ML18003A794: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 3: | Line 3: | ||
| issue date = 12/19/1979 | | issue date = 12/19/1979 | ||
| title = Deficiency Rept:On 791126,identified Defective Welds on Nine Seismic Class 1 Hangers.All Corrective Action Estimated for Completion by 800131,when Final Rept Will Be Submitted | | title = Deficiency Rept:On 791126,identified Defective Welds on Nine Seismic Class 1 Hangers.All Corrective Action Estimated for Completion by 800131,when Final Rept Will Be Submitted | ||
| author name = | | author name = Chiangi N | ||
| author affiliation = CAROLINA POWER & LIGHT CO. | | author affiliation = CAROLINA POWER & LIGHT CO. | ||
| addressee name = | | addressee name = | ||
Revision as of 07:24, 18 June 2019
| ML18003A794 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 12/19/1979 |
| From: | Chiangi N CAROLINA POWER & LIGHT CO. |
| To: | |
| References | |
| NUDOCS 8001110634 | |
| Download: ML18003A794 (6) | |
Text
REGULATORY I)RMATION DISTRIBUTION SYST (RIDS)ACCESSION NBH;8001110630 DOC~OATh: 79/12/19 NOTARIZED; NO PACYL:50 000 Shearon Harris Nuclear Powei Plant~"Onit i~Carolina AOl'H e NAME AUTHOR AFFILIATION
.CFI1ANGlrN,J.
Carot ina Power C Light Co, RECII, NAME AECIPIENf AFFILIATION DOCKET 05000~oil
SUBJECT:
Interim rept re defective welds on nine Seismic Class 1 hangers'll correcti've'ction estimated foi comp/etion by 800131~when final rept will be submitted, DISTRIBUTION CODE: B019S COPIES RECEIVED:LTR
-ENCL SIZE+TIl'I E: Construction Deficiency" Aeport (lUCFA50 55E)NO T hS+mwmoeeeeweseemeem~remmmre RECIPIENT ID'CODE/NAME ACT ION;14 PM~~~W~Ct 20 LA l~ra.W~INTERNAL o 01 0 08 MPA 10 QAS i2 JORDANgE/IE 16 AD F'OA ENGR 17 AO REAC SF1'Y 23 OELD DIRECfOR DSE IBC SYS BR MECH ENG BH S HANAUER EXTERNAL: 03 LPDR*24 ACRS COPIES LTTH ENCL 1 2 1 1 i, 1 i 1 i 1 i 1 1 16 1 RECIPIENT ID"LODE/NAME BCl w'A 4=V 3 AD L~ra 02 NRC PDR 07 EDO E STAFF 09 DEPY DIA DPM 11 STANDRDS DEV 13FIELD COOR/iE 17 AD PLANT SYS 22 DIR DPI" AD/SITE TECH GEObCIENCES BR MATC ENG BA PONhR SYS BR Sl'RUCT hNG 8R 00 NSIC COPIES LlTA ENCL.TOTAL NUMBER OF COPIES l<EQUIRED:
LT1'R 07 ENCL If@
II p 4 h g V,~iII<,.I,I'li l J J I II i il iI ji II f~~5 h IR'L h p'r(-pig,OKER Carolina Power 8 Llglit'Cc@pany-December 19, 1979 pl P)fan@$;p 2 Mr.James P.O'Reilly United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest Atlanta,Georgia
'30303 DEFECTIVE SEISMIC CLASS I HANGER WELDS-INTERIM REPORT
Dear Mr.O'Reilly:
In accordance with 10CFR50.55(e), the Region II office (Mr.R.Bradley)was officially notified of the subject deficiency as being a"potentially reportable" item on November 2, 1979.At this time, Mr.R.Bradley was informed that field welds on 9 Seismic Class I hangers were noted by a QA Inspector to be rejectable per the visual acceptance criteria of AWS D 1.1 and that these welds had previously been accepted by a QA Inspector who is no longer working for the Carolina Power&Light Company.On November 26, 1979, the Region II office (Mr.R.Bradley)was officially notified that the subject deficiency was considered report-, able under the provisions of 10CFR50.55(e).
The intent of this letter is to inform you that all corrective action has not been completed on this item due to the extensive nature of the rework.The current status of corrective action on the subject deficiency is as follows: l.A 100%inspection revealed that there are 331 such hangers in question which had previously been inspected by this QA Inspector.
2.192 out of these 331 hangers on subsequent reinspection have now been rejected for defective welds.3.Approximately 135 of these 192 hangers have, to date, been reworked.4., Out of approximately 135 hangers reworked, approximately 67 have been reinspected and found acceptable.
Inspection on the remaining approximately 68 reworked hangers has not been completed.
pk O 8001110~p~Q~~ipsepic , 411 Fayettevitte Street~P.O.Box 1551~Raleigh, N.C.27602
,l V Mr.J.P.O'Reilly December 19, 1979 It is estimated that all corrective action on this item will be completed by January 31, 1980.Upon completion of corrective action, the final 10CFR50.55(e) report will be submitted.
In the meantime, we will routinely keep you appraised of our progress on this item during your site inspection visits.If you have any questions regarding this matter, please do not hesitate to contact me.Yours very truly, N.J.Ch gi-Manager Engineering
&Construction Quality Assurance KVH/bd (042/860)cc: Mr.V.Stello (2) 0 (~I lg g