{{#Wiki_filter:June 8, 2012
{{#Wiki_filter:une 8, 2012


==SUBJECT:==
==SUBJECT:==

Revision as of 15:00, 15 July 2019

IR 05000341-12-403(DRS), on 05/21/2012 - 05/25/2012; Fermi Power Plant, Unit 2; Routine Security Baseline Inspection - Cover Letter
ML12160A442
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/08/2012
From: Mel Holmberg
Plant Support Branch II
To: Jennifer Davis
Detroit Edison, Co
References
IR-12-403
Download: ML12160A442 (4)


Text

une 8, 2012

SUBJECT:

FERMI POWER PLANT, UNIT 2; NRC SECURITY BASELINE INSPECTION REPORT

05000341/2012403(DRS)

Dear Mr. Davis:

On May 25, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection of your Fermi Power Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process.

The enclosed inspection report documents the inspection results, which were discussed on May 25, 2012, with Mr. W. Collonello and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified. However, one licensee-identified violation, which was determined to be of very low security significance, is listed in this report. The NRC is treating this violation as a Non-Cited Violation (NCV) consistent with Section 2.3.2 of the NRC Enforcement Policy because of the very low security significance of the violation and because it was entered into your corrective action program. If you contest the subject or severity of an NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with a copy to the Regional Administrator, U.S. Nuclear Regulatory Commission - Region III, 2443 Warrenville Road, Suite 210, Lisle, IL 60532-4352; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555- 0001; and the Resident Inspector Office at the Fermi Power Plant.

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter

=s enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/ Mel Holmberg, Acting Chief Plant Support Branch Division of Reactor Safety

Docket No. 50-341 License No. NPF-43 Nonpublic Enclosure: Inspection Report 05000341/2012403(DRS)

w/Attachment: Supplemental Information

cc w/encl: S. Coker, NSIR/DSO/DDSO/ST R. Albert, NSIR J. Trapp, RI B. Desai, RII M. Hay, RIV K. Yale, State Liaison Officer, State of Michigan