ML12307A313: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 5: | Line 5: | ||
| author name = Reis T | | author name = Reis T | ||
| author affiliation = NRC/RGN-II/DRS | | author affiliation = NRC/RGN-II/DRS | ||
| addressee name = Heacock D | | addressee name = Heacock D | ||
| addressee affiliation = Virginia Electric & Power Co (VEPCO) | | addressee affiliation = Virginia Electric & Power Co (VEPCO) | ||
| docket = 05000280, 05000281 | | docket = 05000280, 05000281 | ||
Revision as of 14:03, 22 June 2019
| ML12307A313 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 11/01/2012 |
| From: | Reis T Division of Reactor Safety II |
| To: | Heacock D Virginia Electric & Power Co (VEPCO) |
| References | |
| Download: ML12307A313 (5) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 November 1, 2012
Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Dominion Nuclear Innsbrook Technical Center 5000 Dominion Boulevard
Glen Allen, VA 23060-6711
SUBJECT:
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR SURRY POWER STATION
Dear Mr. Heacock:
In a letter dated August 14, 2011, your staff responded to Regulatory Issue Summary 2012-07 and requested we schedule initial license operator examinations for the Surry Power Station. Based on your letter and following discussions with your staff, we have scheduled the requested examinations as follows:
Plant / Station 2013 2014 Date ApplicantsDate Applicants Surry NR NR 8/11 12 NR - None Requested On-site validation of the examinations is typically scheduled to occur approximately three weeks before each examination. If you have a need to change the dates of your scheduled exam(s) from that (those) listed above, please inform us in writing of your request and the reason for the change. Due to the large number of examinations scheduled to be administered at Region II sites, requests to change examination dates will be considered on a case-by-case basis. We will confirm any change in examination schedule with a follow-up letter.
We understand that your staff will develop the proposed examinations. For examinations that have greater than nine applicants, each examination is scheduled for a minimum of two weeks.
If the number of applicants is reduced to less than ten (10) for any examination, please inform us as this will impact the examination schedule.
A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner=s name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates. If you have any questions concerning this information, please contact Mr. Malcolm Widmann, Chief, Operations Branch I, at 404-997-4550 or Mr. Mark Franke, Chief, Operations Branch II at 404-997-4436.
D. Heacock 2
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC
=s public Web site at http://www.nrc.gov/reading-rm/adams.html. Sincerely,
/RA/
Terrence Reis, Director
Division of Reactor Safety
Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37
cc: (See page 3)
_________________________
G SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII:DRS SIGNATURE RA RA RA RA NAME SCHAAF WIDMANN FRANKE CHRISTENSEN DATE 10/25/2012 11/1/2012 11/1/2012 11/1/2012 11/ /2012 11/ /2012 11/ /2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO D. Heacock 3 cc: Larry Lane Site Vice President Surry Power Station Virginia Electric and Power Company Electronic Mail Distribution
B. L. (Sonny) Stanley
Director, Nuclear Safety and Licensing Virginia Electric and Power Company Electronic Mail Distribution
Kenny B. Sloane
Plant Manager Surry Power Station Virginia Electric & Power Company Electronic Mail Distribution
Lillian M. Cuoco, Esq.
Senior Counsel Dominion Resources Services, Inc.
Electronic Mail Distribution
Tom Huber Director, Nuclear Licensing & Operations Support Inssbrook Technical Center Electronic Mail Distribution
Virginia State Corporation Commission Division of Energy Regulation P.O. Box 1197
Richmond, VA 23209
Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219
Senior Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission 5850 Hog Island Rd Surry, VA 23883
Michael M. Cline
Director Virginia Department of Emergency Services Management Electronic Mail Distribution
Virginia Electric and Power Company ATTN: Mr. Jeff Spence Manager of Nuclear Training Surry Power Station 5570 Hog Island Surry, VA 23883
Letter to David A. Heacock from Terrence Reis dated November 1, 2012
SUBJECT:
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR SURRY POWER STATION
Distribution
- ORA, RII T. Reis H. Christensen M. Widmann M. Franke
K. Schaaf J. Vincent J. Kirby G. McCoy J. McHale RIDSNRRDIRSIRIB Resource Document Control Desk - Licensing RIDSNRRDIRS PUBLIC RidsNrrPMSurry Resource