)G.R.Overbeck (7602)J.C.Velotta (6156)C.K.Seaman (7992)C.E.Williams (7992)J.A.Scott (7295)J.H.Thompson (7602)R.E.Younger (7997)T.R.Bradish (7962)N.E.Meador (7636)P.M.Myers (7636)Source Document Library (7747) | |||
U.S.Nuclear Regulatory | |||
Commission | |||
ATTN: Document Control Desk Reply to NOV 50-528/95-07-01 | |||
Page 2 Should you have any questions, please contact Angela Krainik at (602)393-5421.Sincerely,/I'/~RI5 WLS/AKK/R JH/pv Enclosures: | |||
Restatement | |||
of Notice of Violation 2.Reply to Notice of Violation CC: L.J.Callan K.E.Perkins B.E.Holian K.E, Johnston | |||
ENCLOSURE 1 RESTATEMENT | |||
OF NOTICE OF VIOLATION 50-529/95%71 | |||
NRC INSPECTION | |||
CONDUCTED MARCH 6 THROUGH MARCH 10, 1995 INSPECTION | |||
REPORT NOs.50-528/529/530/957 | |||
Restatement | |||
of Notice of Violation 50-529 9&47%1 During an NRC inspection | |||
conducted on March 6 through March 10, 1995, one vio'lation | |||
of NRC requirements | |||
was identwed.ln accordance | |||
with the"General Statement of Policy and Procedures | |||
for NRC Enforcement | |||
Actions," 10 CFR Part 2, Appendix C, the violation is listed below: Section 6.8.1 of the Palo Verde, Unit 2, Technical Specifications | |||
states in part, that written procedures | |||
shall be established, implemented, and maintained | |||
covering the activities | |||
referenced | |||
in Regulatory | |||
Guide 1.33, Revision 2, February 1978.Appendix A, Section 7.e.(4)of Regulatory | |||
Guide 1.33 references | |||
contamination | |||
control.Palo Verde Radiation Protection | |||
procedure 75RP-ORP01,"Radiological | |||
Posting," Revision 7, Section 3.5, requires that areas identified | |||
as having contamination | |||
levels greater than 100,000 disintegrations | |||
per minute per 100 square centimeters | |||
be posted with radiation warning sign(s)bearing the words: "Caution or Danger, High Contamination | |||
Area." Where practical, radiological | |||
hazard tape should be used to further define area boundaries. | |||
Contrary to the above, on March 8, 1995, the inspectors | |||
identified | |||
an unposted area on the 80-foot elevation of the Unit 2 containment | |||
building where contamination | |||
levels were as high as 150,000 disintegrations | |||
per minute per 100 square centimeters, This is a Severity Level IV violation, applicable | |||
to Unit 2 (Supplement | |||
IV)(529/95-07-01). | |||
Page1 of1 | |||
ENCLOSURE 2 REPLY TO NOTICE OF VIOLATION 50-529/95%7%1 | |||
NRC INSPECTION | |||
CONDUCTED MARCH 6 THROUGH MARCH 10, 4995 INSPECTION | |||
REPORT NOs.50-528/529/530/95%7 | |||
Re I to Notice of Violation 50-529 9&0MB Reason for the Violation APS admits the violation. | |||
At the time of the inspection, Unit 2 was in a refueling outage, where ASME XI testing was performed on Safety Injection System valve 2JSIB-UV332, and the valve was returned to an operable condition. | At the time of the inspection, Unit 2 was in a refueling outage, where ASME XI testing was performed on Safety Injection System valve 2JSIB-UV332, and the valve was returned to an operable condition. | ||
The Radiation Protection | The Radiation Protection Department performed the required weekly survey of the 80-foot containment which was posted as a contaminated area on March 3, 1995, at approximately 11:30 hours and found no leaks or high contamination levels in the general area of valve 2JSIB-UV332. | ||
Department | On March 7, 1995, at approximately 16:22 hours the Shutdown Cooling (SDC)"B" train was placed in operation. | ||
performed the required weekly survey of the 80-foot containment | On March 8, 1995, at approximately 16:00 hours the NRC inspector observed water leaking from valve 2JSIB-UV332, and subsequent survey results indicated that this was a high contamination area.The previous contamination survey performed on March 3, 1995, did not indicate any leaks on or around the area of valve 2JSIB-UV332. | ||
which was posted as a contaminated | Additional surveys were performed on March 6th and 7th, 1995, by the Radiation Protection Operations Manager to verify a"Hot Spot" dose rate in close proximity to valve 2JSIB-UV332, and no leakage was identified during these surveys.Therefore, it is concluded that the valve leak occurred at the approximate time the SDC train"B" was placed in service.The duration that this condition existed fell between the time that the SDC train"B" was placed in service on March 7, 1995, at 16:22 hours until the condition was Identified on March 8, 1995, at 16:00 hours, approximately 24 hours.Page 1 of 4 Radiation Protection Technicians missed an opportunity to identify the condition during routine Containment walkdowns which are conducted on a shiftly basis.The cause of this condition has been determined to be that management expectations were not met by"roving" Containment Radiation Protection Technicians to ensure that routine surveys provide the level of detail and are comprehensive in identifying changing plant conditions. | ||
area on March 3, 1995, at approximately | Although Radiation Technicians typically tour all major elevations of Containment including the 80-foot elevation, no documentation existed to determine whether this particular area had been checked or toured on a shiftly basis during the time the valve was leaking.Corrective Actions Taken and Results Achlev d APS Radiation Protection initiated the following actions to immediately correct the condition: | ||
11:30 hours and found no leaks or high contamination | ~The area was surveyed and posted as a High Contamination Area (HCA)~~A drip catch was installed under the valve to contain the leakage until the valve was repaired.~The area was decontaminated and released from HCA controls.~Work request No.887461 was generated to repair the valve.~All elevations of the Unit 2 Containment (including grating)were surveyed for loose contamination. | ||
levels in the general area of valve 2JSIB-UV332. | No other unposted areas were discovered that required HCA controls.Page 2 of 4 | ||
On March 7, 1995, at approximately | ~Night Order¹95-003 was generated to immediately to communicate Radiation Protection Management's expectations regarding"Roving" Radiation Protection duties in Containment. | ||
16:22 hours the Shutdown Cooling (SDC)"B" train was placed in operation. | The Radiation Protection Operations staff was briefed by management on March 9, 1995, regarding these expectations. | ||
On March 8, 1995, at approximately | Corrective Actions That WIII Be Taken To Avoid Fu her Violations APS will implement the following actions to prevent recurrence: | ||
16:00 hours the NRC inspector observed water leaking from valve 2JSIB-UV332, and subsequent | Night Order¹95-003 was revised on April 21, 1995, to provide further clarification on management expectations for performing routine surveys, performing toursfinspections of plant areas, and personal accountability. | ||
survey results indicated that this was a high contamination | The Radiation Protection Operations Department Leader distributed these expectations to each member of the Radiation Protection staff on April 21, 1995.This condition will be reviewed in Industry Events Training as part of the second quarter Radiation Protection Technician Continuing Training Program.As part of the review, Radiation Protection Management will re-enforce expectations for the"level of detail" and comprehensiveness that is expected when performing routine surveys and conducting shiftly tours or"roving" checks of plant areas.Page 3 of 4 Date When Full Com llance Will Be Achieved Full compliance was achieved on March 8, 1995, when the area was surveved and posted as a HCA.The area was decontaminated and released from HCA controls on March 9, 1995.Page 4 of 4}} | ||
area.The previous contamination | |||
survey performed on March 3, 1995, did not indicate any leaks on or around the area of valve 2JSIB-UV332. | |||
Additional | |||
surveys were performed on March 6th and 7th, 1995, by the Radiation Protection | |||
Operations | |||
Manager to verify a"Hot Spot" dose rate in close proximity to valve 2JSIB-UV332, and no leakage was identified | |||
during these surveys.Therefore, it is concluded that the valve leak occurred at the approximate | |||
time the SDC train"B" was placed in service.The duration that this condition existed fell between the time that the SDC train"B" was placed in service on March 7, 1995, at 16:22 hours until the condition was Identified | |||
on March 8, 1995, at 16:00 hours, approximately | |||
24 hours.Page 1 of 4 | |||
Radiation Protection | |||
Technicians | |||
missed an opportunity | |||
to identify the condition during routine Containment | |||
walkdowns which are conducted on a shiftly basis.The cause of this condition has been determined | |||
to be that management | |||
expectations | |||
were not met by"roving" Containment | |||
Radiation Protection | |||
Technicians | |||
to ensure that routine surveys provide the level of detail and are comprehensive | |||
in identifying | |||
changing plant conditions. | |||
Although Radiation Technicians | |||
typically tour all major elevations | |||
of Containment | |||
including the 80-foot elevation, no documentation | |||
existed to determine whether this particular | |||
area had been checked or toured on a shiftly basis during the time the valve was leaking.Corrective | |||
Actions Taken and Results Achlev d APS Radiation Protection | |||
initiated the following actions to immediately | |||
correct the condition: | |||
~The area was surveyed and posted as a High Contamination | |||
Area (HCA)~~A drip catch was installed under the valve to contain the leakage until the valve was repaired.~The area was decontaminated | |||
and released from HCA controls.~Work request No.887461 was generated to repair the valve.~All elevations | |||
of the Unit 2 Containment (including | |||
grating)were surveyed for loose contamination. | |||
No other unposted areas were discovered | |||
that required HCA controls.Page 2 of 4 | |||
~Night Order¹95-003 was generated to immediately | |||
to communicate | |||
Radiation Protection | |||
Management's | |||
expectations | |||
regarding"Roving" Radiation Protection | |||
duties in Containment. | |||
The Radiation Protection | |||
Operations | |||
staff was briefed by management | |||
on March 9, 1995, regarding these expectations. | |||
Corrective | |||
Actions That WIII Be Taken To Avoid Fu her Violations | |||
APS will implement the following actions to prevent recurrence: | |||
Night Order¹95-003 was revised on April 21, 1995, to provide further clarification | |||
on management | |||
expectations | |||
for performing | |||
routine surveys, performing | |||
toursfinspections | |||
of plant areas, and personal accountability. | |||
The Radiation Protection | |||
Operations | |||
Department | |||
Leader distributed | |||
these expectations | |||
to each member of the Radiation Protection | |||
staff on April 21, 1995.This condition will be reviewed in Industry Events Training as part of the second quarter Radiation Protection | |||
Technician | |||
Continuing | |||
Training Program.As part of the review, Radiation Protection | |||
Management | |||
will re-enforce | |||
expectations | |||
for the"level of detail" and comprehensiveness | |||
that is expected when performing | |||
routine surveys and conducting | |||
shiftly tours or"roving" checks of plant areas.Page 3 of 4 | |||
Date When Full Com llance Will Be Achieved Full compliance | |||
was achieved on March 8, 1995, when the area was surveved and posted as a HCA.The area was decontaminated | |||
and released from HCA controls on March 9, 1995.Page 4 of 4 | |||
}} | |||
Revision as of 09:16, 17 August 2019
| ML17311A832 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 04/27/1995 |
| From: | Stewart W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9505020298 | |
| Download: ML17311A832 (11) | |
Text
F a.roarWv (AC(.ELI'.RATED I'll)(i I'l<OC:I:.SSli('3 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)CCESSION NBR:9505020298 DOC.DATE: 95/04/27 NOTARIZED:
NO DOCKET N FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION F STEWART,W.L.
Arizona Public Service Co.(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)F
SUBJECT:
Forwards response to NRC 950410 ltr re violations noted in insp repts 50-528/95-07-01,50-529/95-07-01
&50-530/95-07-01 on 950306-10.Corrective actions:surveyed area&posted as high contamination area.DISTRIBUTION CODE: IEOID COPIES RECEIVED:LTR I ENCL I SIZE:/TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:STANDARDIZED PLANT Standardized plant.Standardized plant.05000528 I 05000529 05000530 RECIPIENT ID CODE/NAME PD4-2 PD TRAN,L ERNAL: ACRS AEOD/SPD/RAB AEOD/TTC gZM CENTER P NRR/DORS/OEAB'UDOCS-ABSTRACT OGC/HDS2 EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME HOLIAN, B THOMAS, C AEOD/DEIB AEOD/SPD/RRAB DEDRO NRR/DIS P/PI PB NRR/DRCH/HHFB OE DIR RGN4 FILE 01 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 D U iO'I'I I 0 Al.l."Rl DS" Rl:.Cll'I I'.i'I'S PI.L:XSI: I II I.P I'S'I'0 ICFDL'CI:.(i';X&'I'I.!
CONT%(I" I'I II: DOC('),Ilii"I'OiTIZOI.
DESK.IZOOil I'I 37 (I".Xl: 5&4.'(h33 ('I'0 I:I.I!1lli:X'I'I'.
YOl'li X'Aill I'ROTI DIS'I'RI IIL" I'ION I.IS'I'S I'OR D()('.I'ill'.i'I'S 5 ()(')ON"I'l;I'.I)'
TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 22 Arizona Public Service Companv 10CFR2.201 102-03335-WLS/AKK/R JH April 27, 1995 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001
Dear Sirs:
SubJect: Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Docket Nos.STN 50-528/529/530 Reply to Notice of Violation 50-528/529/530/9&071 Arizona Public Service Company (APS)has reviewed NRC Inspection Report 50-528/529/530/95-07 and the Notice of Violation (NOV)dated April 10, 1995.Pursuant to the provisions of 10 CFR 2.201, APS'esponse is enclosed.Enclosure 1 to this letter is a restatement of the NOV.APS'esponse is provided in Enclosure 2.This NRC inspection focused on radiation protection activities associated with the Unit 2 Refueling Outage.The NRC inspectors noted that the APS Radiation Protection program was satisfactory overall to support outage related activities and noted improvements in establishment of more challenging ALARA goals and more detailed pre-job briefings.
However, a need exists for additional improvement in radioactive material and contamination control.As stated by the NRC, although general housekeeping was adequate, improvements are necessary in staging and control of outage equipment and tools.Minor problems were observed in the control of trash and extra protective clothing items.The inspectors concluded that this area of the program needs additional attention and that Radiation Protection Technicians should be more aggressive in their efforts to identify problems.ln an effort to improve radioactive material control, Radiation Protection and Maintenance Management are forming a group to address contaminated tool issues.The current guidelines are under evaluation to include necessary enhancements identified by the Palo Verde corrective action program.Radiation Protection Management has increased monitoring of this area to ensure improvements are effective.
t 9505020298 950427 PDR ADOCK 05000528 9 PDR U.S.Nuclear Regulatory Commission
~~ATlN: Document Control Desk Reply to NOV 50-528/95-07-01 Page 3 bcc: J.M.Levine (7602)M.D.Shea (7297)J.B.Steward (7902)J.P.Gaffney (7397)A.K.Krainik (7636)B.A.Grabo (7636)G.R.Overbeck (7602)J.C.Velotta (6156)C.K.Seaman (7992)C.E.Williams (7992)J.A.Scott (7295)J.H.Thompson (7602)R.E.Younger (7997)T.R.Bradish (7962)N.E.Meador (7636)P.M.Myers (7636)Source Document Library (7747)
U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Reply to NOV 50-528/95-07-01 Page 2 Should you have any questions, please contact Angela Krainik at (602)393-5421.Sincerely,/I'/~RI5 WLS/AKK/R JH/pv
Enclosures:
Restatement of Notice of Violation 2.Reply to Notice of Violation CC: L.J.Callan K.E.Perkins B.E.Holian K.E, Johnston ENCLOSURE 1 RESTATEMENT OF NOTICE OF VIOLATION 50-529/95%71 NRC INSPECTION CONDUCTED MARCH 6 THROUGH MARCH 10, 1995 INSPECTION REPORT NOs.50-528/529/530/957 Restatement of Notice of Violation 50-529 9&47%1 During an NRC inspection conducted on March 6 through March 10, 1995, one vio'lation of NRC requirements was identwed.ln accordance with the"General Statement of Policy and Procedures for NRC Enforcement Actions," 10 CFR Part 2, Appendix C, the violation is listed below: Section 6.8.1 of the Palo Verde, Unit 2, Technical Specifications states in part, that written procedures shall be established, implemented, and maintained covering the activities referenced in Regulatory Guide 1.33, Revision 2, February 1978.Appendix A, Section 7.e.(4)of Regulatory Guide 1.33 references contamination control.Palo Verde Radiation Protection procedure 75RP-ORP01,"Radiological Posting," Revision 7, Section 3.5, requires that areas identified as having contamination levels greater than 100,000 disintegrations per minute per 100 square centimeters be posted with radiation warning sign(s)bearing the words: "Caution or Danger, High Contamination Area." Where practical, radiological hazard tape should be used to further define area boundaries.
Contrary to the above, on March 8, 1995, the inspectors identified an unposted area on the 80-foot elevation of the Unit 2 containment building where contamination levels were as high as 150,000 disintegrations per minute per 100 square centimeters, This is a Severity Level IV violation, applicable to Unit 2 (Supplement IV)(529/95-07-01).
Page1 of1 ENCLOSURE 2 REPLY TO NOTICE OF VIOLATION 50-529/95%7%1 NRC INSPECTION CONDUCTED MARCH 6 THROUGH MARCH 10, 4995 INSPECTION REPORT NOs.50-528/529/530/95%7 Re I to Notice of Violation 50-529 9&0MB Reason for the Violation APS admits the violation.
At the time of the inspection, Unit 2 was in a refueling outage, where ASME XI testing was performed on Safety Injection System valve 2JSIB-UV332, and the valve was returned to an operable condition.
The Radiation Protection Department performed the required weekly survey of the 80-foot containment which was posted as a contaminated area on March 3, 1995, at approximately 11:30 hours and found no leaks or high contamination levels in the general area of valve 2JSIB-UV332.
On March 7, 1995, at approximately 16:22 hours the Shutdown Cooling (SDC)"B" train was placed in operation.
On March 8, 1995, at approximately 16:00 hours the NRC inspector observed water leaking from valve 2JSIB-UV332, and subsequent survey results indicated that this was a high contamination area.The previous contamination survey performed on March 3, 1995, did not indicate any leaks on or around the area of valve 2JSIB-UV332.
Additional surveys were performed on March 6th and 7th, 1995, by the Radiation Protection Operations Manager to verify a"Hot Spot" dose rate in close proximity to valve 2JSIB-UV332, and no leakage was identified during these surveys.Therefore, it is concluded that the valve leak occurred at the approximate time the SDC train"B" was placed in service.The duration that this condition existed fell between the time that the SDC train"B" was placed in service on March 7, 1995, at 16:22 hours until the condition was Identified on March 8, 1995, at 16:00 hours, approximately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.Page 1 of 4 Radiation Protection Technicians missed an opportunity to identify the condition during routine Containment walkdowns which are conducted on a shiftly basis.The cause of this condition has been determined to be that management expectations were not met by"roving" Containment Radiation Protection Technicians to ensure that routine surveys provide the level of detail and are comprehensive in identifying changing plant conditions.
Although Radiation Technicians typically tour all major elevations of Containment including the 80-foot elevation, no documentation existed to determine whether this particular area had been checked or toured on a shiftly basis during the time the valve was leaking.Corrective Actions Taken and Results Achlev d APS Radiation Protection initiated the following actions to immediately correct the condition:
~The area was surveyed and posted as a High Contamination Area (HCA)~~A drip catch was installed under the valve to contain the leakage until the valve was repaired.~The area was decontaminated and released from HCA controls.~Work request No.887461 was generated to repair the valve.~All elevations of the Unit 2 Containment (including grating)were surveyed for loose contamination.
No other unposted areas were discovered that required HCA controls.Page 2 of 4
~Night Order¹95-003 was generated to immediately to communicate Radiation Protection Management's expectations regarding"Roving" Radiation Protection duties in Containment.
The Radiation Protection Operations staff was briefed by management on March 9, 1995, regarding these expectations.
Corrective Actions That WIII Be Taken To Avoid Fu her Violations APS will implement the following actions to prevent recurrence:
Night Order¹95-003 was revised on April 21, 1995, to provide further clarification on management expectations for performing routine surveys, performing toursfinspections of plant areas, and personal accountability.
The Radiation Protection Operations Department Leader distributed these expectations to each member of the Radiation Protection staff on April 21, 1995.This condition will be reviewed in Industry Events Training as part of the second quarter Radiation Protection Technician Continuing Training Program.As part of the review, Radiation Protection Management will re-enforce expectations for the"level of detail" and comprehensiveness that is expected when performing routine surveys and conducting shiftly tours or"roving" checks of plant areas.Page 3 of 4 Date When Full Com llance Will Be Achieved Full compliance was achieved on March 8, 1995, when the area was surveved and posted as a HCA.The area was decontaminated and released from HCA controls on March 9, 1995.Page 4 of 4