| issue date = 03/20/2006
| issue date = 03/20/2006
| title = Notification of Hatch Component Design Bases Inspection 05000321-06-007 and 05000366-06-007
| title = Notification of Hatch Component Design Bases Inspection 05000321-06-007 and 05000366-06-007
| author name = Ogle C R
| author name = Ogle C
| author affiliation = NRC/RGN-II/DRS/EB1
| author affiliation = NRC/RGN-II/DRS/EB1
| addressee name = Sumner H L
| addressee name = Sumner H
| addressee affiliation = Southern Nuclear Operating Co, Inc
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000321, 05000366
| docket = 05000321, 05000366
Line 14: Line 14:
| page count = 5
| page count = 5
}}
}}
See also: [[followed by::IR 05000321/2006007]]
See also: [[see also::IR 05000321/2006007]]


=Text=
=Text=

Revision as of 21:34, 13 July 2019

Notification of Hatch Component Design Bases Inspection 05000321-06-007 and 05000366-06-007
ML060800021
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/20/2006
From: Ogle C
NRC/RGN-II/DRS/EB1
To: Sumner H
Southern Nuclear Operating Co
References
IR-06-007
Download: ML060800021 (5)


See also: IR 05000321/2006007

Text

March 20, 2006Southern Nuclear Operating Company, Inc.ATTN:Mr. H. L. Sumner, Jr.Vice PresidentP. O. Box 1295

Birmingham, AL 35201-1295SUBJECT:NOTIFICATION OF EDWIN I. HATCH NUCLEAR PLANT COMPONENTDESIGN BASES INSPECTION - NRC INSPECTION REPORT05000321/2006007 AND 05000366/2006007Dear Mr. Summer:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)Region II staff will conduct a component design bases inspection at your Edwin I. HatchNuclear Plant during the weeks of June 12-16, 2006, June 26-30, 2006, and July 10-14, 2006. The inspection team will be led by Mr. George Hopper, a Senior Reactor Inspector from theNRC's Region II Office. This inspection will be conducted in accordance with the baselineinspection procedure, Procedure 71111.21, Component Design Bases Inspection, issued

December 2, 2005.The inspection will evaluate the c

apability of risk significant / low margin components to functionas designed and support proper system operation. The inspection will also include a review ofselected operator actions, operating experience, and modifications. During a telephone conversation on March 2, 2006, Mr. Hopper confirmed with Ms. KathyUnderwood of your staff, arrangements for an information gathering site visit and the three-

week onsite inspection. The schedule is as follows:*Information gathering visit: Week of May 22-26, 2006.*Onsite weeks: June 12-16, 2006, June 26-30, 2006, and July 10-14, 2006. The purpose of the information gathering visit is to meet with members of your staff to identifyrisk-significant components and operator actions. Information and documentation needed to

support the inspection will also be identified. Mr. Rudy Bernhard, a Region II Senior ReactorAnalyst, may accompany Mr. Hopper and the inspection team during the information gathering

visit to review probabilistic risk assessment data and identify risk significant components whichwill be examined during the inspection.The enclosure lists documents that will be needed prior to the information gathering visit.Please contact Mr. Hopper prior to preparing copies of the materials listed in the enclosure.

The inspectors will try to minimize your administrative burden by specifically identifying onlythose documents required for the inspection preparation.

SNC2During the information gathering visit, the team leader will also discuss the following inspectionsupport administrative details: office space, supplemental documents requested to be made

available to the team in the Region II office prior to the inspection preparation week of May 28,

2006; arrangements for site access; and the availability of knowledgeable plant engineering andlicensing personnel to serve as points of contact during the inspection.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure will be available electronically for public inspection in the NRC Public DocumentRoom or from the Publicly Available Records (PARS) component of NRC's document system(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Thank you for your cooperation in this matter. If you have any questions regarding theinformation requested or the inspection, please contact Mr. Hopper at (404) 562-4645 or me at

(404) 562-4605.Sincerely,/RA/

Charles R. Ogle, ChiefEngineering Branch 1

Division of Reactor SafetyDocket Nos.: 50-321 & 50-366License Nos.: DPR-57 & NPF-5Enclosure: Information Request for Hatch Nuclear Plant Component Design Bases Inspectioncc w/enc: (See page 3)

SNC3cc w/encl:J. T. Gasser

Executive Vice President

Southern Nuclear Operating Company, Inc.

Electronic Mail DistributionGeorge R. FrederickGeneral Manager, Plant Hatch

Southern Nuclear Operating Company, Inc.

Electronic Mail DistributionRaymond D. BakerManager Licensing - Hatch

Southern Nuclear Operating Company, Inc.

Electronic Mail DistributionArthur H. Domby, Esq.Troutman Sanders

Electronic Mail DistributionLaurence BergenOglethorpe Power Corporatioln

Electronic Mail DistributionBentina C. TerrySouthern Nuclear Operating Company, Inc.

Bin B-022

P. O. Box 1295

Birmingham, AL 35201-1295DirectorDepartment of Natural Resources

205 Butler Street, SE, Suite 1252

Atlanta, GA 30334Manager, Radioactive Materials ProgramDepartment of Natural Resources

Electronic Mail DistributionChairmanAppling County Commissioners

69 Tippins St., Suite 201

Baxley, GA 31513Resident ManagerOglethorpe Power Corporation

Edwin I. Hatch Nuclear Plant

Electronic Mail DistributionSenior Engineer - Power SupplyMunicipal Electric Authority

of Georgia

Electronic Mail DistributionReece McAlisterExecutive Secretary

Georgia Public Service Commission

244 Washington Street, SW

Atlanta, GA 30334

_________________________OFFICERII:DRSRII:DRSRII:DRPSIGNATURE/RA//RA//RA/

NAMEG. HopperC. OgleC. RappDATE3/10/063/20/063/20/06

E-MAIL COPY? YESNO YESNO YESNO YESNO YESNO YESNO YESNO

EnclosureINFORMATION REQUEST FOR HATCH NUCLEAR PLANTCOMPONENT DESIGN BASES INSPECTIONPlease provide the information electronically in ".pdf" files, Excel, or other searchable format onCDROM. The CDROM should be indexed and hyperlinked to facilitate ease of use. Information in "lists" should contain enough information to be easily understood to someone

who has a knowledge of boiling water reactor technology.1.Risk ranking of components from your site specific probabilistic safety analysis (PSA)sorted by Risk Achievement Worth (RAW) and sorted separately by Birnbaum

Importance. If possible, please provide a correlation between actual plant componentsin plain language, and RAW values.2.Provide a list of the top 500 cutsets from your PSA.

3.Risk ranking of operator actions from your site specific PSA sorted by RAW. Providecopies of your human reliability worksheets for these items.4.If you have an External Event or Fire PSA Model, provide the information requested inItems 1 and 2 for external events and fire.5.Any pre-existing evaluation or list of components and calculations with low designmargins (i.e., pumps closest to the design limit for flow or pressure, diesel generator

close to design required output, heat exchangers close to rated design heat removal,