ML12254A090: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 3: | Line 3: | ||
| issue date = 09/07/2012 | | issue date = 09/07/2012 | ||
| title = Notification of NRC Initial Operator Licensing Examination 05000397-13-301 | | title = Notification of NRC Initial Operator Licensing Examination 05000397-13-301 | ||
| author name = Haire M | | author name = Haire M | ||
| author affiliation = NRC/RGN-IV/DRS/OB | | author affiliation = NRC/RGN-IV/DRS/OB | ||
| addressee name = Reddemann M | | addressee name = Reddemann M | ||
| addressee affiliation = Energy Northwest | | addressee affiliation = Energy Northwest | ||
| docket = 05000397 | | docket = 05000397 | ||
| license number = NPF-021 | | license number = NPF-021 | ||
| contact person = Haire M | | contact person = Haire M | ||
| case reference number = 50-397/13-301 | | case reference number = 50-397/13-301 | ||
| document type = Letter | | document type = Letter | ||
| page count = 3 | | page count = 3 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000397/2013301]] | ||
=Text= | =Text= | ||
Revision as of 16:24, 22 June 2019
| ML12254A090 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 09/07/2012 |
| From: | Mark Haire Operations Branch IV |
| To: | Reddemann M Energy Northwest |
| Haire M | |
| References | |
| 50-397/13-301 | |
| Download: ML12254A090 (3) | |
See also: IR 05000397/2013301
Text
September 7, 2012
Mr. Mark E. Reddemann
Chief, Executive Officer
Energy Northwest
P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-
SUBJECT: COLUMBIA GENERATING STATION - NOTIFICATION OF NRC INITIAL
OPERATOR LICENSING EXAMINATION 05000397/2013301
Dear Mr. Reddemann:
In a telephone conversation on September 6, 2012 between Messrs. Ron Hayden, Senior Training Instructor and Steve Garchow, Chief Examiner, arrangements were made for the
administration of licensing examinations at Columbia Generating Station during the weeks of
February 4 and February 11, 2013.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, and NUREG-1123, "Knowledge and Abilities Catalog for
Nuclear Power Plant Operators," Revision 2, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are
administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by November 16, 2012. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by December 14, 2012. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR
55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines,
examinations, and tests before they are submi
tted to the NRC for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary,
sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examinations and reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled. In addition, your support for on-site validation of the examinations is required during the week of January 14, 2013.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator
performance data (e.g., system pressures, UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
M. Reddemann - 2 -
temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office
of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30
days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should
be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Hayden has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Garchow at 817-200-1426, or myself at 817-200-
1159.
Sincerely,
/RA/
Mark S. Haire, Chief
Operations Branch Division of Reactor Safety
Docket No.: 397
License No.: NPF-21
ML12254A090 ADAMS: No Yes SUNSI Review Complete Reviewer Initials:
MSH Publicly Available Non-Sensitive
Non-publicly Available Sensitive RIV/OB RIV/Chief OB SGarchow MHaire /RA/ /RA/ 9/06/2012 9/07/2012