ML060090345: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 9: Line 9:
| docket = 05000390
| docket = 05000390
| license number = NPF-090
| license number = NPF-090
| contact person = Pickett D V, NRR/DLPM, 415-1364
| contact person = Pickett D, NRR/DLPM, 415-1364
| case reference number = TAC MC6569
| case reference number = TAC MC6569
| package number = ML060050408
| package number = ML060050408
Line 21: Line 21:
{{#Wiki_filter:Shield Building 3.6.15 3.6 CONTAINMENT SYSTEMS 3.6.15 Shield Building LCO 3.6.15 APPLICABILITY:
{{#Wiki_filter:Shield Building 3.6.15 3.6 CONTAINMENT SYSTEMS 3.6.15 Shield Building LCO 3.6.15 APPLICABILITY:
The Shield Building shall be OPERABLE.MODES 1, 2, 3, and 4.ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Shield building Inoperable.
The Shield Building shall be OPERABLE.MODES 1, 2, 3, and 4.ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Shield building Inoperable.
A.1 Restore shield building to 24 hours OPERABLE status.B. ----NOTE------  
A.1 Restore shield building to 24 hours OPERABLE status.B. ----NOTE------
 
8.1 Restore annulus pressure 8 hours Annulus pressure within limits.requirement Is not applicable during venting operations, required annulus entries, or Auxiliary Building Isolations not exceeding 1 hour in duration or while Penetration 1-EQH-271  
===8.1 Restore===
annulus pressure 8 hours Annulus pressure within limits.requirement Is not applicable during venting operations, required annulus entries, or Auxiliary Building Isolations not exceeding 1 hour in duration or while Penetration 1-EQH-271  
-0010 or 1-EQH-271-0011 In the Shield Building dome Is open until annulus pressure Is restored.*
-0010 or 1-EQH-271-0011 In the Shield Building dome Is open until annulus pressure Is restored.*
Annulus pressure not within limits.C. Required Action and C.1 Be In MODE S. 6 hours associated Completlon Time not met. AND 0 .2 Be In MODE 5. 36 hours*1. The combined opening ime of Penetrations 1-EQ-H-271-0010 or 1-EQH-271-0011 Is limited lo a total time of five hours a day, six days a week during Cycle 7 operation.
Annulus pressure not within limits.C. Required Action and C.1 Be In MODE S. 6 hours associated Completlon Time not met. AND 0 .2 Be In MODE 5. 36 hours*1. The combined opening ime of Penetrations 1-EQ-H-271-0010 or 1-EQH-271-0011 Is limited lo a total time of five hours a day, six days a week during Cycle 7 operation.

Revision as of 00:53, 14 July 2019

Tech Spec Pages for Amendment 59 Temporary Use of Penetrations in Shield Building Dome During Modes 1-4
ML060090345
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 01/06/2006
From:
Plant Licensing Branch III-2
To:
Pickett D, NRR/DLPM, 415-1364
Shared Package
ML060050408 List:
References
TAC MC6569
Download: ML060090345 (2)


Text

Shield Building 3.6.15 3.6 CONTAINMENT SYSTEMS 3.6.15 Shield Building LCO 3.6.15 APPLICABILITY:

The Shield Building shall be OPERABLE.MODES 1, 2, 3, and 4.ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Shield building Inoperable.

A.1 Restore shield building to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OPERABLE status.B. ----NOTE------

8.1 Restore annulus pressure 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Annulus pressure within limits.requirement Is not applicable during venting operations, required annulus entries, or Auxiliary Building Isolations not exceeding 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> in duration or while Penetration 1-EQH-271

-0010 or 1-EQH-271-0011 In the Shield Building dome Is open until annulus pressure Is restored.*

Annulus pressure not within limits.C. Required Action and C.1 Be In MODE S. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completlon Time not met. AND 0 .2 Be In MODE 5. 36 hour4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />s*1. The combined opening ime of Penetrations 1-EQ-H-271-0010 or 1-EQH-271-0011 Is limited lo a total time of five hours a day, six days a week during Cycle 7 operation.

2. Penetrations 1-EQOI-271

-0010 or 1-EQH-271-001 1 In the Shield Building Dome may not be opened If In Action Conditions LCO 3.6.9A or 3.8.1B.3. Upon opening Penetration 1-EQI-l271-0010 or 1-EQ-I-271-0011 In the Shield BuIldirig Dome, both'EGTS control loops shall be placed In the A-Auto Stand-by position and returned to normal position following closure of penetration.

Walls Bar-Unit I 3.8-40 Amendment No. 59 Containment Pressure 3.6A 3.6 CONTAINMENT SYSTEMS 3.6.4 Containment Pressure LCO 3.6.4 Containment pressure shall be a -0.1 and 5 +0.3 psid relative to the annulus.APPLICABILITY:

MODES 1, 2, 3, and 4.ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. ----NOTE--.- A.1 Restore containment pressure 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to within Emits.When opening or dosing Penetration 1-EQH-271-0010 or 1-EQH-271-0011 in the Shield Building Dome during Cycle 7 operation, time is allowed for Containment Annulus pressure equalization to occur.Containment pressure not within limits.B. Required Action and B.1 Be In MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND B.2 Be In MODE 5. SS hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.1 Verify containment pressure Is within limits. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Watts Bar-Unit I 8.6-15 Amendment No .59