IR 05000302/2006004: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 10/26/2006
| issue date = 10/26/2006
| title = IR 05000302-06-004, on 07/01/2006 - 09/30/2006, Progress Energy Florida (Florida Power Corporation)
| title = IR 05000302-06-004, on 07/01/2006 - 09/30/2006, Progress Energy Florida (Florida Power Corporation)
| author name = Munday J T
| author name = Munday J
| author affiliation = NRC/RGN-II/DRP/RPB3
| author affiliation = NRC/RGN-II/DRP/RPB3
| addressee name = Young D E
| addressee name = Young D
| addressee affiliation = Florida Power Corp, Progress Energy Florida, Inc
| addressee affiliation = Florida Power Corp, Progress Energy Florida, Inc
| docket = 05000302
| docket = 05000302
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:October 26, 2006Mr. Dale E. Young, Vice PresidentCrystal River Nuclear Plant (NA1B)
[[Issue date::October 26, 2006]]
ATTN: Supervisor, Licensing & Regulatory Programs15760 West Power Line Street Crystal River, FL 34428-6708SUBJECT:CRYSTAL RIVER UNIT 3 - NRC INTEGRATED INSPECTION REPORT 05000302/2006004
 
Mr. Dale E. Young, Vice PresidentCrystal River Nuclear Plant (NA1B)
ATTN: Supervisor, Licensing & Regulatory Programs15760 West Power Line Street Crystal River, FL 34428-6708
 
SUBJECT: CRYSTAL RIVER UNIT 3 - NRC INTEGRATED INSPECTION REPORT 05000302/2006004


==Dear Mr. Young:==
==Dear Mr. Young:==
Line 33: Line 28:
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure will be available electronically for public inspection in the NRC Public DocumentRoom or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure will be available electronically for public inspection in the NRC Public DocumentRoom or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,\RA\Joel T. Munday, ChiefReactor Projects Branch 3 Division of Reactor ProjectsDocket No.: 50-302License No.: DPR-72
Sincerely,
\RA\Joel T. Munday, ChiefReactor Projects Branch 3 Division of Reactor ProjectsDocket No.: 50-302License No.: DPR-72


===Enclosure:===
===Enclosure:===
Inspection Report 05000302/2006004  
Inspection Report 05000302/2006004 w/Attachment: Supplemental Information
 
===w/Attachment:===
Supplemental Informationcc w/encl: (See page 2)
 
063000271OFFICERII:DRPRII:DRPRII:DRPSIGNATURESONTXM1RJR1NAMESNinhTMorrisseyRReyesDATE10/16/200610/25/200610/25/300610/ /200610/ /200610/ /200610/ /2006 E-MAIL COPY? YESNO YESNO YESNO YESNO YESNO YESNO YESNO FPC2cc w/encl:Daniel L. Roderick Director Site Operations Crystal River Nuclear Plant (NA2C)
Electronic Mail DistributionJon A. FrankePlant General Manager Crystal River Nuclear Plant (NA2C)
Electronic Mail DistributionTerry D. HobbsManager Nuclear Assessment Crystal River Nuclear Plant (NA2C)
Electronic Mail DistributionMichael J. AnnaconeEngineering Manager Crystal River Nuclear Plant (NA2C)
Electronic Mail DistributionR. Alexander GlennAssociate General Counsel (MAC - BT15A)
Florida Power Corporation Electronic Mail DistributionSteven R. CarrAssociate General Counsel - Legal Dept.
 
Progress Energy Service Company, LLC Electronic Mail DistributionAttorney GeneralDepartment of Legal Affairs The Capitol Tallahassee, FL 32304William A. PassettiBureau of Radiation Control Department of Health Electronic Mail DistributionCraig Fugate, DirectorDivision of Emergency Preparedness Department of Community Affairs Electronic Mail DistributionChairmanBoard of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250Jim MallayFramatome Technologies Electronic Mail DistributionDistribution w/encl: (See page 3)
FPC3Report to from Joel T. Munday dated October 26, 2006


SUBJECT: CRYSTAL RIVER UNIT 3 - NRC INTEGRATED INSPECTION REPORT 05000302/2006004Distribution w/encl
REGION IIDocket No.:50-302 License No.:DPR-72 Report No:05000302/2006004 Licensee:Progress Energy Florida (Florida Power Corporation)
:B. Mozafari, NRR C. Evans (Part 72 Only)
L. Slack, RII EICS RIDSNRRDIRS OE Mail (email address if applicable)
PUBLIC EnclosureU. S. NUCLEAR REGULATORY COMMISSIONREGION IIDocket No.:50-302 License No.:DPR-72 Report No:05000302/2006004 Licensee:Progress Energy Florida (Florida Power Corporation)
FacilityCrystal River Unit 3 Location:15760 West Power Line StreetCrystal River, FL 34428-6708Dates:July 1, 2006 - September 30, 2006 Inspectors:T. Morrissey, Senior Resident InspectorR. Reyes, Resident InspectorApproved by:Joel T. Munday, Chief Reactor Projects Branch 3 Division of Reactor Projects Enclosure
FacilityCrystal River Unit 3 Location:15760 West Power Line StreetCrystal River, FL 34428-6708Dates:July 1, 2006 - September 30, 2006 Inspectors:T. Morrissey, Senior Resident InspectorR. Reyes, Resident InspectorApproved by:Joel T. Munday, Chief Reactor Projects Branch 3 Division of Reactor Projects Enclosure


Line 278: Line 258:
Closed2515/165TIOperational Readiness of Offsite Power and Impact onPlant Risk (Section 4OA5)
Closed2515/165TIOperational Readiness of Offsite Power and Impact onPlant Risk (Section 4OA5)
==LIST OF DOCUMENTS REVIEWED==
==LIST OF DOCUMENTS REVIEWED==
==Section 1R04: Equipment AlignmentProceduresOP-408, Nuclear Services Cooling SystemSection 1R05: Fire ProtectionProceduresAI-2205A, Pre Fire Plan - Control ComplexAI-2205B, Pre Fire Plan - Turbine Building==
Section 1R04: Equipment AlignmentProceduresOP-408, Nuclear Services Cooling SystemSection 1R05: Fire ProtectionProceduresAI-2205A, Pre Fire Plan - Control ComplexAI-2205B, Pre Fire Plan - Turbine Building
: AI-2205C, Pre Fire Plan - Auxiliary Building
: AI-2205F, Pre Fire Plan - Miscellaneous Buildings and Components
: SP-804, Surveillance of Plant Fire Brigade Equipment Attachment
 
==Section 1R07: Heat Sink PerformanceMaintenance Work Orders (* observed actual as-found inspection)533738,==
: SWHE-1B pick/shoot/clean 05/01/2006548226,
: SWHE-1A pick/shoot/clean 07/11/2005
: 783731,
: DCHE-1A pick/shoot/clean 07/18/2006*
: 783732,
: DCHE-1B pick/shoot/clean 04/04/2006
: 27163,
: SWHE-1C pick/shoot/clean 05/30/2006
: 838424,
: SWHE-1B pick/shoot/clean 06/27/2006
: 848932,
: SWHE-1D pick/shoot/clean 07/10/2006*
: 866162,
: SWHE-1B pick/shoot/clean 07/31/2006*
: 874934,
: SWHE-1D pick/shoot/clean 06/29/2006
: 885917,
: SWHE-1C pick/shoot/clean 07/28/2006*
: 2659, A flume and pit video inspection and cleaning 07/18/2006*
: 764638, B flume and pit video inspection and cleaning 04/05/2006Completed TestsPT-922, Service Water Heat Exchanger Thermal Performance Testing completed 05/11/2004Calculation
: PGT-2005-1123, DH DCHE Thermal Performance Test completed 10/30/2005Nuclear Condition Reports
: 146760, no definitive guidance on placing
: RWV-150 in service149219,
: SWHE-1D found with 268 tubes plugged
: 153839, L shaped loose part found in DCHE-1B
: 160353, small area of missing lining found in
: DCHE-1B inlet
: 164021, through wall leakage found on SWHE-1B
: 166957, decay heat closed cycle cooling system has high copper concentration
: 201609,
: SWHE-1A blockage 66 percentMiscellaneousSystem health reports dated June 2006Chemistry data base and chemistry trends for DC and SW Systems
: CP-160, Closed Cycle Water Systems Chemistry Program Guidelines
 
==Section 1R12: Maintenance EffectivenessNuclear Condition Reports185229,==
: SW system leakage elevated163099,
: SWV-151 closed limit switch not making up
: 23632, repeated functional failure in SW system
: 195121, small pin hole leak in
: SWHE-1C shell
: 167430,
: SWV-41 stroke time unsat
: 2695,
: AHF-1A motor winding temperature reads high
: 201317,
: AHF-1A elevated motor winding temperature186661, SW system exceeded MR FF limit
: 149918, minor flow blockage possible in
: AHF-1A motor cooler
: 158381, condensate system exceeded MR performance criteria
: 174440,
: CDP-1B Tripped causing a loss of oil and smoke in the area
: 178612, failure of the ATWS UPS resulted in a repetitive MRFF
: 177364, both UPS units in ATWS failed 1 hour surveillance
: 108593,
: AT-1-JX, ATWS UPS failed surveillanceMaintenance Work OrdersWO
: 744380, adjust limit switch MiscellaneousSW system health reports dated December 2005 and June 2006open maintenance work order database (August 10, 2006)
calculation M94-0048, minimum required
: SWT-1 nitrogen overpressure
: SW design basis document 6/11
: PM-275 general preventative maintenance work
 
==Section 1R20: Refueling and Outage ActivitiesProceduresAI-504, guidelines for cold shutdown and refuelingWCP-102, outage risk assessment==
: OP-203, plant startup
: OP-210, reactor startup
}}
}}

Revision as of 09:42, 13 July 2019

IR 05000302-06-004, on 07/01/2006 - 09/30/2006, Progress Energy Florida (Florida Power Corporation)
ML063000271
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/26/2006
From: Joel Munday
NRC/RGN-II/DRP/RPB3
To: Young D
Florida Power Corp, Progress Energy Florida
References
IR-06-004
Download: ML063000271 (17)


Text

October 26, 2006Mr. Dale E. Young, Vice PresidentCrystal River Nuclear Plant (NA1B)

ATTN: Supervisor, Licensing & Regulatory Programs15760 West Power Line Street Crystal River, FL 34428-6708SUBJECT:CRYSTAL RIVER UNIT 3 - NRC INTEGRATED INSPECTION REPORT 05000302/2006004

Dear Mr. Young:

On September 30, 2006, the US Nuclear Regulatory Commission (NRC) completed aninspection at your Crystal River Unit 3. The enclosed integrated inspection report documents the inspection findings, which were discussed on October 3, 2006, with you and members of your staff.The inspection examined activities conducted under your license as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.Based on the results of this inspection, no findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure will be available electronically for public inspection in the NRC Public DocumentRoom or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

\RA\Joel T. Munday, ChiefReactor Projects Branch 3 Division of Reactor ProjectsDocket No.: 50-302License No.: DPR-72

Enclosure:

Inspection Report 05000302/2006004 w/Attachment: Supplemental Information

REGION IIDocket No.:50-302 License No.:DPR-72 Report No:05000302/2006004 Licensee:Progress Energy Florida (Florida Power Corporation)

FacilityCrystal River Unit 3 Location:15760 West Power Line StreetCrystal River, FL 34428-6708Dates:July 1, 2006 - September 30, 2006 Inspectors:T. Morrissey, Senior Resident InspectorR. Reyes, Resident InspectorApproved by:Joel T. Munday, Chief Reactor Projects Branch 3 Division of Reactor Projects Enclosure

SUMMARY OF FINDINGS

IR 05000302/2006-004; 07/01/2006 - 09/30/2006; Crystal River Unit 3; Routine IntegratedReport.The report covered a three month period of inspection by the resident inspectors. No findingsof significance were identified. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 3, dated July 2000. A.

NRC-Identified and Self-Revealing Findings

NoneB.Licensee-identified Violations None Enclosure

REPORT DETAILS

Summary of Plant Status

Crystal River Unit 3 began the inspection period at 100 percent power. On July 3, theoperators reduced power to approximately 84 percent due to an unexpected trip of one of four non-safety related circulating water pumps (CWP-1D). The unit was returned to full power operation on July 5. The unit operated at essentially full power until August 19 when the unit was shutdown to mode 5 (cold shutdown) to repair a main feedwater leak. The unit was restarted on August 23 and was returned to full power on August 24. The unit remained at essentially full power until September 30 when power was manually reduced to approximately 57 percent when one of the two condensate pumps lost control power due to an electrical fault.

Power was raised to approximately 68 percent later that day.1.

REACTOR SAFETY

Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity [R]

1R01 Adverse Weather ProtectionImpending Adverse Weather: Tropical Storm Ernesto

a. Inspection Scope

On August 28 and 29, the inspectors reviewed the licensee's storm preparations forTropical Storm Ernesto which approached the state of Florida. The licensee implemented Emergency Management Procedure EM-220, Violent Weather, for the tropical storm. The inspectors checked that the licensee maintained the ability to protect vital systems and components from high winds and flooding associated with the storm. The inspectors toured the six plant areas listed below to check for any vulnerabilities, such as inadequate sealing of water tight penetrations or degraded barriers, that could affect systems important to safety. The inspectors verified that the licensee's violent weather committee had been established and that actions required by procedure EM-220 were completed. The inspectors monitored control room activities and attended violent weather committee meetings.*Emergency feedwater pump EFP-3 building*North berm area and intake canal area

  • Sea water room
  • Makeup pump areas

b. Findings

No findings of significance were identified. Winds above tropical storm strength werenot experienced on-site.

4Enclosure1R04Equipment Alignment.1Partial System Walkdowns

a. Inspection Scope

The inspectors performed walkdowns of the critical portions of the selected trains toverify correct system alignment. The inspectors reviewed plant documents to determine the correct system and power alignments, and the required positions of select valves and breakers. The inspectors verified that the licensee had properly identified and resolved equipment alignment problems that could cause initiating events or impact mitigating system availability. The inspectors verified the following five partial system alignments in system walkdowns using the listed documents:July 18 and 19, emergency core cooling system (ECCS) train B (decay heatclosed cycle cooling (DC), decay heat removal (DHR), and building spray (BS))

using procedures OP-404, Decay Heat Removal System, and OP-405, Reactor Building Spray System, during a planned ECCS train A outageOn July 26, feed water pump FWP-7, using procedure OP-605, FeedwaterSystem, during the time the 1A EGDG was unavailable due to planned testing August 2, emergency feedwater pump EFP-3, using OP-450, EmergencyFeedwater System, while emergency feed pump EFP-2 was unavailable due to planned maintenanceOn August 30, decay heat closed cycle cooling pump DCP-1B and raw waterpump RWP-3B trains, using OP-408, Nuclear Services Cooling System and OP-404, Decay Heat Removal System, while feedwater pump FWP-7 was unavailable due to planned maintenanceSeptember 19, raw water pump RWP-3A and decay heat closed cycle coolingDCP-1A trains, using OP-408, Nuclear Services Cooling System, and OP-404, Decay Heat Removal System, while the B ECCS train was out of service for maintenance

b. Findings

No findings of significance were identified..2 Complete System Walkdown

a. Inspection Scope

The inspectors conducted one detailed walkdown/review of the alignment and conditionof accessible portions of all trains of the nuclear services and decay heat cooling (RW)system. The inspectors utilized licensee procedures, as well as licensing and designbasis documents to verify that the system (i.e., pump, valve, and electrical) alignment was correct. During the walkdown, the inspectors also verified that: valves, pumps and heat exchangers did not exhibit leakage that would impact their function; major portions of the system and components were correctly labeled; hangers and supports were 5Enclosureinstalled and functional; and essential support systems were operational. Theonline/outage leak lists, equipment performance priority list, degraded equipment log were reviewed to determine if the identified deficiencies impacted the systems functions. In addition, the inspectors reviewed the system health report with the system engineer, reviewed open work orders and nuclear condition reports (NCRs) to verify that the licensee had appropriately characterized and prioritized equipment problems and alignment issues in the corrective action program. Additional documents reviewed are listed in the attachment.

b. Findings

No findings of significance were identified.

1R05 Fire ProtectionFire Protection Walkdowns

a. Inspection Scope

The inspectors walked down accessible portions of the plant to assess the licensee'simplementation of the fire protection program. The inspectors checked that the areas were free of transient combustible material and other ignition sources. Also, fire detection and suppression capabilities, fire barriers, and compensatory measures for fire protection problems were verified. The inspectors checked fire suppression and detection equipment to determine whether conditions or deficiencies existed which could impair the function of the equipment. The inspectors selected the areas based on a review of the licensee's probabilistic risk assessment. The inspectors also reviewed the licensee's fire protection program to verify the requirements of Final Safety Analysis Report (FSAR) Section 9.8, Plant Fire Protection Program, were met.

Documents reviewed are listed in the attachment. The inspectors toured the following nine areas important to reactor safety:*A and B train decay heat removal and building spray system vaults*Emergency feed pump EFP-1 and EFP-2 area

  • Emergency feed pump EFP-3 building
  • A and B train 250 Vdc vital batteries and associated battery charger rooms
  • Instrument air compressor and tank areas, and condensate pump areas 95'elevation turbine building*Feedwater pump FWP-7 area, 95' elevation turbine building
  • Spent fuel heat exchanger and pump area
  • A and B train raw water pump area
  • C train EGDG building

b. Findings

No findings of significance were identified.

6Enclosure1R07Heat Sink Performance

a. Inspection Scope

The inspectors reviewed inspection records, work documents, preventive maintenance procedures, and other documentation to ensure that heat exchanger deficiencies that could mask or degrade performance were identified. Inspection records for risk significant heat exchangers were reviewed which included performance for the two heat exchangers on decay heat closed cycle cooling (DC) and four heat exchangers on nuclear services closed cycle cooling (SW). The inspectors also reviewed general health of the DC, SW, and RW systems via review of inspection/test results; review of chemistry activities; review of DC, RW and SW corrective maintenance history; review of current system health reports; and discussions with the system engineer. The inspectors observed the as-found condition of the RW system side of the following four heat exchangers during routine and/or corrective maintenance activities: SWHE-1B, SWHE-1C, SWHE-1D and DCHE-1A to verify the licensees program of cleaning the heat exchangers was effective. Selected NCRs were reviewed for potential common cause problems and problems which could affect system performance to confirm the licensee was entering problems into the corrective action program and initiating appropriate corrective actions. In addition, the inspectors conducted a walk down of most of the heat sink systems and major components. Documents reviewed are listed in the attachment.

b. Findings

No findings of significance were identified.

1R11 Licensed Operator RequalificationObserved Simulator Evaluated Session

a. Inspection Scope

On July 12, the inspectors observed licensed operators response and actions for theCrystal River Unit 3 licensed operator requalification LOR-1-22, Loss of all Feedwater.

The inspectors specifically evaluated the following attributes related to operating crew performance:*Clarity and formality of communication including crew briefings*Ability to take timely action to safely control the unit

  • Prioritization, interpretation, and verification of alarms
  • Implementation of EOPs
  • Control board operation and manipulation, including operator actions
  • Assessment of emergency classifications
  • Oversight and direction provided by supervision, including ability to identify andnotification of state authorities within the 15 minute requirement*Effectiveness of the training oversight, evaluation, and critique

b. Findings

No findings of significance were identified.

1R12 Maintenance Effectiveness

a. Inspection Scope

The inspectors reviewed the licensee's effectiveness in performing routinemaintenance activities. This review included an assessment of the licensee's practices pertaining to the identification, scope, and handling of degraded equipment conditions, as well as common cause failure evaluations and the resolution of historical equipment problems. For those systems, structures, and components within the scope of the maintenance rule per 10 CFR 50.65, the inspectors verified that reliability and unavailability were properly monitored, and that 10 CFR 50.65 (a)(1) and (a)(2)classifications were justified in light of the reviewed degraded equipment condition.

Documents reviewed are listed in the attachment. The licensee's maintenance effectiveness was evaluated for the following one system and two degraded equipment conditions:Nuclear services closed cycle cooling water system (SW)Failure of condensate pump Anticipated transients without Scram (ATWS) system power supply repetitivefunctional failures

b. Findings

No findings of significance were identified.

1R13 Maintenance Risk Assessments and Emergent Work Evaluation

a. Inspection Scope

The inspectors reviewed the risk impact associated with those activities listed belowand verified the licensee's associated risk management actions. This review primarily focused on equipment determined to be risk significant within the maintenance rule.

The inspectors also assessed the adequacy of the licensee's identification and resolution of problems associated with risk management including emergent work activities. The licensee's implementation of compliance procedure CP-253, Power Operation Risk Assessment, was verified in each of the following six work week

assessments.Work Week 06W28, risk assessment for operations in condition yellow due tothe A train ECCS out of service for planned maintenanceWork Week 06W30, risk assessment for operations with an unavailableemergency feed pump EFP-2, and entering yellow risk condition on August 02, per AI-500 Appendix 7, control of equipment & system status, due to low grid 8EnclosurevoltageWork Week 06W32, weekly risk assessment for operations with planned cross-train work on the B control complex chiller and emergent cleaning of two service water heat exchangersWork Week 06W34, risk assessment for operations with feedwater pump FWP-7 unavailable due to planned maintenance activitiesWork Week 06W35, risk assessment for operation during the week withindividually out of service EGDG-1B, EGDG-1A and EFIC room air handling fan due to planned maintenance activitiesWork Week 06W36, risk assessment for operation with emergency feed waterpump EFP-3 and EFP-1 unavailable due to planned maintenance activities

b. Findings

No findings of significance were identified.

1R15 Operability Evaluations

a. Inspection Scope

The inspectors reviewed the following five NCRs to verify that the operability ofsystems important to safety was properly established, that the affected components or systems remained capable of performing their intended safety function, and that no unrecognized increase in plant or public risk occurred. The inspectors determined if operability of systems or components important to safety was consistent with technical specifications, the FSAR, 10 CFR Part 50 requirements, and when applicable, NRC Inspection Manual, Part 9900, Technical Guidance, "Operability Determinations &

Functionality Assessments for Resolution of Degraded or Nonconforming Conditions Adverse to Quality or Safety." The inspectors reviewed licensee NCRs, work schedules, and engineering documents to check if operability issues were being identified at an appropriate threshold and documented in the corrective action program, consistent with 10 CFR 50, Appendix B requirements, and licensee procedure NGGC-CAP-200, corrective action program.*201317, Air handling fan AHF-1A elevated motor windings temperature*201609, SWHE-1A 66 percent tube blockage

  • 204386, As-found EGDG-1B voltages outside acceptance criteria
  • 206351, New diesel fuel received for A and B EGDGs did not meet programrequirements

b. Findings

No findings of significance were identified.

9Enclosure1R19Post-Maintenance Testing

a. Inspection Scope

The inspectors witnessed and/or reviewed post-maintenance test procedures and/ortest activities, as appropriate, for selected risk significant systems to verify whether: (1)testing was adequate for the maintenance performed;

(2) acceptance criteria were clear, and adequately demonstrated operational readiness consistent with design and licensing basis documents;
(3) test instrumentation had current calibrations, range, and accuracy consistent with the application;
(4) tests were performed as written with applicable prerequisites satisfied, and
(5) equipment was returned to the status required to perform its safety function. The seven post-maintenance tests reviewed are listed below: *Surveillance Procedure SP-340A, RWP-3A, DCP-1A and Valve Surveillance,performed on July 19, after performing maintenance on the ECCS Train A per WO 855403-01*SP-340B, DHP-1A, BSP-1A and Valve Surveillance, performed on July 19, afterperforming maintenance on the ECCS Train A per WO 852235-01*SP-349B, EFP-2 and Valve Surveillance, performed on August 3, afterperforming maintenance on emergency feed valves EFV-11 and EFV-32 per WOs 676282 and 807403*SP-375B, CHP-1B and Valve Surveillance, and leak inspection instructions onWO 866184, performed on August 14, after performing maintenance on the control complex B chiller *SP-354B, Monthly Functional Test of the Emergency Diesel Generator EGDG-1B, (partial) after replacing manual voltage control rheostat per WO 875482*SP-349C, EFP-3 and Valve Surveillance, performed on Sept 14, afterperforming maintenance on EFV-14 and EFV-33 per WOs 814780 and 814768*SP-340E, DHP-1B, BSP-1B and Valve Surveillance, performed on September20, after performing maintenance on decay heat pump DHP-1B per WO 535146

b. Findings

No findings of significance were identified.

1R20 Refueling and Other Outage ActivitiesOutage to Repair Main Feedwater Leak

a. Inspection Scope

On August 19, the unit was shutdown to mode 5 to repair a feedwater leak on thepiping to once through steam generator (OTSG A). The inspectors attended the licensee's outage schedule safety review meeting to verify that the licensee considered risk in developing the outage schedule. During the outage, the inspectors observed and monitored licensee controls over the outage activities listed below. Documents 10Enclosurereviewed are listed in the attachment.*Outage risk assessment monitoring*Controls associated with shutdown cooling, reactivity management, electricalpower alignments, and containment closure and integrity*Implementation of equipment clearance activities

  • Reactor mode changes
  • Reactor heatup and repressurization
  • Containment cleanup and closeout inspection
  • Reactor power ascension

b. Findings

No findings of significance were identified.

1R22 Surveillance Testing

a. Inspection Scope

The inspectors observed and/or reviewed the surveillance tests listed below to verify that technical specification surveillance requirements were followed and that test acceptance criteria were properly specified. The inspectors verified that proper test conditions were established as specified in the procedures, that no equipment preconditioning activities occurred, and that acceptance criteria had been met.

Additionally, the inspectors also verified that equipment was properly returned to service and that proper testing was specified and conducted to ensure that the equipment could perform its intended safety function following maintenance or as part of surveillance testing. The following six activities were observed/reviewed:In-Service Test:*SP-349C, EFP-3 and Valve Surveillance Surveillance Tests

  • SP-110C, C Channel Reactor Protection System Functional Testing*SP-181, Containment Air Lock Test, Penetration Hatch and Equipment HatchInterlock Test*SP-430, Containment Air Locks Seal Leakage Test
  • SP-354B, Monthly Functional Test of the Emergency Diesel GeneratorEGDG-1B*SP-412, ECCS and Containment Spray System Leak Rate Test (B Train only)

b. Findings

No findings of significance were identified.Cornerstone: Emergency Preparedness (EP)1EP6Drill Evaluation

a. Inspection Scope

The inspectors observed and reviewed one emergency response activity to verify thelicensee was properly classifying emergency events, making the required notifications, and appropriate protective action recommendations. The inspectors assessed the licensee's ability to classify emergent situations and make timely notification to State and Federal officials in accordance with 10 CFR Part 50.72. Emergency activities were verified to be in accordance with the Crystal River Radiological Emergency Response Plan, Section 8.0, Emergency Classification System, and 10 CFR Part 50, Appendix E.

Additionally, the inspectors verified that adequate licensee critiques were conducted in order to identify performance weaknesses and necessary improvements. *On July 12, licensed operator requalification LOR-1-22, Loss of all Feedwater

b. Findings

No findings of significance were identified.4.OTHER ACTIVITIES 4OA1Performance Indicator (PI) Verification

a. Inspection Scope

The inspectors checked the accuracy of the performance indicators listed below.Performance indicator data submitted from July 2004 through June 2006, was compared for consistency to data obtained through the review of chemistry department records, monthly operating reports, and control room records. Surveillance procedures SP-317, Reactor Coolant System Water Inventory Balance, and SP-702A, Reactor Coolant Dose Equivalent I-131 were reviewed.

  • Reactor coolant system activity*Reactor coolant system leakage

b. Findings

No findings of significance were identified.

12Enclosure4OA2Problem Identification and Resolution.1Daily Screening of Items Entered Into the Corrective Action Program

a. Inspection Scope

As required by inspection procedure 71152, "Identification and Resolution ofProblems," and in order to help identify repetitive equipment failures or specific human performance issues for follow-up, the inspectors performed a daily screening of items entered into the licensee's CAP. This review was accomplished by attending daily plant status meetings, interviewing plant operators and applicable system engineers, and accessing the licensee's computerized database.

b. Findings

No findings of significance were identified.

.2 Annual Sample Review

a. Inspection Scope

The inspectors selected NCRs 196164 and 188885 for a detailed review. In additionthe inspectors reviewed the operator workaround program to verify the licensee is identifying workarounds at an appropriate threshold and is entering them in the corrective action program. The inspectors performed an evaluation of the potential cumulative effect of all outstanding operator workarounds. The NCRs were initiated to evaluate 1) on May 31, 2006, as-found voltage for EGDG-1B was below the acceptance criteria during SP-354B, monthly functional test of the emergency diesel generator EGDG-1B, and 2) corroded piping and supports on piping to RWP-3A. The inspectors checked that the issue had been completely and accurately identified in the licensee's CAP, and that safety concerns were properly classified and prioritized for resolution, apparent cause determinations were sufficiently thorough, and appropriate corrective actions were implemented in a manner consistent with safety and compliance with plant technical specifications and 10 CFR 50. The inspectors also evaluated the NCR using the requirements of the licensee's CAP as delineated in corrective action procedure CAP-NGGC-200, Corrective Action Program.

b. Findings and Observations

No findings of significance were identified. NCR 196164 documented finding EGDG-1B voltage outside of the acceptance criteriaduring a routine monthly (May 2006) surveillance. The licensee initially determined that the voltage was low due to incorrect setting of the local manual Rheostat. A second NCR (196165) addressed the fact that the operator failed to inform the control room supervisor (CRS) of the out of specification as-found values. The second NCR specified an enhancement to discuss with the operator involved, the need to inform the 13EnclosureCRS when unexpected conditions arise. In August, the as-found voltage for EGDG-1Bwas again found outside the acceptance criteria during the monthly surveillance (NCR 204386). The Rheostat was subsequently replaced. The inspectors determined that since April 2006, there were three additional instances when the voltages for EGDG-1B were found outside of the acceptance criteria. Each time the voltages were adjusted by the surveillance procedure however, NCRs were not written. After discussions with the licensee, NCR 206491 was written to address the failure to write NCRs. The licensee re-evaluated the emergency diesel generator loading calculation and determined the as-found low voltages did not affect EGDG-1B operability. The inspectors noted that NCR 196164 was inappropriately classified as priority 5 for trending only. A more thorough review would have determined that the as-found voltages were outside the acceptable range during the previous two monthly surveillances and was due to equipment degradation. The inspectors identified that the licensee had not thoroughly documented the seismicevaluation of corroded pipe supports that had been found on decay heat closed cycle cooling water (DC) piping to RWP-3A motor cooler. Two NCRs describing similar issues relating to corrosion on DC pipe and its supports had been written. NCR 188885 was written to evaluate corrosion identified on the piping. NCR 188942 was written to evaluate corroded pipe supports on the same piping. NCR 188942 referenced an evaluation documented in NCR 188885. The evaluation described the technical basis for concluding that the pipe had adequate wall thickness to maintain a leak free pressure boundary. However, the inspectors noted that the evaluation did not address the corrosion on the pipe supports that had been identified in NCR 188942.

After reviewing this issue with the licensee, engineering determined that the evaluation had been completed but that the documentation had not been added to the NCR as had been planned. NCR 188885 was reopened and updated to address the corroded pipe supports. The inspectors did not identify any operability or regulatory issues. The inspectors determined that, in general, the licensee was identifying workarounds atan appropriate threshold and is entering them in the corrective action program for resolution. The inspectors did find one degraded component, feedwater valve FWV-217 (non-safety auxiliary feedwater discharge valve to B steam generator) that required manual actions for approximately one week that was not screened as an operator workaround. Since this valve was used in emergency operating procedures, the manual actions would have classified it as a Category 1 operator workaround under the licensees program. All compensatory actions necessary for a Category 1 workaround were in place, however it was not screened as a workaround. The licensee initiated NCR 206113 to address this issue. 40A3Followup of Events and Notices of Enforcement Discretion

a. Inspection Scope

For the five non-routine plant evolutions described below, the inspectors reviewed theoperating crew's performance, operator logs, control board indications, and the plant computer data to verify that operator response was in accordance with the associated 14Enclosureplant procedures.July 5, power escalation from 84 to 90 percent in accordance with OP-204,Power OperationsAugust 2, operator actions associated with entry into AP-730, Grid InstabilityAugust 19, reactor shutdown in accordance with OP-209A, Plant Shutdown andCooldownAugust 23, reactor and plant startup in accordance with OP-210, ReactorStartup and OP-203, Plant StartupSeptember 30, power reduction to 57 percent in accordance with AP-510, RapidPower Reduction

b. Findings

No findings of significance were identified.4OA5Other(Closed) NRC Temporary Instruction (TI) 2515/165: Operational Readiness of OffsitePower and Impact on Plant RiskThe inspectors reviewed licensee procedures and controls and interviewed operationsand maintenance personnel to verify these documents contained specific attributes delineated in the TI to ensure the operational readiness of offsite power systems in accordance with plant Technical Specifications; the design requirements provided in 10 CFR 50, Appendix A, General Design Criterion 17, "Electric Power Systems;" and the impact of maintenance on plant risk in accordance with 10 CFR 50.65(a)(4),

"Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants." Documents reviewed are listed in the Attachment. Appropriate documentation of the results of this inspection was provided to NRC headquarters staff for further analysis, as required by the TI. This completes the Region II inspection TI requirements for the Crystal River Nuclear Plant.4OA6Meetings

Exit Meeting Summary

On October 03, 2006, the resident inspectors presented the inspection results to Mr. D.Young, Site Vice President and other members of licensee management, who acknowledged the findings. The inspectors confirmed that proprietary information was not provided or examined during the inspection.ATTACHMENT:

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee

M. Annacone, Manager, Engineering
W. Brewer, Manager, Maintenance
R. Hons, Manager, Training
J. Franke, Plant General Manager
J. Hays, Manager, Outage and Scheduling
J. Holt, Manager, Operations
P. Infanger, Supervisor, Licensing
M. Rigsby, Superintendent, Radiation Protection
D. Roderick, Director Site Operations
J. Stephenson, Supervisor, Emergency Preparedness
T. Hobbs, Manager, Nuclear Assessment
D. Young, Vice President, Crystal River Nuclear Plant

NRC personnel

J. Munday, Chief, Reactor Projects Branch 3, NRC Region II

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Closed2515/165TIOperational Readiness of Offsite Power and Impact onPlant Risk (Section 4OA5)

LIST OF DOCUMENTS REVIEWED