IR 05000324/2017407: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:February 6, 2018 | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 February 6, 2018 Scott D. West, Director | ||
Nuclear Plant Security Brunswick Steam Electric Plant P.O. Box 10429 | |||
BRUNSWICK STEAM ELECTRIC PLANT - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000325/2017407 AND | |||
Southport, NC 28461 SUBJECT: BRUNSWICK STEAM ELECTRIC PLANT - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000325/2017407 AND | |||
05000324/2017407 | 05000324/2017407 | ||
Revision as of 21:15, 12 July 2019
| ML18037A152 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 02/06/2018 |
| From: | Steven Rose NRC/RGN-II/DRP/RPB4 |
| To: | Stephanie West Carolina Power & Light Co |
| References | |
| IR 2017407 | |
| Download: ML18037A152 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 February 6, 2018 Scott D. West, Director
Nuclear Plant Security Brunswick Steam Electric Plant P.O. Box 10429
Southport, NC 28461 SUBJECT: BRUNSWICK STEAM ELECTRIC PLANT - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000325/2017407 AND
Dear Mr. West:
On December 31, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a material control and accounting inspection at your Brunswick Nuclear Plant, Units 1 and 2. On January 23, 2018, the NRC inspectors discussed the results of this inspection with Mr. W. Gideon and other members of his staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding." However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for
withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA/ Steven D. Rose, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos.: 50-325, 50-324 License Nos.: DPR-71, DPR-62
Enclosure:
IR 05000325/2017407 and 05000324/2017407 w/Attachment: Supplemental Information
cc w/encl.: See page 3 cc w/o encl.: Distribution via ListServ