IR 05000224/2013404: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 5: | Line 5: | ||
| author name = Dimitriadis A | | author name = Dimitriadis A | ||
| author affiliation = NRC/RGN-I/DRS/PSB1 | | author affiliation = NRC/RGN-I/DRS/PSB1 | ||
| addressee name = Pacher J | | addressee name = Pacher J | ||
| addressee affiliation = Constellation Energy Nuclear Group, LLC | | addressee affiliation = Constellation Energy Nuclear Group, LLC | ||
| docket = 05000244 | | docket = 05000244 | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:September 30, 2013 | ||
==SUBJECT:== | |||
R. E. GINNA NUCLEAR POWER PLANT, LLC - NRC SECURITY INSPECTION REPORT 05000244/2013404 | |||
SUBJECT: R. E. GINNA NUCLEAR POWER PLANT, LLC - NRC SECURITY INSPECTION REPORT 05000244/2013404 | |||
==Dear Mr. Pacher:== | ==Dear Mr. Pacher:== | ||
Revision as of 21:37, 21 June 2019
| ML13274A213 | |
| Person / Time | |
|---|---|
| Site: | Ginna, Berkeley Research Reactor |
| Issue date: | 09/30/2013 |
| From: | Anthony Dimitriadis Plant Support Branch 1 |
| To: | Joseph Pacher Constellation Energy Nuclear Group |
| References | |
| IR-13-404 | |
| Download: ML13274A213 (4) | |
Text
September 30, 2013
SUBJECT:
R. E. GINNA NUCLEAR POWER PLANT, LLC - NRC SECURITY INSPECTION REPORT 05000244/2013404
Dear Mr. Pacher:
On August 22, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your R. E. Ginna Nuclear Power Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on August 22, 2013, with Mr. Mike Philippon, Plant General Manager, and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
One Licensee identified finding of very low security significance (i.e., Green as determined by the Baseline Security Significance Determination Process) was identified during this inspection. The finding involved a violation of NRC requirements and the deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the site.
In accordance with 10 CFR §2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security-Related Information, in accordance with 10 CFR §2.390(d)(1), and its disclosure to unauthorized individuals could present a security
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, the transmittal document is decontrolled. vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from public disclosure under 10 CFR §2.390" in accordance with 10 CFR §2.390(d)(1) and follow the instructions for withholding in 10 CFR §2.390(b)(1). In accordance with 10 CFR §2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/ Anthony Dimitriadis, Chief
Plant Support Branch 1 Division of Reactor Safety Docket No. 50-244 License No. DPR-18
Non-Public Enclosure: Inspection Report 05000244/2013404 w/Attachment: Supplemental Information (OUO-SRI)
cc w/o encl; OUO-SRI: Distribution via ListServ cc w/encl; w/OUO-SRI: G. Palmer, Director of Security J. Hauer, Commissioner, NY State Div. of Homeland Security and Emergency Services F. Murray, President and CEO New York State Energy Research and Development Authority
ML13274A213 ADAMS ACCESSION NUMBER: ML13274A196 Cover Letter: SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter w/Enclosure: SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRP RI/DRS NAME DEverhart JBream DSchroeder ADimitriadis DATE 09/25/13 09/25/13 09/25/13 09/30/13 Distribution w/o OUO-SRI: (via E-Mail) W. Dean, RA (R1ORAMAIL RESOURCE)
D. Lew, DRA (R1ORAMAIL RESOURCE) D. Roberts, DRP (R1DRPMAIL RESOURCE)
M. Scott, DRP (R1DRPMAIL RESOURCE) R. Lorson, DRS (R1DRSMAIL RESOURCE)
J. Trapp, DRS (R1DRSMAIL RESOURCE)
D. Schroeder, DRP
A. Rosebrook, DRP
B. Scrabeck, DRP N. Perry, DRP, SRI D. Dodson, DRP, RI M. Rose, DRP, AA V. Campbell, RI OEDO RidsNrrPMREGinna Resource
RidsNrrDorlLpl1-1 Resource ROPreports Resource
Distribution w/OUO-SRI: (via E-Mail)
J. Bream, DRS A. Dimitriadis, DRS
R. Albert, NSIR S. Coker, NSIR C. Johnson, NSIR B. Desai, DRS, RII