| | title = IR 05000413/2015007 and 05000414/2015007; on 08/10/2015 - 09/17/2015; Catawba Nuclear Station, Units 1 and 2; Component Design Bases Inspection | | | title = IR 05000413/2015007 and 05000414/2015007; on 08/10/2015 - 09/17/2015; Catawba Nuclear Station, Units 1 and 2; Component Design Bases Inspection |
| | author name = Bartley J H | | | author name = Bartley J |
| | author affiliation = NRC/RGN-II/DRS/EB1 | | | author affiliation = NRC/RGN-II/DRS/EB1 |
| | addressee name = Henderson K | | | addressee name = Henderson K |
| Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 October 21, 2015 Mr. Kelvin Henderson Site Vice President | | {{#Wiki_filter:October 21, 2015 |
|
| |
|
| Duke Energy Carolinas, LLC Catawba Nuclear Station
| | ==SUBJECT:== |
| | | CATAWBA NUCLEAR STATION - NRC COMPONENT DESIGN BASES INSPECTION REPORT 05000413/2015007 AND 05000414/2015007 |
| 4800 Concord Road York, SC 29745
| |
| | |
| SUBJECT: CATAWBA NUCLEAR STATION - NRC COMPONENT DESIGN BASES INSPECTION REPORT 05000413/2015007 AND 05000414/2015007 | |
|
| |
|
| ==Dear Mr. Henderson:== | | ==Dear Mr. Henderson:== |
| Line 37: |
Line 34: |
| Jonathan H. Bartley, Chief Engineering Branch 1 Division of Reactor Safety | | Jonathan H. Bartley, Chief Engineering Branch 1 Division of Reactor Safety |
|
| |
|
| Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52 Enclosure: | | Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52 |
| | |
| | ===Enclosure:=== |
| Inspection Report 05000413/2015007 and 05000414/2015007, w/Attachment: Supplementary Information | | Inspection Report 05000413/2015007 and 05000414/2015007, w/Attachment: Supplementary Information |
|
| |
|
| cc: Distribution via ListServ
| | REGION II== |
| | |
| _________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RI:DRS RII:DRS RII:DRS RII:DRS CONTRACTOR CONTRACTOR RII_DRP SIGNATURE DMK (EMAIL) SPS (EMAIL) EJS2 TXS2 (EMAIL) GHG1 (EMAIL) SJG3 (EMAIL) FJE NAME DKERN SSANCHEZ ESTAMM TSU GGARDNER SGARDNER FEHRHARDT DATE 10/6/2015 10/6/2015 10/6/2015 10/6/2015 10/7/2015 10/15/2015 10/21/2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICE RII:DRS SIGNATURE EJS2 FOR JHB1 NAME JBARTLEY DATE 10/21/2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Enclosure U. S. NUCLEAR REGULATORY COMMISSION
| |
| | |
| ==REGION II==
| |
|
| |
|
| Docket Nos.: 050000413, 05000414 | | Docket Nos.: 050000413, 05000414 |
| Line 187: |
Line 182: |
|
| |
|
| ==LIST OF DOCUMENTS REVIEWED== | | ==LIST OF DOCUMENTS REVIEWED== |
| ===Calculations===
| | |
| : CNC-1206.03-00-0101, Tornado Protection Due to Postulated Tornado Event, Rev. 7
| |
| : CNC-1210.04-00-0130, Refueling Water Storage Tank (FWST) Narrow Range Level Scaling and Accuracy, Rev. 3
| |
| : CNC-1211.00-00-0013, Diesel Generator Building HVAC Calculations, Rev. 27
| |
| : CNC-1223.02-00-0005, Minimum Height of Water Above Outlet Nozzle Required to Prevent Vortexing on the Outflow of Tanks, Rev. 0
| |
| : CNC-1223.04-00-0107, VCT NPSH and Low-Low Level Auto-swap Setpoint, Rev. 0
| |
| : CNC-1223.04-00-0116, Flowserve Overpressure Evaluation of Centrifugal Charging Pumps, Rev. 0
| |
| : CNC-1223.11-00-0022,
| |
| : GL 95-07 Pressure Locking and Thermal Binding Review of ND System Valves, Rev. 3
| |
| : CNC-1223.11-00-0048, Evaluation of Potential Steam Voids in ECCS Alignments, Rev. 3
| |
| : CNC-1223.11-00-0050, Evaluation of Gas Transport in Catawba ND Pump Suctions Piping (NAI-1463-001), Rev. 0
| |
| : CNC-1223.12-00-0054,
| |
| : GL 95-07 Pressure Locking and Thermal Binding Review of ND System Valves, Rev. 2
| |
| : CNC-1223.12-00-0076, Evaluation of Systems (ND, NI, NV, FW, NS) for Generic Letter 2008-01 Response, Rev. 3
| |
| : CNC-1223.12-00-0079, Acceptable Gas Volumes (Suction Side of Pumps) for
| |
| : PT/1(2)/A/4200/006B, Rev. 1
| |
| : CNC-1223.21-00-0002, RWST vent sizing, Rev. 2
| |
| : CNC-1223.21-00-0004, Level Setpoints for Refueling Water Storage Tank, Rev. 5
| |
| : CNC-1223.21-00-0005, Sizing of Refueling Water Storage Tank Missile Shield Wall. Rev. 4
| |
| : CNC-1223.21-00-0009, RWST overflow verification, Rev. 2
| |
| : CNC-1223.40-01-0003, Determination of Condensate Volume for Cooldown to RHR Conditions, Rev. 0
| |
| : CNC-1223.43-02-0009, SA System TDAFWP Steam Supply Pipe Heat Tracing Operability Evaluation, Rev. 6
| |
| : CNC-1223.43-02-0012, Calculation of Maximum Operator Response Time for SA Heat Trace System Failure to De-energize Scenario, Rev. 1
| |
| : CNC-1223.59-02-0001, DG Lube Oil System, Pressure, Temperature and Level Setpoints, Rev.8
| |
| : CNC-1223.59-02-0002, Diesel Generator Prelube Oil Pump NPSH Verification, Rev. 4
| |
| : CNC-1223.59-02-0003, Diesel Generator Lube Oil system Verification Calculation, Rev. 9
| |
| : CNC-1223.59-02-0005, Clean Lube Oil Storage Tank Level Verification vs NPSH Requirements, Rev.1
| |
| : CNC-1223.59-02-0006, LD Minimum Temperature Surveillance Documentation, Rev. 0
| |
| : CNC-1223.59-03-0002, Diesel Generator Fuel Oil Storage Tank Low, Tech Spec, and High Level Setpoints, Rev. 6
| |
| : CNC-1223.59-03-0004, Diesel Generator Fuel oil Day Tank Level Setpoints, Rev. 7
| |
| : CNC-1223.59-03-0005, Diesel Generator Engine Fuel Oil System Filter, Strainer, and system Pressure Alarm Setpoints, Rev. 5
| |
| : CNC-1223.59-03-0006, Diesel Generator Engine Driven Fuel Oil Pump NPSHA Verification, Rev. 8
| |
| : CNC-1223.59-03-0007, Diesel Generator Fuel Oil System Verification Calculations, Rev. 2
| |
| : CNC-1223.59-03-0011, Design Basis Calculation for Fuel Oil Storage Tank Level, Rev. 5
| |
| : CNC-1223.59-03-0012, Design Basis Calculation for Fuel Oil Day Tank Level, Rev. 2
| |
| : CNC-1223.59-03-0014, Operability Evaluation for Diesel Generator Fuel Oil Storage Tank Vent Line, Rev. 2
| |
| : CNC-1223.59-03-0015, FD Filter Pressure Setpoint Determination, Rev. 1
| |
| : CNC-1223.59-03-0017, Loss of Cylinder Analysis, Rev. 1
| |
| : CNC-1341.00-00-0001, Min Voltage from EMXS for H2 Mitigation System to Function, Rev. 0
| |
| : CNC-1381.05-00-0012, 4160V Essential Aux Pwr System Switchgear Relay Setting, Rev. 16
| |
| : CNC-1381.05-00-0050, 125VDC Diesel Generator Battery and Charger Sizing Calc, Rev. 10
| |
| : CNC-1381.05-00-0069, Environmental Qualification of Class 1E Components Located in Duke Designed Enclosures, Rev. 2
| |
| : CNC-1381.05-00-0135, U1/2, 125VDC Vital I&C Power System (EPL) Short Circuit Analysis, Rev. 5, Dated 7/19/07
| |
| : CNC-1381.05-00-0135-ICC-0001, 5a-Replacement of Unit 1/2 A&B Train 125VDC Vital I&C
| |
| : System (EPL) Cables from 125VDC Vital Battery Distribution Center 1EDA(D) through Auctioneering Diode EADA (B) to 125VDC Distribution Center EDE(F), Dated 04/15/13
| |
| : CNC-1381.05-00-0135-ICC-0002, 6A-Replace the 125 VDC Vital I&C Battery Chargers, Rev.
| |
| : 00, Dated 04/15/13
| |
| : CNC-1381.05-00-0135-ICC-0003, 6B-Replace Fuses on EPL distribution panels 1(2) EDA, EDB, EDC, and EDD, Dated 04/15/13
| |
| : CNC-1381.05-00-0135-ICC-0004, 7A-Replace EPQ Breaker and Cable, Dated 04/15/13
| |
| : CNC-1381.05-00-0135-ICC-0005, 7B-Replace EPQ Breaker and Cable, Dated 04/15/13
| |
| : CNC-1381.05-00-0135-ICC-0006, 7C-Proposed Modification to Purchase Larger Batteries for the EPL System, Dated 04/15/13
| |
| : CNC-1381.05-00-0135-ICC-0007, Add Fuses in Seri es with Breaker in 2EDE and 2EDF Distribution Centers, Rev. 00, Rev. 0, Dated 12/18/14
| |
| : CNC-1381.05-00-0135-ICC-0008, Add Fuses in Series with Breaker in 1EDF Distribution Centers, Rev. 00, Dated 08/11/14
| |
| : CNC-1381.05-00-0135-ICC-0009, Add Fuses in Seri es with Breaker in 2EDE and 2EDF Distribution Centers, Rev. 01, Dated 02/17/15
| |
| : CNC-1381.05-00-0135-ICC-0010, Add Fuses in Seri es with Breaker in 1EDE and 1EDF Distribution Centers, Dated 02/02/15
| |
| : CNC-1381.05-00-0150, Essential
| |
| : DG 125VDC Aux Power System SBO Battery Sizing, Rev. 5
| |
| : CNC-1381.05-00-0151, Voltage Analysis for 125VDC Essential DG Aux Pwr during SBO, Rev.5
| |
| : CNC-1381.05-00-0198, Unit 1 6.9KV & 600V Aux Pwr System SR Voltage Analysis, Rev. 13
| |
| : CNC-1381.05-00-0209, 6.9KV, 4.16KV and 600V Aux Power Short Circuit Analysis, Rev. 3
| |
| : CNC-1381.05-00-0243, Intercell Resistance Calculation for 125VDC Vital I&C Battery System (EPL) and 125 VDC Essential Diesel Auxiliary Power Battery System (EPQ), Dated 7/26/10
| |
| : CNC-1552.08-00-0387, Diesel Generator Room Ventilation Dampers Response to a Design Basis Tornado Event, Rev. 1
| |
| : CNC-1552.08-00-4264, RWST Level Setpoints (PIP 06974085) Appendix J., Rev. 11
| |
| : CNM-1148.00-0053.001, Seismic Stress Analysis of ASME Section III Class 2 Tanks (RWST), Dated 9/25/86
| |
| : Completed Procedures
| |
| : OP/2/A/6550 001, Recirculating Diesel Fuel Oil Tanks, Performed 7/22/15
| |
| : PT/0/A/4150/019 B, NC System Dilution following Refueling, Performed 6/18/08
| |
| : PT/0/A/4700/061, Time Critical Operator Action Review, Performed 6/9/14
| |
| : PT/1/A/4200/004 B, Containment Spray Pump 1A Performance Test, Performed 5/14/15 PT/1/A/4200/004 C, Containment Spray Pump 1B Performance Test, Performed 8/06/15 PT/1/A/4200/006 B, ECCS Valve Lineup Verification, Performed 8/04/15
| |
| : PT/1/A/4200/006 D, ECCS Throttle Valve Mechanical Stop Position Verification, Performed
| |
| : 5/29/14
| |
| : PT/1/A/4350/002 A, Diesel Generator 1A Operability Test, Performed 5/20/15 and 8/15/15
| |
| : PT/1/A/4350/002 B, Diesel Generator 1B Operability Test, Performed 9/4/13
| |
| : PT/1/A/4400/006 C, KC Heat Exchanger 1A Heat Capacity Test, Performed 11/24/12 PT/1/A/4400/009, Cooling Water Flow Monitoring for Asiatic Clams and Mussels Test, Performed 9/28/13, 11/10/13, 12/21/13, 4/26/14, 10/18/14, 12/6/14, 4/18/15, and 6/6/15 PT/1/A/4550/004, D/G Fuel Oil Storage Tank Water Inspection, Performed 7/20/15
| |
| : PT/1/A/4600/002 A, Mode 1 Periodic Surveillance Items, Performed 7/12/15, 7/17/15, & 7/26/15
| |
| : PT/2/A/4200/004 B, Containment Spray Pump 2A Performance Test, Performed 7/23/15
| |
| : PT/2/A/4200/004 C, Containment Spray Pump 2B Performance Test, Performed 4/30/15 PT/2/A/4200/006 B, ECCS Valve Lineup Verification, Performed 7/27/15 PT/2/A/4350/002, Diesel Generator 2A Operability Test, Performed 8/11/15
| |
| : Completed Work Orders
| |
| : WO 96066902, Refurbish Spare 5HK Breaker, Performed 2/4/97
| |
| : WO 00903504, Perform Inspection of Auctioning Diode Assemblies, Performed 12/10/97
| |
| : WO 00934715, 1VD DA DSFD01 - Replace Damper Motor Assy, Performed 7/28/11
| |
| : WO 00943538, 1VD DA DSFD03 - Replace Damper Motor Assy, Performed 10/16/12
| |
| : WO 00974013, 1VD DA DSFD02 - Pfm. Inspect/PM (Damper & Hydramotor), Performed
| |
| : 2/23/15
| |
| : WO 01026263, Verify Correct Operation of Auctioning Diode Assembly, Dated 08/17/04
| |
| : WO 01778619, 2SA145 Replace Screw Spindle & Slip Ring, Performed 4/02/09
| |
| : WO 01857952 01, Verify Correct Operation of Auctioneering Diode Assembly, Performed
| |
| : 2/20/11
| |
| : WO 01908973, Refurbish Spare 5-HK Breaker, Performed 6/10/10
| |
| : WO 01915329, 2SA145* Perform Comprehensive Limitorque PM, Performed 4/15/10
| |
| : WO 02090601, 1-R-FW-0002; Perform ISI Visual Inspection (VT-3), Performed 5/14/14
| |
| : WO 02094201, Replace D/G-1B Tach Relay Power Supply, Performed 4/30/13
| |
| : WO 02099398, 1EHT CA CTCCSA:
| |
| : Inspect SA Heat Trace, Performed 12/31/13
| |
| : WO 02111490, 1EHT CA CTCCSA:
| |
| : Calibrate Heat Trace Controller, Performed 6/18/14
| |
| : WO 02137493, 1FW
| |
| : TK 0001; Insp. FWST Tank Internals / Bottom Tank Welds, Performed
| |
| : 5/24/14
| |
| : WO 02142787, 1SA145* Perform Comprehensive Limitorque PM, Performed 9/18/14
| |
| : WO 02143844, 2EHT - Inspect SA Heat Trace, Performed 9/23/14
| |
| : WO 02155226, 2DGBB Perform Battery Service Test, Performed 3/13/15
| |
| : WO 02156138, 2EHT PL CTCCSA:
| |
| : Calibrate Heat Trace Controllers, Performed 3/29/15
| |
| : WO 02157613,
| |
| : EC 110305 Install U1 FD System Connection for Portable Pump, Performed
| |
| : 5/14/15
| |
| : WO 02159066,
| |
| : EC 110305 Install U2 FD System Connection for Portable Pump, Performed
| |
| : 11/3/14
| |
| : WO 02173938, Refurbish Spare 5-HK Breaker, Performed 8/26/15
| |
| : Corrective Action Program Documents
| |
| : AR 00268237
| |
| : AR 00326885
| |
| : AR 01344910
| |
| : AR 01456109
| |
| : AR 01494558
| |
| : AR 01498079
| |
| : AR 01499539
| |
| : AR 01501430
| |
| : AR 01501490
| |
| : AR 01502895
| |
| : AR 01504346
| |
| : AR 01507930
| |
| : AR 01508031
| |
| : AR 01509948
| |
| : AR 01513815
| |
| : AR 01515261
| |
| : AR 01516493
| |
| : AR 01520233
| |
| : AR 01521344
| |
| : AR 01522314
| |
| : AR 01523095
| |
| : AR 01523464
| |
| : AR 01526142
| |
| : AR 01526423
| |
| : AR 01526910
| |
| : AR 01528108
| |
| : AR 01529566
| |
| : AR 01532794
| |
| : AR 01534642
| |
| : AR 01535149
| |
| : AR 01535251
| |
| : AR 01535297
| |
| : AR 01536721
| |
| : AR 01537113
| |
| : AR 01537606
| |
| : AR 01538473
| |
| : AR 01539867
| |
| : AR 01541392
| |
| : AR 01541915
| |
| : AR 01588214
| |
| : AR 01897264
| |
| : AR 01897410
| |
| : AR 01897410
| |
| : AR 01898080
| |
| : AR 01898164
| |
| : AR 01898590
| |
| : AR 01898671
| |
| : AR 01897471
| |
| : AR 01897850
| |
| : AR 01900921
| |
| : AR 01928776
| |
| : AR 01932558
| |
| : AR 01935401
| |
| : AR 01935545
| |
| : AR 01935625
| |
| : AR 01937903
| |
| : AR 01943385
| |
| : AR 01953722
| |
| : PIP C-99-00691
| |
| : PIP C-06-03314
| |
| : PIP C-08-07140 PIP C-11-05581 PIP C-12-01063
| |
| : PIP C-12-04000
| |
| : PIP C-12-05457
| |
| : PIP C-12-05464 PIP C-12-07121 PIP C-12-07717 PIP C-12-09946
| |
| : PIP C-13-05044 PIP C-13-06688 PIP C-14-00293
| |
| : PIP C-14-01575
| |
| : PIP C-14-03427
| |
| : PIP C-14-05796
| |
| : PIP C-14-06198 PIP C-14-06246 PIP C-14-07071
| |
| : PIP C-14-09722
| |
| : PIP C-14-10290
| |
| : PIP C-14-10780 PIP C-15-00611 PIP C-15-01604
| |
| : PIP C-15-03448
| |
| : PIP C-15-04418
| |
| : PIP G-93-00053
| |
| : Design Basis Documents
| |
| : CA-2.03, Three-conductor Cable Impedances for Use in ETAP Analyses and Other Power System Calculations, Rev. 1 Catawba Units 1 & 2 Site License Commitment (SLC) 6.17-13, Auxiliary Feedwater Steam Supply Pipe Temperature Monitoring System
| |
| : CNM-1148.00-30, Unit 1 Data Book Figure 22 - Upper Surge Tank Volume vs. Level, Rev. 1
| |
| : CNM-1202.00-01, Unit 1 Data Book Figure 11 - Hotwell Volume vs. Level, Rev. 2
| |
| : CNS-0106.01-EPG-0001, Design Basis Specifications for the 120VAC Vital Instrumentation and Control Power System (EPG), Rev. 7
| |
| : CNS-0106.01-EPL-001, Design Basis Specifications for the125 VDC Vital I&C Power System (EPL), Rev. 11
| |
| : CNS-0106.03-EPQ-0001, Design Basis for EPQ (125VDC DG Aux Pwr) System, Rev. 13
| |
| : CNS-0115.01-EPC-0001, 4.16KV Essential Power System (EPC) and Class 1E D/G Protective Relaying and Metering System (ERN), Rev. 14
| |
| : CNS-0165.EHM-00-0001, Hydrogen Mitigation System (EHM), Rev. 14
| |
| : CNS-0354.05-EHT-0001, Electrical Heat Tracing System (EHT), Rev. 10
| |
| : CNS-1211.00-00-0005 SUPPLEMENT 7, Heating, Ventilation and Air Conditioning Diesel Buildings, Rev. 11
| |
| : CNS-1465.00-00-0002, System Class Design Basis Specification, Rev. 6
| |
| : CNS-1465.00-00-0008, Design Basis Specification for the Plant for Tornado/Wind, Rev.4
| |
| : CNS-1554.NV-00-0001, Chemical and Volume Control System (NV) Design Basis Specification, Rev. 48
| |
| : CNS-1561.ND-00-0001, Residual Heat Removal (ND) System Design Basis Specification, Rev.
| |
| : CNS-1562.NI-00-0001, Safety Injection (NI) System Design Basis Specification, Rev. 45
| |
| : CNS-1571.FW-00-0001, Refueling Water (FW) System, Rev. 27
| |
| : CNS-1573.KC-00-0001, Component Cooling System (KC) Design Basis Specification, Rev. 42
| |
| : CNS-1579.VD-00-0001, Diesel Building Ventilation System (VD), Rev. 21
| |
| : CNS-1592.CA-00-0001, Auxiliary Feedwater System (CA) Design Basis Specification, Rev. 44
| |
| : CNS-1593.SA-00-0001, Main Steam to Auxiliary Equipment System (SA) and FWP Turbine Exhaust System (TE), Rev. 31
| |
| : CNS-1609.FD-03-0001, Diesel Generator Engine Fuel Oil System (FD), Rev. 18
| |
| : CNS-1609.LD-00-0001, Diesel Generator Engine Lube Oil System (LD), Rev. 25
| |
| : DPM-1205.00-0009.001, NRC Generic Letter 96-05 Program Plan, Rev. 2
| |
| ===Drawings===
| |
| : 044399-5256, Yarway Automatic Recirculation Control Valve, Rev. D
| |
| : CN-1211.00-0124.001 - D01 - Diesel Generator System Supply Fan Seismic Reports, Rev. 1
| |
| : CN-1239-1, Unit 1 Auxiliary Building Inside Doghouse Plants - Concrete, Rev. 13
| |
| : CN-1325-02, Yard Area Tanks Refueling Water Storage Tank System FW, Rev. 6
| |
| : CN-1491-TE001, Unit 1 Reactor/Doghouse Buildi ng FDW Pump Turbine Exhaust System (TE), Rev. 3
| |
| : CN-1492-FW 022, Auxiliary Building Refueling Water Storage System, Rev.5
| |
| : CN-1492-TE001, Unit 1 Auxiliary Building FDW Pump Turbine Exhaust System (TE), Rev. 13
| |
| : CN-1492-TE006, Unit 1 Auxiliary Building (A-43) Turbine Exhaust System (TE), Rev. 5
| |
| : CN-1554-01.00, Unit 1 Chemical and Volume Control System (NV), Rev. 33
| |
| : CN-1554-01.01, Unit 1 Chemical & Volume Control System (NV), Rev. 17
| |
| : CN-1554-01.07, Unit 1 Chemical & Volume Control System (NV), Rev. 29
| |
| : CN-1561-01.00, Unit 1 Residual Heat Removal System (ND), Rev. 32
| |
| : CN-1561-01.01, Unit 1 Residual Heat Removal System (ND), Rev. 26
| |
| : CN-1562-1.0, Unit 1 Safety Injection System (NI), Rev. 11
| |
| : CN-1562-01.02, Unit 1 Safety Injection System (NI), Rev. 31
| |
| : CN-1573-01.00, Unit 1 Component Cooling System (KC), Rev. 29
| |
| : CN-1574-02.01, Unit 1 Nuclear Service Water System (RN), Rev. 58
| |
| : CN-1574-02.05, Unit 1 Nuclear Service Water System (RN), Rev. 58
| |
| : CN-1579-01.00, Diesel Building Ventilation System (VD), Rev. 10
| |
| : CN-1592-01.00, Unit 1 Auxiliary Feedwater System (CA), Rev. 31
| |
| : CN-1592-1.1, Unit 1 Auxiliary Feedwater System (CA), Rev. 25
| |
| : CN-1593-01.01, Unit 1 Main Steam to Aux Equipment (SA) Main Steam Bypass to Condenser (SB), Rev. 25
| |
| : CN-1593-1.2, Unit 1 Steam Supply to FDWP Turbine (SP) FDWP Turbine Exhaust (TE)
| |
| : Systems, Rev. 14
| |
| : CN-1609-02.00, Diesel Generator Engine Lube Oil System (LD), Rev. 28
| |
| : CN-1609-02.01, Diesel Generator Engine Lube Oil System (LD), Rev. 13
| |
| : CN-1609-02.02, Diesel Generator Engine Lube Oil System (LD), Rev. 25
| |
| : CN-1609-03.00, Diesel Generator Engine Fuel Oil System - FD, Rev. 22
| |
| : CN-1609-03.01, Diesel Generator Engine Fuel Oil System - FD, Rev. 18
| |
| : CN-1702-02.02, One Line 4160 Switchgear 1ETB, Rev. 18
| |
| : CN-1702-05.02, One Line Essential and Blackout Power Systems 4.16kV
| |
| : CN-1703-01.02, One Line 600V Load Centers 1ELXB, 1ELXD
| |
| : CN-1705-01.01, One Line Diagram, 120 VAC Vital Instrumentation and control Power System (EPL), Rev. 14
| |
| : CN-1705-01.01-01, One Line Diagram, 120 VAC Vital Instrumentation and control Power System (EPL), Rev. 11
| |
| : CN-1705-01.02, One Line Diagram, 120VAC Vital Instrumentation and Control Power System (EPG), Rev. 5
| |
| : CN-1705-01.02, One Line Diagram, 120VAC Vital Instrumentation and Control Power System (EPG), Rev. 6
| |
| : CN-1705-01.02-01, One Line Diagram, 120VAC Vital Instrumentation and Control Power System (EPG), Rev. 17
| |
| : CN-1705-01.02-02, One Line Diagram, 120VAC Vital Instrumentation and Control Power System (EPG), Rev. 17
| |
| : CN-1FW-61, Refueling Water Storage Tank Vent, Rev.1
| |
| : CN-1FW-65, Refueling Water System From Refueling Water Storage Tank, Rev. 0
| |
| : CN-2592-01.00, Unit 2 Auxiliary Feedwater System (CA), Rev. 31
| |
| : CNEE-0106-01.05, Elementary Diagram, 120VAC & 125VDC Vital Inst. & Control Monitor Alarms (EPG & EPL), Rev. 14
| |
| : CNEE-0106-01.06, Elementary Diagram, 120VAC & 125VDC Vital Inst. & Control Monitor Alarms (EPG & EPL), Rev. 11
| |
| : CNEE-0106-01.08, Elementary Diagram, 120VAC & 125VDC Vital Inst. & Control Monitor Alarms (EPG & EPL), Rev. 10
| |
| : CNEE-0106-01.12, Elementary Diagram, 120VAC & 125VDC Vital Inst. & Control Monitor Alarms, Rev. 8
| |
| : CNEE-0106-01.14, Elementary Diagram, Auct. Diode Assemblies Alarm and Monitoring Circuits, Rev. 3
| |
| : CNEE-0115-01.36, Elementary 4160V Switchgear 1ETB Unit#16, Rev. 6
| |
| : CNEE-0115-01.38, Elementary 4160V Switchgear 1ETB Unit#18, Rev. 21
| |
| : CNEE-0115-01.38-01, Elementary 4160V Switchgear 1ETB Unit#18, Rev. 13
| |
| : CNEE-0115-01.41, Elementary 4160V Switchgear 1ETB Breaker Internal Controls, Rev. J
| |
| : CNEE-0120-02.01, Elementary Diagram Diesel Engine 1A Fuel Oil System, Rev.15
| |
| : CNEE-0120-02.01-01, Elementary Diagram Diesel Engine 1A Fuel Oil System, Rev.16
| |
| : CNEE-0120-04.01, Elementary Diagram Diesel Engine 1A Lube Oil System, Rev. 14
| |
| : CNEE-0120-04.01-01, Elementary Diagram Diesel Engine 1A Lube Oil System, Rev. 6
| |
| : CNEE-0120-04.01-02, Elementary Diagram Diesel Engine 1A Lube Oil System, Rev. 5
| |
| : CNEE-0165-02.01, Elementary EHM Ignitor Box Group A, Rev. 9
| |
| : CNEE-0165-02.02, Elementary EHM Ignitor Box Group A, Rev. 7
| |
| : CNEE-0220-01.01-09, Elementary DG Control Panel, Rev. 9
| |
| : CNM-1148.00-0050 001, Refueling Water Storage Tank, Rev. 1
| |
| : CNM-1148.00-0051 001, Refueling Water Storage Tank, Rev. 1
| |
| : CNM-1148.00-0052.001, Details - RWST plate structure, Rev 4
| |
| : CNM-1211.00-0559 001, Diesel Building Outside Air Damper, Rev.5
| |
| : CNM-1211.00-0560 001, Diesel Building Return Air Damper, Rev. 6
| |
| : CNM-1211.00-0561 001, Diesel Building Return Air Damper, Rev. 5
| |
| : CNM-1211.00-0562 001, Damper Schedule, Rev. 2
| |
| : CNM-1211.00-1127 001, Diesel Generator Room (VD) Plenum Detail - Sheet 1 of 2, Rev. D11
| |
| : CNM-1211.00-1128 001, Diesel Generator Room (VD) Plenum Detail - Sheet 2 of 2, Rev. D11
| |
| : CNM-1318.22-1, Motor Data Sheet Component Cooling Pump Motor, Dated 12/19/74
| |
| : CNM-1318.22-4, Amps vs Time Component Cooling Pump Motor, Dated 7/28/75
| |
| : CNM-1318.22-5, Motor Damage Curve Component Cooling Pump Motor, Dated 7/28/75
| |
| : CNM 1354.05-0103 001, SA Heater Control Panel Schematic, Rev. D11
| |
| : CNM 1354.05-0107 001, SA Heater Control Panel Wiring Diagram, Rev. D13
| |
| : CNM-1361-00-6, Low Voltage Containment Penetration, Dated 7/6/78
| |
| : DNU-050-1, SA System Isometric Heat Tracing Layout, Rev. 9
| |
| : Q-55-13462, Auctioneering Diode Assembly Schematic Diagram, Rev. 2
| |
| ===Miscellaneous Documents===
| |
| : 2015 1 st Quarter Auxiliary Feedwater System Health Report
| |
| : 2015 1 st Quarter Chemical and Volume Control System Health Report
| |
| : 2015 1 st Quarter Component Cooling (KC) System Health Report
| |
| : 2015 1 st Quarter Heat Exchanger Health Group Component Health Report
| |
| : 2015 1 st Quarter Residual Heat Removal System Health Report
| |
| : 2015 1 st Quarter Safety Injection (NI) System Health Report 462650-QA1, BOM Parts Replaced on Rebuild for Class-1E Breaker, Rev. 2
| |
| : 716656T68, Refurbishment Kit 5HK250, Rev. 18
| |
| : Catawba In-Service Testing Program Submittal - Valves, Rev. 27 Catawba Site License Condition (SLC) 16.7-13, Auxiliary Feedwater (AFW) Pump Turbine Steam Supply Piping Temperature Monitoring System, Rev. 2 C-ENG-SA-12-10, 2012 Catawba Component Design Bases Inspection Readiness
| |
| : C-ENG-SA-15-04, 2015 NRC Component Design Bases Inspection (CDBI) Readiness Assessment
| |
| : CGD-3006.05-00-0007, Sprague Capacitors Ceramic Film and Aluminum, Rev. 2
| |
| : CGD-3011.09-00-0002, Acopian Power Supplies Commercial Grade Item Technical Evaluation, Rev. 3
| |
| : CGD-3011.14-00-0001, E-Max Instrument Inc. Optical Isolation Devices Commercial Grade Item Technical Evaluation, Rev. 5 CJ4355.FE, Curtiss-Wright Failure Evaluation for Agastat Relay at Catawba Station, Rev. 0
| |
| : CN-SFL, Surveillance Frequency List, Dated 6/15/11
| |
| : CNM 1201.06-0060-001, Yuba Heat Transfer Corporation Heat Exchanger Specification Sheet, Rev. 2
| |
| : CNM 1205.06-0140.001, Yarway Automatic Recirculation Control Valve, Series 5300, 3" through 16", Dated 1/28/77
| |
| : CNM 1301.00-0237.001 thru 006, Diesel Generator Instruction Manual Vol. 1 - 6, Rev. D57
| |
| : CNM-1341.01-0001.01, Tayco H2 Igniter Assy vendor manual, Rev. D3
| |
| : CNM 1354.05-0231.001, Proportional Controller Type 3910, Rev. D2
| |
| : CNM 1354.05-2236.001, Chromalox 2110 Temperature Controller, Rev. 0
| |
| : CNM-1359.01-0007.001, Vital I&C Auctioneering Diode Assemblies - I/B
| |
| : CNM-1359.01-009, Seismic Qualification test report on Auctioneering Diode Assembly, Dated
| |
| : 10/13/78
| |
| : CNM-1361.00-0009, O'Brien Containment Penetration vendor manual, Rev. 0
| |
| : CNM-1361.00-0015.001, O'Brien Electrical Penetration Assembly, Rev. 0
| |
| : CNS-1361.00-00-0001, Specification Electrical Penetrations, Rev. 6 Computer traces of all EDG room Temperatures, Dated 8/1/14-7/1/15 Computer traces of EDG battery enclosure temperatures, Dated 7/31/15-8/14/15
| |
| : DPM 1205.00-0009.001, NRC Generic Letter 96-05 Program Plan, Rev. 2
| |
| : Duke-1-A, Duke Energy Carolinas Topical Report, Amendment 40
| |
| : Duke Energy Response to NRC Generic Letter 95-07, Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves, dated February 13, 1996 Duke Energy Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, dated
| |
| : October 13, 2008 Duke Energy Response to Request for Additional Information Regarding NRC
| |
| : GL 2008-01, dated 3/04/10 Duke Energy Response to Request for Additional Information Regarding NRC
| |
| : GL 2008-01, dated 5/06/11
| |
| : EDM-601, Engineering Change Manual, Rev. 28
| |
| : EQMM-1393.01-A05-00,
| |
| : NH-90 Damper Motor Actuators, Rev. 3
| |
| : I-T-E SpeedFax, ITE and Siemens-Allis Electric Products, Dated 1985
| |
| : ICES Report
| |
| : 314221, FME Discovered in 4160V Cubicle Prevents Operation of Containment Spray Pump, Dated 11/15/14
| |
| : IN 93-64, Periodic Testing and Preventive Maintenance of Molded Case Circuit Breaker, Dated
| |
| : 8/12/93
| |
| : Institute of Electronics and Electrical Engineers (IEEE) Standard 515-2011, Standard for the Testing, Design, Installation, and Maintenance of Electrical Resistance Trace Heating for Industrial Application, Rev. 0 Maintenance PM Feedback Report, Unit 1 Diesel Generator Building Ventilation, Dated
| |
| : 08/02/15 Maintenance PM Feedback Report, Unit 1 Diesel Generator Fuel Oil System, Dated 08/01/15
| |
| : Maintenance PM Feedback Report, Unit 1 Diesel Generator Lube Oil System, Dated 08/02/15
| |
| : Maintenance Rule Scoping, 10.D - Diesel Ventilation System (VD), Dated 7/29/15
| |
| : Maintenance Rule Scoping, 10.E - Diesel Lube Oil System (LD),
| |
| : Maintenance Rule Scoping, 10.F - Diesel Fuel Oil System (FD), Dated 7/29/15 Maintenance Rule Scoping, 10.H - Refueling Water Storage Tank (Unit 1 FWST), Dated 7/29/15
| |
| : Maintenance Services Carolinas,
| |
| : SE-ELEC-SG-21, Training and Qual Guide, Dated 7/7/14
| |
| : Metallurgy File #5305, CNS 1ETA-08 Breaker Pin and Retaining Rings, Dated 12/9/14
| |
| : NCIG-07, EPRI Guideline for the Utilization of Commercial Grade Items in Nuclear Safety Related Applications dated June 1988 NRC Generic Letter 95-07, Pressure Locking and Thermal Binding of Safety-Related Power-
| |
| : Operated Gate Valves NRC Generic Letter 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves NRC Information Notice 2014-11, Recent Issues Related to the Qualification of Safety-Related Components
| |
| : NSD-514, Control of Time Critical Tasks, Rev. 002
| |
| : NSD-703, Administrative Instructions for Technical Procedures, Rev. 037
| |
| : Nuclear Policy Manual, Chapter 11, Regulated Fl eet Generation Dept Interface, Dated 5/11/10 OEDB Number - 06-044711, NRC Regulatory Issue Summary 06-023, Dated 01/22/07 Power Distribution For Branch Circuit Protection by Ed Cordial, senior Project Manager, Ametek Solidstate Controls and Jim Murrill, Pan Tech Engineering
| |
| : SCD-230, Commercial Grade Items, Rev. 5
| |
| : SCD-285, Procurement Processes, Rev. 11
| |
| : SCD-290, Sampling for Special Tests and Inspections, Rev. 3 SD 2.3.2, Control of Process Instrumentation Used as Test and Measurement Equipment, Rev.
| |
| : SE-ELEC-SG-23, Refurbish Circuit Breakers Qualification Report, Dated 8/26/15
| |
| : SOMP 01-13, Operations Work List, Routine Task List, and OPS Guides, Rev. 0
| |
| : System Health Reports: Emergency Diesel Generator, 2013Q1, 2014Q1, 2015Q1 System Health Reports: Refueling Water System, 2013Q1, 2014Q1, 2015Q1
| |
| : TB-04-13, Technical Bulletin: Replacement Solutions for Obsolete Classic Molded Case Circuit Breakers, UL Testing Issues, Breaker Design Life and Trip Band Adjustment, Dated 06/28/04
| |
| : TB-06-2, Technical Bulletin: Aging Issues and Subsequent Operating Issue for Breakers that are at Their 20 Year Design / Qualified Lives; UL Certification / Testing Issues Update, Dated
| |
| : 03/10/06
| |
| : Time-Current-Curve Characteristic Curve I-T-E Circuit Breaker Type CC 1, 2 &3 Poles
| |
| : WPM 403, SPOC Planning Guidelines, Rev. 9
| |
| : Modifications
| |
| : EC 0000094272, CD101318 - Cmp. Install FWST Narrow Range Level Instrument, Rev. 6
| |
| : EC 0000106417, U1 - Provide CR Bypass Indication for FWST WR Level, Rev. 0
| |
| : EC 0000106930, Install Valve Body Vents on 1NI185A, 1NI184B, and 1ND28A, Rev. 1
| |
| : EC 0000107775, Equivalent Replacement for Diesel Generator Ventilation (VD) System, Rev. 0
| |
| : EC 0000109628, Temp EC - Disconnect FWST Heater 1HETR0049 (Htr. 1A) Expected Removal 1EOC21, Rev. 2
| |
| : EC 0000113174, Add LD Manual Valve 1LD160 to 1A Diesel Engine, Rev. 1
| |
| : EC 0000113203, Add 1LD-163, 1LD-164 and 1LD-165 to 1B D/G Lube Oil System, Rev. 2
| |
| : EC 0000113223, Revise LD System DBD to Add New Oil Temp Operating Criteria, Rev. 0
| |
| : EC 0000113230, Install Temporary Monitoring Device for 1(2)A & 1(2)B Lube Oil Filters, Rev. 1
| |
| : EC 0000400097, Provide Temperature Control for Stagnant LD System Piping on the 1A and 1B, Rev. 0
| |
| ===Procedures===
| |
| : AD-DC-ALL-0201, Development and Maintenance of Controlled Procedure Manual Procedures, Rev. 013
| |
| : AD-EG-ALL-1103, Procurement Engineering Products, Rev. 0
| |
| : AD-EG-ALL-1209, System, Component, and Program Health Reports and Notebooks, Rev. 003
| |
| : AD-OP-ALL-0105, Operability Determinations and Functionality Assessments, Rev. 0
| |
| : AD-OP-ALL-0202, Aggregate Operator Impact Assessment, Rev. 1
| |
| : AD-PI-ALL-0100, Corrective Action Program, Rev. 3
| |
| : AD-TQ-ALL-0640, Review and Evaluation of Supplemental Personnel Quals, Rev. 4 AP/0/A/5500/039, Control Room High Temperature, Rev. 7
| |
| : AP/0/A/5500/022, Loss of Instrument Air, Rev. 036
| |
| : AP/1/A/5500/006, Loss of Steam Generator Feedwater, Rev. 042
| |
| : AP/1/A/5500/013, Boron Dilution, Rev. 024 EP/1/A/5000/E-0, Reactor Trip or Safety Injection, Rev. 042
| |
| : EP/1/A/5000/E-1, Loss of Reactor or Secondary Coolant, Rev. 029
| |
| : EP/1/A/5000/E-3, Steam Generator Tube Rupture, Rev. 043
| |
| : EP/1/A/5000/ECA-0.0, Loss of All AC Power, Rev. 48
| |
| : EP/1/A/5000/ES-1.3, Transfer to Cold Leg Recirculation, Rev. 029
| |
| : EP/1/A/5000/FR-I.1, Response to High Pressurizer Level, Rev. 019 EP/1/A/5000/G-1, Unit 1 Generic Control Room Enclosures, Rev. 009
| |
| : IP/O/A/3710/005, Equalize Charging-Lead Calcium Batteries, Rev. 068
| |
| : IP/1/A/3170/001, H2 Mitigation System Igniter Temp Check, Rev. 028
| |
| : IP/1/A/3670/001, Calibration Procedure for D/G 1A Load Sequencer Timers, Rev. 037 IP/2/A/3710/051, 125VDC Essential Diesel Aux Power System Battery Service Test, Rev. 7 IP/2/A/3710/052, 125VDC Essential DG Aux Power Sys Weekly/Quarterly Inspection, Rev. 14
| |
| : IP/2/A/3710/053, 125VDC Essential DG Aux Power Battery Modified Performance Test, Rev. 11
| |
| : IP/O/A/4974/003, Inspection and Maintenance of 5HK Air Circuit Breakers, Rev. 051
| |
| : IP/0/A/4974/021, Catawba Nuclear Station, Procedure for Motor On-Line Testing, Rev. 008
| |
| : IP/O/A/4974/043, 5HK Air Circuit Breaker Refurbishment, Rev. 006 IP/O/A/4974/043, 5HK Air Circuit Breaker Refurbishment, Rev. 018 IP/1/A/3560/010, Thermography of SA Trace Heat Controls, Rev. 1
| |
| : IP/1/A/3710/041, Catawba Nuclear Station, Function Verification for Unit 1 EPQ Alignment to EDE and EDF, Rev. 005
| |
| : IP/1/A/3830/009 A, Chart Recorder Programming and Calibration, Rev. 19 IP/1/A/6350/008, Catawba Nuclear Station, 125VDC/120VAC Vital Instrument and Control Power System, Rev. 072 IP/1/B/3560/005, EHT System - SA Controllers (1CTCCSA), Rev. 20
| |
| : IP/1/B/3560/006, Calibration Procedure for EHT Monitor Panel Points NV and SA Systems, Rev. 30 IP/2/B/3560/005, EHT System - SA Controllers (2CTCCSA), Rev. 16 IP/2/B/3560/006, Calibration Procedure for EHT Monitor Panel Points NV and SA Systems, Rev. 34 OMP 2-29, Attachment 10.11, Safety Related Equipment - Fluid Leakage Guidance, Rev. 0
| |
| : OP/0/B/6250/007, Enclosure 4.1, Unit 1 Auxiliary Steam System Alignment, Rev. 59
| |
| : OP/1/A/6100/009A, D/G Building Ventilation Malfunction, Rev. 67 OP/1/A/6200/014, Refueling Water System, Rev. 87
| |
| : OP/1/A/6350/002, Diesel Generator Operation, Rev. 171 OP/1/A/6450/010, Containment Hydrogen Control Systems, Rev. 43 OP/1/A/6550/001, Diesel Generator Fuel Oil System Operation, Rev. 72 OP/2/A/6100/010 I, Panel 2AD-8, Trace Heating Borated Water Alarm, Rev. 57
| |
| : OP/2/A/6250/002, Auxiliary Feedwater System, Rev. 135
| |
| : PT/0/A/4150/001, Controlling Procedure for Startup Physics Testing, Rev. 42
| |
| : PT/0/A/4150/001, Controlling Procedure for Startup Physics Testing, Rev. 43 PT/0/A/4150/011 A, Control Rod Worth Measurement by Boration/Dilution, Rev. 18 PT/0/A/4150/011 A, Control Rod Worth Measurement by Boration/Dilution, Rev. 19
| |
| : PT/0/A/4150/019 B, NC System Dilution following Refueling, Rev. 17
| |
| : PT/0/A/4150/019 B, NC System Dilution Following Refueling, Rev. 18
| |
| : PT/0/A/4700/061, Time Critical Operator Action Review, Rev. 007 PT/1/A/4200/009, Engineered Safety Features Actuation Periodic Test, Rev. 186 PT/1/A/4200/009A, Auxiliary Safeguards Test Cabinet Periodic Test, Rev. 252
| |
| : PT/1/A/4550/004, D/G Fuel Oil Storage Tank Water Inspection, Rev. 24
| |
| : PT/2/A/4200/009, Catawba Nuclear Station, Engineering Safety Features Actuation Periodic Test, Rev. 163 RP/0/A/5000/007, Natural Disaster and Earthquake, Rev. 43 SI/O/A/5120/002, Wire Terminal Installation, Labeling, and Termination, Rev. 026
| |
| : SI/O/A/5120/002, Wire Terminal Installation, Labeling, and Termination, Rev. 038
| |
| : UFSAR UFSAR Chapter 7, Rev. 17, Dated 17/10/13
| |
| : UFSAR Chapter 8, Rev. 17, Dated 17/10/13
| |
| : UFSAR Section 9.2.7, Refueling Water System
| |
| : UFSAR Section 9.4.4, Diesel Building Ventilation System
| |
| : UFSAR Section 9.5.4, Diesel Generator Engine Fuel Oil System
| |
| : UFSAR Section 9.5.7, Diesel Generator Engine Lube Oil System Corrective Action Program Documents Initiated Due to CDBI Activity
| |
| : AR 01942119, 2A D/G Room Scaffolding in close proximity of QA1 component, Dated 8/11/15
| |
| : AR 01943086, Testing not performed as outlined in vendor manual for 1VADB, Dated 8/13/15
| |
| : AR 01943142, Damaged SV Insulation, Dated 8/13/15
| |
| : AR 01943221, Seismic concern w/ breaker lift loosely tied in 1ETB room, Dated 8/13/15
| |
| : AR 01943340, Housekeeping items near 1ETB, Dated 8/13/15
| |
| : AR 01943385, 10-year vital inverter overhaul not performed as required, Dated 8/13/15
| |
| : AR 01943463, CDBI issue: Breaker Part Cat ID label was missing PQL level, Dated 8/13/15
| |
| : AR 01943472, EDG battery load bank not tethered in 2ETB room, Dated 8/13/15
| |
| : AR 01945686, LD System DBD needs clarification, Dated 8/20/15
| |
| : AR 01946435, Editorial revision to EDG Lube Oil (LD) System Drawings, Dated 8/24/15
| |
| : AR 01947091, Contradiction in Duke Energy Scaffold Manual, Dated 8/26/15
| |
| : AR 01947227, To correct drawing
| |
| : CN-1705-01.02 error reference in note 1, Dated 8/26/15
| |
| : AR 01947271, CAPT Exhaust Piping Configuration on DH Roof, Dated 8/26/15
| |
| : AR 01947326, Procurement requirement removed for SSPS part 6D30350G01, Dated 8/26/15
| |
| : AR 01947335, EHT Chart Recorder and Controller Thermocouple Temp Delta, Dated 8/26/15
| |
| : AR 01947464, Audits not performed at Toddville Breaker Shop, Dated 8/26/15
| |
| : AR 01947505, 1/SA/VA/5:
| |
| : I/R Potential Leak by on 1SA-5, Dated 8/27/15
| |
| : AR 01947631, Inspect/Clean Auctioneering Diode Assembly Cabinet 1VADB, Dated 8/27/15
| |
| : AR 01947633, Inspect/Clean Auctioneering Diode Assembly Cabinet 1VADA, Dated 8/27/15
| |
| : AR 01947636, Inspect/Clean Auctioneering Diode Assembly Cabinet 1EADA, Dated 8/27/15
| |
| : AR 01947637, Inspect/Clean Auctioneering Diode Assembly Cabinet 1EADB, Dated 8/27/15
| |
| : AR 01947638, Inspect/Clean Auctioneering Diode Assembly Cabinet 2VADA, Dated 8/27/15
| |
| : AR 01947639, Inspect/Clean Auctioneering Diode Assembly Cabinet 2VADB, Dated 8/27/15
| |
| : AR 01947641, Inspect/Clean Auctioneering Diode Assembly Cabinet 2EADA, Dated 8/27/15
| |
| : AR 01947642, Inspect/Clean Auctioneering Diode Assembly Cabinet 2EADB, Dated 8/27/15
| |
| : AR 01947805, Evaluate Potential Impact of Rain Intrusion into Doghouse, Dated 8/27/15
| |
| : AR 01948069, Seismic concern/ Storage of Maint. Equipment in plant, Dated 8/28/15
| |
| : AR 01948357, Unit 2 Interior Doghouse Floor Poor Housekeeping, Dated 8/30/15
| |
| : AR 01948442, IP/0/A/3560/010 Revision, Dated 8/31/15
| |
| : AR 01948444, IP/1/B/3560/005 Revision, Dated 8/31/15
| |
| : AR 01948447, IP/2/B/3560/005 Revision, Dated 8/31/15
| |
| : AR 01948666, OP/1/A/6100/010 I Revision, Dated 8/31/15
| |
| : AR 01948670, Revise flow diagram
| |
| : CN-1574-1.1, Dated 8/31/15
| |
| : AR 01948949, EDG Annunciator Response References Deleted System Description, Dated
| |
| : 9/1/15
| |
| : AR 01950875, Conflicting Information between SA System Design Basis Document and Calculations, Dated 9/08/15
| |
| : AR 01951570, Calculation
| |
| : CNC-1223.43-02-0012 used incorrect inputs, Dated 9/9/15
| |
| : AR 01952352,
| |
| : CNC-1223.43-02-0012 Error of Using the Wrong Heat Input, Dated 9/11/15
| |
| : AR 01953190, CA Turbine Governor Oil Levels, Dated 9/15/15
| |
| : AR 01953706, Auctioneering Diode Assemblies, Dated 9/15/15
| |
| : AR 01953721, 2SA-09 and 2SA-10 Heat Trace Temperature, Dated 9/16/15
| |
| : AR 01953772, SA Piping Serviced by Heat Trace 2SA9 and 2SA-10, Dated 9/16/15
| |
| : AR 01953897, Criteria for Instrument OOT Review, Dated 9/16/15
| |
| : AR 01954001, Re-issue ICES posting clarifying parts in cubicle came from breaker, Dated
| |
| : 9/16/15
| |
| : AR 01954123, Add acceptance criteria to SA EHT Temp Comparison, Dated 9/16/15
| |
| : AR 01954179, Untimely Corrective Actions for SA Heat Trace, Dated 9/16/15
| |
| : Operations Guide 15-23, Units 1 & 2 SA Heat Trace Temperature Monitoring, Rev. 0 Operations Guide 15-24, Unit 2 SA Points 2SA-09 and 2SA-10, Revs. 0, 1, and 2
| |
| : WO 20011639, Repair Damaged SV Insulation, Dated 8/18/15
| |
| : WO 20014147, 1SA-5:
| |
| : Repair Potential Leakby on 1SA-5
| |
| : WO 20014779, Test/Inspect SA EHT Chart Recorder Thermocouple 2S-SA-09T, Performed
| |
| : 9/09/15
| |
| : WO 20016694, 2AS PP System:
| |
| : Install Waterproof Section of Sheet Metal, Performed 9/15/15
| |
| : WR 20004144, Replace the Metal Cage Around 2CAPT Outboard Bearing Trico Oiler, Dated
| |
| : 8/24/15
| |
| : WR 20005592, Inspect 2PBOX0084 Bottom 6 Inch Conduit Connector Locking Ring, Dated
| |
| : 8/30/15
| |
| : WR 20007019, Unit 2 Doghouse Interior West Window Chicken Wire Needs Repair, Dated
| |
| : 9/16/15
| |
| }} | | }} |