IR 05000331/2005005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 01/31/2006
| issue date = 01/31/2006
| title = Errata to Duane Arnold Energy Center NRC Integrated Inspection Report 05000331-05-005
| title = Errata to Duane Arnold Energy Center NRC Integrated Inspection Report 05000331-05-005
| author name = Burgess B L
| author name = Burgess B
| author affiliation = NRC/RGN-III
| author affiliation = NRC/RGN-III
| addressee name = VanMiddlesworth G D
| addressee name = Vanmiddlesworth G
| addressee affiliation = Nuclear Management Co, LLC
| addressee affiliation = Nuclear Management Co, LLC
| docket = 05000331
| docket = 05000331
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:January 31, 2006Mr. Gary Van MiddlesworthSite Vice-President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785SUBJECT:ERRATA TO DUANE ARNOLD ENERGY CENTERNRC INTEGRATED INSPECTION REPORT 05000331/2005005
[[Issue date::January 31, 2006]]
 
Mr. Gary Van MiddlesworthSite Vice-President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785
 
SUBJECT: ERRATA TO DUANE ARNOLD ENERGY CENTERNRC INTEGRATED INSPECTION REPORT 05000331/2005005


==Dear Mr. Van Middlesworth:==
==Dear Mr. Van Middlesworth:==
On January 25, 2006, the U.S. Nuclear Regulatory Commission (NRC) issued IntegratedInspection Report 05000331/2005005 (ML060260024). Several paragraphs were inadvertently omitted from the original report. The enclosed errata contains the missing information and should be inserted where appropriate into Integrated Inspection Report 05000331/2005005.We apologize for any inconvenience to you and your staff.
On January 25, 2006, the U.S. Nuclear Regulatory Commission (NRC) issued IntegratedInspection Report 05000331/2005005 (ML060260024). Several paragraphs were inadvertently omitted from the original report. The enclosed errata contains the missing information and should be inserted where appropriate into Integrated Inspection Report 05000331/2005005.We apologize for any inconvenience to you and your staff.


Sincerely,/RA by Carey Brown for/Bruce L. Burgess, ChiefProjects Branch 2 Division of Reactor ProjectsDocket No. 50-331License No. DPR-49
Sincerely,
 
/RA by Carey Brown for/Bruce L. Burgess, ChiefProjects Branch 2 Division of Reactor ProjectsDocket No. 50-331License No. DPR-49Enclosure:Errata to Inspection Report 05000331/2005005 cc w/encl:J. Stall, Senior Vice President, Nuclear and Chief Nuclear OfficerR. Helfrich, Senior Attorney M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs Chairman, Linn County Board of Supervisors D. McGhee, Iowa Department of Public Health DOCUMENT NAME:E:\Filenet\ML060320272.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIRIIIRIIIRIIINAMEBBurgess/trtDATE01/31/06OFFICIAL RECORD COPY G. Van Middlesworth-2-ADAMS Distribution
===Enclosure:===
Errata to Inspection Report 05000331/2005005 cc w/encl:J. Stall, Senior Vice President, Nuclear and Chief Nuclear OfficerR. Helfrich, Senior Attorney M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs Chairman, Linn County Board of Supervisors D. McGhee, Iowa Department of Public Health DOCUMENT NAME:E:\Filenet\ML060320272.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIRIIIRIIIRIIINAMEBBurgess/trtDATE01/31/06OFFICIAL RECORD COPY G. Van Middlesworth-2-ADAMS Distribution
:HKN DWS RidsNrrDirsIrib
:HKN DWS RidsNrrDirsIrib



Revision as of 00:04, 14 July 2019

Errata to Duane Arnold Energy Center NRC Integrated Inspection Report 05000331-05-005
ML060320272
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 01/31/2006
From: Burgess B
NRC/RGN-III
To: Vanmiddlesworth G
Nuclear Management Co
References
IR-05-005
Download: ML060320272 (4)


Text

January 31, 2006Mr. Gary Van MiddlesworthSite Vice-President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785SUBJECT:ERRATA TO DUANE ARNOLD ENERGY CENTERNRC INTEGRATED INSPECTION REPORT 05000331/2005005

Dear Mr. Van Middlesworth:

On January 25, 2006, the U.S. Nuclear Regulatory Commission (NRC) issued IntegratedInspection Report 05000331/2005005 (ML060260024). Several paragraphs were inadvertently omitted from the original report. The enclosed errata contains the missing information and should be inserted where appropriate into Integrated Inspection Report 05000331/2005005.We apologize for any inconvenience to you and your staff.

Sincerely,

/RA by Carey Brown for/Bruce L. Burgess, ChiefProjects Branch 2 Division of Reactor ProjectsDocket No. 50-331License No. DPR-49Enclosure:Errata to Inspection Report 05000331/2005005 cc w/encl:J. Stall, Senior Vice President, Nuclear and Chief Nuclear OfficerR. Helfrich, Senior Attorney M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs Chairman, Linn County Board of Supervisors D. McGhee, Iowa Department of Public Health DOCUMENT NAME:E:\Filenet\ML060320272.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIRIIIRIIIRIIINAMEBBurgess/trtDATE01/31/06OFFICIAL RECORD COPY G. Van Middlesworth-2-ADAMS Distribution

HKN DWS RidsNrrDirsIrib

GEG KGO GAW1 CAA1 C. Pederson, DRS (hard copy - IR's only)

DRPIII DRSIII PLB1 JRK1 ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)

ERRATA TO NRC INTEGRATED INSPECTION REPORT 05000331/2005005 1.On page 1, add the following to the list of inspectors.T. Ploski, Senior Emergency Preparedness Analyst2.On page 13, in the line above the line "4. OTHER ACTIVITIES", insert the following:1EP4Emergency Action Level and Emergency Plan Changes (71114.04) a.Inspection ScopeThe inspectors performed a screening review of Revision 22 of Section I of theDuane Arnold Energy Center Emergency Plan to determine whether the changes made in Revision 22 decreased the effectiveness of the licensee's emergency planning. The screening review of this revision did not constitute an approval of the changes and, as such, the changes are subject to future NRC inspection to ensure that the emergencyplan continues to meet NRC regulations. These activities completed one inspection sample. b.FindingsNo findings of significance were identified.3.On page 18, Section 4OA6.2, on the line below "President, on October 7, 2005" insertthe following:*Emergency Preparedness inspection with Mr. P. Sullivan on December 16, 2005.4.On page 1 of the attachment under the heading "Licensee personnel" insert thefollowing:P. Sullivan, Emergency Preparedness Manager5.On page 6 of the attachment, in the line above the line beginning "Section 4OA2:

",insert the following:Section 1EP4: Emergency Action Level and Emergency Plan ChangesDuane Arnold Energy Center Emergency Plan;Section I; Revision 22