ML062160529: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 2: | Line 2: | ||
| number = ML062160529 | | number = ML062160529 | ||
| issue date = 08/04/2006 | | issue date = 08/04/2006 | ||
| title = | | title = (BFN) - Withdrawal of Technical Specification (TS) Change 426 - Revision to Diesel Generators Allowed Outage Time | ||
| author name = Crouch W | | author name = Crouch W | ||
| author affiliation = Tennessee Valley Authority | | author affiliation = Tennessee Valley Authority | ||
| addressee name = | | addressee name = | ||
Revision as of 13:51, 13 July 2019
| ML062160529 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 08/04/2006 |
| From: | Crouch W Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| TVA-BFN-TS-426 | |
| Download: ML062160529 (4) | |
Text
August 4, 2006 TVA-BFN-TS-426 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001
Gentlemen:
In the Matter of )
Tennessee Valley Authority )
Docket No. 50-259 BROWNS FERRY NUCLEAR PLANT (BFN) - UNIT 1 - WITHDRAWAL OF TECHNICAL SPECIFICATION (TS) CHANGE 426 - REVISION TO DIESEL GENERATORS ALLOWED OUTAGE TIME By letter dated December 6, 2004 (ADAMS Accession No.
ML043430120), Tennessee Valley Authority (TVA) submitted a request for an amendment to license DPR-33 for BFN Unit 1.
The proposed amendment revises the current diesel generators seven day allowed outage time to fourteen days.
The purpose of increasing the allowed outage time is to provide additional flexibility for preventive or corrective maintenance and repair of the diesel generators. The change was also noted as ensuring consistency with the current Units 2 and 3 Technical Specifications.
Due to higher priority, ongoing items concerning the
restart of Unit 1 and the requests for Extended Power Uprate for Unit 1 and Units 2 and 3, TVA hereby withdraws this TS request.
U.S. Nuclear Regulatory Commission Page 2 August 04, 2006 There are no regulatory commitments associated with this submittal. If you have any questions about this amendment, please contact me at (256)729-2636.
I declare under penalty of perjury that the foregoing is true and correct. Executed August 4th, 2006.
Sincerely, Original signed by:
William D. Crouch Manager of Licensing
and Industry Affairs
U.S. Nuclear Regulatory Commission Page 3 August 4, 2006 cc: State Health Officer Alabama Dept. of Public Health RSA Tower - Administration Suite 1552
P.O. Box 303017 Montgomery, AL 36130-3017 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-3415
Mr. Malcolm T. Widmann, Branch Chief U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931
NRC Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 NRC Unit 1 Restart Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970
Margaret Chernoff, Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)
One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739
Ms. Eva A. Brown, Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739
U.S. Nuclear Regulatory Commission Page 4 August 4, 2006 JEM:TLE:BAB cc:. Bajestani, NAB 1A-BFN A. S. Bhatnagar, LP 6A-C J. C. Fornicola, LP 6A-C
R. G. Jones, POB 2C-BFN G. V. Little, NAB 1D-BFN R. F. Marks, Jr., PAB 1C-BFN B. J. O'Grady, PAB 1E-BFN
P. D. Swafford, LP 6A-C K. W. Singer, LP 6A-C E. J. Vigluicci, WT 6A-K EDMS-WT CA-K S:lic/submit/subs/Withdrawal of TechSpec 426.doc