ML101320062: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 05/06/2010
| issue date = 05/06/2010
| title = Certification of Work - Permit No. 2009-00654
| title = Certification of Work - Permit No. 2009-00654
| author name = Church C R
| author name = Church C
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
| addressee name = Brannan M A
| addressee name = Brannan M
| addressee affiliation = NRC/NRR, US Dept of the Army, Corps of Engineers
| addressee affiliation = NRC/NRR, US Dept of the Army, Corps of Engineers
| docket = 05000327, 05000328
| docket = 05000327, 05000328

Revision as of 08:52, 11 July 2019

Certification of Work - Permit No. 2009-00654
ML101320062
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/06/2010
From: Church C
Tennessee Valley Authority
To: Brannan M
Office of Nuclear Reactor Regulation, US Dept of the Army, Corps of Engineers
References
Download: ML101320062 (2)


Text

Tennessee Valley Authority, Post Office Box 2000, Soddy Daisy, Tennessee 37384-2000 May 06, 2010 Department of the Army Corps of Engineers Eastern Regulatory Field Office Spring Cress Business Park 501 Adesa Blvd., Suite B250 Lenoir City, Tennessee 37771

Dear Ms. Mary Ann Brannan,

TENNESSEE VALLEY AUTHORITY (TVA) -SEQUOYAH NUCLEAR PLANT (SQN) -CERTIFICATION OF WORK -PERMIT NO. 2009-00654 Enclosed is the Certification of Work form for Sequoyah Nuclear Plant in reference to Permit No. 2009-00654.

If you have any questions or need additional information, please contact Ann Hurt at (423) 843-6714.

or Stephanie Howard at (423) 843-6700 of Sequoyah's Environmental staff.I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.

Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.

I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

Sincrl Christopher R. Church Site Vice President Sequoyah Nuclear Plant Enclosure cc (Enclosure):

Mr. Daniel C. Eagar, Manager U.S. Nuclear Regulatory Commission.

Natural Resources Section* ATTN: Document Control Desk Division of Water Pollution Control Washington, D.C. 20555 Tennessee Department of Environment and Conservation 7 th Floor, L&C Annex 401 Church Street Nashville, Tennessee 37243-1534 Dr. Richard Urban, Environmental Field Office Manager Division of Water Pollution Control Tennessee Department of Environment and Conservation State Office Building, Suite 550 540 McCallie Avenue Chattanooga, Tennessee 37402 UJL~

ATTENTION YOU ARE REQUIRED TO SUBMIT THIS SIGNED CERTIFICATION REGARDING THE COMPLETED ACTIVITY AND ANY REQUIRED MITIGATION.

I hereby certify that the work authorized by Permit No. 2009-00654 and any required mitigation was done in accordance with the Corps authorization, including any general or special conditions.

Permittee Signature Date L; 2-x>Lrt Submit this signed certification to the office checked below:[N Eastern Regulatory Field Office Spring Cress Business Park 501 Adesa Blvd.Suite B250 Lenoir City, TN 37771 TRM 484.4 R, Hamilton Co TN Commercial

113