IR 05000293/2008006: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 3: | Line 3: | ||
| issue date = 04/11/2008 | | issue date = 04/11/2008 | ||
| title = IR 05000293-08-006, on 02/28/2008, for Pilgrim, Temporary Instruction 2515/171, Verification of Site Specific Implementation of B.5.b Phase 2 & 3 Mitigating Strategies. | | title = IR 05000293-08-006, on 02/28/2008, for Pilgrim, Temporary Instruction 2515/171, Verification of Site Specific Implementation of B.5.b Phase 2 & 3 Mitigating Strategies. | ||
| author name = Rogge J | | author name = Rogge J | ||
| author affiliation = NRC/RGN-I/DRS/EB3 | | author affiliation = NRC/RGN-I/DRS/EB3 | ||
| addressee name = Bronson K | | addressee name = Bronson K | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter | {{#Wiki_filter:April 11, 2008 Mr. Kevin Bronson Site Vice President Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 SUBJECT: PILGRIM NUCLEAR POWER STATION - NRC TEAM INSPECTION REPORT 05000293/2008006 | ||
Mr. Kevin Bronson Site Vice President Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 | |||
SUBJECT: PILGRIM NUCLEAR POWER STATION - NRC TEAM INSPECTION REPORT 05000293/2008006 | |||
==Dear Mr. Bronson:== | ==Dear Mr. Bronson:== | ||
| Line 32: | Line 27: | ||
The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commission's rules and regulations, and with the condition of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel. | The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commission's rules and regulations, and with the condition of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel. | ||
This report documents three NRC-identified findings of very low safety significance (Green). One of the findings was determined to involve a violation of NRC requirements. Because of the very low safety significance and because the violation was entered into your corrective action program, the NRC is treating this finding as a non-cited violation (NCV), in accordance with Section VI.A.1 of the NRC's Enforcement Policy. If you contest this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555- | This report documents three NRC-identified findings of very low safety significance (Green). One of the findings was determined to involve a violation of NRC requirements. Because of the very low safety significance and because the violation was entered into your corrective action program, the NRC is treating this finding as a non-cited violation (NCV), in accordance with Section VI.A.1 of the NRC's Enforcement Policy. If you contest this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Pilgrim Nuclear Power Station. | ||
0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Pilgrim Nuclear Power Station. | |||
When separated from the Enclosure, this document is DECONTROLLED. In accordance with 10 CFR 2.390 of the NRC "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of the NRC Agency-wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. | When separated from the Enclosure, this document is DECONTROLLED. In accordance with 10 CFR 2.390 of the NRC "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of the NRC Agency-wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. | ||
Sincerely,/RA/ John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-293 License No. DPR-35 | Sincerely, | ||
/RA/ John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-293 License No. DPR-35 Enclosure: Inspection Report 05000293/2008006 w/Attachment: Supplemental Information | |||
Inspection Report 05000293/2008006 | |||
Supplemental Information | |||
}} | }} | ||
Revision as of 12:42, 12 July 2019
| ML081020070 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 04/11/2008 |
| From: | Rogge J Engineering Region 1 Branch 3 |
| To: | Bronson K Entergy Nuclear Operations |
| References | |
| IR-08-006 | |
| Download: ML081020070 (5) | |
Text
April 11, 2008 Mr. Kevin Bronson Site Vice President Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 SUBJECT: PILGRIM NUCLEAR POWER STATION - NRC TEAM INSPECTION REPORT 05000293/2008006
Dear Mr. Bronson:
On February 28, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a team inspection of your Pilgrim Nuclear Power Station (PNPS). The enclosed report documents the team's results, which were discussed on February 28, 2008, with Mr. Stephen Bethay and other members of your staff. A follow-up telephone exit was conducted on April 3, 2008, with Mr.
Joseph Lynch and other members of your staff.
The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commission's rules and regulations, and with the condition of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel.
This report documents three NRC-identified findings of very low safety significance (Green). One of the findings was determined to involve a violation of NRC requirements. Because of the very low safety significance and because the violation was entered into your corrective action program, the NRC is treating this finding as a non-cited violation (NCV), in accordance with Section VI.A.1 of the NRC's Enforcement Policy. If you contest this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Pilgrim Nuclear Power Station.
When separated from the Enclosure, this document is DECONTROLLED. In accordance with 10 CFR 2.390 of the NRC "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of the NRC Agency-wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
Sincerely,
/RA/ John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-293 License No. DPR-35 Enclosure: Inspection Report 05000293/2008006 w/Attachment: Supplemental Information