ML070600189: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 2: | Line 2: | ||
| number = ML070600189 | | number = ML070600189 | ||
| issue date = 03/01/2007 | | issue date = 03/01/2007 | ||
| title = | | title = Inspection / Activity Plan 03/01/2007 - 09/30/2008 - Report 22 | ||
| author name = | | author name = | ||
| author affiliation = NRC/RGN-II/DRP/RPB4 | | author affiliation = NRC/RGN-II/DRP/RPB4 | ||
Revision as of 04:34, 13 July 2019
| ML070600189 | |
| Person / Time | |
|---|---|
| Site: | Robinson, 07200003 |
| Issue date: | 03/01/2007 |
| From: | NRC/RGN-II/DRP/RPB4 |
| To: | Carolina Power & Light Co |
| Shared Package | |
| ML070600171 | List: |
| References | |
| IR-07-001 | |
| Download: ML070600189 (2) | |
Text
Robinson Inspection / Activity Plan 03/01/2007
-09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/01/2007 09:06:40 Report 22 3 OL RQ-REQUAL INSPECTION Baseline Inspections 02/26/2007 03/02/2007 2 7111111B IP Licensed Operator Requalification Program 1 EB3-ISI-U2 INSERVICE INSPECTION Baseline Inspections 04/16/2007 04/20/2007 2 7111108P IP Inservice Inspection Activities - PWR 2 PSB1-RP-RP OCCUPATIONAL BASELINE INSP Baseline Inspections 04/16/2007 04/20/2007 2 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 04/16/2007 04/20/2007 2 7112102 IP A LARA Planning and Controls Baseline Inspections 04/16/2007 04/20/2007 2 71151 IP Performance Indicator Verification 1 EB3SGISI-U2 STEAM GENERATOR ISI Baseline Inspections 04/23/2007 04/27/2007 2 7111108P IP Inservice Inspection Activities - PWR 2 EB1-SUMP-PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)
Safety Issues 04/30/2007 05/04/2007 2 2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02
]1 PSB1-EP-EP INSP Baseline Inspections 06/04/2007 06/08/2007 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 06/04/2007 06/08/2007 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 06/04/2007 06/08/2007 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 06/04/2007 06/08/2007 2 71151-EP03 IP A lert & Notification System 7 EB1-CDBI-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 06/25/2007 06/29/2007 2 7111121 IP Component Design Bases Inspection Baseline Inspections 07/16/2007 07/20/2007 2 7111121 IP Component Design Bases Inspection Baseline Inspections 07/30/2007 08/03/2007 2 7111121 IP Component Design Bases Inspection Baseline Inspections 08/13/2007 08/17/2007 2 7111121 IP Component Design Bases Inspection 1 60855.1-OPERATIONAL ISFSI INSPECTION BY RESIDENT Other Routine 07/09/2007 07/13/2007 2 60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 5 TFP-TRIENNIAL FP - INFO TRIP Baseline Inspections 10/02/2007 10/04/2007 2 7111105T IP Fire Protection [Triennial]
5 TFP-TRIENNIAL FIRE PROTECTION INSP Baseline Inspections 10/22/2007 10/26/2007 2 7111105T IP Fire Protection [Triennial]
Baseline Inspections 11/05/2007 11/09/2007 2 7111105T IP Fire Protection [Triennial]
1 PSB1-RP-RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections 11/26/2007 11/28/2007 2 7112101 IP A ccess Control to Radiologically Significant Areas 2 PSB1-EP-EP EXERCISE Baseline Inspections 12/03/2007 12/07/2007 2 7111401 IP Exercise Evaluation Baseline Inspections 12/03/2007 12/07/2007 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 12/03/2007 12/07/2007 2 71151-EP01 IP Drill/Exercise Performance This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Robinson Inspection / Activity Plan 03/01/2007
-09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/01/2007 09:06:40 Report 22 2 PSB1-EP-EP EXERCISE Baseline Inspections 12/03/2007 12/07/2007 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 12/03/2007 12/07/2007 2 71151-EP03 IP A lert & Notification System 4 PSB1-RP-RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections 01/14/2008 01/18/2008 2 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 01/14/2008 01/18/2008 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 01/14/2008 01/18/2008 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 01/14/2008 01/18/2008 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 01/14/2008 01/18/2008 2 71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 01/14/2008 01/18/2008 2 71151-PR01 IP RETS/ODCM Radiological Effluent 4 EB1-MODS-MODIFICATIONS-10CFR50.59 Baseline Inspections 01/28/2008 02/01/2008 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 01/28/2008 02/01/2008 2 7111117B IP Permanent Plant Modifications 1 EB3-HS-HEAT SINK Baseline Inspections 06/02/2008 06/06/2008 2 7111107B IP Heat Sink Performance 1 PSB1-EP-EP INSP Baseline Inspections 06/23/2008 06/27/2008 2 7111402 IP A lert and Notification System Testing Baseline Inspections 06/23/2008 06/27/2008 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 06/23/2008 06/27/2008 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 06/23/2008 06/27/2008 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 06/23/2008 06/27/2008 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 06/23/2008 06/27/2008 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 06/23/2008 06/27/2008 2 71151-EP03 IP A lert & Notification System 2 OL PREP-INITIAL EXAM PREP Not Applicable 07/28/2008 08/01/2008 2 V23285 ROBINSON/AUGUST 2008 EXAM AT POWER FACILITIES 1 EB3 - MR-MAINT RULE Baseline Inspections 08/04/2008 08/08/2008 2 7111112B IP Maintenance Effectiveness 3 OL EXAM-INITIAL EXAM Not Applicable 08/18/2008 08/29/2008 2 V23285 ROBINSON/AUGUST 2008 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.