ML061070215: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML061070215
| number = ML061070215
| issue date = 04/13/2006
| issue date = 04/13/2006
| title = Pilgrim, Technical Specification Page, Deletes the Main Steam Isolation Valve Twice Per Week Partial Stroke Testing Surveillance Specified in Technical Specification 4.7.A.2.b.1.c
| title = Technical Specification Page, Deletes the Main Steam Isolation Valve Twice Per Week Partial Stroke Testing Surveillance Specified in Technical Specification 4.7.A.2.b.1.c
| author name =  
| author name =  
| author affiliation = NRC/NRR/ADRO
| author affiliation = NRC/NRR/ADRO
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:LIMITING CONDITIONS FOR OPERATION-SURVEILLANCE REQUIREMENTS
{{#Wiki_filter:LIMITING CONDITIONS FOR OPERATION-SURVEILLANCE REQUIREMENTS 3.7 C01NTAINMENT SYSTEMS (Cont) 4.7 CONTAINMENT SYSTEMS (Cont)A. Primary Containment (Cont)c. Deleted d. Verify reactor coolant system instrument line flow check valve operability as specified in 3.13.2. b. 2. Whenever a primary containment automatic isolation valve is inoperable, the position of the isolated valve in each line having an inoperable valve shall be recorded daily.2.c. Continuous Leak Rate Monitor When the primary containment is inerted, the containment shall be continuously monitored for gross leakage by review of the inerting system makeup requirements.
 
===3.7 C01NTAINMENT===
 
SYSTEMS (Cont) 4.7 CONTAINMENT SYSTEMS (Cont)A. Primary Containment (Cont)c. Deleted d. Verify reactor coolant system instrument line flow check valve operability as specified in 3.13.2. b. 2. Whenever a primary containment automatic isolation valve is inoperable, the position of the isolated valve in each line having an inoperable valve shall be recorded daily.2.c. Continuous Leak Rate Monitor When the primary containment is inerted, the containment shall be continuously monitored for gross leakage by review of the inerting system makeup requirements.
This monitoring system may be taken out of service for maintenance but shall be returned to service as soon as practicable.
This monitoring system may be taken out of service for maintenance but shall be returned to service as soon as practicable.
2.d. Drywell Surfaces The interior surfaces of the drywell and torus above the water line shall be visually inspected every refueling outage for evidence of deterioration.
2.d. Drywell Surfaces The interior surfaces of the drywell and torus above the water line shall be visually inspected every refueling outage for evidence of deterioration.
Amendment No. 441 , 220 3/4.7-6}}
Amendment No. 441 , 220 3/4.7-6}}

Revision as of 19:57, 13 July 2019

Technical Specification Page, Deletes the Main Steam Isolation Valve Twice Per Week Partial Stroke Testing Surveillance Specified in Technical Specification 4.7.A.2.b.1.c
ML061070215
Person / Time
Site: Pilgrim
Issue date: 04/13/2006
From:
NRC/NRR/ADRO
To:
References
Download: ML061070215 (1)


Text

LIMITING CONDITIONS FOR OPERATION-SURVEILLANCE REQUIREMENTS 3.7 C01NTAINMENT SYSTEMS (Cont) 4.7 CONTAINMENT SYSTEMS (Cont)A. Primary Containment (Cont)c. Deleted d. Verify reactor coolant system instrument line flow check valve operability as specified in 3.13.2. b. 2. Whenever a primary containment automatic isolation valve is inoperable, the position of the isolated valve in each line having an inoperable valve shall be recorded daily.2.c. Continuous Leak Rate Monitor When the primary containment is inerted, the containment shall be continuously monitored for gross leakage by review of the inerting system makeup requirements.

This monitoring system may be taken out of service for maintenance but shall be returned to service as soon as practicable.

2.d. Drywell Surfaces The interior surfaces of the drywell and torus above the water line shall be visually inspected every refueling outage for evidence of deterioration.

Amendment No. 441 , 220 3/4.7-6