ML060610437: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 2: | Line 2: | ||
| number = ML060610437 | | number = ML060610437 | ||
| issue date = 03/02/2006 | | issue date = 03/02/2006 | ||
| title = | | title = Inspection/Activity Plan for 03/01/2006 - 09/30/2007 | ||
| author name = | | author name = | ||
| author affiliation = NRC/RGN-II/DRP | | author affiliation = NRC/RGN-II/DRP | ||
Revision as of 22:35, 13 July 2019
| ML060610437 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 03/02/2006 |
| From: | Division Reactor Projects II |
| To: | |
| Shared Package | |
| ML060610429 | List: |
| References | |
| IR-06-001 | |
| Download: ML060610437 (2) | |
Text
Watts Bar Inspection / Activity Plan 03/01/2006
-09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/02/2006 11:45:03 Report 22 1 PSB1-RP-RP PUBLIC PRE-INSPECTION VISIT Baseline Inspections 04/11/2006 04/13/2006 1 7112101 IP A ccess Control to Radiologically Significant Areas 4 PSB1-RP-RP PUBLIC BASELINE Baseline Inspections 05/08/2006 05/12/2006 1 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 05/08/2006 05/12/2006 1 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 05/08/2006 05/12/2006 1 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 05/08/2006 05/12/2006 1 71151 IP Performance Indicator Verification 3 PS2 EP-EP EXERCISE Baseline Inspections 06/05/2006 06/09/2006 1 7111401 IP Exercise Evaluation 3 OL PREP-INITIAL EXAM PREP Not Applicable 08/07/2006 08/11/2006 1 V23241 WATTS BAR/SEPTEMBER 2006 EXAM AT POWER FACILITIES 2 OL RQ-REQUAL INSPECTION Baseline Inspections 08/14/2006 08/18/2006 1 7111111B IP Licensed Operator Requalification Program 1 PS2-EP-EP INSP Baseline Inspections 09/04/2006 09/08/2006 1 7111402 IP A lert and Notification System Testing Baseline Inspections 09/04/2006 09/08/2006 1 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 09/04/2006 09/08/2006 1 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 09/04/2006 09/09/2006 1 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 09/04/2006 09/09/2006 1 71151 IP Performance Indicator Verification 3 OL EXAM-INITIAL EXAM Not Applicable 09/05/2006 09/15/2006 1 V23241 WATTS BAR/SEPTEMBER 2006 EXAM AT POWER FACILITIES 1 EB3-ISI-U1 INSERVICE INSPECTION Baseline Inspections 09/18/2006 09/22/2006 1 7111108P IP Inservice Inspection Activities - PWR 1 RP BR6-UNIT 2 SYSTEMS LAY-UP INSPECTION Other Routine 09/25/2006 09/29/2006 1 92050 IP Review Of Quality Assurance For Extended Construction Delays 2 EB1-SUMP-PWR CONTAINMENT SUMP BLOCKAGE TI (U-1)
Baseline Inspections 10/01/2006 10/06/2006 1 71111 IP Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 2 PSB1-RP-RP BASELINE OCCUPATIONAL & S/G REPL-WK1 Other Routine 10/02/2006 10/06/2006 1 50001 IP Steam Generator Replacement Inspection Baseline Inspections 10/02/2006 10/06/2006 1 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 10/02/2006 10/06/2006 1 7112102 IP A LARA Planning and Controls Baseline Inspections 10/02/2006 10/06/2006 1 71151 IP Performance Indicator Verification 3 EB3SGRP-SG REPLACEMENT Other Routine 10/02/2006 10/06/2006 1 50001 IP Steam Generator Replacement Inspection Other Routine 10/23/2006 10/27/2006 1 50001 IP Steam Generator Replacement Inspection This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Watts Bar Inspection / Activity Plan 03/01/2006
-09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/02/2006 11:45:03 Report 22 3 EB3SGRP-SG REPLACEMENT Other Routine 10/30/2006 11/03/2006 1 50001 IP Steam Generator Replacement Inspection Other Routine 11/13/2006 11/17/2006 1 50001 IP Steam Generator Replacement Inspection 1 PSB1-RP-RP BASELINE OCCUPATIONAL & S/G REPL WK2 Other Routine 10/16/2006 10/20/2006 1 50001 IP Steam Generator Replacement Inspection Baseline Inspections 10/16/2006 10/20/2006 1 7112101 IP A ccess Control to Radiologically Significant Areas 6 EB1-CDB-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 01/29/2007 02/02/2007 1 7111121 IP Component Design Bases Inspection Baseline Inspections 02/12/2007 02/16/2007 1 7111121 IP Component Design Bases Inspection Baseline Inspections 02/26/2007 03/02/2007 1 7111121 IP Component Design Bases Inspection Baseline Inspections 03/12/2007 03/16/2007 1 7111121 IP Component Design Bases Inspection 5 TFP-TFP INFO TRIP Baseline Inspections 05/08/2007 05/10/2007 1 7111105T IP Fire Protection [Triennial]
3 PSB1-RP-RP OCCUPATIONAL BASELINE INSPECTION Baseline Inspections 05/21/2007 05/25/2007 1 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 05/21/2007 05/25/2007 1 7112102 IP A LARA Planning and Controls Baseline Inspections 05/21/2007 05/25/2007 1 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 05/21/2007 05/25/2007 1 71151 IP Performance Indicator Verification 5 TFP-TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 05/28/2007 06/01/2007 1 7111105T IP Fire Protection [Triennial]
Baseline Inspections 06/11/2007 06/15/2007 1 7111105T IP Fire Protection [Triennial]
1 PS2-EP-EP INSP Baseline Inspections 06/04/2007 06/08/2007 1 7111402 IP A lert and Notification System Testing Baseline Inspections 06/04/2007 06/08/2007 1 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 06/04/2007 06/08/2007 1 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 06/04/2007 06/08/2007 1 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 06/04/2007 06/08/2007 1 71151 IP Performance Indicator Verification 1 EB3-HS-HEAT SINK Baseline Inspections 06/25/2007 06/29/2007 1 7111107B IP Heat Sink Performance 4 RPB6-PIR-BIENNIAL PI&R INSPECTION WEEK 1 Baseline Inspections 08/27/2007 08/31/2007 1 71152B IP Identification and Resolution of Problems 4 RPB6-PIR-BIENNIAL PI&R INSPECTION WEEK 2 Baseline Inspections 09/10/2007 09/14/2007 1 71152B IP Identification and Resolution of Problems This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.