ML17333A852: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 3: | Line 3: | ||
| issue date = 03/31/1997 | | issue date = 03/31/1997 | ||
| title = Monthly Operating Rept for Mar 1997 for DC Cook Nuclear Plant Unit 1.W/970402 Ltr | | title = Monthly Operating Rept for Mar 1997 for DC Cook Nuclear Plant Unit 1.W/970402 Ltr | ||
| author name = | | author name = Minor J, Russo M, Sampson J | ||
| author affiliation = AMERICAN ELECTRIC POWER CO., INC. | | author affiliation = AMERICAN ELECTRIC POWER CO., INC. | ||
| addressee name = | | addressee name = | ||
Revision as of 13:31, 18 June 2019
| ML17333A852 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 03/31/1997 |
| From: | Minor J, Russo M, Sampson J AMERICAN ELECTRIC POWER CO., INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9704160012 | |
| Download: ML17333A852 (7) | |
Text
CATEGORY 1 REGULATOEZNFORMATZON DZSTRZBUTZON TEM (RZDS)ACCESSION NBR:9704160012 DOC.DATE: 97/03/31 NOTARIZED:
NO DOCKET FACIL:50-'315 Donald C.Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUT'A.NAYiE
..AUTHOR AFFILIATION MINOR,J.W.
American Electric Power Co., Inc.RUSSOFM.E.'merican Electric Power Co., Inc.SAMPSON',J.R.
~American Electric Power Co., Inc.RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Mar 1997 for DC Cook Nuclear Plant Unit 1.W/970402 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: A T RECIPIENT ID CODE/NAME PD3-3 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB RGN3 EXTERNAL: LITCO BR'ZCE,J H NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME HICKMAN,J FILE CENTER OC/DBA/PA'D'OAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D 0 U E N NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 41S-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 L J J Indiana Michigan Power Company Cook Nudear Plant One Cook Place Bridgman, MI 491 06 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.20555 April 2, 1997 Gentlemen, Pursuant to the requirements of Donald C.Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of March 1997 is submitted.
Sincerely, J.R.Sampson Plant Manager/mr,, Attachment
>502 53 M.E.Ru 9704i600i2 97033i PDR ADQCK 050003i5 R PDR LLIl'3IOtLIltIllIOllnllLtltl3LLtNIl NRC Region III D.R.Hahn R.C.Callen S.Hamming INPO Records Center ANI Nuclear Engineering Department E.E.Fitzpatrick A.A.Blind P.A.Barrett S.J.Brewer D.W.Paul J.A.Kobyra D.L.Noble W.H.Schalk D.G.Turner B.L.Bartlett sso N.R.C.OPERATING DATA REPORT DOCKET NO.50-315 DATE Apr.2, 1997 COMPLETED BY JW Minor TELEPHONE 616-465-5901 D.C OPERATING STATUS 1.Unit Name 2.Reporting Period 3.Licensed Thermal Power (MWt)4.Name Plate Rating (Gross MWe)5.Design Electrical Rating (Net MWe)6.Maximum Dependable Capacity (GROSS MWe)7.Maximum Dependable Capacity (Net MWe)Cook Unit 1 Mar-97 3250 1152 1020 1056 1000 Notes: 8.If Changes Occur in Capacity Ratings (Items no.3 through 7)Since Last Report Give Reasons: 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: 11.Hours in Reporting Period 12.No.of Hrs.Reactor Was Critical 13.Reactor Reserve Shutdow'n Hours 14.Hours Generator on Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Gen.(MWH)17.Gross Electrical Energy Gen.(MWH)18.Net Electrical Energy Gen.(MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (MDC Net)22.Unit Capacity Factor (DER Net)23.Unit Forced Outage Rate This Month 744.0 3.2 0.0 3.0 0.0 1544.4 500.0 418.0 0.4 0.4 0.1 0.1 0.0 Year-to-Date 2160.0 1419.2 0.0 1419.0 0.0 4270359.4 1414580.0 1362895.0 65.7 65.7 63.1 61.9 0.0 Cumulative 195024.0 148006.5 463.0 145620.8 321.0 430075156.4 139714490.0 134414256.0
.75.5 75.5 68.7 67.0 5.9 24.Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
None 25.If Shut Down At End of Report Period, Estimated Date of Startup: A ril 14 1997 26.Units in Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast Achieved DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-315 D.C.Cook Unit1 Apr.2, 1997 JW Minor 616-465-5901 AVERAGE DAILY POWER LEVEL (MWe-Net)MARCH 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 3/1/97 3/2/97 3/3/97 3/4/97 3/5/97 3/6/97 3/7/97 3/8/97 3/9/97 3/1 0/97 3/11/97 3/12/97 3/13/97 3/14/97 3/15/97 3/16/97 17 0 0 0'0 0 0 0 0 0 0 0 0 0 0 3/17/97 3/1 8/97 3/1 9/97 3/20/97 3/21/97 3/22/97 3/23/97 3/24/97 3/25/97 3/26/97 3/27/97 3/28/97 3/29/97 3/30/97 3/31/97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C.Cook Unit 1 Apr.2, 1997 ME Russo 616-697-5100 1 of1 MONTHLY OPERATING ACTIVITIES
-MARCH 1997 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 30%RTP and reducing power in preparation for the cycle 15 to 16 maintenance and refueling outage.Commenced cycle 15 to 16 maintenance and refueling outage March 1, 1997 at 0312 following a manual trip of the reactor.Outage activities continued this entire period.The unit exited this reporting period in Mode 6 with Reactor core reload complete.There were no challenges to the pressurizer safety valves or power operated relief valves.Gross electrical generation for the month of March was 500 MWh.DETAILS 03-01-97 03-02-97 03-08-97 03-11-97 03-13-97 03-29-97 03-31-97 r 0300 0312 2035 0825 0303 1345 2310 1543 1527 Manually tripped Main Turbine Generator.
Manually tripped Reactor to commence cycle 15 to 16 maintenance and refueling outage.Entered Reactor Mode 3.Entered Reactor Mode 4.Entered Reactor Mode 5.Entered Reactor Mode 6.Commenced Reactor fuel off-load core alterations.
Core alterations complete.All fuel off-loaded to the Spent Fuel Pool.Commenced Reactor refueling core alterations.
Core alterations complete.
DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C.Cook Unit.1 Apr.2, 1997 ME Russo" 616-697-5100 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS
-MARCH 1997 DURATION NO.DATE TYPE" HOURS REASON2 METHOD OF SHUTTING LICENSEE DOWN EVENT REACTOR3 REPORT NO.'YSTEM CODE4 COMPONENT CODE5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 330 030197 S 740.8 B,C N/A N/A N/A The Reactor was manually tripped for commencement of the cycle 15 to 16 maintenance and refueling outage on 030197 at 0312.1 F: Forced S: Scheduled 2 Reason: A: Equipment Failure (Explain)B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)H: Other (Explain)3 Method: 1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain)4 Exhibit G-Instructions for preparation of data entry sheets for Licensee Event Report (LER)File (NUREG 0161)5 Exhibit I: Same Source