ML072010149: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 08/31/2007
| issue date = 08/31/2007
| title = Closeout of Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations
| title = Closeout of Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations
| author name = Miller G E
| author name = Miller G
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-2
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-2
| addressee name = Peschel J M, St.Pierre G F
| addressee name = Peschel J, St.Pierre G
| addressee affiliation = Florida Power & Light Energy Seabrook, LLC
| addressee affiliation = Florida Power & Light Energy Seabrook, LLC
| docket = 05000443
| docket = 05000443

Revision as of 21:53, 12 July 2019

Closeout of Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations
ML072010149
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 08/31/2007
From: Geoffrey Miller
NRC/NRR/ADRO/DORL/LPLI-2
To: Peschel J, St.Pierre G
Florida Power & Light Energy Seabrook
Miller G, NRR/DORL, 415-2481
References
GL-06-003, TAC MD1631
Download: ML072010149 (4)


Text

August 31, 2007Mr. Gene F. St. Pierre, Site Vice Presidentc/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874

SUBJECT:

SEABROOK STATION, UNIT NO. 1 - CLOSEOUT OF GENERIC LETTER2006-03, "POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS" (TAC NO. MD1631)

Dear Mr. St. Pierre:

The Nuclear Regulatory Commission (NRC) acknowledges the receipt of your June 9, 2006,response (Agencywide Documents Access and Management System (ADAMS) Accession No.

ML061640269) to Generic Letter (GL) 2006-03, "Potentially Nonconforming Hemyc and MT Fire Barrier Configurations." This letter was supplemented by letter dated July 10, 2007 (ADAMS Accession No. ML071990101) in response to NRC staff questions. Under oath or affirmation, you have submitted documentation that Seabrook Station, Unit No. 1 does not rely on either the Hemyc or MT fire barrier system. You have submitted documentation under oath or affirmation that other 1- or 3-hour fire barriers that separate redundant safe shutdown trains located within the same fire area have been designed and installed in accordance with current NRC guidance.

Therefore, the NRC staff finds your June 9, 2006, letter and July 10, 2007, supplement to be responsive to GL 2006-03. The basis for stating that this other fire barrier has been designed and installed in accordance with NRC guidance should be maintained on site and will be subject to inspection during the normal NRC inspection process. If you have any questions regarding this response, please contact me at (301) 415-2481. Sincerely,/ra/G. Edward Miller, Project ManagerPlant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-443 cc: See next page August 31, 2007Mr. Gene F. St. Pierre, Site Vice President c/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH 03874

SUBJECT:

SEABROOK STATION, UNIT NO. 1 - CLOSEOUT OF GENERIC LETTER2006-03, "POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS" (TAC NO. MD1631)

Dear Mr. St. Pierre:

The Nuclear Regulatory Commission (NRC) acknowledges the receipt of your June 9, 2006,response (Agencywide Documents Access and Management System (ADAMS) Accession No.

ML061640269) to Generic Letter (GL) 2006-03, "Potentially Nonconforming Hemyc and MT Fire Barrier Configurations." This letter was supplemented by letter dated July 10, 2007 (ADAMS Accession No. ML071990101) in response to NRC staff questions. Under oath or affirmation, you have submitted documentation that Seabrook Station, Unit No. 1 does not rely on either the Hemyc or MT fire barrier system. You have submitted documentation under oath or affirmation that other 1- or 3-hour fire barriers that separate redundant safe shutdown trains located within the same fire area have been designed and installed in accordance with current NRC guidance.

Therefore, the NRC staff finds your June 9, 2006, letter and July 10, 2007, supplement to be responsive to GL 2006-03. The basis for stating that this other fire barrier has been designed and installed in accordance with NRC guidance should be maintained on site and will be subject to inspection during the normal NRC inspection process. If you have any questions regarding this response, please contact me at (301) 415-2481. Sincerely,/ra/G. Edward Miller, Project ManagerPlant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-443 cc: See next pageDISTRIBUTION

PUBLICCJackson, NRRRidsOgcRp LPLI-2 R/FRidsNrrDorlLpl1-2(HChernoff)

RidsNrrPMGMillerRidsNrrLAABaxter RidsAcrsAcnwMailCenterRidsRgn1MailCenter(GMatakas)

TDinh, NRRSWeerakkody, NRR Accession Number: ML072010149OFFICELPLI-2/PMLPL1-2/LAitLPLI-2/LADRA/AFPB/BCLPLI-2/BCNAMEGEMillerABaxterMO'BrienAKleinHchernoff(JLamb for)DATE8/22/078/22/078/30/078/27/078/31/07OFFICIAL RECORD COPY

Seabrook Station, Unit No. 1 cc:

Mr. J. A. StallSenior Vice President, Nuclear and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420Mr. Peter BrannAssistant Attorney General State House, Station #6 Augusta, ME 04333Resident InspectorU.S. Nuclear Regulatory Commission Seabrook Nuclear Power Station P.O. Box 1149 Seabrook, NH 03874Town of Exeter10 Front Street Exeter, NH 03823Regional Administrator, Region IU.S. Nuclear Regulatory Commission

475 Allendale Road King of Prussia, PA 19406Office of the Attorney GeneralOne Ashburton Place, 20th Floor Boston, MA 02108Board of SelectmenTown of Amesbury Town Hall Amesbury, MA 01913Mr. Robert PooleFederal Emergency Management Agency Region I 99 High Street, 6 th FloorBoston, MA 02110Mr. Tom CrimminsPolestar Applied Technology One First Street, Suite 4 Los Altos, CA 94019John GiarrussoMassachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399Ms. Kelly Ayotte, Attorney GeneralMr. Orvil Fitch, Deputy Attorney General 33 Capitol Street Concord, NH 03301Mr. Christopher M. Pope, DirectorHomeland Security & Emergency Mgmt.

New Hampshire Department of Safety Bureau of Emergency Management 33 Hazen Drive Concord, NH 03301Mr. M. S. Ross, Managing AttorneyFlorida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420Mr. Rajiv S. KundalkarVice President - Nuclear Technical Services Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420James M. PeschelRegulatory Programs Manager FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH 03874Ms. Marjan MashhadiSenior Attorney Florida Power & Light Company 801 Pennsylvania Ave., NW Suite 220 Washington, DC 20004 Updated 7.16.07 Seabrook Station, Unit No. 1 cc:

Mr. Mark E. WarnerVice President, Nuclear Operations, North Region (Seabrook & Duane Arnold Plants)

Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420Mr. Gene F. St. PierreSite Vice President FPL Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874Mr. Joseph RoyDirector of Operations Massachusetts Municipal Wholesale Electric Company Moody Street Ludlow, MA 01056Mr. Don E. GrissetteVice President, Nuclear Training and Performance Improvement Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 3340Mr. Michael W. KileyPlant General Manager FPL Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874