IR 05000261/2017403: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:August 16, 2017 | ||
==SUBJECT:== | |||
H. B. ROBINSON STEAM ELECTRIC PLANT UNIT 2 - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000261/2017403 | |||
==Dear Mr. Remick:== | ==Dear Mr. Remick:== | ||
Revision as of 06:19, 19 June 2019
| ML17228A759 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 08/16/2017 |
| From: | James Shehee NRC/RGN-II/DRS/PSB2 |
| To: | Remick J Duke Energy Progress |
| References | |
| IR 2017403 | |
| Download: ML17228A759 (4) | |
Text
August 16, 2017
SUBJECT:
H. B. ROBINSON STEAM ELECTRIC PLANT UNIT 2 - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000261/2017403
Dear Mr. Remick:
On July 20, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your H. B. Robinson Steam Electric Plant Unit 2. The NRC inspector discussed the results of this inspection with Mr. E. Kapopoulos and other members of your staff. The inspector documented the results in the enclosed inspection report (IR).
The NRC inspector did not identify any finding or violation of more than minor significance.
This letter will be made available for public inspection and copying at
https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA/
James Shehee, Acting Chief Plant Support Branch 2
Division of Reactor Safety
Docket No. 50-261 License No. DPR-23
Enclosure:
NRC IR 05000261/2017403 w/Attachment:
Supplemental Information (OUO)
cc: (See page 3) cc: Edward T. O'Neil GM, Nuclear Protective Services Duke Energy Corporation 526 South Church Street, Phase II, EC5ZD
Charlotte, NC 28202
_____________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII/ DRS/PSB2 RII/DRS/PSB2 RII/DRP RII/DRS/PSB2 SIGNATURE RLP5 JCS3 JSD for SDR2 JCS3 NAME R. PATTERSON J. SHEHEE S. ROSE J. SHEHEE DATE 8/15/2017 8/15/2017 8/16/2017 8/16/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO