ML071620201: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 3: | Line 3: | ||
| issue date = 07/06/2007 | | issue date = 07/06/2007 | ||
| title = Summary of Telephone Conference Call Held on May 24, 2007, Between the NRC and Wolf Creek Nuclear Operating Corporation Concerning the Analysis of Service Accident Mitigation Alternatives Pertaining to the Wolf Creek Generating Station, Uni | | title = Summary of Telephone Conference Call Held on May 24, 2007, Between the NRC and Wolf Creek Nuclear Operating Corporation Concerning the Analysis of Service Accident Mitigation Alternatives Pertaining to the Wolf Creek Generating Station, Uni | ||
| author name = Jacobs C | | author name = Jacobs C | ||
| author affiliation = NRC/NRR/ADRO/DLR/REBB | | author affiliation = NRC/NRR/ADRO/DLR/REBB | ||
| addressee name = | | addressee name = | ||
Revision as of 23:08, 12 July 2019
| ML071620201 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 07/06/2007 |
| From: | Christian Jacobs NRC/NRR/ADRO/DLR/REBB |
| To: | NRC/NRR/ADRO |
| Logan, Dennis NRR/DLR/REBA - 415-0490 | |
| References | |
| Download: ML071620201 (7) | |
Text
July 6, 2007LICENSEE:Wolf Creek Nuclear Operating CorporationFACILITY:Wolf Creek Generating Station
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON MAY 24, 2007,BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND WOLF CREEK NUCLEAR OPERATING CORPORATION, CONCERNING THE ANALYSIS OF SEVERE ACCIDENT MITIGATION ALTERNATIVES PERTAINING TO THE WOLF CREEK GENERATING STATION, UNIT 1, LICENSE RENEWAL APPLICATIONThe U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Wolf CreekNuclear Operating Corporation (WCNOC) held a telephone conference call on May 24, 2007, to discuss and clarify some of the responses provided by WCNOC to requests for additional information (RAIs) concerning the analysis of Severe Accident Mitigation Alternatives (SAMAs) for Wolf Creek Generating Station, Unit 1, license renewal application (LRA). The telephone conference call was useful in clarifying responses to RAIs previously provided by WCNOC to SAMA requests for additional information.Enclosure 1 provides a listing of the participants, and Enclosure 2 contains a listing of theSAMA questions discussed with the applicant, including a brief description on the status of the items.The applicant had an opportunity to comment on this summary./RA/Christian Jacobs, Project Manager Environmental Branch B Division of License Renewal Office of Nuclear Reactor RegulationDocket No. 50-482
Enclosures:
- 1. List of Participants
ML071620201OFFICEPM:REBB:DLRLA:DLRBC:REBB:DLRNAMEC. JacobsY. EdmondsR. Franovich DATE06/29/0706/29/0707/06/07 TELEPHONE CONFERENCE CALLWOLF CREEK GENERATING STATION, UNIT 1LICENSE RENEWAL APPLICATIONLIST OF PARTICIPANTSMay 24, 2007PARTICIPANTSAFFILIATIONSChristian JacobsU.S. Nuclear Regulatory Commission (NRC)Robert PallaNRC Bruce MrowcaInformation Systems Laboratories Charlie MedenciyWolf Creek Nuclear Operating Corporation (WCNOC)Patrick GuevelWCNOCDavid AlfordWCNOC Mark FerrelWCNOC J.C. PatelWCNOC Bill KetchumWCNOC SEVERE ACCIDENT MITIGATION ALTERNATIVEADDITIONAL QUESTIONS REGARDINGWOLF CREEK GENERATING STATION, UNIT 1LICENSE RENEWAL APPLICATIONMay 24, 2007The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Wolf CreekNuclear Operating Corporation (WCNOC) held a telephone conference call on May 24, 2007, to discuss the following questions regarding responses to requests for additional information (RAIs) analysis for Severe Accident Mitigation Alternatives (SAMAs) for Wolf Creek Generating Station Unit 1, license renewal application. 1.In response to Question 1b (QU-9) it is stated that "internal flooding scenarios have notbeen included in Probalistic Safety Assessment updates and that new internal flooding criteria may identify new human-induced floods through consideration of errors of commission." State how this could impact the SAMA analysis.Discussion: The applicant provided clarification of their RAI response in a follow-up e-mail.Reference response in (ADAMS under Accession No. ML071590339). Issue resolved.2. The answer provided to Question 1b (TH-6) talks about the definition used in the Individual Plant Examination (IPE) while the Facts and Observations are focused on the Modular Accident Analysis Program (MAAP) calculation and states that "the 30-minute criteria was not likely a factor in determining success or failure in many (if any) of the analyses performed for the IPE. "State the issue associated with the core damage criteria used in the MAAP calculations and its impact on the SAMA evaluation.Discussion: The applicant provided clarification of their RAI response. Issue resolved.3. In response to Question 2b, it is stated that NUREG-1570 asserts that only 2 percent of the high pressure melt scenarios with dry steam generators (SG) would result in an induced Steam Generator Tube Rupture (SGTR) and that the applicability of percentage is predicated on the conditions that the secondary side is not depressurized and that the Reactor Coolant Pumps (RCPs) are not operated. A review of NUREG-1570 found that for cases where an RCP seal Loss of Coolant Accident (LOCA) occurs that the Thermally Induced SGTR failure probability for 3 steam generators (4 SG scenario is not available) is 1.0. State how this increased failure likelihood on RCP seal failure was accounted for in the response to Question 2b.Discussion: The applicant provided clarification of their RAI response in a follow-up e-mail. Reference response in (ADAMS under Accession No. ML071590339). Issue resolved.4. In response to Question 3c, it is stated that "WCGS has high temperature seal material installed in only one RCP." State the seal LOCA model used. Discuss plans for installing qualified seals in the remaining RCPs. Provide a cost-benefit assessment for installing qualified seals in the remaining RCPs, if this is not currently planned. Discussion: The applicant clarified that they have high temperature seals in all 4 RCPs. Issue resolved.5. In response to Question 7a, it is stated that procedures exist at WCGS to operate the turbine driven auxilary feedwater pump after battery depletion. Describe these procedures, including the instrumentation used to effectively control SG level. State the human error probability or probabilities used for this action.Discussion: The applicant provided clarification of their RAI response. NRC understands theprocedure that WCNOC is using for this turbine driven pump. Issue resolved.6. In response to Question 6.b.ii it is stated that extending the Emergency Diesel Generator (EDG) completion time actions 24/7 would potentially place Technical Specification Amendment #163 in jeopardy. This appears to be due to the presence of a reduced base risk profile as a result of implementing the proposed alternative making the removal of an EDG more significant (Its not that an EDG outage is more significant, it is that the plant's risk profile is lower making the delta risk greater). Please clarify this.Discussion: The applicant provided clarification of their RAI response. The applicant alsosuggested that NRC staff re-examine information provided on Pages 30-40 of SAMA RAIresponse, letter ET 07-0006 (ADAMS Accession No. ML071160203). Issue resolved.
Memo to Wolf Creek Nuclear Operating Corporation from C. Jacobs dated July 6, 2007
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON MAY 24, 2007,BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND WOLF CREEK NUCLEAR OPERATING CORPORATION, CONCERNING THE ANALYSIS OF SEVERE ACCIDENT MITIGATION ALTERNATIVES PERTAINING TO THE WOLF CREEK GENERATING STATION, UNIT 1, LICENSE RENEWAL APPLICATIONDISTRIBUTION
- E-mail P.T. Kuo / S. Lee (RidsNrrDlr)
R. Franovich (RidsNrrDlrReba)
E. Benner (RidsNrrDlrReba)
C. Jacobs A. Williamson Bobbie.hurley@earthtech.comV. Rodriguez J. Donohew G. Pick, RIV S. Cochrum, RIV C. Long, RIV OGC (RidsOGCMailRoom)
D. Roth, OGC DLR/REBB DLR/REBA Wolf Creek Generating Station cc:
Jay Silberg, Esq.Pillsbury Winthrop Shaw Pittman, LLP 2300 N Street, NW Washington, DC 20037Regional Administrator, Region IVU.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-7005Senior Resident InspectorU.S. Nuclear Regulatory Commission P.O. Box 311 Burlington, KS 66839Chief Engineer, Utilities DivisionKansas Corporation Commission 1500 SW Arrowhead Road Topeka, KS 66604-4027Office of the GovernorState of Kansas Topeka, KS 66612Attorney General120 S.W. 10 th Avenue, 2 nd FloorTopeka, KS 66612-1597County ClerkCoffey County Courthouse 110 South 6 th StreetBurlington, KS 66839Thomas A. Conley, Section ChiefRadiation and Asbestos Control Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson, Suite 310 Topeka, KS 66612-1366Vice President Operations/Plant ManagerWolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839Supervisor LicensingWolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839U.S. Nuclear Regulatory CommissionResident Inspectors Office/Callaway Plant
8201 NRC Road Steedman, MO 65077-1032Mr. Terry J. GarrettVice President Engineering Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839Kevin J. Moles, ManagerRegulatory Affairs Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839Lorrie I. Bell, Project ManagerWolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839Ms. Julie KeysNuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Ms. Valerie Williams, Branch DirectorCoffey County Library Burlington Branch 410 Juniatta St.