ML15022A245: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 3: | Line 3: | ||
| issue date = 01/21/2015 | | issue date = 01/21/2015 | ||
| title = Ltr 01/21/15 Clinton Notification of NRC Supplement Security Inspection Request for Information (Cover Letter Only) | | title = Ltr 01/21/15 Clinton Notification of NRC Supplement Security Inspection Request for Information (Cover Letter Only) | ||
| author name = Orth S | | author name = Orth S | ||
| author affiliation = NRC/RGN-III/DRS/PSB | | author affiliation = NRC/RGN-III/DRS/PSB | ||
| addressee name = Pacilio M | | addressee name = Pacilio M | ||
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | | addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | ||
| docket = 05000461 | | docket = 05000461 | ||
Revision as of 04:01, 21 June 2019
| ML15022A245 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 01/21/2015 |
| From: | Steven Orth Plant Support Branch II |
| To: | Pacilio M Exelon Generation Co, Exelon Nuclear |
| References | |
| Download: ML15022A245 (4) | |
Text
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532
-4352 January 21, 2015 Mr. Michael J. Pacilio Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
CLINTON POWER STATION
- NOTIFICATION OF NRC SUPPLEMENTAL SECURITY INSPECTION (9500 1) AND REQUEST FOR INFORMATION
Dear Mr. Pacilio:
In a telephone conference on January 14, 2015 , your staff at the Clinton Power Station informed the U.S. Nuclear Regulatory Commission (NRC) that the Clinton facility was ready for the NRC to perform a supplemental inspection using NRC Inspection Procedure (I P) 9500 1 , "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area
." On February 9, 201 5, the NRC will begin the IP 95001 supplemental inspection.
This on-site inspection is scheduled to be performed February 23 through 27, 201 5. The purpose of this inspection is to provide assurance that the root causes and contributing causes of the performance issue associated with the Greater than Green security violation are understood, the extent of condition and extent of cause of the failures are identified, and your corrective actions are sufficient to address the root and contributing causes to prevent recurrence
. To minimize the impact to your on
-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up
-to-date and complete, thereby minimizing the number of additional documents requested during the preparation and/or the onsite portions of the inspection. We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. Duane Avery of your organization.
If there are any questions regarding our schedule or the materials being requested
, please contact Dale Lawver at 630-829-9831. She may also be reached electronically at dale.lawver@nrc.gov
.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled.
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION M. Pacilio However, the material enclosed herewith contains Security
-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability.
Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security
-Related Information is necessary to provide an acceptable response, please mark your entire response "Security
-Related Information
-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. Sincerely, /RA/ Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50
-461 License No. NPF
-62
Enclosure:
Supplemental Inspection Document Request cc w/encl:
N. Simonian, NSIR/DSO/DDSO/ST E. Wharton, NSIR T. Dimitriadis, RI B. Desai, RII C. Pederson, RIII D. Roberts, RIII M. Haire, RIV E. Brooks, Clinton Station Security Manager J. Klinger, State Liaison Officer Illinois Emergency Management Agency cc w/o encl: Distribution via LISTSERV OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION M. Pacilio However, the material enclosed herewith contains Security
-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability.
Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security
-Related Information is necessary to provide an acceptable response, please mark your entire response "Security
-Related Information
-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely, /RA/ Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50
-461 License No. NPF
-62
Enclosure:
Supplemental Inspection Document Request cc w/encl:
N. Simonian, NSIR/DSO/DDSO/ST E. Wharton, NSIR T. Dimitriadis, RI B. Desai, RII C. Pederson, RIII D. Roberts, RIII M. Haire, RIV E. Brooks, Clinton Station Security Manager J. Klinger, State Liaison Officer Illinois Emergency Management Agency
cc w/o encl: Distribution via LISTSERV DISTRIBUTION w/o encl
- See next page ADAMS Accession Number ML15022A245 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII E RIII RIII RIII NAME DLawver:jw DFunk SOrth DATE 0 1/21/1 5 01/21/1 5 01/21/1 5 OFFICIAL RECORD COPY
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION Letter to Mr. Michael J. Pacilio from Mr. Steven K. Orth dated January 21, 2015
SUBJECT:
CLINTON POWER STATION
- NOTIFICATION OF NRC SUPPLEMENTAL SECURITY INSPECTION (95001) AND REQUEST FOR INFORMATION DISTRIBUTION w/o encl:
Kimyata MorganButler RidsNrrDorlLpl3
-2 Resource RidsNrrPMClinton Resource RidsNrrDirsIrib Resource Eric Duncan Allan Barker Carole Ariano Linda Linn DRSIII DRPIII Jim Clay Carmen Olteanu ROPreports.Resource@nrc.gov