IR 05000373/2006011: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 3: | Line 3: | ||
| issue date = 12/15/2006 | | issue date = 12/15/2006 | ||
| title = IR 05000373/2006011(DRS); 05000374/2006011(DRS); 11/13/2006 - 11/17/2006; LaSalle County Station; Emergency Preparedness Specialist Report | | title = IR 05000373/2006011(DRS); 05000374/2006011(DRS); 11/13/2006 - 11/17/2006; LaSalle County Station; Emergency Preparedness Specialist Report | ||
| author name = Riemer K | | author name = Riemer K | ||
| author affiliation = NRC/RGN-III/DRS/PSB | | author affiliation = NRC/RGN-III/DRS/PSB | ||
| addressee name = Crane C | | addressee name = Crane C | ||
| addressee affiliation = Exelon Generation Co, LLC | | addressee affiliation = Exelon Generation Co, LLC | ||
| docket = 05000373, 05000374 | | docket = 05000373, 05000374 | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter | {{#Wiki_filter:December 15, 2006Mr. Christopher M. CranePresident and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555SUBJECT:LASALLE COUNTY STATION, UNITS 1 AND 2NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 05000373/2006011(DRS); 05000374/2006011(DRS) | ||
==Dear Mr. Crane:== | ==Dear Mr. Crane:== | ||
| Line 32: | Line 27: | ||
In accordance with 10 CFR Part 2.390 of the NRC's "Rules of Practice," a copy of this letterand its enclosure will be available electronically for public inspection in the NRC PublicDocument Room, or from the Publicly Available Records (PARS) component of NRC's C. Crane-2-document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | In accordance with 10 CFR Part 2.390 of the NRC's "Rules of Practice," a copy of this letterand its enclosure will be available electronically for public inspection in the NRC PublicDocument Room, or from the Publicly Available Records (PARS) component of NRC's C. Crane-2-document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Sincerely,/RA/Kenneth Riemer, ChiefPlant Support Branch Division of Reactor SafetyDocket Nos. 50-373; 50-374License Nos. NPF-11; NPF- | Sincerely, | ||
/RA/Kenneth Riemer, ChiefPlant Support Branch Division of Reactor SafetyDocket Nos. 50-373; 50-374License Nos. NPF-11; NPF-18Enclosure:Inspection Report 05000373/2006011(DRS); 05000374/2006011(DRS) | |||
w/Attachment: Supplemental Informationcc w/encl:Site Vice President - LaSalle County StationLaSalle County Station Plant Manager Regulatory Assurance Manager - LaSalle County Station Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Clinton and LaSalle Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission W. King, DHS, Region V | |||
Inspection Report 05000373/2006011(DRS); 05000374/2006011(DRS) | |||
Supplemental Informationcc w/encl:Site Vice President - LaSalle County StationLaSalle County Station Plant Manager Regulatory Assurance Manager - LaSalle County Station Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Clinton and LaSalle Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission W. King, DHS, Region V | |||
=SUMMARY OF FINDINGS= | =SUMMARY OF FINDINGS= | ||
| Line 107: | Line 98: | ||
==LIST OF DOCUMENTS REVIEWED== | ==LIST OF DOCUMENTS REVIEWED== | ||
The following is a list of documents reviewed during the inspection. | The following is a list of documents reviewed during the inspection. | ||
: Inclusion on this list doesnot imply that the NRC inspectors reviewed the documents in their entirety but rather that | : Inclusion on this list doesnot imply that the NRC inspectors reviewed the documents in their entirety but rather that | ||
}} | }} | ||
Revision as of 07:34, 13 July 2019
| ML063540516 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 12/15/2006 |
| From: | Kenneth Riemer Plant Support Branch II |
| To: | Crane C Exelon Generation Co |
| References | |
| IR-06-011 | |
| Download: ML063540516 (3) | |
Text
December 15, 2006Mr. Christopher M. CranePresident and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555SUBJECT:LASALLE COUNTY STATION, UNITS 1 AND 2NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 05000373/2006011(DRS); 05000374/2006011(DRS)
Dear Mr. Crane:
On November 17, 2006, the NRC completed an inspection at your LaSalle County Station,Units 1 and 2. The enclosed report documents the inspection findings, which were discussed on November 17, 2006, with Mr. D. Enright and other members of your staff.The inspection examined activities conducted under your license as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Specifically, this inspection focused on emergency preparedness, including your staff's determinations of performance indicators for the Emergency Preparedness Cornerstone.On the basis of the results of this inspection, no findings of significance were identified.
In accordance with 10 CFR Part 2.390 of the NRC's "Rules of Practice," a copy of this letterand its enclosure will be available electronically for public inspection in the NRC PublicDocument Room, or from the Publicly Available Records (PARS) component of NRC's C. Crane-2-document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/Kenneth Riemer, ChiefPlant Support Branch Division of Reactor SafetyDocket Nos. 50-373; 50-374License Nos. NPF-11; NPF-18Enclosure:Inspection Report 05000373/2006011(DRS); 05000374/2006011(DRS)
w/Attachment: Supplemental Informationcc w/encl:Site Vice President - LaSalle County StationLaSalle County Station Plant Manager Regulatory Assurance Manager - LaSalle County Station Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Clinton and LaSalle Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission W. King, DHS, Region V
SUMMARY OF FINDINGS
IR 05000373/2006011(DRS); 05000374/2006011(DRS); 11/13/2006 - 11/17/2006;LaSalle County Station; Emergency Preparedness Specialist Report.The report covers a 1 week baseline inspection by two regional emergency preparednessinspectors, a resident inspector, and a licensed operator examiner. The inspection focused on the Emergency Preparedness Cornerstone in the Reactor Safety strategic performance area during the biennial emergency preparedness exercise. This inspection also included a review of records related to the three emergency preparedness performance indicators for the period January 1, 2005, through September 30, 2006.The NRC's program for overseeing the safe operation of commercial nuclear power reactors isdescribed in NUREG-1649, "Reactor Oversight Process," Revision 3, dated July 2000.A.Inspector-Identified and Self-Revealed Findings None.
B.Licensee-Identified Violations
None.
2
REPORT DETAILS
1.REACTOR SAFETYCornerstone: Emergency Preparedness1EP1Exercise Evaluation (71114.01)
a. Inspection Scope
The inspectors reviewed the November 15, 2006, biennial emergency preparednessexercise's objectives and scenario to ensure that the exercise would acceptably test major elements of the licensee's emergency plan and to verify that the exercise's simulated problems provided an acceptable framework to support demonstration of the licensee's capability to implement its plan. The inspectors also reviewed records of quarterly drills and exercises conducted in 2005 and 2006, to verify that those drills' scenarios were sufficiently different from the scenario used in the November 15, 2006 exercise.The inspectors evaluated the licensee's exercise performance, focusing on therisk-significant activities of emergency classification, notification, and protective action decision making, as well as implementation of accident mitigation strategies in the following emergency response facilities:*Control Room Simulator (CRS);*Technical Support Center (TSC);
- Operations Support Center (OSC); and
- Emergency Operations Facility (EOF).The inspectors also assessed the licensee's recognition of abnormal plant conditions,transfer of responsibilities between facilities, internal communications, interfaces with offsite officials, readiness of emergency facilities and related equipment, and overall implementation of the licensee's emergency plan.The inspectors attended post-exercise critiques in the CRS, TSC, OSC, and EOFto evaluate the licensee's initial self-assessment of its exercise performance. The inspectors later met with the licensee's lead exercise evaluators to obtain the licensee's refined assessments of its exercise participants' performances. These self-assessments were then compared with the inspectors' independent observations and assessments to assess the licensee's ability to adequately critique its exercise performance.These activities completed one of one inspection sample.
b. Findings
No findings of significance were identified.
OTHER ACTIVITIES
4OA1 Performance Indicator (PI) Verification
Cornerstone: Emergency Preparedness.1Reactor Safety Strategic Area
a. Inspection Scope
The inspectors reviewed the licensee's records associated with each of the threeemergency preparedness PIs to verify that the licensee's program was implemented consistent with the industry guidelines in the applicable revision of Nuclear Energy Institute Publication No. 99-02, "Regulatory Assessment Performance Indicator Guideline," and related licensee procedures. Specifically, licensee records related to the performance of the Alert and Notification System (ANS), key Emergency Response Organization (ERO) members' drill participation, and Drill and Exercise Performance (DEP) were reviewed to verify the accuracy and completeness of the PI data submitted to NRC for the period from January 1, 2005 through September 30, 2006. The following three PIs were reviewed:Common
- ANS*ERO Drill Participation
- DEPThese activities completed three of three PI samples.
b. Findings
No findings of significance were identified.4OA6Meetings.1Exit MeetingAn exit meeting was conducted for:
- Emergency Preparedness with Mr. D. Enright and other members of licenseemanagement and staff at the conclusion of the inspection on November 17, 2006. The licensee acknowledged the information presented. No proprietary information was identified.
4.2Public and Media Briefing*On November 17, 2006, an inspector summarized NRC's preliminary exerciseinspection conclusions at a public and media briefing hosted by Department of Homeland Security Region V Field Office staff in Ottawa, Illinois.ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- J. Barichello, Security
- J. Bashor, Engineering Director
- R. Bassett, Emergency Preparedness Manager
- J. Bearden, Emergency Preparedness Coordinator
- L. Blunk, Operations
- R. Chrzanowski, Chemistry Manager
- D. Collins, Radiation Protection
- T. Conner, Maintenance Director
- P. Dohm, Corporate Emergency Preparedness
- D. Enright, Plant Manager
- S. Erickson, Corporate Emergency Preparedness
- S. Marik, Work Control Director
- S. McCain, Corporate Emergency Preparedness Manager
- J. Rappeport, Nuclear Oversight Manager
- S. Shields, Regulatory AssuranceIllinois Emergency Management Agency
- J. Yesinowski, Resident Inspector
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened, Closed, and
Discussed
None.
2
LIST OF DOCUMENTS REVIEWED
The following is a list of documents reviewed during the inspection.
- Inclusion on this list doesnot imply that the NRC inspectors reviewed the documents in their entirety but rather that