| issue date = 10/11/2012 | | issue date = 10/11/2012 | ||
| title = Follow-Up Assessment 10-11-12 | | title = Follow-Up Assessment 10-11-12 | ||
| author name = Kennedy K | | author name = Kennedy K | ||
| author affiliation = NRC/RGN-IV/DRP | | author affiliation = NRC/RGN-IV/DRP | ||
| addressee name = Edington R | | addressee name = Edington R | ||
| addressee affiliation = Arizona Public Service Co | | addressee affiliation = Arizona Public Service Co | ||
| docket = 05000528, 05000529, 05000530 | | docket = 05000528, 05000529, 05000530 | ||
Revision as of 15:06, 22 June 2019
| ML12285A079 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 10/11/2012 |
| From: | Kennedy K NRC/RGN-IV/DRP |
| To: | Edington R Arizona Public Service Co |
| References | |
| Download: ML12285A079 (3) | |
Text
October 11, 2012
Randall K. Edington, Executive Vice President, Nuclear/CNO
Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034
SUBJECT:
FOLLOW-UP ASSESSMENT LETTER FOR PALO VERDE NUCLEAR GENERATING STATION
Dear Mr. Edington:
As a result of our continuous review of plant performance, which was completed on September 30, 2012, the U. S. Nuclear Regulatory Commission (NRC) updated its assessment of Palo Verde Nuclear Generating Station. The NRC's evaluation consisted of a review of performance indicators and inspection results. This letter informs you of the NRC's assessment of your facility. This letter supplements, but does not supersede, the mid-cycle assessment letter issued on September 4, 2012.
On May 14, 2012, we were notified by your staff of your readiness for the NRC to conduct a supplemental inspection to review the action taken to address a Greater than Green finding in the security cornerstone. On June 11, 2012, the NRC completed the supplemental inspection, pursuant to Inspection Procedure 95001. As documented in NRC Inspection Report 05000528/2012405, 05000529/2012405 and 05000530/2012405, this supplemental inspection was performed to assess your station's evaluation of the root causes, contributing causes, and corrective actions associated with the Greater than Green finding. No inspection findings were identified. Based on these results, and the fact that four quarters have passed since the finding was identified, the Greater than Green finding was closed effective September 30, 2012, placing
the facility in the Licensee Response column of the NRC's action matrix. Therefore, at this time, we plan to conduct baseline inspections at your facility.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
Please contact Ryan Lantz at (817) 200-1173 with any questions you may have about this letter.
Sincerely, /RA/ Kriss M. Kennedy, Director Division of Reactor Projects
Docket Nos: 50-528; 50-529; 50-530
License Nos: NPF-41; NPF-51; NPF-74
Electronic distribution by RIV
- Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov) DRP Acting Deputy Director (Allen.Howe@nrc.gov)
DRS Acting Director (Tom.Blount@nrc.gov)
DRS Acting Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Tony.Brown@nrc.gov)
Resident Inspector (Dustin.Reinert@nrc.gov)
Resident Inspector (Mica.Baquera@nrc.gov)
Branch Chief, DRP/D (Ryan.Lantz@nrc.gov)
Senior Project Engineer, DRP/D (Nick.Taylor@nrc.gov)
Project Engineer, DRP/D (Brian.Parks@nrc.gov)
Project Engineer, DRP/D (David.You@nrc.gov) PV Administrative Assistant (Revonna.Stuart@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Lauren.Gibson@nrc.gov)
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource ROPreports RIV/ETA: OEDO (Cayetano.Santos@nrc.gov) DRS/TSB STA (Dale.Powers@nrc.gov) Chief, NSIR/DSP/RSB Chief, NSIR/DSO/RSOB
RidsNsirDso@nrc.gov RidsNrrDirslpab@nrc.gov ROPassessment Resource@nrc.gov Ronald Albert (Ronald.Albert@nrc.gov), Chief, Reactor Security Oversight Branch Shyrl Coker, (Shyrl.Coker@nrc.gov) NSIR/DSO/DDSO, TWFN Mail Stop: T-3A5M File Located: R:\_REACTORS\_PV\2012 ML12285A079 ADAMS: No x Yes X SUNSI Review Complete Reviewer Initials: NHT x Publicly Available x Non-Sensitive Non-publicly Available Sensitive C:PBD C:PSB1 D:DRS D:DRP RELantz MHaire TBlount KKennedy /RA/ /RA/ /RA/ /RA/
9/25/12 9/26/12 9/27/12 10/10/12 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax