ML15112B123: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 3: | Line 3: | ||
| issue date = 04/30/2015 | | issue date = 04/30/2015 | ||
| title = General Electric Company Parent Guarantee of Funds for Decommissioning, Annual Financial Test (TAC L33372) | | title = General Electric Company Parent Guarantee of Funds for Decommissioning, Annual Financial Test (TAC L33372) | ||
| author name = Naquin T | | author name = Naquin T | ||
| author affiliation = NRC/NMSS/DFCSE/FMB | | author affiliation = NRC/NMSS/DFCSE/FMB | ||
| addressee name = Murray S | | addressee name = Murray S | ||
| addressee affiliation = Global Nuclear Fuel - Americas, LLC | | addressee affiliation = Global Nuclear Fuel - Americas, LLC | ||
| docket = 05000018, 05000070, 05000073, 05000183, 07000754, 07001113, 07002872, 07200001 | | docket = 05000018, 05000070, 05000073, 05000183, 07000754, 07001113, 07002872, 07200001 | ||
| license number = DPR-001, DPR-010, R-033, SNM-0960, SNM-1097, SNM-1826, SNM-2500, TR-001 | | license number = DPR-001, DPR-010, R-033, SNM-0960, SNM-1097, SNM-1826, SNM-2500, TR-001 | ||
| contact person = Naquin T | | contact person = Naquin T | ||
| case reference number = TAC L33372 | | case reference number = TAC L33372 | ||
| document type = Letter | | document type = Letter | ||
Revision as of 00:01, 21 June 2019
| ML15112B123 | |
| Person / Time | |
|---|---|
| Site: | Vallecitos Nuclear Center, 07000754, 07001113, 07002872, 07200001, Vallecitos |
| Issue date: | 04/30/2015 |
| From: | Ty Naquin Fuel Manufacturing Branch |
| To: | Murray S Global Nuclear Fuel |
| Naquin T | |
| References | |
| TAC L33372 | |
| Download: ML15112B123 (3) | |
Text
April 30, 2015
Mr. Scott P. Murray, Manager Licensing & Liabilities Global Nuclear Fuel-Americas 3901 Castle Hayne Road P.O. Box 780 - M/C K-84
Wilmington, NC 28401
SUBJECT:
GENERAL ELECTRIC COMPANY PARENT GUARANTEE OF FUNDS FOR DECOMMISSIONING, ANNUAL FINANCIAL TEST (TECHNICAL ASSIGNMENT CONTROL NUMBER L33372)
Dear Mr. Murray:
The U.S. Nuclear Regulatory Commission (NRC) reviewed your documents relating to financial assurance for the General Electric Company, submitted by letter dated March 17, 2015. This financial assurance documentation addresses decommissioning financial assurance for the Global Nuclear Fuel - America's Fuel Manufacturi ng facility, the Reuter-Stokes facility, the Vallecitos Nuclear Center, and the Morris Operations facility.
The NRC staff reviewed the documents for conformance to NRC's regulations and NUREG-1757, Volume 3, "Consolidated NMSS Decommissioning Guidance: Financial Assurance, Recordkeeping, and Timeliness." The documents submitted were found acceptable in accordance with NUREG-1757, Volume 3, Appendix A.8. The licensees comply with Appendix A, "Criteria Relating to Use of Financial Tests and Parent-Company Guarantees for Providing Reasonable Assurance of Funds for Decommissioning" of Title 10 of the Code of Federal Regulations (10 CFR), Part 30; therefore, the parent company guarantee is acceptable financial assurance for decommissioning. To continue utilizing the parent-company guarantee, General Electric must repeat passage of the financial test within 90 days after the close of each succeeding fiscal year as required by 10 CFR, Part 30, Appendix A, Section C.1.
In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electroni cally for public inspection in the NRC Public Document Room or from the Publicly Av ailable Records component of NRC's document system, Agencywide Documents Access and M anagement System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Technical Assignment Control number L33372 is considered closed.
If you have any questions regarding this matter, I can be reached at (301) 415-7918 or via e-mail at Tyrone.naquin@nrc.gov. Sincerely, /RA/ Tyrone D. Naquin, Project Manager Fuel Manufacturing Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review
Office of Nuclear Material Safety
and Safeguards
Dockets:
70-1113 50-73 72-1
70-2872 50-70 70-754
50-18 50-183 Licenses:
SNM-1097 TR-1 SNM-2500 SNM-1826 DR-10 DPR-1 R-33 SNM-960
ML15112B123 Package No. ML15112B132 OFFICE NMSS/FCSE/FMBNMSS/FCSE NMSS/FCSE/FMB NAME TNaquin TBrockington RJohnson DATE 04/30 /2015 04/29/2015 04/30/2015