ML18038A500: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 3: | Line 3: | ||
| issue date = 12/31/1991 | | issue date = 12/31/1991 | ||
| title = Monthly Operating Rept for Dec 1991 for Unit 2 Shutdowns & Power Reductions.W/920115 Ltr | | title = Monthly Operating Rept for Dec 1991 for Unit 2 Shutdowns & Power Reductions.W/920115 Ltr | ||
| author name = | | author name = Mccormick M, Saunderson R | ||
| author affiliation = NIAGARA MOHAWK POWER CORP. | | author affiliation = NIAGARA MOHAWK POWER CORP. | ||
| addressee name = | | addressee name = | ||
Revision as of 23:42, 17 June 2019
| ML18038A500 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 12/31/1991 |
| From: | Mccormick M, Saunderson R NIAGARA MOHAWK POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NMP83189, NUDOCS 9201240290 | |
| Download: ML18038A500 (298) | |
Text
ACCELERATED D?STRIBUTION DEMONS TION SYSTEM r REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)DOCKET FACIL:50-410 Nine Mile Point.Nuclear Station, Unit 2, Niagara Moha 05000410 AUTH.NAME AUTHOR AFFILIATION SAUNDERSON,R.
Niagara Mohawk Power Corp.MCCORMICK,M.
Niagara Mohawk Power Corp.RECIP.NAME RECIPIENT AFFILIATION r
SUBJECT:
Monthly operating r Dec 1991 for Unit Shutdowns&Power Reductions.
920115 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR Q ENCL J SIZE: PO TITLE: Monthly Operating Report (per Tech Specs)NOTES: D RECIPIENT ID CODE/NAME PD1-1 LA BRINKMAN,D INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN1 EXTERNAL: EG&G BRYCE,J.H NSIC p&NpQ cy gg COPIES LTTR ENCL 3 3 1 1 10 10 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD1-1 PD AEOD/DOA NRR/DLPQ/LPEB10 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:
A'D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24 V I A yV l ll 4, A(
V MIIASA, A Q PgQog@QK NINE MILE POINT-UNIT 2/P.O.BOX 63, LYCOMING, NY 13093/TELEPHONE (315)343-2110 NMP83189 January 15, 1992 U.S.Nuclear Regulatory Commission Attention:
Document Control Desk Washington, DC 20555
Subject:
Operating Statistics
-December 1991 Unit Shutdowns and Power Reductions Docket No.50-410 Nine Mile Point Unit 2
Dear Sir:
Submitted herewith is the Report of the Operating Statistics and Shutdown and Narrative Report of Operations Experience for December 1991 for the Nine Mile Point Nuclear Station Unit 2.Also enclosed is the annual summary of challenges to safety/relief valves during the calendar year 1991.Very truly yours, MartI J, McCormick Jr.Plant Manager-NMP2 MJM/Imc Enclosures xc: Regional Administrator, Region I Resident Inspector mOia40Z90 9~taai ,PDR ADOCK 050004i0 R PDR gg Bf l f/
4 M~'E L P 4-Lv L b I NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT 42 NARRATIVE OF OPERATING EXPERIENCE Nine Mile Point Unit 2 operated with a capacity factor of 70.91%(MDC-net)and an availability factor of 76.23%during the month of December 1991.On December 7, 1991, at 0935 hours0.0108 days <br />0.26 hours <br />0.00155 weeks <br />3.557675e-4 months <br />, with the reactor mode switch in the"RUN" position (Mode 1), and the plant operating at approximately 90 percent rated thermal power, Nine Mile Point Unit 2 experienced an Enginecrcd Safety Feature actuation.
Specifically, an automatic reactor scram occurred caused by a Turbine Generator stop valve closure, which was initiated by (most probable cause)an Electrohydraulic Control (EHC)System malfunction.
The root cause investigation is not yet completed; however, the most probable cause is a defective relay actuation.
The immediate corrective action was to respond to the reactor scram and turbine trip in accordance with plant procedures.
A Work Request was issued to investigate the EHC malfunction, which lcd to the replacement of the relay board containing the suspected faulty relay (refer to LER 91-22 for further details).On December 12, 1991, at 0322 hours0.00373 days <br />0.0894 hours <br />5.324074e-4 weeks <br />1.22521e-4 months <br />, with the reactor mode switch in the"RUN" position and the plant operating at approximately 55 percent rated thermal power, Nine Mile Point Unit 2 (NMP2)experienced a reactor scram on a reactor vessel low water level (Level 3)signal.Specifically, following the startup of Feedwater System pump 2FWS-P1A in support of raising plant power, a Condensate System (CNM)and Fecdwater System (FWS)transient occurred, resulting in the loss of both FWS pumps.Reactor vessel water level lowered to 159.3 inches (Level 3 trip setpoint), initiating an automatic reactor scram.signal.On December 12, 1991, at 1023 hours0.0118 days <br />0.284 hours <br />0.00169 weeks <br />3.892515e-4 months <br />, while operators were attempting to return the Reactor Water Cleanup (WCS)System to an operable status following the scram, the WCS isolated on a high differential flow signal (Engineered Safety Feature actuation).
The root cause for the reactor scram was determined to be poor work practices.
The root cause for the WCS isolation was inadequate system design.Immediate actions included restoring reactor vessel inventory and commencing a controlled plant shutdown.Additional corrective actions included: 1)administering disciplinary action for individuals involved in the scram;2)evaluating and revising Operating Procedure N2-OP-3,"Condensate and Fccdwater System";and 3)troubleshooting electrical circuitry for condensate pump 2CNM-P1C;and 4)evaluating WCS isolation circuitry (refer to LER 91-23 for further details).Other capacity losses during the month of December 1991 were due to power reductions to repair steam leaks through the packing of several valves assocated with the Moisture Separator Rehcaters, Condenser tube fouling, Cooling Tower inefficiency, and Feedwater Heater Cycle inefficiency resulting in slightly low final feedwater temperature.
There were no challenges to safety relief valves during this reporting period.2.-.-.9201240290-
~~4'~i OPERATING STATUS OPERATING DATA REPORT DOCKET NO.: 50-410 DATE: 1/06/92 PREPARED BY: R.Saunderson TELEPHONE:
(315)349-4888 L.":.:,;>>$
?,j%;r.,.
": ',.ej:$g I: S(P>j?'-4;-S??>>$
<<.(:<<,:."<<1;~$
- .
- ;;:<<V:<<,I<<,>>:.;:;.;.(:.";:::,:
ji""';;:.:.';::".;,'.:,,':~),::::;,';:;,':,;.".').,'.'i':pt'j';::;:;;,::,i':
1.Unit Name: Nine Mile Point Unit¹2 2.Reporting Period: December 1-31, 1991 3.Licensed Thermal Power (MWt): 3323 4.Nameplate Rating (Gross MWe): 1214 5.Design Electrical Rating (Net MWe): 1097 6.Maximum Dependable Capacity (Gross MWe): 1159 7.Maximum Dependable Capacity (Net MWe): 1097 8.If Changes Occur in Capacity Ratings (Items Number 3 through 7)Since Last Report, Give Reasons: Items 6 and 7 recalculated monthly 9.Power Level To Which Restricted, If Any (Nct MWe): N/A 10.Reasons For Restrictions, If Any: N/A This Month Yr-to-Date Cumulative 11.Hours in Reporting Period 744.0 8$760.0 12.Number of Hours Reactor Was Critical 604.0 6,971.8 13.Reactor Reserve Shutdown Hours 0.0 0.0 14.Hours Generator On-Line 567.13',486.26 15.Unit Reserve Shutdown Hours 0,0 0.0 16.Gross Thermal Energy Generated (MWH)1,807,413.60 20,546,699.67 17.Gross Electrical Energy Generated (MWH)613,698,59 6,960,099.07 18.Net Electrical Energy Generated (MWH)578,747.82 6,560,407.82 19.Unit Service Factor 76,23 74.04 20.Unit Availability Factor 76,23 74.04 21.Unit Capacity Factor (Using MDC Nct)70,91 68.60 22.Unit Capacity Factor (Using DER Net)70.91 68.27 23.Unit Forced Outage Rate 23.77 19.49 24.Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): ,Refuel, 2/29/92, 75 days 32,785.0 19,960.7 0.0 18,813,26 0.0 54,347,499.72 18,732,324.49 1.7,584,191.07 57.38 57.38 49.33 49.09" 23.91 25.If Shut Down At End of Report Period, Eatfmated Date of Slartup:~NA 26.Unit in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 05/23/87 08/08/87 04/05/88 xi P APPENDIX B DOCKET NO.: 50-410 AVERAGE DAILY UNIT POWER LEVEL Unit: NMP2 DATE: 1/06/92 PREPARED BY: R.Saunderson 0 TELEPHONE:
(315)349-4888 MONTH December 1991 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)DAY AVERAGE DAILY POWER LI"VEL (MWe-Net);9 10 11 12 13 14 15 16 1,080 1)081 1,079 1,081 1,081 1)080 847 0 0 0 69 178 0 0 199 960 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 986 1,089 1,088 1,075 940 1)059 1)083 1)086 1,085 1,084 1,084 1)073 1)081 1,083 1,083 INSTRUCTIONS On this form, list the average daily unit power level in MWe-Net for each day in the reporting month.Compute to the nearest whole megawatt.
l~I t UNIT SHUTDOWNS WER REDUCTIONS REPORT MONTH-December 1991 DOCKET 0410 UNIT NAME: NMP¹2~'ATE: 1/06/92 PREPARED BY: R.Saunderson P TELEPHONE:
(315)3494888 No.Date Typet Duration (ifours)Reason Method of Shutting Down Reactor Licensee Event Report¹System Component Code~Code Cause&Corrective Action to Prevent Recurrence 9108 12/07/91 102.2 91-22 TG N/A On December 7, 1991, at 0935 hours0.0108 days <br />0.26 hours <br />0.00155 weeks <br />3.557675e-4 months <br />, with the reactor mode switch in the"RUN" position (Mode 1), and the plant operating at approximately 90 percent rated thermal power, Nine Mile Point Unit 2 experienced an Engineered Safety Feature actuation.
Specifically, an automatic reactor scram occurred caused by a Turbine Generator stop valve closure, which was initiated by (most probable cause)an Electrohydraulic Control (EHC)System malfunction.
The root cause investigation is not yet completed; however, the most probable cause is a defective relay actuation.
The immediate corrective action was to respond to the reactor scram and turbine trip in accordance with plant procedures.
A Work Request was issued to investigate thc EHC malfunction, which led to the replacement of the relay board containing the suspected faulty relay.1 F: Forced S: Scheduled 2 Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Exam F-Administrative G-Operational Error (Explain)H-Other (Explain)Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG4)161)Exhibit 14ame Source tp J'(1 V' UNIT SHUTDOWNS WER REDUCTIONS REPORT MONTH-December 1991 DOCKET 0410 UNIT NAME'MP¹2 DATE: 1/06/92 PREPARED BY: R.Sauntierson l TELEPHONE:
(315)3494888 No.Date Type Duration (Hours)Reason Method of Shutting Down Reactor Licensee Event Report tti System Code Component Codes Cause&Corrective Action to Prevent Recurrence 9109 12/12/91 F 74.67 91-23 N/A On December 12, 1991, at 0322 hours0.00373 days <br />0.0894 hours <br />5.324074e-4 weeks <br />1.22521e-4 months <br />, with the reactor mode switch in the"RUN" position and the plant operating at approximately 55 percent rated thermal power, Nine Mile Point Unit 2 (NMP2)experienced a reactor scram on a reactor vessel low water level (Level 3)signal;Specifically, following thc stattup of Feedwater System pump 2FWS-P1A in support of raising plant power, a Condensate System (CNM)and Feedwater System (FWS)transient occurred, resulting in the loss of both FWS pumps.Reactor vessel water level lowered to 1593 inches (Level 3 trip setpoint), initiating an automatic reactor scram signal.On December 12, 1991, at 1023 hours0.0118 days <br />0.284 hours <br />0.00169 weeks <br />3.892515e-4 months <br />, while operators were attempting to return th'e Reactor Water Cleanup (WCS)~tern to an operable status following the scram, WCS isolated on a high differential flow signal (Engineered Safety Feature actuation).
'Ihe root cause for the reactor scram was determined to be poor work practices.
'Ihe root cause for the WCS isolation was inadequate system design.Immediate actions induded restoring reactor vessel inventory and commencing a controlled plant shutdown.Additional corrective actions induded: 1)administering disciplinary action for individuals involved in the scram;2)evaluating and revising Operating Procedure N2.OP-3,"Condensate and Feedwater System";3)troubleshooting electrical circuitry for Condensate Pump 2CNM-P1C;and 4)evaluating WCS isolation circuitry.
F: Forced S: Scheduled Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Exam F-Administrative G-Operational Error (Explain)H-Other (Explain)3 Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG4161)
Exhibit ISame Source
SUMMARY
OF CHALLENGES TO SAFETY RELIEF VALVES DURING 1991 In accordance with the Nine Mile Point Nuclear Station-Unit¹2 Technical Specification 6.9.1.5c, documentation of all challenges to safety relief valves during the reporting calendar year 1991 is hereby presented:
At 0548 hours0.00634 days <br />0.152 hours <br />9.060847e-4 weeks <br />2.08514e-4 months <br /> on August 13, 1991, Nine Mile Point Unit 2 (NMP2)experienced a turbine trip and reactor scram when the"B" Phase Main Transformer developed an internal fault.The transformer fault created an electrical disturbance in the station electrical distribution system resulting in the loss of five non-safety related Uninterruptible Power Supplies (UPS).As a result, the Control Room lost annunciation and most Balance of Plant (BOP)instrumentation.
The conditions described in LER 91-17 mandated entry into a Site Area Emergency as speciTied by the Site Emergency Plan.Prior to the event, NMP2 was in operaitonal condition 1 (RUN)at 100%rated thermal power.During the event, two Main Steam System (MSS)Safety Relief Valves (SRVs), 2MSS*PSV128 and 2MSS'PSV133, lifted for approximately 30 seconds, to limit reactor pressure to 1070 psig;both valves functioned as designed.There were no other challenges to the safety relief valves at Nine Mile Point Unit¹2 during the calendar year 1991.
~>MODIFICATIONS ACCEPTED BY OPERATIONS JANUARY 1991 NOD NUNBER.WORK DOC NO.1 PN2Y86NX002 M20957>N21011>N21038>H21039>N21096>N21219>M21221~N21225 2 PN2Y86MX041 N20862>M20863>N20864>N20865>M20866>N20867 SYSTEN MODIFICATION TITLE.CEC ADDITION OF RADIOACTIVE RELEASE DISPLAY TO THE ERF/LWS CONPUTER SYSTEM-SPDS.
CMS NODIFY HUMIDITY ANALYZER 3 PN2Y86NX188 N20896 4 PN2Y87NX035 N20731>N20856>M20880>N20895>H20983>N20990>M21004>M21012>N21020>N21030>M21 063>M21070>N21 077>H2108'4>N21 105>M21 112>N21 135>N21 142>N21149>N21156>M21164>N20732>N20857>N20881~N20919>N20984>M20992>N21005>N21013>H21 02 1~N21031>M21064>N21071>N21078>M21085>M21106>N21118>N21 136>N21143>N21 150>N21157>M21 174>H20851~H20875>H20882>M20920>N20985>N20999>N21006>N21014>N21022>N21032>H21065>N21 072>N21079>H21086>N21 107>N21 125>N21137>N21144>N21151>M21158>N21 193>N20852>H20876>H20883>H20921>N20986>H21000>N21007>N21015>N21023>N21045>M21066>N21073>N21080>N21090>N21 108>N21 131>N21 138>N21 145>N21152>N21159>N21212 N20853>N20854>M20877>H20878>M20884>M20885>N20922>N20979>M20987>H20988>N21001>N21002>N21008>N21009>N21016>M21017>N21024>N21028>N21060>N21061>N21067>N21068>M21074>N21075>N21 08 1>N21 082>N21102>N21103>N21 109>N21 1 10>N21 132>H21 133>N21139>N21140>N21146>N21147>N21153>N21154>N21160>N21161>N20855>H20879>H20886>N20982>N20989>N21003>N21010>N21019>N21029>N21062>M21069>N21076>N21083>M21104>N21111>N21 134>N21141>H21 148>N21 155>M21 162>ESS CEC CLOSURE OF EXTRACTION BTEAH ISOLATION VALVES FROM SEPARATE RELAYS HUMAN FACTORS FIRST REFUEL COMMITMENTS 5 PN2Y87NX037 N20606>N20653>H20654>H20963 6 PN2YBBNX085 H20969 7 PN2YBBNX 1 10 N20868>N20869>M20870>N20888>N20889>N20907>N20908>M21056>N21051>N21055>N21172>H21177>M21 194 8 PN2YBBMX190 N20800>H20811>H20812>N20912>N21222 9 PN2Y89MX026 M20964, N20965>N20966 10 PN2Y89HX039 M20993, N20994, N20995.N20996 VBB>PLC INPUT TRANSIENT MODIFICATION VBA RPB PROVIDE LIOHTB TO VERIFY RPB TSV CLOSURE RELAYS ENEROIZED RCS REACTOR RECIRCULATION PUMP STUFFINO BOX NOD CEC ADDITION OF OE 3D NONICORE CORE MONITOR INO BYSTEH DER REPLACENENT OF RIS LEVEL DIFFERENT IATOR NSB INSTALLATION OF NUNAC HAIN STEAN 0
MOD NUMBER.WORK DOC NO.11 PN2Y89MX040 M20931 SY8TEM MODIFICATION TITLE LINE RADIATION MONITORS RECONFIOURE FEEDWATER VENT VALVE ASSEMBLY TO CLEAR SRV REMOVAL PATH 12 PN2Y89MX082 M20891 13 PN2Y89MX 1 14 M20923>M20924>M21200 14 PN2Y90MX016 M21025>M21057>M21088>M21095 15 PN2Y90MX039 M21087>M21089>M21 117 SPO PHS CNM>FWS CPS>HVR INCREASE ACCURACY OF MAIN OENERATOR WATT TRANSDUCER CHANOE REACTOR BUILDINO AIRLOCK DOORS WEATHERSTRIP FEEDWATER PUMP SUCTION PIP INO REVISION DRYWELL OUTAOE VENTILATION 16 PN2Y90MX040 M21094>M21173 17 PN2Y90MX044 M21206>M21207>M21208 18 PN2Y90MX053 M21199>M21204 19 PN2Y90MX054 M21209 CWS COOLINO TOWER IMPROVEMENTS RM8 IMPROVE RELIABILITY OF SERVICE WATER EFFLUENT RAD MONITOR8 SLS SLS VENT REMOVAL MSS ENHANCE MSIV 6C DISK OUIDES t>>
I'IODIFICATIOHS ACCEPTED BY OPERATIONS IIARCH 1991 MOD NUMBER.WORK DOC NO.1 PN2Y88NX015 M20584e M20585n M20943 SYSTEN MODIFICATION TITLE LPN UPGRADING ANPL.OF VhLP MONITOR SYSTEN
MODIFICATIONS ACCEPTED BY OPERATIONS APRIL 1991 MOD NUMBER.WORK DOC NO.1 PN2Y87MX208 M20566.M20586e M20587i M20591.M20593 SYSTEM MODIFICATION TITLE HVEe PBS EXPAND CONTROL ROOM VITAL AREA 2 PN2YBBMX164 M21026i M21027 3 PN2Y90MX037 M21210.M21211 PHS PROVIDE REACTOR TRACKBAY EMERGENCY EGRESS IMPROVE RELIABILITY OF RHR HEAT EXCHANGER SERVICE WATER RAD MONITORS (2SWP%CAB23A/8) 4 PN2Y91MX011 M21242 RCS REVISE SAMPLE LINE 2RCS+HOSE44
MODIFICATIONS A ED BY OPERATIONS MAY 1991 NOD NUMBER.WORK DOC NO.SYSTEM NODIFICATION TITLE.1%PN2Y86MX094 N20818 2 PN2Y89MX004 M20897t M20925n M21163 COP FPM OAI-TRONIC8 UNIT'Bi AND UNIT N2 INTER-TIE PROVIDE FIRE DETECTION INSIDE PRIMARY CONTAINNENT 3 PN2Y89NX079 M21034e M21047s M21058e N21 197 4 PN2Y89NX134 N20968 MSSe ONS TURBINE TORSIONAL RESONANCE FREQUENCIES MSS TURBINE FULL ARC TO PARTIAL ARC 5+PN2Y90NX043 N21251 RNS STANDBY OAS RAD NONITOR TINE DELAY I
MODIFICATIONS ACC BY OPERATIONS JUNE 1991 NOD NUNBER.WORK DOC NO.1 PN2Y90MX019 163989 SYSTEN NODIFICATION TITLE LAN 2LAN-PNLV01 BREAKER OVERLOAD 0
MODIEICATIONS ACC BY OPERATIONS JULY 1991 MOD NUMBER.WORK DOC NO..1 PN2Y87MX111 M21243 2 PN2Y90MX018 162471 SYSTEM MODIFICATION TITLE IHS PROCESS COMPUTER TERMINET REMOTE INTERFACE MODULE (TRIM)WSS HEAT TRACINC FOR RADWASTE PIPINQ i~w MODIFICATIONS ACCE BY OPERATIONS AUGUST 19 MOD NUMBER.WORK DOC NO.1 PN2Y87MX143 M20243i M20254.M20256i M21046e M21059 2 PN2Y88MX028 M21273 3 PN2Y89MX033 131199'68434 SYSTEM MODIFICATION TITLE RCS VIBRATION EQUIPMENT ADDITION TO RECIRC PUMPS 2RCS-PiA/P1B MSS MODIFY 2MSS-MOV199 CONTROL TO DELETE 2MSS-MOV19Ai B INTERLOCKS GSN RELOCATE 2GSN-SOV154 0~I HODIEICATIONS ACCE BY OPERATIONS OCTOBER 19 NOD NUNBER.WORK DOC NO.1 PN2Y89NX047 N21230s N21231~N21232e N21233 2 PN2Y89NX136 162129i 164121'64114.
161770.161772'61800 SYSTEN NODIF ICATION TITLE ABN INSTALL NECHANICAL SEAL ON 2ABN PiA h P1B FWS QROVNDINQ OF 2FWS-GEAR 1Ai 1Bi iC GEARBOXES
MODIFICATIONS ACCE BY OPERATIONS NOVEMBER 1991 MOD NUMBER.WORK DOC NO.1 PN2Y88MX047 M20643i M20890i M21234 2 PN2Y89MX100 162106.M21290 3 PN2Y90MX030 145891 M21310 4 PN2Y90MX033 176395'21311
'SYSTEM MODIFICATION TITLE XXX DESIQN AND CONSTRUCT A TURBINE BUILDINQ TOOL ROOM AT ELEVATION 306 XXX STAIRMAY TO OFFQAS RAD MONITOR/SAMPLE ROOM ABM AUX BOILER CONTROL PANEL DOOR NHS RPS MQ SET BREAKER TRIP ELIMINATION
MODIFICATIONS ACCE BY OPERATIONS DECEMBER 199 NOD NUMBER.WORK DOC NO.1 PN2Y87MX078 M20322>M20323>M20448>M20449>M20475>N20567>N20645 2 PN2Y89MX 132 M21260>N21261>N21262>N21263>N21264>N21265>N21266>N21 267>N21 268>M2 1 269>N21 270>N21 27 1>N2 1 274>N21 275>M21276>N21277>M21278>M21279>N21280>M21281>M21284>M21285>N21286>M21297>N21298>N21299>M21300 SYSTEN NODIFICATION TITLE WSS REPLACE RADWASTE ROPER PROGRESSIVE CAVITY PUMPS HVR SC DRAWDOWN RELATED UNIT COOLERS CLEANING 3 PN2Y90MX045 N21282>N21283 DCS DECONTAMINATION PLATFORN BRIDGE DRIVE NOTOR CONTROL l
13:44:36 01-13"92 CLASS I WORK-MECHANICAL HAINTENANCE 1991 PAGE:1 MR NUMBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION M110963 M1 16838'M116947 W122345 W128989 W137165'M138764 W1 38783 CSH-2CSHWHCV 133 HVR-2HVR4 UC4 11A SMP"2SWPOHOV 938 H I 5C NOCOHP I D HVP-2HVPAFN1 C RHS-2RHSAV24 7 RHS-2RHS-PSS T133A2 SWP-2SWP4 P2B POSITION INDICATION ROOD IS BINDING AND BENT AGAINST VALVE BONNETT POSSIBLY GIVING IHPROPER POSITION IND ICAT IONI STRAIGHTEN ROO BOLTS HISS INGI SOHE OF THE UNIT COOLER OUTLET AIR DIFFUSER HOUNTING BOLTS ARE HISSING.VENDOR HANUAL INST 10-412-5000 ORW 1107838 INSPECT" REPLACE HBC HOUSING COVER GASKET'TO'MORK IN CONJUNCTION WITH'MR 117342.THIS WRITTEN TO CLOSE WR 116660 SNUBBER PSA-35 5-N 10358 PIN1801112 TAG ENH-AH FIG 306 12177 BZ STOCK-34 TO REPLACE SCREWS ON DUST COVER REHOVED FOR TEST TO ANSWER NCR 2-87-0116 THIS PART IS LOCATED IN'WAREHOUSE HOLD AREA UNDER A HAT HGHT HOLD TAG USE APPROVED LOCKTIGHT DIV I DIESEL ROOH GUARD OVER THE FRONT OF THE FAN HAS FASTENER NUTS WELDED TO THE GUARD THREADED HOLES ARE WEARING FROH USAGE AND NEED REPAIR-REPLACEHENT 2RHS-V247 IS LEAKING PAST ITS VLV SEAT 2RHS"V247 IS LEAKING PAST ITS VLV SEATIDO'WNSTREAH CAP IS LEAKING 2 DROPS PER HIN LOCATION IS EL 289 SOUTH RX BLDG LOCK NUTS ON STRUT LOOSE NOTED DURING IS I VISUAL EXAH TIGHTEN LOCK NUTS PER SITE ENGINEERING DISPOSITION ON ATTACHED DATA SHEET SUPPORT LOCATED NORTH AUX BAY 185 ELEVATION BZ-71EH-2 REPACK PUMP TO COHPLY WITH NCR 2-90-0024 THE WHITE GARLOCK PACKHASTER 1 MHICH IS NOM INSTALLED CAN CAUSE IGSCC ELEVATION 261 COLUHN 012 20 AFTER FIELD INSPECTION FOUND NOTHING WRONG WITH POSITION INDICATOR NO SIGNS OF BINDING REINSTALLED BOLTSI MASHERS AND NUTS TO OUTLET AIR DIFFUSER HADE VISUAL INSPECTION ON 911018" FOUND NO EXTERNAL LEAKAGE AT THIS T IHE REHOVED 3 SCREWS APPLIED LOCTITE 242 REINSTALLED SCREWS REPLACED CLIPS FLUSHED VALVE WITH HOSE TO DRAINS REINSTALLED CAP WITH APPROVED SEALANT TIGHTEN LOCK NUTS ON STRUT SCOTT REED NQAO-NDE REPLACED PACKING WITH CORRECT TYPE PER NCR 2-90-0024m MR 190592 WRITTEN TO REPLACE SHAFT SLEEVE DUE TO'WEAR l
13:44:36~x-13"92 CLASS I WORK-iANICAL HAINTENANCE 1991 PAGE-2 MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION M139412 GTS-2GTSOHOV 2A 2GTSAHOV2A 28 5A 58 3A 38 28A AND 288 ARE ALL HISSING THE HANUAL JACK HANDLE REQUIRED TO BE'WITH THE VALVES HANUFACTURER REPLACEHENT HANDLES AND DRILL ATTACH IN NEAR VICINITY OF EACH VALVE SEE OPS FOR ASSISTANCE WE INSTALLED THE NEM JACK HANDLES BY THE VALVES W141346 EGS" 2EGS4EG2 HPCS DIV 3 EG2 DISEL PETCOCK IS STRIPPED-MILL NOT OPEN THIS IS A HONTHLY SAHPLE POINT FOR CHEHISTRY REPLACED PETCOCK W145754'W145755 SWP-2SMPCV1C SWP" 2SWPAV1A FLANGED CONNECTION FOR CHECK VALVE 2SMPOV1C'MAS OBSERVED TO BE LEAKING 8 DPH DURING VT2 EXAHINATION WALKDOWN PER PROCEDURE N2"ISI-SWP-9002 THE VT2 EXAMINATION WAS NOT A FAILURE REJECT HOWEVER THE PROCEDURE REQUIRES A MR TO ELIHINATE THE LEAKAGE SM 226 ELEVATION EDC 2F00293 FLANGED CONNECTION FOR CHECK VALVE 2SWP4'V1A WAS OBSERVED TO BE LEAKING 5 DPH DURING VT2 EXAHINATION WALKDOWN PER PROCEDURE N2-ISI"SWP-9002 THE VT2 EXAH'MAS NOT A FAILURE REJECT HOMEVER THE PROCEDURE REQUIRES A MR TO ELIHINATE THE LEAK SW 226 ELEVATION EDC 2F00293 REPLACED GASKETS~WORK ACCOHPLISHED ON WR 194572 BOLTING TIGHTENED IN A CRISS CROSS PATTERNS VALVE REHOVED FROH SYSTEH FOUND PINS TO BE STAKED REINSTALLED VALVE IN SYSTEH.COUNTER WT SECURED TO STEH INSTALLED NEW FLEX GASKETS AND SWING"ARH STOP W146340 CHS-2CHSCAB 108 BOLT BROKEN OFF AT THE TOP ON HOVING FILTER HOUNTING BRACKET REPAIR AS NEC BOLT BROKEN OFF AT THE TOP ON HOVING FILTER HOUNTING BRACKET REPAIR AS NEC.DOES NOT EFFECT OPERABILITY.
1 BOLT REPLACED OTHER BOLT DRILLED OUT NEED TO REPLACE'MITH LONGER BOLT LONGER BOLT INSTALLED W147440 HVR-2HVROSOV 236 2HVR-SOV236 APPEARS TO LEAK BYr FLOW INDICATES AT FLOW HETER ON 2SSP-IPNL101 EL 289 THREE FOURTHS INCH~REPLACED HAIN DISC-PILOT DISC AND PISTON RING W148255 HVR-2HVReCAB 14A HVR CA814A RX BLDG VENT HON'RX BLDG EL 328 FILTER REPLACE HINGES PIN IN ONE FILTER HOUSING BOLT HINGE PIN ON SWING-AWAY BOLT IS HOUSING HISSING PLEASE FIXION FILT HOUSING WHICH IS IN LINE'MITH PARTICULATE
'HOVING FILTER M148256 HVR-2HVRoCAB 148 HVR-CA8148 RX BLDG VENT HONITORIRX BLDG EL 328 F ILTER HOUSING SWING A'MAY BOLT HINGE PIN HISSING ON A TRAIN SIDE PLEASE FIX REPLACE PINS IN BOTH FILTERS I
13-44-36 x-13-92 CLASS I WORK->>ANICAL MAINTENANCE 1991 PAGE:3 MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION M148257'M148258'M148259 M15 4408'M154473 W154477 M15 4485 M154548'It154588 CHS-2CHS4CAB 10A HVR-2HVRNCAB 328 HVC-2HVCeCAB 18A EGA"2EGANSV3 A RCS-2RCSAHOS E44 IAS-2IASAV36 7 IAS-2IASASOV Y186 IAS-2IAS-754 PSA004C3 SWP-2-SWP-00 1-65P-3 CHS-10A CONTAINHENT AIR RAD MONITOR)RX BLDG EL 289.FILTER HOUSING SWING-AWAY BOLT HINGE PIN MISSING ON BYPASS.FILTER HOUSING PLEASE FIX HVR CAB32B RX BLDG VENT RAD HONITORiRX BLDG EL 289 FILTER HOUSING SWING"AWAY BOLT.HINGE PIN HISSING ON A TRAIN SIDE PLEASE FIX HVC CAB18A CONTROL ROON VENT RAD MONeCB 306 FILTER HOUSING S'MING-AMAY BOLTS HINGE PINS ARE HISSING ON A AND B TRAINS PLEASE FIX TO FULTILL THE NMP2 FIRST PUMP AND VALVE PROGRAH PLAN REHOVE VALVE 2EGAASV3A FOR TESTING CALIBRATION AND REINSTALL WHEN NOTIFIED BY THE ICC DEPARTHENT LOCATED DIESEL GEN ELEVATION 261 LINE A COLUHN 011 50 REF SEI-712 AND ASME ANSI OH-1 1981 FABRICATE NEW REPLACEHENT EXPANSION LOOP PIPING PER EDC 2M10290 AND HOD 91-011 ALSO PERFORM MOCKUP IN FAB SHOP NO TAG-SHOP WORK ONLY DRAIN VALVE 2IASAV367 IS LEAKING AND COHING 2IAS4TKSA TO BLOWN DOMN AT ON EXCESSIVE VALVE ADS-B-NITROGEN HEADER EXHIBITS AN INCREASE IN PRESSURE BEYOND HIGH ALARH SETPOINT EVEN WHEN LO AND HIGH FLOW PRESSURE CONTROL VALVES ARE SHUT COULD BE PROBLEM WITH LOM FLO'W VALVE 2IASASOVY186 INTERNAL LEAKAGE PLEASE REPAIR OR REPLACE VALVE AS NECESSARY.
WORK'WITH WRS 154484 154483 INITIATED AGAINST PRESSURE CONTROL VALVES TAG HUNG ON VALVE SC 289 NORTH END BOLTING OiV SUPPORT FOUND TO BE LOOSE BZ 300 AH REQUIRES A 10 PLUS OR HINUS 3 FT/LB TORQUE REPLACE SUPPLY AND DISCHARGE PIPING TO 2SMPACAB23B PER EDC 2F00308 AND SIHPLE DESIGN CHANGE SC2-0126-91.
LOCATION ELEC TUNNEL ELEVATION 215 HINGE P IN'WAS NOT HISSING NO WORK REQUIRED REPLACED BROKEN PIN IN SWING BOLT REPLACED BROKEN HINGE PIN REPLACED VALVE ON TANK NEll PIPING INSTALLED IN PLACE OF DAMAGED FLEX LINE WORK DONE PER HOD 91-011 CUT OUT AND REPLACED VALVE REPLACED PARTS TIGHTENED BOLTS TO 10 FT LBS PER'WORK DOCUMENT 154548 REPLACED SAHPLE INLET OUTLET LINES THAT WERE CLOGGED WITH IRON OXIDES-SEDIMENTS AND MICROBIOLOGICALLY INFLUENCES CORROSION.
THIS REPLACEMENT PER EDC 2F00508 0 4 1 ,4 13-44-36-13-92 CLASS I WORK-ANICAL HAINTENANCE 1991 PAGE:4 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION M154590 ICS-2-ICS-00 6-33-1 REHOVE FLEX GASKET ON SPOOL PIECE DOWN STREAH OF 2ICS¹AOV157 AND INSTALL BLANK PANCAKE TO SUPPORT LLRT TEST ON 21CS¹AOV156 REMOVE AFTER TEST AND REINSTALL FLEX SUPPORT INSTALL'ED BLIND FLANGE FOR TESTING PURPOSES AND REHOVED.TORQUED BOLTS FOR NOZZLE FLANGE TO ELBOW TO 305 FTLBS.TIGHTEN BOLTS WRENCH TIGHT FOR ELBOW TO FLANGE WRENCH TIGHT.REPLACED 12 STUDS AND 24 NUTS W1 54615 SMP-2SWP¹P1D 2SWP¹plD OUTBOARD PUHP BEARING LEAKS OIL SCREENWELL ELEVATION 224 DIV I I SMP PIT REPLACED LEAKING OUT BOARD BEARING GASKET WITH A NEW ONE ALSO STONED AND CLEAN SEATING SURFACES W154627'Wl 54651'M154681 W1 54691 W154694 W154721 W154750 RDS-2RDS¹V11 1(3023)RDS-2RDS¹V13 8(3447)ICS-2ICS¹T1 HVC-2HVC¹ACU 3B HVK"2HVK¹V32 7 HVC-2HVC¹ACU 1A PCB-2PCB¹DRA 5 2RDS¹HCU3023 (V111)HAS EXCESSIVE PACKING LEAKAGE AROUND STEH MHEN VALVE IS OPEN OR SHUT VALVE IS CURRENTLY BACKSEATED TO PREVENT LEAKAGE REPAIR REPLACE VALVE ROD 34-47 COOLING WATER CHECK VALVE V138 DOES NOT CHECK FLOW)LOCATED RX BLDG 261 NORTH SIDE HCU'S WHEN RCIC WAS STARTED A HI L/0 DIFF ALARH WAS RECEIVED.WHEN FILTERS WERE SWAPPED STANDBY FILTER LEAKED-REPLACE BOTH FILTERS AND REPLACE FILTER HOUSING GASKETS I IF REQD 2HVC¹ACU3B FILTER DELTA P IS AT 1 7 IN (IT HAS BEEN STEADILY INCREASING PER 2HVC-PDIS66B))
NEED FILTER CLEANED.LOCATED CB 270 SOUTH END OF D IVI I SMGR ROOH TAG ON START S'MITCH FOR 2HVC¹ACU3B IN DIV 2 REHOTE S/D ROOH HVK HAKEUP CHECK VALVE APPEAR TO BE STUCK'MHEN F ILL INGS AND VENT ROTEHETER PASSED ONLY 1 2GPH AND SYSTEH MOULD NOT FILL MITH BOTH NORMAL HAKEUP AND BYPASS VALVE OPEN.LOCATED DIV 4 CHILLER ROOH ELEV 261.TAG HUNG ON PNL 871 CRA-EL289 BOLTS ARE OUT OF ADJUSTHENT BELT TENSION IS ON LOW SIDE ADJUST BELTS TO OBTAIN 1/2 INCH DEFLECTION AT 9 3/5 TO 13 1/2 POUNDS HPH-GEN-A562 DOES HEET ACCEPT CRITERIA REMOVE EQUIPHENT HATCH TO SUPPORT OUTAGE'ACTIVITIES AND REINSTALL PRIOR TO STARTUP.2PCB¹DRA5 INSPECT AND REPALCE DOOR SEALS AS REQD INSTALLED HEll¹Vlll IN SYSTEH REPLACED BALL AND CLEANED SEAT NEW FILTERS INSTALLED NEW FILTER INSTALLED CLEANUP DISK AND BORE AND BORE OF VALVE NEW GASKET ADJUSTED BELTS TO 1/2 INCH DEFLECTION AT PROPER TENSION WE REHOVED AND INSTALLED THE LARGE DOORS
'II 0, 13:44-36-13-92 CLASS I'MORK-ANICAL HAINTENANCE 1991 PAGE:5'MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION M157985 M159147 M159182 M159194 M161089 M161461 M161629 W162119 M162371 CEC-2CEC0PNL 875 S'MP-NOCOHP ID SMP-2SWP4 F V5 48 ICS-2ICSAT1 CSL-2CSLx V47 CSH-2CSH4 V13 8 ICS-2ICS4P1 HVR-2HVR0UC4 08A RDS-2RDS~HCU 2635 CONTROL ROOH PANEL P875'PLEASE INSTALL PROCEDURE HOLDER ON PANEL P875 PER INSTRUCTION ON EOC 2E00255 AND FOR KG1-6311 ONE HOLDER REQD 2SMPNP28 DRIP TRAY DRAIN LINE IS PLUGGEDI MATER DRAINS OVER SIDES AND ON TO FLOOR INSTEAD OF THROUGH DRAIN LINE AND INTO DRAIN FUNNEL~CLEAR DRAIN LINE.CB 261 DIV I I CHILLER RH TAG AT TRAY VALVE ACTUATOR HAS OIL LEAKAGE)TROUBLESHOOT AND REPAIR LOCATED IN THE SOUTH SERVICE WATER VALVE P IT ELEV 255 THE OVERSPEED TRIP DEVICE ON THE TURBINE DOES NOT OPERATE FREELY-SOHE BINDING MAS EXPERIENCED IN PERFORHING PROCEDURE N2-PH"H1 STEP 7.4 PLEASE INVESTIGATE CAUSE OF BINDING.RCIC TURBINE ROOH 175RB TAG PLACED ON DOOR ENTRANCE VLV LEAKS BY AND DRIPS OUT PIPE CAP PLEASE REPAIR AS NEC.FIX THE VLV.VALVE PACKING 2CSHCV138 IS LEAKING AT 1-2 OPH HAVE TAKEN UP ON PACKING LOCATED RX 195 AT CSH SUPP POOL SUCTION UNCOUPLE 2ICS-T1 TO SUPPORT PERFORHANCE OF N2-PH-9001 RCIC TURB OVERSPEEO TEST (END OF OUTAGE)RECOUPLE AFTER TEST COHPLETION REPAIR DOOR HINGE BOLT ON DOOR HINGE IS STRIPPED AND NEEDS TO BE REPAIRED OR REPLACED MR WRITTEN IN RESPONSE TO OH25108 2HVReUC408A REPEAT CHARG INGS OF HCU 2635 NITROGEN ACCUHULATE INDICATES A LEAK CARTRIDGE VALVE V111 MAS REPACKING 10/90 VIA MR 189617 SUSPECT PROBLEH WITH P6 CHARGING CONNECTION PLEASE INVESTIGATE AND REPAIR SOURCE OF NITROGEN LEAK DEF TAG 26282 HUNG ON V111 VALVE STEM RX BLDG 261 OPS TO INSTALL THEIR OMN PROCEDURE HOLDERS USING 2 SIDED TAPE NO WR REQUIRED CLEANED DRIP PAN AND DRAIN LINE SO DRIP FLOW WILL REACH DRAIN PAN DRAIN LINE AFTER FIELD INSPECTION FOUND NO OIL LEAKS REPLACED TAPPOT MITH NEWLY DESIGNED TAPPOT ADJUSTEO OVERSPEED TRIP HECHANISH WE CUT OUT THE OLD VALVE NO.47 AND MELDED IN A NEW ONE REHOVE OLD: REPACK IN VALVE AND TORQUE TO 84 IN LBS.2 JUNK 2 GARFOIL UNCOUPLED PUHP TO PERFORH OVERSPEED TRIP TEST CLEANED THREADS REPLACED FITTING Iv P 13:44:36-13-92 CLASS I'WORK-M ANICAL HAINTENANCE 1991 PAGE:6 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION'W162375'W162391 W162944 W164457 W164525 W1 65487 W167090 W167091 W168421 RDS-NOCOMPID WCS-2WCS4V32 5 CSL-2CSL~HOV 107 PHS-AB261-4 5'WP-NOCOHP ID HVR RMS-2HVReCAB 32A PCB-2PCBoDRA 4A PCB-2PCB4DRA 48 RDS-2RDSAHCU 4259 PLEASE INSPECT ALL 185 HCU'S CHANGING WATER RISEN PIPING AT UPPER PIPE CLAHPS FOR EXISTENCE OF RESEN MOVEHENT USING TORQUE WRENCH CHECK CHANGING WATER PIPE CLAHP SUPPORT BOLTS FOR TIGHTNESS 75 (70-80)INCH LBS AND BOLTS FOR MISSING HARDWARE AND REPLACE AS NECESSARY THIS INSPECTION IS PER GE R ICSTL056 SEAL WELD CAP V326 IN ACCORDANCE WITH TEHP HOD 91-055 EXTEND ASME III CL2 BOUNDARY TO CAP 2CSLeMOV107 LOCATION ON 176'X N AUX BAY IN CSL PUHP HAS A PACKING LEAK PLEASE CORRECT INSTALL 4X4X1/4 IN.ANGLE IRON IN FRONT OF AUX BOILER DOORS AB261/1/AB261/2 r'B 261/3 AND AB 261/4 TO CONTAIN UNHONITORED RELEASES FROH CONTACT CONDENSER'WORK AS PER EDCI 2F00378A.THIS IS A TOP TEN ISSUE CONCERN'TOP TEN ISSUE NO.8 FLANGES (4 EA)PURCHASED PER HOD 89-132 AS SCHEDULE 80 NEED TO BE COUNTERBORED TO MEET EXISTING SCHEDULE 40 PIPING FLANGES TO BE PROVIDED TO NHH BY CBI (REF EDC 2M10181)HVR-32A SAHPLE PUMP IS MAKING AN EXCESSIVE AHOUNT OF NOISE.(RX 289)OPEN NORTH SUPPRESSION POOL HATCH DURING AUGUST OUTAGE AND RECLOSE AND RETORQUE AS REQUIRED 71-87 FT LBS PER N2-HMP-PCB-003-NOTIFY I AND C TO DO LLRT'WHEN COHPLETE REHOVE SOUTH SUPPRESSION POOL HATCH DURING AUGUST AND RECLOSE AND RETORQUE AS REQUIRED 71-87 FT LBS PER N2-HHP-PCB-003.
NOTIFY I AND C TO DO LLRT'WHEN COMPLETE-HCU 4259 NITROGEN ACCUMULATOR REQUIRES REPEAT CHARGINGS ON A CONTINUOUS BASIS.PLEASE INVESTIGATE SOURCE OF LEAK Vill VALVE P6 CHARGING CONNECTOR AND REPAIR LEAK AS NECESSARY.
TORQUE ALL BOLTS ON CHARGING WATER RISERS.WR LISTED ON S"HI-5~3-001 FOR ANY HISSING OR LOOSE CLAMP OR PARTS REHOVED VALVE 326 USING A FREEZE ON THE LINE)THEN REINSTALLED A PIPE CAP ALSO REPLACED 2 CAPSCREWS WASHERS AND NUTS TO RESTRAINT THIS ACTION OUTLINES IN TEHP HOD 91-069 REPACKED FROH LANTERN RING UPt LANTERN RING FROZEN IN VALVE PLACED TEMPORARY CARDS IN FRONT OF DOORS TO STOP RELEASE OF CONT.FLUIDS INTO CLEAN AREAS CUT DOWN PIPE PER HOD 89-132 REF EDC 2H10181 INSTALLED NEW PUHP SUPPRESSION HATCH CLEANED AND NEW 0-RINGS INSTALLED.
WR USED TO OPEN HATCH-TEHPORARILY CLOSE REOPEN AND TO PERFORH FINAL CLOSURE OF HATCH SUPPRESSION HATCH CLEANED AND NEW 0-RINGS INSTALLED.
WR USED TO OPEN HATCH TEHPORARILY CLOSE REOPEN AND TO PERFORH FIND CLOSURE OF HATCH WE INSTALLED NEW PACKING
~'D~l 13-44-36 13-92 CLASS I WORK-NICAL HAINTENANCE 1991 PAGE:7 MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W168422 M168423'M168433 W168443 W168476'M168477 W168479 W168480 RDS-2RDS4 HCU 5043 RDS-2RDSoHCU 1407 RDS-2RDSASOV 121(3019)HVR-2HVR4DHP 19 S'MP-2-SMP-75 0-65G-3 S'MP-2-SWP-75 0-65H-3 I AS-NOCOHP I 0 I AS-2 I ASS'PSE 19A HCU 5043 NITROGEN ACCUHULATOR REQUIRES REPEAT CHARGINGS ON A CONTINUOUS FREQUENCY PLEASE INVESTIGATE SOURCE OF LEAK V111 VALVE P6 CHARGING CONNECTOR ANO REPAIR LEAK AS NECESSARY HCU 1407 NITROGEN ACCUHULATOR REQUIRES REPEAT CHARGINGS ON A CONTINUOUS FREQUENCY.
PLEASE INVESTIGATE SOURCE OF LEAK V111 VALVE P6 CHARGING CONNECTOR AND REPAIR LEAK AS NECESSARY CORRESPONDING CRDH EXHIBITS ULTRA HIGH STALL FLOWS UPON ROD WITHDRAWAL.
WR 191502 INITIATED AGAINST THAT CRDH.HOWEVER SUSPECT LEAKY OR HISPOSITIONED SOLENOID VALVE SOV121.PLEASE TROUBLESHOOT AND REPAIR AS NECESSARY TAG HUNG ON HCU V107 VALVE HANDMHEEL RB 261 SOUTH BANK BACK DRAFT DAHPER 2HVRADHP18 19 DOES NOT CLOSE WHEN 0UC413A B SHUT DO'MN.READJUST COUNTER WEIGHT REPLACE 3/4 IN PIPE IN SAHPLE LINES WITH STAINLESS STEEL PIPE PER ENGINEERING DIRECTION EDC 2F00299.ET 214 NORTH REPLACE 3/4 IN.PIPE IN SAHPLE LINES WITH STAINLESS STEEL PIPE PER ENGINEERING DIRECTION EDC 2F00299.ET 214 SOUTH PLEASE TROUBLESHOOT AND REPAIR AS NECESSARY SOURCE OF LEAKS ON-B-LOOP (2IASeTK5 LOOP)ADS NITROGEN SUPPLY SYSTEH.SEE ATTACHED TROUBLESHOOTING PLAN NOTE: RETURN THIS WR TO PLANNING ONCE LEAKAGE SOURCE HAS BEEN IDENTIFIEO TO FACILITATE PROPER WORK CONTROL REVIEW AND APPROPRIATE REPAIR PLANNING REPLACE RUPTURE DISK WITH NEW DISK EXISTING DISK HAS BEEN INSTALLED FOR A PERIOD GREATER THAN ONE YEAR WHICH IS BEYOND HANUFACTURERS RECOHHENDATION FOR ONE YEAR SERVICE LIFE.EXISTING DISK WAS LAST INSTALLED ON 891021 PER MR 170156 TAG HUNG ON TANK 2IAS4TK4 INSTALLED NEW PACKING INSTALLED REBUILT VALVE REPLACED SOV 121 ON HCU 3019 ADJUSTED COUNTER MEIGHTS ON DAHPER CARBON STEEL PORTION OF LINE REMOVED AND REPLACED MITH STAINLESS STEEL PER EDC 2F00299 WE REPLACED OLD CARBON PIPING WITH NEW STAINLESS PIPING IDENTIFIED LEAK ON 2IASoV367'ROTE WR 154477 TO REPLACE VALVE TROUBLESHOOTING AFTER REPLACEHENT OF 2IAS4Y367 INDICATE THAT NO OTHER LEAKAGE OF LARGE HAGNITUDE EXISTS REPLACED RUPTURED DISK PER HI HARD COPY TAG LOST
~E 4 I 13:44-36-13-92 CLASS I WORK-ANICAL MAINTENANCE 1991 PaGE-8 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W1 68481 W168482 W168599 W1 68694 W168700 W169163 W169183 W169193 W169804 I AS-NOCOHP ID I AS-2 I ASV36 3 HSS-NOCOHPID EGA-2EGA0SV1 ll SWP-2SWPeV10 F HSS-NOCOMP ID PCB-2PCBADRA 9 PCB-2PCBADRA 4A SWP-2-SWP-00 4-242-3 PLEASE TROUBLESHOOT AND REPAIR AS NECESSARY SOURCE OF LEAKS ON"A" LOOP 2 IAS4TK4 LOOP ADS NITROGEN SUPPLY SYSTEH SEE ATTACHED TROUBLESHOOTING PLAN NOTE RETURN THIS'WR TO PLANNING ONCE LEAKAGE SOURCE HAS BEEN IDENTIFIED TO FACILITATE PROPER WORK CONTROL REVIEW AND APPROPRIATE REPAIR PLANNING.NO TAG HUNG OR REQUIRED.VALVE LEAKS BY SEAT DESPITE VALVE CYCLING AND CAUSES ADS TANK 2IAS4TK4 TO DEPRESSURIZED.
PLEASE REPLACE VALVE AS NECESSARY.
THANK YOU ACTUATOR SER NO 1221199-WHILE PERFORMING HONTHLY PROCEDURE N2-IPM-MSS-Hool 1 1/4 TEST FITTING GALLED WHILE REHOVING FITTING BACKED OUT FITTING 1 1/2 TURNS BEFORE GETTING STUCK WAREHOUSE ENVIRONHENTAL ROOH NE CORNER TO FULFILL THE NHP2 IST PUMP AND VALVE PROGRAH PLAN'EHOVE VALVE 2EGA4SV111 FOR TESTING CALIBRATION AND REINSTALL WHEN NOTIFIED BY THE I8C DEPARTMENT LOCATEO DIESEL GENERATOR ELEV 261 REF SEI 712 ANO ASHE 1 ANSI OH"1 1981 INSPECT OR ADJUST MECHANICAL STOPS ON VALVE TO ALLOW VALVE TO SEAT PROPERLY EDC 2F00329 INSTALL DRYER SEPARATOR STORAGE POOL PLUGS-REACTOR SHIELD PLUGS AND REFUELING CANAL PLUGS REHOVE STRONGBACK ON DRYWELL EMERGENCY LOCK AND AT END OF HPCS OUTAGE REINSTALL FINGER TIGHT.RX BLDG 261 OPEN NORTH AND SOUTH SUPPRESSION POOL HATCHES DURING HPCS OUTAGE AND RECLOSE ANO RETORQUE AS REQD 71-87 FT LBS PER N2-HHP-PCB-003.
NOTIFY I8C TO DO LLRT WHEN COMPLETE INSTALL PRESSURE TAP ON DISCHARGE SIDE OF 2SWP4'PZB INSTALL ISOLATION VALVE 2SWPAV1103 AND REQUIRED PIPE ALL WORK PER SDC SC2-0037-90 NA FOR TROUBLESHOOTING PORTION.OPS T I GHTENED ADS TANK 2I AS4TK32 PRESSURE TRANSHITTER 2IASAPT230.
INSTRUHENT LINE CAP THAT WAS LOOSE AND LEAKING NITROGEN SNOOP CHECKED CAP TO ENSURE LEAK TIGHT SETUP TO REPLACE VALVE VALVE PASTED.LEAK TEST DID NOT HAVE TO REPLACE IT NO WORK DONE IN FIELD CUT OUT REDUCER BY MACHINING AND RUN TAP TO CLEAN UP THREAD REHOVED SV111 SERIAL NO 124157E REHOVED VALVE 10 FOUND A PIECE FOR PLYWOOD AND INSULATION IN VALVE PREVENTING IT FROH CLOSING CLEANED UP VALVE AND INSTALLED NEW LAHINATED DISK SEAL ALL POOL CAVITY AND FUEL CANAL PLUGS INSTALLED STRONBACK REHOVED;STRONG BACKS ON 910909 STRONG BACK BOLTS LOOSENED ON DOOR STRONG BACKS INSTALLED 910924-FINGER TIGHT HATCH OPENED SEALING SURFACES COVERED HATCH CLOSED AND TORQUED TO 80 FT LBS INSTALLED NE'W 3/4 INCHES GLOBE VALVE IN LINE 2-SWP-004-242-3 FOR TESTING PURPOSES,
~l 4 13:44-36-13-92 CLASS I MORK-ANICAL HAINTENANCE 1991 PAGE:9 MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION M169825 SWP INSTALL 5'MAGELOK FITTING TO REPLACE DEFECTIVE FITTING ON 2SWPACAB146B..
PARTS WITH SYSTEH ENGINEERING-RICK SCHAHP TB 250 SM SERVICE WATER ROOH.REPLACE SECTION OF PIPE TUBING W169830'W169831'W169832 RHS-2SMPNCAB 146B ROS-2RDS4V11 1(0619)RDS-2RDSAV11 1(3815)ROS-2RDS4 V11 1 (5051)RELEASED LEAKAGE V111 ON ACCUH 061-14 LEAKS EXCESSIVELY WHEN VALVE IS CLOSED ACCUH'MILL NOT HOLD CHARGE 38-15 REBUILT 111 VALVE REBUILD 111 VALVE ACCUH MILL NOT HOLD CHARGE 50-51.P6 CONN LEAKIING REPLACED 0-RINGS AND PACKING ON AND REPAIR V111 VALVE V111 REPLACED THE P6 CONN CLEANED AND INSPECTED THE PIPE THREADS'W169833 M169834 M169835 RDS-2ROS4V11 1(1051)RDS-2RDSCV11 1(1823)ROS-2RDSov11 1(0243)ACCUH MILL NOT HOLD CHARGE~10-51 ACCUH WILL NOT HOLD CHARGE 18-23 ACCUH MILL NOT HOLD CHARGE 02-43 REBUILT 111 VALVE REBUILT 111 VALVE REBUILT 111 VALVE'M169836 RDS-2RDSAV11 ACCUH WILL NOT HOLD CHARGE 46-55 1(4655)REPLACED ORINGS AND PACKING M1 74809 M174960 M175811 Ml'76298 ZZZ-NOCOHPIO HSS-2HSS-PSS P184A4 RHS-2RHSCV23 5 HVK-2HVKNRV4 3B INSPECT SNUBBER REHOVED FROH BZ-12AC SNUBBER REHOVEO AND LOCATED AT SNUBBER ELEVATION 215 RX BLDG SNUBBER REHOVEO UNDER WR 174961 DURING TECH SPEC VISUAL EXAHS IT WAS OBSERVED THAT THE ATTACHED LIST OF HECHANICAL SNUBBERS HAVE DISPLACED SPHERICAL BEARINGS CONDITION DOES NOT AFFECT OPERABILITY 2RHS4V235 WAS LEAKING BY DURING SURVEILLANCE TESTING ON RHS-C VALVE NEEDS TO BE FIXED.LOCATED ON 289 ELEVATION RX RHS-C HIGH POINT VENT VALVE LEAKING WATER OUT OF GAG SCREW HOLE-REPAIR SNUBBER DISASSEHBLED ANO OAHAGE WAS NOTED BEYOND JUSTIFIED REBUILD SNUBBER SCRAPPED.SNUBBER WAS REHOVEO FROH SERVICE UNDER HOD 89-085 REPLACED 2HSS-PSSP038A SN8383 MITH NEM SNUBBER SN8168 REHAINING SNUBBERS SPHERICAL BEARINGS MERE CLEANED LUBRICATED AND RESTAKED ASSURED FREEOOH OF HOVEHENT RHSAV235 MAS TESTED DURING OPS SURVEILLANCE ON 910528 THIS VALVE WAS NOT LEAKING HAO VALVE RECALIBRATED AND ADJUSTEO
~l S l II 4 13:44:36-13-92 CLASS I WORK-NICAL HAINTENANCE 1991 PAGE10 WR NUHBER EPN NUMBER FAILURE DESC CORRECTIVE ACTION W176390 W176730 W17 6819 W1 76896 W1 76990 W177153 W177156'W177157'W177159 RHS-2RHS0MOV 9A ICS-21CSAP1 ICS-2-ICS-75 0-65-2 HVK-2HVKAP18 SLS-2SLSAP1A HVC-2HVC4UC1 02 RDS-2RDSNHCU 4623 RDS-2RDSAHCU 3815 RDS-2RDS4HCU 1407 HAS SMALL OIL LEAK FROH GEAR BOX ELEVATION 196 NORTH AUX BAY DOES NOT AFFECT VALVE OPERABILITY OUT BOARD SEAL IS LEAKING APPOX 80 DRIPS PER MINUTE.REPAIR AS NECESSARY ALSO DO INBOARD SEAL PIN HOLE STEAN LEAK AT DRAIN LINE ELBOW BETWEEN ICS-AOV130 AND AOV 131 UPSTREAH OF ICS-V15 AND V16 DRAIN VALVES.LINE 2-ICS-750-65-2.
PUMP SHAFT OIL SEAL LEAKS PLEASE REPAIR TAG 15750 HUNG ON OIL BUBBLER FOR PUHP PUHP IS LOCATED ON CONTROL BLDG ELEVATION 261 IN DIV II CHILLER ROOH PUHPS 1ST PISTON HAS PACKING LEAK (2 DROPS/SEC)
TAG 16233 HUNG ON PUHP PLEASE REPAIR UC102 FAILED TO ACHIEVE RATED FLOW 18C TO TROUBLESHOOT FLOW PROBLEH CONTACT C BURNS'WORTH X 4626 FOR TROUBLESHOOTING INFO HCU 4623 HAS EXCESSIVE NITROGEN LEAKS AS INDICATED BY REPEAT CHARGINGS OF HCU ACCUHULATOR.
PLEASE TROUBLESHOOT AND REPAIR AS NECESSARY V111 VALVE-P6 CONNECTOR AND OTHER POTENTIAL LEAKAGE SOURCES.NOTE WR 187548 RECENTLY REPACKED P6 CONNECTION ON THIS HCU (COHPLETED 910119)TAG HUNG ON Vill VALVE STEH RX BLDG ELEV 261 NORTH HCU BANK HCU3815 HAS EXCESSIVE NITROGEN LEAKS AS INDICATED BY REPEAT CHARGINGS OF N2 ACCUHULATOR PLEASE TROUBLESHOOT AND REPAIR AS NECESSARY SOURCE OF LEAK (EG P6 CONNECTOR)
NOTE WRS 169831 AND 191627 RECENTLY REBUILT Vill VALVE AND REPACKED VALVE ON 910118 AND 910119 RESPECTIVELY TAG HUNG ON P6 CONNECTOR RX BLDG ELEV 261 NORTH HCU BANK PLEASE INVESTIGATE AND REPAIR SOURCE OF NITROGEN LEAK ON HCU14-07 Vill VALVE WAS RECENTLY REPLACED VIA WR 168423 ON 910108.SUSPECT P6 N2 FILL CONNECTION.
TAG HUNG ON P6 CONNECTOR ON HCU RX BLDG ELEV 261 SOUTH HCU BANK TIGHTENED GREASE FITTING INBOARD AND OUTBOARD SEAL REBUILT REMOVED OLD WELD BY GRINDING HAS NDE DO A PT THEN REPAIRED USING WPS 1-1-BA-101-ALL WORK DONE BY ATTACHMENT 2 ASHE SECTION XI WORK PLAN REBUILT HECH SEAL AND INSTALLED NEW BEARINGS AND OIL SEAL REPLACED PACKING ON NO 1 CYL BACK FLUSHED UNIT COILS REMOVED CLEANED AND INSTALLED P6 CONNECTION REMOVED AND CLEANED P6 CONNFCTOR REHOVED AND CLEANED P6 CONNECTOR
'h t 13:44:36 i-13-92 CLASS I WORK-H ttANICAL MAINTENANCE 1991 PAGE11 WR NUMBER EPN thUMBER FAILURE DESC CORRECTIVE ACTION W177165 W1 77196 W177244 W177260 W177266'W17 742 8 W177603 W177604 W17 8801 W178817 SWP-2SWP¹V20 1A RDS-2RDS¹HCU 3851 HVR-2HVR¹AOD 10A HSS-2MSS¹PSV 120 SWP RHS"2SWP¹CAB 146B PCB-2PCB¹DRA 5 SWP-2SWP¹P1E S WP-25 WP¹P 1F RDS-2RDS¹HCU 2611 RDS-2RDS¹HCU 5051 REHOVE INTERNALS FROH CHECK VALVE RUN SYSTEHI CHECK FOR PROPER FLO'W PRESSURE REWORK REPLACE INTERNALS AS REQD (TROUBLESHOOT)
CRD HYDRAULIC CONTROL UNIT-HCU-38-51 NITROGEN SECTION LEAKS SUCH THAT ACCUHULATOR REQUIRES REPEAT CHARGINGS ON A DAILY BASIS.PLEASE INVESTIGATE AND TROUBLESHOOT SOURCE OF LEAK EG P6 CONNECTOR VI I I VALVE ETC.NOTE WR191619 RECENTLY COMPLETED ON 1-09-91 REPLACED VI I I VALVE PACKING HOWEVER HCU STILL REQUIRES REPEAT CHARGINGS TAG HUNG ON P6 CONNECTOR ON HCU RB 261 AIR IS LEAKING FROM THE BODIES OF BOTH ACTUATORS ON THIS DAHPER.INSTALL AND REHOVE GAGGING DEVICES ON THE HAIN STEAH SAFETY REL IEF VALVES AS DIRECTED BY N2-ISI-RPV-RQ002 AND N2-HHP-HSS-029 SAHPLE PUHP IS RUNNING HOT-REPLACE BEARINGS AS NECESSARY.
TAG LOCATED ON SKID TB 250 SOUTHWEST SERVICE WATER BAY (ALSO TROUBLESHOOT FLOW SWITCH)EXCESS EXPOSURE EXPENDED REHOVING AND RE INSTALLING STRONGBACKS AT POWER.INSTALL STRONGBACKS AND LEAVE IN PLACE EXCESSIVE LEAKAGE O>,'NBOARD AND OUTBOARD PACKING t.OUSINGS Of PUHP 2SWP¹P1E ADJUST ADD OR REPLACE PACKING AS NECESSARY.
LOCATION-SW 244 ELEV LINE K COL 8.20 TAG ON EYE BOLT ON PUMP CASING EXCESSIVE LEAKAGE ON INBOARD PACKING HOUSING ON PUHP 2SWP¹P1F.ADJUST ADO OR REPLACE PACKING AS NECESSARY.
LOCATION-SW 224 ELEV LINE L COL 8.20.TAG ATTACHED TO EYE BOLT ON PUHP CASING FITTING ON THE P6 CONNECTION LEAKS NITROGEN.REPAIR OR REPLACED AS NECESSARY LOCATED 261 RX BLDG SOUTH TAG HUNG AT HCU.MALE FITTING P6 ON FRONT OF CHARGING BLOCK ON HCU 50-51 LEAKS BY THREADS-TO BLOCK-NOT CAP-NEEDS LEAK LOCK APPLIED AND REPLACED AND TORQUED.TOOK VALVE INTERNALS OUT FOR FLOW TEST REHOVED OLD P6 CONNECTOR CLEANED AND INSTALLED NEW'ITTING REPLACED BAD STOP SCREW WASHER WITH NEW ONE INSTALLED GAGS ON PSV'S-ALL BUT 127 PUMP HOTOR WERE REPLACED BY HOD 90-044 DURING OUTAGE NO WORK REQD BY HA INT WE INSTALLED THE STRONG BACKS"i!THE PERSONAL DOOR NEW PACKING INSTALLED<3 RINGS ON EACH SIDE OF PUHP ADJUSTED PACKING REMOVED AND CLEANED P6 CONNECTOR REMOVED AND CLEANED P6 CONNECTOR l'l i.1 I 1 13:44:36~-13-92 CLASS I'WORK-ANI CAL HAINTENANCE 1991 PAGE12 MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION M1 78890 M1 78901 M178917 M178922 M178929 W178930 W179133 M179162 W179264 W179265 RDS-ZRDSoSOV 120(2655)HVP-ZHVPNFN1 A CSL-ZCSLAPZ CSL-ZCSL4 H2 SFC"2SFC-PSS T512A3 SFC-2SFC-PSS T573A3 E JS-ZE JS4 US1-5D CSH-ZCSHeH1 SWP-ZSWPAV1A SMP-ZSWPAV1B PLUG ON SOLENOID BLOCK IS LEAKING MATER-SOV120-PLEASE REPAIR.TAG AT HCV26-55 CONTROL BLDG DIV 1 DIESEL ROOH GUARD OVER FRONT OF FAN IS HISSING CLIPS ALONG WITH BOLTS HOLDING THEH ON.PLEASE REPLACE REBUILD PUHP SERIAL N7738980 ALSO DUE ECDCR C93028A ATTACHED-2 REHOVED FROM ZCSLAPZ LOCATION ON WR 148659.PUHP MAS EXPERIENCING INCREASING VIBRATION AND DATA INDICATOR BAD BEARINGS.PUHP TO BECOHE SPARE FOR ZCSLAPZ ZCSHAPZ ZRHSAPZ AND ZICSPZ REFERENCE WAREHOUSE SYHBOL NUHBER 92-18-401.
ASHE BASE N7738980-5 RETURNED TO HATERIALS HANAGEHENT AS SPARE UNDER SYMBOL 92"18-401.
BASE TO BE STORED SEPARATELY UNDER NEM 89 SERIES SYHBOL.RX ELEVATION 175 LPCS ROOH HOTOR EQUIPPED WITH TWO DIFFERENT BOLTING HATERIAL TYPES REQUIRING DIFFERENT TORQUE VALVES.REPLACE HOLD DO'WN BOLTS WITH NEM BOLTS OF ORIGINAL SAHE TYPE.SC ELEVATION 298 SFC PUHP ROOH A INSTALL PAD EYES FOR REHOVAL ZSFCAV256A HV6A AND PUHP'WORK PER EDC 2F00100 TO BE WORKED WITH MR 178930 SC ELEVATION 299 SFC PUHP ROON"A" INSTALL PAD EYES FOR REHOVAL OF ZSFC4V256A AND PUHP WORK PER EDC 2F00100.TO BE WORKED WITH MR 178929 INTERNAL LOCK OUT BRACKET IS HISSING REPLACE THE OIL RESERVOIR SIGHT GLASS 0"RINGS AT THE FIRST HAINTENANCE OPPORTUNITY FOR THE HIGH PRESSURE CORE SPRAY PUHP HOTOR (GE SIL 484)WHEN PERFORHING PH ON STRAINER 4A REMOVE AND INSPECT CHECK VALVE V1A FOR ANY DAHAGE IF ANY DAHAGE REPAIR EDC ZF00072 WHEN PERFORHING PH ON STRAINER 4B REHOVE AND INSPECT CHECK VALVE V18 FOR ANY DAHAGE IF ANY DAHAGE REPAIR REHOVED OLD FILTER AND INSTALLED NEW FILTER REPLACED CLIPS DISASSEHBLEDI CLEANED AND REBUILT PUHP~PUHP STORED IN HAINT DIRTY SHOP HATERIAL RETURN 005548 INSTALLED NE'W HOTOR BOLTS WELD PAD EYES FOR REHOVAL OF PUHP PARTS AND VALVE PARTS.TAG NOT FOUND MELDED PD EYES FOR REMOVAL AND INSTALLATION OF PUHP CASING AND INTERNALS AND VALVE INTERNALS FABRICATED NE'W BRACKET PER REF 3213 HADE NEW PART)PLUG PER PRINT-SHOP'WORK INSTALLED NEM PINS AND DISC PACK AND RUBBER GASKETS REPLACE SHIH PACK ON VALVE
,~
13-44-36-13-92 CLASS I WORK-.ANICAL HAINTENANCE 1991 PAGE13'MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W179266 W179268 W179285'M179306 W179307 W179313 W179345 W179364 W179370 W1 79371 SWP-2SWP¹V1D S'WP-2SWP¹V1F ZZZ-NOCOHPID EGS-2EGS¹EG1 EGS-2EGS¹EG3 EGA"2EGA¹STR 1 WCS-2WCS-PSS T1006A3 SFC-2SFC¹AOV 19B RHS-2RHS¹AOV 16C PCB-2PCB¹DRA 9 WHEN PERFORHING PH STRAINER 4D REHOVE AND INSPECT CHECK VALVE V1D FOR ANY DAHAGE IF ANY DAHAGE REPAIR WHEN PERFORHING PH ON STRAINER 4F REHOVE AND INSPECT CHECK VALVE VIF FOR ANY DAHAGE IF ANY DAHAGE REPAIR FUNCTIONAL TEST 50 SNUBBERS PURCHASED FROH GRINNEL CORPORATION TEST REQUIRED TO USE AS SPARES DURING 1990 REFUEL OUTAGE CHECK TORQUE ON TURBO SUPPORT BOLTS PER PR7956 SEE ATTACHED SHEET FOR FURTHER DIRECTION LOCATION DG ROOH.CHECK TORQUE ON TURBO SUPPORT BOLTS PER PR7956.SEE ATTACHED SHEET FOR FURTHER DIRECTION.
LOCATION DIV 11 DIESEL ROOH.2EGA¹STR1 IS CROSS THREADED.PLUG IS JAHHED AND CANNOT BE REHOVED TO INSPECT STRAINER ELEHENT PLEASE REPAIR A STRUT ON BZ-74XY-2 INTERFERES MITH TORQUING STUDS ON VALVES 2WCS-FV16A AND 2WCS-AOV27A.
REHOVE AND REINSTALL UPON COHPLETION OF VALVE WORK SC EL 310 PACKING FOLLOWER CANNOT BE TIGHTENED DUE TO INTERFERENCE.
HODIFY HOUNTING BRACKET PER PR 09224 DISPOSITION.
PACKING IS LEAKING TAKE UP ON PACKING REPLACE TMO SET SCREWS ON COUPLING ON INSIDE DOOR.EXISTING ONES ARE ROUNDED HAKING THEH DIFFICULT TO REHOVE.REHOVED VALVE INSPECTED BLUED SEAT OK.VALVE WORK FREELY REINSTALLED REPLACE LAHINATED DISC SEAL SNUBBERS TESTED SAT.ALL SNUBBERS ENTERED INTO SPARE PARTS DOCUHENTATION AND TEST RECORD WITH PO AT HATERIALS HGNT.CHECKED TORQUE ON TURBO SUPPORT CHECKED TORQUE TO SOFT LBS TORQUE WRENCH 22-1044 DUE 910711 THIS STRAINER WAS DISASSEHBLED AND REASSEHBLED DURING SURVEILLANCE IN OCTOBER OF 1990 REHOVED PIPE CLAMP AND STRUT REPLACED CLAHP AND STRUT REQUIRED USE OF NEM RETAINING RING~LOST DURING DISASSEHBLY.
NEM PIPE CLAHP INSTALLED READJUSTED PACKING FOLLOWER WITH 3/8 INCH DRIVE 11/16 INCH DEEP MELL THIN WALL SOCKET NO HODIF ICATION TO HOUNTING BRACKET REQUIRED.MRENCH WIRED TO VALVE.PLENTY OF TAKEUP LEFT ON FOLLOWER NEW PACKING INSTALLED ON INDICATOR SIDE REHOVED OLD SET SCREWS AND INSTALLED NEW ONES II I'4 ig (1 I II 13:44 36-13-92 CLASS I WORK-ANICAL MAINTENANCE 1991 PAGE14 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W179373 W179380'W179425 W180265'W182613 SWP-2SWPAV26 0 PCB-2PCBDRA 9 CEC-NOCOHP IO BLDG-NOCOHPI D RDS-NOCOHPID HANDWHEEL IS NOT ATTACHED TO VENT VALVE-V26D" ON 2SWPAP1D.STEH NUT IS MISSING EL 225 NORTH SERVICE WATER BAY INSTALL AND REHOVE STRONGBACKS FOR LEAK RATE TEST LOCATION PRI CONT ELEV 261 VERTICAL LOCKING BARS HISSING FROH CONTROL AND RELAY ROOH CABINET DOORS FOR 2CEC4PNL631 2CECAPNL899 AND 2SVV4'IPNL140 REHOVEABLE W8X48 BEAM AND GRATING THAT WAS REHOVED TO HOVE HATERIALS TO-FROH ELEV 240 DURING OUTAGE LOCATION SEC.SONT EL 261 190 DEGREES AZ-REF ES-53D.PLEASE REBUILD CRDH SERIAL NUHBER A4341 REHOVED FROM POSITION 2ROS4CROH1419 VIA WR 184408 INCLUDE GROUP 12 CRDM UPGRADE DURING REBUILD STORE DRIVE AS SPARE AFTER REBUILD DRIVE LOCATED IN CRD REBUILD ROOH S.C.ELEV 289 WE INSTALLED A NEW HANDWMEEL NUT INSTALLED STRONG BACKS AFTER TEST WAS COHPLETED REMOVED STRONG BACKS 2 NEW ROD HADE BY HAINT PER PRINT 209A5414 REINSTALLED BEAM AND FLOOR GRATING FOR HOIST WELL BOLTING A325 AND TIGHTENED 1/2 TURN AFTER CONTACT REPLACED PARTS AS NOTED IN ATTACHED PROCEDURE N2-HHP-ROS-652
'W182614 RDS-NOCOMP ID PLEASE REBUILD CROM SERIAL NUHBER A501?REMOVED FROH POSITION 2RDSCRDH4619 VIA WR 184410 INCLUDE GROUP 12 CROH UPGRADE DURING REBUILD.STORE DRIVE AS SPARE AFTER REBUILD.DRIVE LOCATEO IN CRO REBUILD ROOH S C.ELEV 289 REPLACED PARTS AS NOTED IN ATTACHED PROCEDURE N2-HHP-RDS-652 REV 1 W182615 W182617 W18 2619 RDS-NOCOMP ID ROS-NOCOHPID RDS-NOCOHPID PLEASE REBUILD CRDM SERIAL NUHBER A3979 REHOVED FROH POSITION 2RDS4ICRDH1455 VIA WR 183237.INCLUDE GROUP 12 CRDH UPGRADE DURING REBUILD.STORE DRIVE AS A SPARE AFTER REBUILD~DRIVE LOCATED IN CRD REBUILD ROOH S.C.ELEV 289 PLEASE REBUILD CRDM SERIAL NUMBER A4113 REMOVED FROH POSITION 2RDSNCRDM0223 VIA WR 184404 INCLUDE GROUP 12 CRDH UPGRADE DURING REBUILD STORE DRIVE AS SPARE AFTER REBUILD DRIVE LOCATED IN CRO REBUILD ROOH S C ELEV 289 PLEASE REBUILD CROH SERIAL NUMBER 5067 REHOVED FROH POSITION 2ROSACRDH0643 VIA WR 183240 STORE DRIVE FOR FUTURE DISPENSATION AFTER REBUILD THIS CRDH IS A GROUP 4 OR 761E387G004 VINTAGE DRIVE LOCATEO IN CRD REBUILD ROOH S.C ELEV 289.DO NOT GROUP 12 UPGRADE DURING REBUILD.REPLACED PARTS AS NOTED IN ATTACHED PROCEDURE N2-MMP-RDS-652 REV 1 REPLACED PARTS AS NOTED IN ATTACHHENT PROCEDURE N2-HHP-RDS-652 REV 1 RFPLACED PARTS AS NOTED IN ATTACHED PROCEDURE N2"HHP-RDS-652 REV 1
~I K 13:44:36-13-92 CLASS I WORK-ANICAL HAINTENANCE 1991 PAGE15 WR NUHBER EPN NUMBER FAILURE DESC CORRECTIVE ACTION M182620 M182933 W182996 M1 83069 M1 83082 M183088 W183128 M183129 W183130 M183182'W183370\RDS-NOCOHPID HSS-2HSSAPSV 137 HSS-2HSS4SOV 7C-1 SMP-2-SWP.-OO 4"83-3 SMP-2SMPAIP1A PCB-2PCB4 DRA 3 n I AS-2 I ASS PSE 146 ICS-2ICS4PSE 117 I CS-2 I CSAPSE 118 SWP-2SMP4STR 4C SFC-2SFCAP18 PLEASE REBUILD CRDH SERIAL NUHBER 5465 REHOVED FROH POSITION 2RDS4'CROH4647 VIA WR 183235 STORE DRIVE FOR FUTURE DISPENSATION AFTER REBUILD THIS CRDH IS A GROUP 4 OR 761E387G004 VINTAGE DRIVE LOCATEO IN CRO REBUILD ROOH S C ELEV 289 DO NOT GROUP 12 UPGRADE DURING REBUILD INSTALL SPECIAL AIR VALVE ASSEHBLIES (SPECIAL TOOL F8531-8)TO THE EXHAUST PORTS OF THE SOLENOID VALVES AIR SUPPLY LINE AT SOV LEAKS HAIN STEAH TUNNEL INSTALL PRESSURE TAP ON DISCHARGE SIDE OF PUHPS 2SMPAP2A ALSO INSTALL ISOLATION VALVES 2SMPAV1107 AND REQUIRED PIPE ALL PER SDC SC2-0037-90 REPACK OR-AOD PACKING TO PUMP MATER SPRAYING ALL OVER ALSO CHECK OIL ON BEARINGS TO HAKE SURE THERE ISN'T ANY WATER IN OIL DISASSEHBLE OB THRUST BRNG INSPECT REPAIR REPLACE AS REQO REHOVE HATCH-REINSTALL AFTER CRO WORK COHPLETE RUPTURE DISC TO EXTEND SERVICE DATE REPLACE RUPTURE DISC DUE TO POTENTIALLY EXPIRED SERVICE LIFE REPLACE RUPTURE DISC DUE TO POTENTIALLY EXPIRED SERVICE LIFE REHOVE TEHP HOD 91-013 FROH 2SMP4STR4C AT NEXT STRAINER HAINTENANCE OUTAGE REPLACE STRAINER ELEHENT DI V I SMP PUHP BAY THE OUTBOARD BEARING OF 2SFCAP1B IS OPERATING APPROX.10 DEG.HOTTER THAN CP1A OUTBOARD BEARING INSPECT 4P18 PUHP OUTBOARD BEARING AND CHECK FOR MEAR AND PROPER CLEARANCE REPLACED PARTS AS NOTED IN ATTACHED PROCEDURE N2-HHP-RDS-652 REV 1 INSTALLED ALL AIR RESTRICTORS ON PSV REPLACED TEE AT SOV PER EDC-2H10325 PUT LINE TAP IN PLACE OF BLANK TAP ON DISCHARGE.
SIDE OF 2SMPLP2A REPACKED PUHP FROH LANTERN RING OUT (COULD NOT GET LANTERN RING OUT).FOUND WATER IN BEARINGS ON OUTBOARD SIDE-REPLACED OUTBOARD BEARING LOOSENED NUTS)OPENED HATCH-FLANGE-PROTECTOR INSTALLED'NSTALLED HATCH TORQUED TO 65 FT LBS.0"RINGS WERE IN GOOD CONDITION REPLACED DISC NE'W RUPTURE DISC INSTALLED NEW RUPTURE DISC INSTALLED REHOVEO TEHP HOD AND REINSTALLED NEM BASKETS REHOVED INBOARD AND OUTBOARD BEARINGS REPLACED ORINGS ON INBOARD ANO OUTBOARD b t lO l lg C t zl 13:44.36-13-92 CLASS I WORK-ANICAL HAINTENANCE 1991 PAGE16 MR NUHBER EPN NUHBER FAILURE DESC CORRECT I VE ACTION W184542 M184674'M184808 W184 825 M1 84836'M184869 W184876 W184901 M184923 W1 84980 EGS-2EGS4EG3 I AS-21AS4 V16 11 RDS-2RDS4HCU 4627 SMP-2SWP4'V24 OA ICS-2 ICS4'T1 SMP-2SMP4 P2A HVK-2HVK4CHL 1B SPR-2SPRCSHL D39P ICS-2ICSAT1 CSH-2CSHAPRR 003A REPLACE PNEUHATIC CYLINDER-FUEL RACK POSITIONER SHOMS EVIDENCE OF HATERIAL WEAR ON CYLINDER SHAFT COOPER-BESSEHER PART NO.Z32-4-3-ill.
SEE JOE SAVOCA/KEENO LAHPHAND ABOVE NAHEO VALVE WILL NOT HOLD PRESSURE 249 OW AT HSIV6C HYDRAULIC CONTROL UNIT LEAKS NITROGEN OUT P6 CONNECTION.
REPAIR AS NECESSARY HCU LOCATED REACTOR BLDG ELEVATION 261 NORTH DID NOT SHUT WITH REVERSE FLOW APPLIEDIPLEASE REPAIR VALVE TAG CB 261 OIV I CHILLER (HVR)ROON REPLACE CRACKED COUPLING AND SHORT NIPPLE LINE 4 OIL LINE ON TOP OF OIL PUHP.LINE IS HARKED MITH GREY TAPE WITH 4 ON IT CRACK IS FROM ELBOW TO PUHP RELEASED LEAKAGE PUHP INBOARD BEARING LEAKS OIL.TROUBLESHOOT AND REPAIR LOCATED IN CONTROL BLDG ELEVATION 261 IN CHILLER ROOH DEFICIENCY TAG 26535 BOTH LUBE OIL FILTERS NEEDS REPLACEHENT OIL PRESSURE IS LOM WITH FILTER ON LINE.TAG HUNG ON LEFT LUBE OIL FILTER OF 2HVKACHL18 IN CONTROL BLDG 261 PENETRATION Z74 (AZ 223 DEG.EL 295)NEEDS TO BE OPENED TO SUPPORT NDE AND MELD OVERLAY ACTIVITIES SEE ORGS NO EV-187B AND 003 040 040-3808 TACK MELDS ON RAD SHIELD NEED TO BE CUT AND FLANGE NEEDS TO BE REHOVED.THIS MR TO DO RESTORATION ALSO OVERSPEED TR IP DFV'ICE DOES NOT TRIP AS REQD.INVESTIGATE AND REPAIR.LOC 175 EL RX BLDG RCIC TURBINE ROOH REHOVE PIPE MHIP RESTRAINTS TO SUPPORT INSPECTION OF MELDS ON LINE 2-CSH-010-27-1 AND REINSTALL POST INSPECTION DWG EV-89A LOC PC AX 240 DEG.EL 308 WE INSTALLED NEW PISTON 0-RINGS'SPRING AND SHAFT ALONG WITH NEW END CAPS ME INSTALLED A NEM VALVE REHOVED P-6 CONNECTOR)
CLEANED AND INSTALLED NEW FITTING CLEANED VALVE INTERNALS-SWING CHECK VALVE WAS STUCK IN THE OPEN POSITION WHEN VALVE WAS DISASSEHBLED COUPLING LOOSE REPLACED BEARINGS SEALS SHAFT SLEEVE REPLACED OIL FILTERS AND ADDED APPROX 4 GALLONS OF OIL PLACED FLANGE BACK ON PENETRATION WITH NE'M ORINGS.TIGHTENED BOLTS READJUSTED OVERSPEED TRIP HECHANISH RESTRAINTS REHOVED
13:44:36"13-92 CLASS I WORK NICAL HAINTENANCE 1991\PAGE17 WR NUHBER EPN NUMBER FAILURE DESC CORRECTIVE ACTION W187509 ICS-2 ICS4 Tl THE TERRY TURBINE LUBE OIL SYSTEH IS CONTAHINATED WITH'MATER (HILKY)CHANGEOUT LUBE OIL AND CHANGE FILTER CHANGED OUT CONTAHINATED OIL AND REPLACED FILTERS AND OIL USING HOBIL VAPORTER LIGHT OIL APPROXIHATELY 5 1/2 GALS'M187531 M187544 M187548 M18 7549 W187567 W187581 W187990 M189090 W189325 ROS-2RDSHCU 5011 CHS"2CHSSOV 26C ROS-2RDS4HCU 4623 IAS-2IASCV52 6 HVK-2HVKACHL 1A RDS-2RDS4V11 1(1823)PHS-R261-2 CSH-2CSHePRR 0038 SWP-2SMPCP18 2RDS4HCU5011 IS LEAKING FROH THE CHARGING BLOCK NIPPLE PLEASE TIGHTEN-REDOPE NIPPLE 2CHSOSOV26C
-SURVEILLANCE TEST N2-OSP-CHS-R001 SUCT 7 3.109-IT WOULD NOT HOLD ANY PRESSURE WHEN CLOSED AND LINE ISOLATED DOWNSTREAH.
LOCATED RX BLDG EL 215 AZ 117.2RDS HCU 46-23 HAS A LEAK NEEDS TO BE CHANGED ABOUT ONCE A DAY PLEASE INVESTIGATE~
HCU 46-23 LOCATED ON NORTH SIDE.WORK'WITH WR 176813 TAG HUNG AT HCU.ALSO REPAIR P6 FILL CONNECTION VALVE WILL NOT CHECK FLOW MHEN TESTED PER N2-OSP-IAS-CS001.
TAG HUNG AT P601 PI CHILLER-A-TRIPS 30 SEC~S AFTER START ON HIGH REF PRESS CHILLER SHOULD REHAIN ON LINE TO ACCEPT LOAD.TROUBLESHOOT AS NEEDED 2RDS-V111 LEAKS NITROGEN WHEN TAKEN OFF ITS BACKSEAT.PLEASE REPAIR LOCATEO RX 261 SOUTH TAG LOCATED ON Vill ON HCU 18-23 ELECTRIC LATCH REQUIRED REPLACEHENT RB ELEVATION 261 REHOVE AND REINSTALL PIPE RESTRAINT 2CSHoPRR003B (DETAIL ATTACHED)IN SUPPORT OF HPCS NOZZLE OVERLAY PREPARATION OUTBOARD BEARING IS LEAKING OIL EXCESSIVELY LEAKING TO POSSIBLE PUHP BEARING DAHAGE.PLEASE FIX AS SOON AS POSSIBLE REHOVED ANO CLEANED P6 CONNECTION AND REINSTALLED REPLACED INTERNAL PARTS ON VALVE REPLACED PACKING AND 0-RINGS AFTER HECHANICALLY AGITATING VALVE-VALVE CHECKED AND SEATED AS REQD PURGED UNIT TO GET AIR PRESSURE BELD'W 5 LBS.NEW PACKING AND ORINGS INSTALLED ON SPARE VALVEl THIS MORK WAS COHPLETED ON MR 169834 GROUND OFF OLD PLATE AND WELDED NEM PLATE ON RESTRAINT WAS NOT REHOVED NO WORK REQUIRED'NSPECTION COULD BE DONE WITH RESTRAINT IN PLACE REPLACED THRUST BEARING 93-78-283 AND REPLACED 0 RING 93-20-503 i'1~PP J 13:44-36-13"92 CLASS I'WORK-ANICAL HAINTENANCE 1991 PAGE18 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W189587 W189636 W189661 SWP-2SWPAP1D HVY-2HVY0UC2 C SWP-2SWPAV1C 2SWP4P1D OUTER PUHP BEARING OVERHEATING TO EXTREHELY HIGH TEHPS AS HIGH AS 250 DEGREES F BY SURFACE PYROHETER INVESTIGATE AND REPAIR HACHINE REPLACEHENT SLEEVE BEARINGS TO ACCEPT THE APPROPRIATE THERHOCOUPLE PROBES HACHINE THE BROKEN VIBRATION DETECTOR STUD FROH THE OUTBOARD BEARING CAP REPAIR BY SPRAY HETALIZING THE 08 BEARING AREA OF USED SHAFT FROH 2SWP4 P18 PER EDC 2F00239 FOR REPLACEHENT IN 2SWP4 P10 2HVYAUC2C WENT INTO HOTOR OVERLOAD TROUBLESHOOT AND REPAIR OR REPLACE PARTS AS NECESSARY TAG ON 2CECAPNL870 NEXT TO CONTROL SWITCH CHECK VLV APPARENTLY NOT SEATING WHEN PUMP IS SECURED AS INDICATED BY LACK OF WATER OUT VENT ON STRAINER 4C~THIS DESPITE RECENT HODIFICATION PURSUANT TO EDC 2F000708-WR 176272 REBUILT REPLACED PARTS AS REDO PUMP COHPONENT DEGRADATION DUE TO NORHAL EROSION RECONNECTED FAN TO MOTOR REPLACED CHECK VALVE INTERNALS REPLACED CHECK VALVE INTERNALS NOTE: VALVE INTERNALS CONSIST OF-DISK WHICH'WAS REPLACED USING ASHE TRAVELERs BEARINGS DISK SEAL AND REDOWELED.
REDOWELED TO EDC 2F00293 W189735 SLS-2SLSAP18 SLSAP18 PISTON 3 LEAKS PLEASE REPAIR REPLACED PLUNGER PACKING W189980 RCS-2RCSAP18 W190214 MMR-2HHR4 CRN 1 W190245 RDS-NOCOHP ID W190265 I CS" 2ICSx AOV 157 IRC NOTED THAT PUHP SHAFT INDICATORS WERE GIVING A HIGH VIBRATION READING.INVESTIGATE AND RESOLVE AS REQUIRED CHECK MOUNTING BRACKET SOCKET HEAD CAPSCREW TO ENSURE THEY ARE TORQUED TO A MINIMUH OF 15 FT RB EL 390 TROLLEY IS NOISY'WHEN OPERATING AND TRIPS THE BREAKER (BRAKE HAY NOT RELEASE COMPLETELY)
CRANE FAILS TO RESTART.TROUBLESHOOT TAG LOCATED AT BREAKER RB 289 NJS-U52 REBUILD SPAN VALVES IN SHOP AND RETURN TO INTERH STORAGE INDICATOR ARH ON 2ICSAAOV157 DOES NOT HOVE DURING VALVE STROKING.PLEASE REPAIR AS NECESSARY SDC SC2-0274-91.
HOUNTING BRACKET INSPECTION EVERYTHING OK VIBRATION DATA ANALYZED BY GE AT SAN JOSE-SEE ATTACHED REPORT"DECISION HADE TO OPERATE AND HONITOR ADJUSTED DREG ON TROLLEY BRAKE REBUILT 5 VALVES 910820IREBULT 5 VALVES 910821IREBUILT 6 VALVES 910822.REBUILT 3 VALVES 910823 CLEAN DISC REPLAC ACTUATOR ANO INDICATION SHAFTS REPLACE ALL PACKING I'l I<<~II l 13:44:36-13-92 CLASS I WORK-NICAL HAINTENANCE 1991 PAGE19 WR NUHBER EPN NUMBER FAILURE DESC CORRECTIVE ACTION W1 90406 W190429 W190437 W190457 W190490'W190493 W190531 W1 90647 W190652'W190653 PCB-2PCB4DRA 9 SWP-2SWPASTR 4C PCB-2PCBx DRA 5 MHR-2HHRACRN 1 RDS-2RDS4HCU 4647 HVR RMS-2HVR4 CAB 32A SWP-2SWPAH1C RDS-NOCOHPID RDS-NOCOHPID RDS-NOCOHPID RX BLDG EL 261 AZ-236 DEG INSTALL STRONGBACKS TO THE DOOR FRAHE IN PREPARATION FOR TESTING ONCE ENGINEERING DIRECTION IS RECEIVED ALARA CONCERN WHILE PERFORHING REHOVAL OF STRAINER ON N2-HPH-SWP-SA513 4 STRAINER ELEHENTS'WERE DAHAGED REHOVE DAHAGED ELEHENTS AND INSTALL 4 BLANKS PER TEMP HOD 91-013.HACHINE PLUGS PER EDC REMOVE TEST CLAMPS ON INNER DOOR TO GAIN ACCESS TO DRYWELL FOR INSPECTION HAINT REINSTALL WHEN WORK IS COHPLETE AND INSPECTIONS ARE COHPLETE BROKEN BOLT ON FALK COUPLING BRIDGE DRIVE-OPP CAB END ON POLAR CRANE 353 RX BLDG.P6 CONNECTION IS LEAKING-LOCATED RX BLDG 261 NORTH TAG AT HCU 46"47 PUHP REHOVED ON'W165487 NEEDS TO BE REBUILT PUHP LOCATED IN HECH HAINT DIRTY SHOP REPAIR HOTOR CVR SCREENS PER EOC 2F00288 DISCOVERED DURING PERF.OF N2-EPH-GEN-R550 PLEASE REBUILD CRDH SERIAL NUHBER A5128 REHOVED FROH POSITION 2RDSC CROM 4259 VIA'WR 183227 INCLUDE GROUP 12 CROH UPGRADE DURING REBUILD STORE DRIVE AS SPARE AFTER REBUILD DRIVE LOCATED IN CRD REBUILD ROOH 5 C ELEV 289 PLEASE REBUILD CRDH SERIAL NUHBER A4102 REHOVEO FROH POSITION 2RDSACRDH2247 VIA WR 183232 INCLUDE GROUP 12 CRDH UPGRADE DURING REBUILD STORE DRIVE AS SPARE AFTER REBUILD DRIVE LOCATED IN CRD REBUILD ROOH S C.ELEV 289 PLEASE REBUILD CRDH SERIAL NUHBER A4834 REHOVED FROM POSITION 2RDSCCRDH5431 VIA WR 183268 INCLUDE GROUP 12 CROM UPGRADE DURING REBUILD STORE DRIVE AS SPARE AFTER REBUILD DRIVE LOCATED IN CRD REBUILD ROOH S.C.ELEV 289 REINSTALLED STRONGBACK LUBRICATED BOLTS TORQUED TO 280 FT LBS'WE INSTALLED 4 BLANK ELEMENTS PER TEHP MOO 91-013 INSTALLED THE INTERLOCKS 910409.OPENED SHIELD DOOR 910331 CLOSED DOORS 910409 PUT A NEW BOLT IN PLACE OF OLD ONE REHOVED AND CLEANED P6 CONNECTOR PUHP CANNOT BE REBUILTINO WORK REQD BUILT WASHERS IN SHOP REPLACED PARTS AS NOTED IN ATTACHED PROCEDURE N2-HHP-RDS-652 REV 1 REPLACED PARTS AS NOTED IN ATTACHED PROCEDURE N2"HHPJ-RDS-65L REV 1 REPLACED PARTS AS NOTED IN ATTACHED PROCEDURE N2-HHP-RDS-652 REV 1 4 4'l 13:44:3 13-92 CLASS I WORK-NICAL HAINTENANCE 1991 PAGE20 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W190682 W190891 W190956 W190988'W191007 W1 91133 W191503 W191512 W191566 RDS-2RDS4V11 1(2611)I CS-2 I CS4'HYV 151 RDS-2RDSAHCU 1447 PCB-2PCB4DRA 5 RCS-NOCOHPID HVK-2HVKAV25 1 EGS-2EGS4IEG1 CSH-2CSHNHOV 110 HSS-2HSSAV37 2D HYDRAULIC CONTROL UNIT NITROGEN REQUIRES REPEAT CHARGINGS AT LEAST ON A DAILY BASIS PLEASE INVESTIGATE AND REPAIR AS NECESSARY SUSPECT V111 VALVE OR NITROGEN CHARGING CONNECTION LEAK.NOTE WR176443 REPLACED CHARGING CONNECTION ON 901108 TAG HUNG ON HCV26-11 V111 VALVE AT RB 261 SOUTH HCV BANK.RCIC TURBINE SPEED OR GOV VALVE HUNTING HAY BE CAUSED BY FRICTION IN THE REHOTE SERVO RECOHHEND REBUILD AS SOON AS POSSIBLE NOTIFY SYSTEH ENGINEER OF ANY CORROSION OR CRUD FOUND DURING 0 ISASSEHBLY 2RDS4'V111(1447)
JAS A STEH LEAK IN ALL POSITIONS EXCEPT BACKSEATED REPAIR OR REPLACE TEST FITTING FOR THE OUTER DOOR 10 LB TEST IS STRIPPED'EE ATTACHED DRAWING REASSEHBLE SPARE VALVE WHICH WAS USED AND DISASSEHBLED BY CBI FOR TRAINING PURPOSES REFERENCE WR 180226 FOR LOCATION OF PARTS PARTS LOCATED IN OLD PIPE FAB SHOP CONT BLDG 8 CHILLER RH 261 DRAIN VALVE 2HVKAV251 CANNOT BE FULLY OPEN DUE TO INTERFERENCE TAG HUNG AT HVKCV251 ABOUT 1 DROP SEC LUBE OIL LEAK ON THE DRAIN LINE BACK TO LUBE SUHP FROH THE TURBO-CHARGER 2CSHOHOV110 HAS PACKING LEAK'WHICH IS DRIPPING TO RB FLOOR EL 175~VALVE IS LOCATED IN RB EL 198 SOUTH SIDE.PLEASE INVESTIGATE AND REPAIR DURING THE PERFORHANCE OF N2-OSP-RPV-a001 PACKING LEAKAGE WAS NOTED AT 2HSSAV372D.
STEAH TUNNEL BACKING RING AND PACKING ON Vill VALVE PER ATTACHED HI REPLACED VALVE WITH NEW ONE VALVE TO BE REBUILT UNDER WR 190245 DRILLED AND-TAP THE EXISTING 1/8 INCH HOLE FOR 1/4 INCH NPT X 1/2 INCH DEEP WORK WAS DONE PER EDC 2F00422 REASSEHBLED VALVE BONNET TO CASING REPLACED VALVE OLD BODY SERIAL 8639'7-12-20 WITH NEW BODY AND INTERNALS SERIAL NO 86397-20-11 ASHE TAGS ARE ON NEW VALVE INSTALLED VALVE AT DIFFERENT POSITION TO ALLOW FULL OPENING OF VALVE INSPECTED ANO TIGHTENED FITTING TOOK UP ON PACKING ON VALVE TO STOP LEAK TORQUED PACKING FOLLOWER TO 28 FT LBS.PUT NEW PACKING INTO VALVE STUFFING BOX Vl<<l 4 QV 13:44-36-13-92 CLASS I WORK-H ANICAL MAINTENANCE 1991 PAGE21 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION'M191567 W1 91568'M191570 M191575 W191586 W191610'M191611'M191615'W191616 W19 1617 M191619 M191626 M191627 CSL-2CSLAHCV 117 RHS-2RHSCV20 9 SMP-2SMP4 STR 4D SWP-2SMPASTR 4E SMP-2SMP0RV8 48 RDS-2RDSAV11 1(0631)RDS"2RDSAV11 1(0627)RDS-2RDSAV11 1(3059)RDS-2RDS4 V11 1 (3451)RDS-2RDSAV11 1(3051)RDS-2RDSoV11 1(3851)RDS"2RDSAV11 1(5051)RDS-2RDSAV11 1(3815)VALVE LEAKS FROH THE PACKING OPS ADJUSTED THE PACKING UNTIL IT WAS TIGHT AND IT STILL LEAKS ADJUST AND REPACK AS NECESSARY VALVE LOCATED ON 306 DRYWELL DURING THE PERFORHANCE N2-OSP-RPV-9001 LEAKAGE WAS NOTED COHING FROH PIPE END OF 2RHSAV209 CAP TROUBLESHOOT EDGES ON VENTCOCK HAVE BECOHE ROUNDED HAKING REHOVAL DIFFICULTY REPLACE WITH NEll VENTCOCK 2SMPASTR4E 1/4 INCH VENTCOCK IS VERY'WORN AND HARD TO HANIPULATE NEEDS REPLACEHENT DIV I SMP PUHP BAY 1 2SWPARV84B RELIEF VALVE IS LEAKING BY TO DRAIN OFF 2HVRAUC4108 PLEASE INVESTIGATE AND REPAIR RB EL 240 V111 ON ACCUHULATOR 0631 LEAKS EXCESSIVELY WHEN VALVE IS CLOSED.PLEASE REPAIR OR REPLACE AS NECESSARY V111 ON ACCUHULATOR 06-27 LEAKS BY EXCESSIVELY WHEN VALVE IS CLOSED.PLEASE REPAIR OR REPLACE AS NECESSARY.
V-111 FOR ACCUH 30-59 LEAKS BY EXCESSIVELY MHILE CLOSED PLEASE REPLACE OR REPAIR AS NECESSARY V-111 LEAKS BY EXCESSIVELY WHEN CLOSED.PLEASE REPAIR OR REPLACE AS NECESSARY V-111 FOOTVALVE LEAKS NITROGEN TO ATHOSPHERE EXCESSIVELY
'MHEN CLOSED PLEASE REPAIR OR REPLACE AS NECESSARY.
V-111 FOOTVALVE FOR ACCUH 38-51 LEAKS EXCESSIVELY MHEN CLOSED.PLEASE REPLACE OR REPAIR AS NECESSARY V111 LEAKS BY IN EVERY POSITION BUT FULL OPEN LOCATED 261 RX BLDG NORTH SIDE TAG=HUNG ON VALVE V111 LEAKS BY IN EVERY POSITION BUT FULL OPEN LOCATED 261 RX BLDG NORTH SIDE TAG HUNG ON VALVE REPLACED WORN PACKING REPACKED WITH 7 RINGS TORQUEO BELLVILLE WASHERS TO 255 FT.LBS REHOVED PLUG CLEAN BOTH HALE AND FEHALE THREADS.RESCREWED FITTING BACK'WITH APPROVED HUB WE INSTALLED A NE'W VENTCOCK WE INSTALLED A NEW VENT COCK REPLACED VALVE WITH NEM)ALSO REBUILT OLD)RETURNED TO STORES FOR SPARE INSTALLED REBUILT VALVE INSTALLED REBUILT VALVE INSTALLED NEW PACKING INSTALLED NE'M PACKING INSTALLED NEW PACKING INSTALLED NEW PACKING INSTALLED NEW PACKING INSTALLED NE'W PACKING tI ,4 f 13:44:36 13-92 CLASS I WORK-NICAL MAINTENANCE 1991 PAGE22 WR NUMBER EPN NUMBER FAILURE DESC CORRECTIVE ACTION'W191629 W191630 W191631 W191632 W1 91633'W191634 W1 91636 W191637 W1 91668 W191711 W191712 W191838 W19 1852 W191853 W191887 RDS-2RDSAV11 1(1039)RDS-2ROS4V11 1(2239)ROS-2ROSAV11 1(2639)RDS-2RDSAV11 1(2231)RDS-2RDSA V11 1(3027)RDS-2RDSA V11 1(0219)RDS-2RDSAV11 1(3011)ROS-2ROSAV11 1(3003)SLS-25LSARV2 B GSN-2GSN4V73 B GSN-2GSNV72 A RDS-2RDSOHCU 1051 ROS-2RD54V11 1(4655)SWP-25WP4 P2A RDS-2RDSAV11 1(4647)VALVE LEAKS BY UNLESS IT'5 BACKSEATED.
LOCATED 261 RX BLDG.TAG IS HUNG ON VALVE VALVE LEAKS BY UNLESS ITS BACK SEATED LOCATED 261 RX BLDG.TAG IS HUNG ON THE VALVE VALVE LEAKS BY UNLESS IT'S BACKSEATEO LOCATED 261 RX BLDG.TAG IS HUNG ON VALVE VALVE LEAKS BY UNLESS IT'5 BACKSEATED LOCATED 261'X BLDG TAG 15 HUNG ON VALVE VALVE LEAKS BY UNLESS IT'S BACKSEATED.
LOCATED 261 RX BLDG.TAG IS HUNG ON VALVE VALVE LEAKS BY UNLESS IT'S BACKSEATED LOCATED 261 RX BLDG TAG IS HUNG ON VALVE VALVE LEAKS BY UNLESS IT'S BACKSEATED LOCATEO 261 RX BLDG.TAG IS HUNG ON VALVE VALVE LEAKS BY UNLESS IT'S BACKSEATED.
LOCATED 261 RX BLDG TAG 15 HUNG ON VALVE RELIEF VALVE IS LEAKING FROH TOP OF PRESSURE SETTING SCREW TAG HUNG ON VALVE RB 289 VALVE LEAKS NITROGEN OUT THE PACKING GLAND NEEDS TO BE ADJUSTED"PLEASE REPAIR AS NECESSARY VALVE IS MISSING A NUT ON THE HANDWHEEL PLEASE REPLACE AS NECESSARY LEAKS EXCESSIVELY-REPLACE 2RDS-Vill TO STOP LEAKAGE.RX 261 SOUTH HCU'S N2 CARTRIDGE V111 HAS PACKING LEAK PLEASE INVESTIGATE AND REPAIR RX EL 261 N.SIDE EXCESSIVE PACKING LEAKAGE.PLEASE REPLACE OR REPAIR AS NEEDED PACKING NEEDS TO BE ADJUSTEO-PLENTY OF TAKEUP.2RDS-V111 ON HCU 4647 LEAKS EXCESSIVELY REPAIR AND OR REPLACE Vill AND PG CHARGING CONNECTOR BACKING RING ANO PACKING ON Vill VALVE BACKING RING AND PACKING ON V111 VALVE REPLACED ORINGS REPLACED 0"RINGS-BACKING RING ANO PACKING ON Vill VALVE REPLACED 0-RINGS-BACKING RING AND PACKING ON V111 VALVE INSTALLED REBUILT VALVE REPLACED 0-RINGS-BACKING RING AND PACKING ON V111 VALVE REPLACED 0-RINGS-BACKING RING.AND PACKING ON V111 VALVE REPLACED 0-RINGS-BACKING RING AND PACKING ON V111 VALVE REPLACED CAP GASKETS 25 AND 27 ALSO REHOVED VALVE FROM LINE TO HAVE ICC RECALIBRATE VALVE REINSTALLED IN LINE ALL WORK COMPLETE ADJUSTED PACKING TO STOP LEAK REPLACED HISSING NUT WITH A NEW ONE-REPLACED VALVE.INSTALLED REBUILT VALVE REBUILD II I VAVLE REPLACE STUFFING BOX PACKING AND GLAND FOLLOWER PACKING WE INSTALLED NEW PACKING
~'U'I 13:44:36-13-92 CLASS I WORK-ANICAL HAINTENANCE 1991 PAGE23 MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W19 1889'M191901 M191902 W191920 W191969 M191985 W192803 W192826 W192831'M192833 W1 92834 RDS-2RDS4 HCU 2627 RDS-2RDSAV11 1(1855)RDS-2RDSAV1(4247)EGS-2EGSAEG3 FWS-2FWSOV19 A RHS" 2RHS4(V38 4 HVK-2HVKOCHL 1A HSS-2-HSS-75 0-263-2 EGO-2EGOORV2 61 PCB-2PCB4DRA 9 PCB"2PCBADRA 5 2RDS-V111 ON HCU 2627 LEAKS EXCESSIVELY REPAIR AND OR REPLACE V111 FOOT VALVE 111 ON HCU 1855 LEAKS EXCESSIVELY WHEN CLOSED PLEASE REPAIR OR REPLACE AS NECESSARY 2RDSAV1 ON HCU 4247 HAS A HISSING PLUG NEED A NEW PLUG DEF TAG 20781 ON VALVE LOCATED ELEVATION 275 ABOVE NORTH HCU'S TURNING GEAR COVER ON EG1 AND 3 ARE HISSING BOLTS AND EG3 FLYWHEEL COVER BOLTS ARE HISSING ALSO CONDUIT GROUND SCREW EG3 CONDUIT 2CK673NR REPLACE BOLTS AND SCREW 2FMSAV19A HAS A SHALL LEAK AT ITS BONNET TO BODY MELD WITHIN BOUNDARY OF N2-OSP-RPV-9001 2RHSAV384 HOV 80B HANUAL ISOLATION VALVE IS LEAKING APPROXIHATELY 20 DROPS PER HINUTE FROH THE PACKING RX BLDG 215 ELEVATION 8 SFC HEAT XCHANGER ROOH 20 FEET ABOVE FLOOR CHILLER FAILED TO START LO'M OIL BRAIDED FLEX HOSE HAS A BULGE IN IT REPLACE EL 277 PC REHOVE CLEAN AND BENCH TEST DISCHARGE RELIEF VALVE REPAIR ADJUST AS NECESSARY (SETTING 50 PSIG).REINSTALL MHEN TEST SAT LOCATED ON EGSAEG3 ON ELEV 261 IN DIESEL BLDG TAG ON VALVE RX BLDG 261 E2 236 DEG INSTALL STRONGBACKS TO THE DOOR FOR I&C TEST'NSTALL STRONGBACK ON DRYWELL PERSONNEL HATCH FOR I&CD TEST)LEAVE STRONGBACK ON AFTER TEST JUST LOOSEN BOLTS TO FINGER TIGHT BACKING RING AND PACKING ON Vill VALVE INSTALLED REBUILT VALVE REPLACED HISSING PLUGS WITH NEW PLUGS AND ORINGS REPLACED BOLTING 2 NEW BOLTS TOO LONG SHORTENED BOLTS FROH 1 1/2 INCH TO 1 1/4 INCHES GROUND OUT HOLE IN VALVE AND WELDED UP PINHOLE TO ELIHINATE LEAK REPACK VALVE ADDED OIL TO CHILLER AS IT'MAS-LOW AND WOULD TRIP ON LOW OIL PRESSURE REHOVED DAHAGE FLEX AND REWELDED NEECE FLEX IN PLACE OF OLD REHOVED RV FOR I&C TO RECALIBRATE STRONG BACKS INSTALLED AND TORQUED TEST COHPLETE AND STRONGBACKS LOOSENED TORQUED STRONGBACK FOR I&C TEST)LEFT FINGER TIGHT AFTER TEST I~1 f f(I 13:44:36 13-92 r CLASS I'WORK" NICAL HAINTENANCE 1991 PAGE24 MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACT ION M192864 M192865'W192907'M192973 W19 2992 W1 92998 W193006 M193040 W193041 PCB-ZPCBADRA 5 PHS-R261-9
~SWP-ZSMPAV24 OA HSS RPS LDS-ZHSSATS1 615C HVK-ZHVK0V32 7 HVK-ZHVK4CHL 18 RDS-ZRDSCHCU 3023 CSH-ZCSHAHOV 111 CSH"ZCSH4HOV 101 DISABLE INTERLOCKS TO ALLOW BOTH DOORS TO BE OPEN SIHULTANEOUSLY WHEN DIRECTED BY SSS USE THIS MR TO RESTORE BACK TO NORHAL (INTERLOCKS)
PER SSS ALSO REHOVE STRONGBACKS AND INSTALL'TRONGBACK TO NORHAL TO CLOSE DRYWELL AT END OF OUTAGE OPEN SHIELD DOORS AT PRIHARY CONTAINHENT EQUIP PERSONNEL HATCH IN THE UPCOHING HPCS OUTAGE FOR DRYMELL ACCESS.RETURN TO CLOSED POSITION AFTER OUTAGE THE ABOVE VALVE DOES NOT PREVENT FLO'M THROUGH THE LOOP WHEN CONDENSING
'MATER PUHP SHUTS DOWN ON HI SWP TEHPERATURE CAUSING ASSOCIATED CHILLER TO TRIP ON LOM SWP FLOW PLEASE REPAIR WHILE PERFORHING N2-ISP-LDS-H009 ATT 3 HSIV HALF ISOLATION CAHE IN 1 1/2 HINUTES AFTER HIGH ALARH REPLACE TEHP SWITCH ZHVKAV327 DOES NOT PASS REVERSE FLOW TEST PER N2-OSP-HVK-Q002 VLV LOCATED CB 261-8" CHILLER ROOM TAG AT VLVI FAILED PHT FOR WR 154694 WHILE PERFORHING N2-OSP-SMP"Q001 ATT 88-2 AS PHT FOR WR 193053 VALVE ZSWPAV2408 FAILED TO PASS THE REQUIRED FLO'M V2408 MAS 0ISASSEHBLED FOR WR 193053 AND NO CAUSE FOR LOM FLOM COULD BE FOUND SUSPECT SERVICE WATER SIDE OF ZHVKACHL18 IS FOULEO TROUBLESHOOT LOll FLOM CONDITIONS CLEAN FLUSH CHL18 AS NFCESSARY TAG HUNG ON CHL18 CONTROL BLDG 261 DIV II CHILLER ROOH THE P6 CONNECTION IS LEAKING WHERE'FITTING THREADS INTO INST BLOCK REPAIR LEAK PACKING LEAKAGE FROH HOV111 LOCATED 215 ELEV RB BEHIND HCC14 TAG LOCATED ON VALVE PACKING LEAKAGE LOCATED 175 FT~ELEV RB OUTSIDE CSH PUMP ROOM.TAG LOCATED ON VALVE INTERLOCKS DEFEATED TEST CLAHPS REHOVED INTERLOCK RESTORED.STRONG BNACK ON 910909 SHEID DOORS CLOSED AND SECURED OPENED SHIELD DOORSISHIELD DOORS CLOSED WE TOOK THE VALVE APART AND CLEANED ALL OF THE INTERNALS ALSO DID A BLUE CHECK AND GOT A 360 DEGREE.CONTACT INDICATION REPLACED RILEY TEHPERATURE'SWITCH WITH SPARE LOCATION E31-N624C PNL ZCEC4PNL609 CLEANED GLUED AND REINSTALLED CLEANED TUBES AND REPLACED GASKETS REHOVED P-6 CONNECTOR CLEANED AND INSTALLED NE'M FITTING PACKING WAS TAKEN UP BY USING A TORQUE'WRENCHIGLAND NUTS BROKE OR FIRST HOVED AT 22-25 FT LBS AND LEFT AT 35 FT LBS ADJUST PACKINGITOOKUP 4 FLATS-AS LEFT TORQUE 18 FT LBS "k~-
13:44:36 13-92 CLASS I WORK-NICAL HAINTENANCE 1991 PAGE25 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W193053 W19 3079 W193097'W193186 W193 209 W193288 W193375 W1 93414'W193544 W193617 W193622 SWP-2SWP4 V24 08 SWP-2SWPCV55 3D ICS-2ICSAAOV 131 SWP-2SWPAV16 48 SWP-2SWPCV57 1E HDS-RR261-1 ICS-2ICSAV53 EGA-NOCOHPID RDS-2RDSAHCU 4655 RDS-2RDSAHCU 1023 SWP-2SWP4STR 4D V2408 FAILS TO PASS SUFFICIENT FLOW IAW N2"OSP-SWP"Q001 ATT 88-2 REPAIR REPLACE 2SWPAV2408
~TAG LOCATED ON 2SWPAV2408 DIV II CHILLER VALVE CANNOT BE CLOSEDI APPARENTLY DUE TO EXCESSIVE RUST LOCATED ON UC 404D-RX BLDG 196 AZ 195 2ICS4AOV131 HAS A STEAH LEAK FROH PACKING AT THE RATE OF ONE PINT PER HINUTE VALVE LOCATED RB EL 188 AZ 172 DEG IN RCIC PUHP ROOH PLEASE INVESTIGATE AND REPAIR ADJUST TAG HUNG ON DOOR TO RCIC PUMP ROOH VALVE IS VERY HARD TO OPERATEI HAY NOT BE ABLE TO SHUT IF NEEDED HANDLE NUT IS HISSING REPLACE NUT AND FREE UP VALVE TAG LOCATED ON VALVE RX BLDG 175 IN RCIC ROOH LOWER UNIT CODER*VALVE IS HARD TO OPERATE AND HANDLE IS BENTIFREE UP VALVE AND REPAIR HANDLE TAG LOCATED ON VALVE RB 215 SOUTH BY HVR4UC407E I REPLACE VALVE BODY 2PHS-RR261-1 OUTER REACTOR TRACKBAY DOOR DRIVE CHAIN HAS BROKEN LINCH PIN DOOR FAILS TO OPEN ON COHHAND DUE TO BROKEN DRIVE CHAIN DOORS LOCATED REACTOR BUILDING TRACKBAY NORTH OUTER SET OF DOORS PACKING LEAKING ON 2ICS4V53 AT 3 DROPS PER SECOND VALVE LOCATED IN SDC TV ROOH RX 240 ELEVATION NO DEF TAG DUE TO ALARA THIS IS THE STEAM SUPPLY LINE TO RCIC TURBINE GUT ACCESS HOLES IN DIESEL GENERATOR ACCUHULATOR SKIDS FOR VISUAL INSPECTION
.SEE EDC 2F00358 WATER LEAKAGE FROH FLANGE CONNECTION ON THE TOP OF ACCUMULATOR P6 CONNECTION LEAKS LOCATED 261 RX BLDG SOUTH SIDE TAG HUNG AT HCU PACKING LEAKAGE BY STRAINER ROTOR IS RUNNING DOWN ON TO FANS AND OTHER ELECTRICAL EQUIPHENT.
LOCATED SCREENWELL EL 261 IN DIV II SWP BAY.PLEASE INVESTIGATE AND REPAIR TAG ON PNL CESS'PNL505 DISASSEMBLE VALVE CLEAN AND REINSTALL REHOVED OLD VALVE AND INSTALLED NEW VALVE BODY REPACKED VALVE REHOVED OLD VALVE ASSEHBLY AND INSTALLED NEW VALVE ASSEHBLY NEW VALVE BODY INSTALL'ED REPLACED LINKS REHOVED PACKING AND REPACKED WITH NEW ALL HOLES CUT PER EDC TORQUED PACKING TO 5 POUNDS ON THE ACCUHULATOR SIDE REHOVED AND CLEANED P6 CONNECTION INSTALLED P6 CONNECTION WE TIGHTENED UP ON THE PACKING lg ll, gi 13:44:36-13-92 CLASS I WORK-NICAL HAINTENANCE 1991 PAGE26.WR NUHBER EPN NUHBER FAILURE OESC CORRECTIVE ACTION W193623.W193692 W19 3731 W193732 W193748 W193750 W193751'W193752 W193790 W1 93843 SWP-2SWP4STR 4E RCS-2RCS4'HOV 10A RDS-2RDS4V11 1(3455)RDS-2RDS4'V11 1(4651)HVC-2HVC4UC1 07 SWP-2SWP4V20 1A SWP-25'WP4V20 18 SWP-2SWP4V80
.OA SWP-2SWPOV80 08 ICS-2 ICS-00 2-162-2 THE STRAINER HOTOR COUPLING IS NOT HADE UP TO THE STRAINER ROTOR COUPLINGI THEREFORE NO SELF CLEANING ACTION IS TAKING PLACE LOCATED SCREENWELL BLDG EL 261 IN THE DIV I SWP BAY PLEASE INVESTIGATE AND REPAIR TAG ON PNL CES4IPNL504 DURING A DRYWELL INSPECTION AT 100 PSIG KEN CIGLER AND BRIAN HOORE FOUND THE PACKING FOR 2RCSAHOV10A LEAKING ADJUST OR REPLACE PACKING AS NECESSARY DURING PERFORHANCE OF N2-ISP-RDS-R103 CARTRIDGE VALVE V111 LEAKED AT THE STEH'WHEN VALVE CLOSED HCU 34-55 (R708)VALVE DOES NOT LEAK IN NORHAL OPERATING OPEN POSITION.HCU HAINTAINS 1100 PSIG REPAIR REPLACE V111 TAG ON V111 DURING PERFORHANCE OF N2-ISP-RDS-R103 CARTRIDGE VALVE V111 LEAKS OUT AT STEH IN THE CLOSED POSITION.NO LEAKAGE FOUND IN THE NORHAL OPERATING CONDITION.
OPEN-PRES MAINTAINS AT 1040 PSIG~TAG AT V111 2HVC4UC107 HAS HIGH FILTER DELTA P PRESSURE LESS THAN 1 IN.WC 237 CONTROL BLDG EAST SIDE 2SWP4'V201A FAILED N2-OSP-SWP-Q001 SECTION 7 2 106 FORWARD FLOW EXERCISE HEASURED FLO'W WAS 12 GPH N2-OSP-S'WP-Q001 CALLS FOR FLOW GREATER THAN 19 GPH 2SWPAV2018 FAILED N2-OSP-5'WP-Q001 FOR'WARD FLOW EXERCISE (OBTAINED 12 GPH FLOW-OSP-SWP-Q001 CALLS FOR GREATER THAN 19GPH)SEE SECTION 7 2 109 HPCS SWGR RH CB 261 VALVE ELEV 262 2SWPeV800A FAILEO FOR'WARD FLOW EXERCISE TEST ON N2-OSP-SWP-Q001 HEASURED FLOW'WAS l2 GPH-PROCEDURE CALLS FOR GREATER THAN 19GPH 2SWP4 V8008 FAILED N2-OSP-SWP-Q001 FOR'WARD FLO'W EXERCISE (OBTAINED 12 GPH-OSP-S'WP-Q001 CALLS FOR GREATER THAN 19 GPH)SEE SECTION 7 2 109 2-ICS-750-65-2 SOCKET WELD AT TEE STEAH CUT.LOCATION HEZZ IN RC IC ROOH 175 RX BLDG'CTUAL LEAK ON 2 IN LINE AT INSERT TAG HUNG ON GATE TO RCIC ROOH'WE INSTALLED NEW SHEAR PINS TIGHTENED PACKING TO 300 FT LBS-STOPPED LEAKAGE HIDDLE PACKING HAS SLIGHT LEAKAGES NE'W PACKING AND 0-RINGS INSTALLED I REHOVED OLD VALVE AND INSTALLED REBUILT VALVE OLO VALVE TO BE REBUILT UNDER'WR 190662 NEW PACKING AND 0"RINGS INSTALLEDI REHOVED OLD VALVE-CLEANED INSTALLED REBUILT VALVE OLD VALVE TO BE REBUILT UNDER WR 190662 FILTERS CHANGED UNDER PH 910227 CHECKED AND CLEANED CHECKED AND CLEANED VALVE CHECKED AND CLEANED CHECKED AND CLEANED VALVE WE GROUND OUT PART OF THE OLD WELD AND WELDED IT BACK IN WHERE THE LEAK WAS I~gl I 13:44:36-13-92 CLASS I WORK NICAL HAINTENANCE 1991 PAGE27 WR NUHBER EPN NUHBER FAILURE OESC CORRECTIVE ACTION W193914 W193920 W193925 W193927 W193938 W193960 W193970 W193980 W193994 W193999 HVK-2HVKAV10 1 RDS-2RDSAHCU 1855 WCS-2WCSAV32 6 ROS-2RDSA HCU 4647 SLS"2SLS4RV2 A RDS-2RDSAHCU 0223 SWP-2SWPeSTR 4D SLS-2SLSARV2 A SWP-2SWPOFV4 78 I CS-2 I CSAV13 2 DURING THE PERFORMANCE OF N2-OSP-HVK-9001 THE CHILLEO WATER LOOP FLOW COULD NOT BE RAISED ABOVE APPROXIHATELY 322 GPM.AFTER CYCLING V101 FLOW RAISED SIGNIFICANTLY DISASSEMBLE AND INSPECT INTERNALS OF 2HVKCV101 P6 CONNECTION LEAKAGE WCSAV326 HAS A PACKING LEAK ADJUST REPACK AS NECESSARY VALVE IS IN A HIGH RAD AREA-HAIN STM TUNNEL 261 TAG HUNG ON HAIN STEAH TUNNEL DOOR RX 240 P6 CONNECTION LEAKS CAUSING AN ALARH IN THE CONTROL ROOM LOCATED 261 RX BLDG NORTH TAG HUNG AT HCU 46-47 RELIEF VALVE BEGAN LIFTING AT APPROXIHATELY 1250 PSIG DURING PERFORHANCE OF N2-OSP"SLC-9001 ON SECOND ATTEHPT TO ACHIEVE DESIRED PRESSURE BAND STARTING LIFTING AT APPROXIHATELY 1150 PSIG REHOVE RECALIBRATE AND REINSTALL ACCUMULATOR NITROGEN P6 CHARGING CONNECTION LEAKS'WHERE THREADED INTO VALVE BLOCK REPAIR LOCATED REACTOR BLDG EL 261 SOUTH SIDE HCU AREA TAG ON P6 CONNECTION PACKING LEAK ON STRAINER NO ADJUSTHENT LEFT SCREENWELL 261 DIV II.TAG HUNG ON STR CALIBRATE RELIEF VALVE 2SLSARV2A THIS RELIEF VALVE WAS FOUND LIFTING AT 1220 PSIG DURING THE PERFORHANCE OF N2-OSP-SLS-9001 ANNUN 601203 ALARHS FOR SWPAFV478 LOW PRESSURE BEFORE LOW PRESSURE START OF VALVE ACCUMULATOR PRESSURE PUHP TROUBLESHOOT'ALVE IS IN-PIPE TUNNEL SOUTHWEST OF CCS H/X ON TB 250 EL'AG ON 601203 2ICS4'V132 (LS132 INST ROOT ISOL VALVE)HAS A PACKING LEAK STEAN IS BLOWING OUT APPROX 18 IN LOCATEO IN RC1C ROOH 175 EL RX BLDG ON HEZZANINE TAG HANGING ON DOOR REHOVED VALVE FROH LINE CHECK FOR OBSTRUCTION OR VALVE PROBLEH NONE FOUND LINE AND VALVE CHECKED BY HIKE DOWNS REHOVED AND CLEANED P6 CONNECTION AND RE INSTALLED PULLED OLD PACKING OUT REPLACED WITH NEW PACKING WE REPAIREO COHPONENT ACCORDING TO THE M I-5~3-001 ADJUST SETTING AND RECALIBRATE REMOVED CLEANED AND REINSTALLED P6 CONNECTION REHOVEO OLD PACKING AND INSTALLED NEW PACKING VALVE REHOVEO FROM SYSTEH RECAL BY ICC AND PASSED BENCH TEST REINSTALLED VALVE INSTALLED NEW COUPLING REPLACED PACKING IN VALVE bi C Og 13:44 36-13-92 CLASS I WORK NICAL HAINTENANCE 1991 PAGE28 MR NUHBER EPN NUHBER FAILURE OESC CORRECTIVE ACTION W194000'M194030 HVK-2HVKNV32 7 RDS-2RDS4V11 1(3427)WHILE PERFORHING N2-OSP"9002 CHECK VALVE 2HVKAV327 FAILEO TO SEAT (REVERSE FLOW TEST)VALVE LOCATED CB 261 DIV I I CHILLER RH CARTRIDGE VALVE LEAKS.-LOC NORTH HCU'S VALVE OISASSEHBLEO CLEANED SEAT LAPPED BLUE CHECKED AND REASSEHBLEO
'WITH NEW BONNET GASKET REHOVED VALVE 7 CLEANED AND INSTALLED REBUILT VALVE OLO VALVE TO BE REBUILT UNDER MR 190662 M194031 ROS-2RDS~V11 CARTRIDGE VALVE LEAKS-LOC NORTH HCU'S 1(4227)'M194032 RDS" 2RDS4V11 CARTRIDGE VALVE LEAKS.LOC NORTH HCU'S 1(5027)M194033 RDS" 2RDS4V11 CARTRIDGE VALVE LEAKS LOC NORTH HCU 1(4631)M194034 RDS-2RDS4V11 CARTRIDGE VALVE LEAKS-LOC NORTH HCU'S 1(3831)W194035 RDS-2RDS4V11
, CARTRIDGE VALVE LEAKS-LOC NORTH HCU'S 1(3431)W194036 RDS-2RDSAV11 CARTRIDGE VALVE LEAKS.LOC NORTH HCU 1(5031)W194037 RDS-2ROS4V11 CARTRIDGE VALVE LEAKS LOCATION-NORTH HCU'S 1(5827)W194038 RDS-2RDSAV11 CARTRIDGE VALVE LEAKS LOC NORTH HCU 1(5431)M194039 ROS-2ROSOV11 CARTRIDGE VALVE LEAKS LOC NORTH HCU 1(5035)W194040 RDS-2RDSOV11 CARTRIDGE VALVE LEAKS LOC NORTH HCU 1(4235)REMOVED VALVE I CLEANED AND INSTALLED REBUILT VALVE)OLD VALVE TO BE REBUILT UNDER WR 190662 REHOVE VALVE)CLEANED INSTALLED REBUILT VALVE)OLD VALVE TO BE REBUILT UNDER'WR 190662 REHOVED VALVE)CLEANED ANO, INSTALLED REBUILT VALVE OLD VALVE TO BE REBUILT UNDER MR 190662 REHOVED VALVEs CLEANED AND INSTALLED REBUILT VALVE OLO VALVE TO BE REBUILT UNDER WR 190662 REHOVED VALVE)CLEANED AND INSTALLED REBUILT VALVE OLD VALVE REBUILT UNDER WR 190662 REHOVEO OLD VALVE'CLEANED AND INSTALLED NE'W VALVE OLD VALVE WILL BE REBUILT UNDER'WR 190662 REHOVED VALVE)CLEANED AND INSTALLED REBUILT VALVE: OLO VALVE TO BE REBUILT UNDER MR 190662 REHOVED OLD VALVE)CLEANED ANO INSTALLED REBUILT VALVE OLD VALVE WILL BE REBUILT UNDER WR 190662 REHOVED VALVEICLEAND AND INSTALLED REBUILT VALVE OLD VALVE'MILL BE REBUILT UNDER MR 190662 REHOVED VALVE)CLEANED AND INSTALLED REBUILT VALVE)OLD VALVE MILL BE REBUILT UNDER WR 190662 g,~'I g 4 ,~Q, 13:44:36-13-92 CLASS I WORK NICAL HAINTENANCE 1991 PAGE29 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION M194041 W194044 RDS-2RDS4Vll 1(3835)RDS-2RDSAV11 1(3035)CARTRIDGE VALVE LEAKS-LOC NORTH HCU'S CARTRIDGE VALVE LEAKS.NORTH HCU'S.REHOVEO OLD VALVE!CLEANED AND INSTALLED REBUILT VALVE REHOVED VALVE)CLEANED AND INSTALLED REBUILT VALVE.OLO VALVE WILL BE REBUILT UNDER WR 190662 W194045 RDS-2ROSV11 CARTRIDGE VALVE LEAKS LOCATION NORTH HCU'S 1(3439)M194046 RDS-2RDSoV11 CARTRIDGE VALVES LEAKS LOCATION NORTH HCU'S 1(5443)W194047 RDS-2RDSAV11 CARTRIDGE VALVE LEAKS.LOCATION NORTH HCU'5 1(4643)M194048 RDS"2RDS>V11 CARTRIDGE VALVE LEAKS LOCATION NORTH HCU'S 1(4247)W194049 RDS-2RDS4V11 CARTRIDGE VALVE LEAKS LOCATION NORTH HCU'S 1(4243)REHOVED VALVE CLEANEDI INSTALLED REBUILT VALVE OLO VALVE WILL BE REBUILT UNDER'WR 190662 REHOVEO VALVE-CLEANED AND INSTALLED REBUILT VALVE OLD VALVE WILL BE REBUILT UNDER WR 190662 REHOVEO OLD VALVE-CLEANED AND INSTALLED REBUILT VALVE OLD, VALVE WILL BE REBUILT UNDER WR 190662 REHOVEO OLO VALVE" CLEANED INSTALLED REBUILT VALVE OLD VALVE REBUILT UNDER WR 190662 REHOVED OLD VALVE-CLEANED INSTALLED REBUILT VALVE OLD VALVE WILL BE REBUILT UNDER WR 190662 M194050 M194 051 RDS-2RDSCHCU 3847 RDS-2RDSAV11 1 (3447)LEAKS FITTING P6 LEAKS WAS TORQUED TO GREATER THAN 200 INLBS TO STOP LEAKS REPLACE LOCATION NORTH HCU'S RX 261 CARTRIDGE VALVE LEAKS LOCATION NORTH HCU'5 REMOVED CLEANED AND REINSTALLED P6 CONNECTION REHOVED CLEANED AND INSTALLED REBUILT VALVE OLD VALVE TO BE REBUILT UNDER WR 190662 M194052 RDS-2RDS4'Vll CARTRIDGE VALVE LEAKS.LOCATION NORTH HCU'S 1(3443)M194063 RDS-2RDS4V11 CARTRIDGE VALVE LEAKS LOCATION NORTH HCU'S 1(4251)M194064 ROS-2ROSCV11 CARTRIDGE VALVE LEAKS LOCATION NORTH HCU'S 1(4627)REHOVEO OLD VALVE CLEANED AND INSTALLED REBUILT VALVE OLD VALVE REBUILT UNDER MR 190662 REMOVED OLD VALVE CLEANED AND INSTALLED REBUILT VALVE OLO VALVE TO BE REBUILT UNDER'MR 190662 REHOVEO OLD VALVE)CLEANED INSTALLED REBUILT VALVE.OLO VALVE TO BE REBUILT UNDER WR 190662
13:44-36 13-92 CLASS I WORK-NICAL HAINTENANCE 1991 PAGE30 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W194 065 RDS-2RDS4 Vll 1(3819)CARTRIDGE VALVE LEAKS LOCATION NORTH HCU~S REHOVE LEVEL SWITCH TO REHOVE 0-RING FROH V111 VALVE.REHOVED OLD VALVEI CLEANED ANO INSTALLED REBUILT VALVE OLO VALVE TO BE REBUILT UNDER WR 190662 M194066 RDS-2ROSeV11 CARTRIDGE VALVE LEAKS LOCATION NORTH HCU'S 1(3419)M194067 ROS-2RDS4Vll CARTRIDGE VALVE LEAKS LOCATION NORTH HCU'S 1(4611)REHOVED OLD VALVE)CLEANED AND INSTALL REBUILT VALVE.OLD VALVE TO BE REBUILT UNDER WR 190662 REHOVEO OLD VALVE CLEANED AND INSTALLED REBUILT VALVE OLD VALVE TO BE REBUILT UNDER WR 190662 W194 068 W194069 ROS"2RDSAV11 1(4203)RDS-2ROSAV11 1(3807)CARTRIDGE VALVE LEAKS LOCATION NORTH HCU'S REHOVE LEVEL SWITCH INSPECTEO FOR CARTRIDGE VALVE 0"RING CARTRIDGE VALVE LEAKS LOCATION NORTH HCU'S REMOVED OLD VALVE AND INSTALLED REBUILT VALVE OLD VALVE TO BE REBUILT UNDER WR 190662 REHOVED OLD VALVE CLEANED AND INSTALLED REBUILT VALVE.OLD VALVE TO BE REBUILT UNDER WR 190662 W194070 RDS-2RDSAV11 CARTRIDGE VALVE LEAKS LOCATION NORTH HCU'S 1(4207)REHOVED OLD VALVE CLEANED AND INSTALLED REBUILT VALVE.OLD VALVE WILL BE REBUILT UNDER'MR 190662 W194201 W194203 W194215 M194234 W194251 RCS-2RCSNHOS E44 I AS-2 I AS%PSE 144 RDS-2RDSAV11 1(3007)EGF-2EGFLS1 28 RDS-2RDS4HCU 4623 FLEXIBLE HOSE LEAKING)DRYMELL 269 OFF RCS RECIRC LOOP-A-LINE 2RCS-024-3-1 EQUIPT IN ORYWELL REHOVED AND REPLACE INSULATION TO SUPPORT HOD 91-011 RUPTURE DISK IS BLOWING THROUGH'ILL NOT HOLD AIR REPAIR OR REPLACE AS REQO LOCATED D'M ELEV 254 AZ 0 FOOT VALVE ON 2RDSAHCU3007 LEAKING N2 CHANGING VALVE PLEASE REPLACE RX 261 SOUTH SEAL HCU'S 2EGFALS128 IS IN ALARH COHP PT EGFL'C09 WITH SOTRAGE TANK LEVEL IN NORHAL BAND BRINGING IN NUISANCE ANNUNCIATOR IN CONTROL ROOH 852210 P6 CAP MILL NOT SEAL PROPERLY CAUSING N2 PRESSURE TO BLEED DOWN REPLACE CAP DEF TAG 27443 STUB HUNG AT P603 CONTROL ROOH HCU 4623 LOCATEO RB 261 NORTH SIDE WORKED TO HOD 91-011 PREPPEO AREA FOR HOD 91-011 HWR 21242 REPLACED RUPTURED DISC VALVE REHOVEO)CLEANED AND INSTALLED REBUILT VALVE OLD VALVE TO BE REBUILT UNDER WR 190662 SHOP WORK ONLY NO PLANT WORK REHOVED CAP CLEANED THREADS AND INSTALLED CAP SNOOPED AROUND CAP AND FOUND NO LEAKS
~'~y 13:44:36-13-92 CLASS I'WORK-AHI CAL HAINTENANCE 1991 PAGE31 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION'W194267'W194270'W194275'W194297 W194298 W194 299 W194339'W194343 W194362'W194372'W194560 CPS-2CPSAAOV 106 CPS-2CPSAAOV 104 RDS-2RDScv11 1(1443)IAS-2IAS4PSE 145 I AS-21ASAPSE 148 IAS-2IASAPSE 147 RDS-2RDSQHCU 3851 CSH-2CSH4P2 I AS-2IASAPSE 198 SLS-2SLSOV25 CMS-2CMSoSOV 250 DURING N2-ISP-CPS-9001 LLRT AOV106'WAS FOUND TO HAVE LEAKAGE WHICH EXCEEDED TECH SPEC CRITERIA WHILE PERFORHING VACUUH TEST ON 2CPSAAOV104 EXCESSIVE BUBBLING WAS NOTICED AT THE VALVE STEH WHEN IT WAS SNOOPED PLEASE TIGHTEN PACKING VALVE AT EL 289 AZ 120 SECONDARY CONT DEF TAG AT VALVE VALVE STEH ON FOOTVALVE 111 LEAKS HCU 1443 261 RX BLDG SOUTH SIDE 2IAS4'PSE145 RUPTURE DISK IS BLOWN REPLACE RUPTURE DISK TAG HUNG ON STEAH TUNNEL DOOR MST 240 21ASAPSE148 IS LEAKING BY REPLACE RUPTURE DISK TAG HUNG ON STEAM TUNNEL DOOR HGT 240 2IAS4'PSE147 IS LEAKING BY REPLACE RUPTURE DISK TAG HUNG ON STEAH TUNNEL DOOR HGT 240 2RDS4'HCU3851 LEAKS NITROGEN EXCESSIVELY FROM CHARGING CONNECTION LOCATED RB ELEVATION 261 NORTH HCU'S PLEASE INVESTIGATE AND REPAIR OIL LEAKAGE IS OCCURRING AS VERIFIED BY ADSORBER PAOI BUT LEAKAGE IS SHALL ENOUGH SUCH THAT IT HAKES PIN POINTING EXACT LOCATION VERY DIFFICULT INSPECT AND DETERMINE IF REPAIR OF LEAKAGE IS NECESSARY SUSPECT BLOWN RUPTURE DISC AND LEAKING RELIEF VALVE IASATK5 HAS TO BE REPRESSURED EVERY 2-3 HRS DUE TO LEAK.INVESTIGATE AND REPAIR AS NECESSARY RX 289 TAG ON DISC VALVE IS LEAKING BYE PLEASE INVEST AND REPAIR RX 289 VALVE WILL NOT OPENS TROUBLESHOOT ANO REPAIR AS REQDI LOC ELEV 219 IH SUPPRESSION POOL AZ 120 LINE 8 COL 17 TAG'WITH WR 193058 CLEANED VALVE INTERNALS WIPE SEAT CLEAN WITH RAG ADJUSTED PACKING CHANGED OUT V111 VALVE WITH A.REBUILT Vill THAT WAS REBUILT UNDER WR 190662 REPLACED RUPTURE DISC AHD GASKETS REPLACED RUPTURE DISC AND GASKETS REPLACED RUPTURE DISC AND CHANGED GASKETS WORK COHPLETED ON WR 177196 THE 20 OF HARCH 1991 INSPECTED AND FOUND HO LEAKS IHSPECTED FOR OIL LEAK TWICE NOTHING NOTICEABLE REPLACED RUPTURE'DISC'WITH NEW REMOVED SEAT FROR VALVE AHD LAPPED VALVE SEAT WE INSTALLED A NEW DISC SEAL l+
13:44:36-13-92 CLASS I'MORK-NICAL HA INTENANCE 1991 PAGE32 MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION'M194572 SMP"ZSMPNV1C REHOVE VALVE FROH LINE FOR INSPECTION OF THE EAR TO DISC PINS A CONCERN OVER THE PINNING HETHOD MAS RAISED AND THE RESOLUTION IS AN INTERNAL INSPECTION BY ENGR.AND VENDOR)DO NOT SHUT PUHP DOMN UNTIL ENGR VENDOR PRESENT PERFORHED INSPECTION AS PER HI-5 3-001 ATTACHED M194580 M194 584 W194702 M194705 W194712'M194730 M19 4749 M194756 HVK-ZHVKOCHL 1A ICS-ZICSAAOV 156 RDS-ZRDSAV11 1(2655)RDS-ZRDSAHCU 2243 RDS-ZRDS4HCU 1835 RDS-ZRDSAV11 1(2207)SWP-ZSMP4VZO 2A CHS-ZCHS4SOV 26A BASED ON N2-OSP-SMP-9003 P28 FAILEO SURVEILLANCE REHOVE END BELLS AND CLEAN SERVICE MATER SIDE TUBES ON SHILLER BEFORE SURVEILLANCE ON P2A.CONTACT DICK GREEN 343-8499 WHEN SHILLER IS OPEN WITH SYSTEH SECURED ZICS4AOV156'S PACKING WAS LEAKING.THIS MR GENERATED TO CORRECT DEFICIENCY NOTE ON WR 193343 INDICATOR ARE HAY BE BENT REPAIR AS NECESSARY CARTRIDGE VALVE FOR 2RDS-L109 LEAKS AT STEH HCU 2655 ZRDSAV111(2655)
CARTRIDGE VALVE V111 LEAKS AT THE STEH WHEN VALVE IS CLOSED HOLDS PRESSURE ON BACKSEAT REPAIR OR REPLACE PN NUMBER 117C4272P001 REF GEK 37469 FAILED DURING N2-ISP"RDS-R103 DURING PERFORHANCE OF N2-ISP-RDS-R103 CARTRIDGE VALVE V111 LEAKS BY THE STEH IN THE CLOSED POSITION HAINTAINS PRESSURE IN OPEN POSITION IN BACK SEAT.REPAIR OR REPLACE,2RDS-Vill(2207)
HAS A PACKING LEAK TAG HUNG AT 2RDS-V111 (2207)ZSWPCVZOZA FAILED TO STROKE FREELY DURING PERFORMANCE OF N2-OSP"SWP-CSOOZ KEPT HANGING UP TAG HUNG ON ZSWPAVZOZA PIPE TUNNEL 247 CONTACT DICK GREEN FOR STAGING ZCHSASOV26A FAILED N2-OSP-CHS-R001 IT'MOULD NOT HOLD PRESSURE AND LEAKS BY EXCESSIVELY REPAIR VALVE SDC SC2-0287-91 REHOVE COVERSI CLEAN TUBE MITH GOOD WAY HACHINE SPARYED INDICATOR SHAFT WITH'MD 40 REPLACED V111 WITH REBUILT VALVE.VALVE MILL BE REBUILT UNDER WR 190245 INSTALLED NEW VALVE REPLACED VALVE WITH NEW ONE VALVE TO BE REBUILT UNDER MR 190245 INSTALLED NEW VALVE VALVE WILL BE REBUILT UNDER MR 190245 VALVE EXERCISED TWICE NO CORRECTIVE ACTION REQUIRED SEE TROUBLESHOOT PLAN REPAIRED COMPONENTS AND PARTS FOUND TO BE CORRODED.REPLACED HAIN DISC AND ORINGS AND PILOT DISC VALVE FAILED PHT NEM WR MRITTEN TO REBUILD VLV AGAIN-MR 196038 M194772 RDS-ZRDS4 HCU 1411 V111 LEAKS ON HCU L605 NE'M VALVE INSTALLED VALVE MILL BE REBUILT UNDER WR 190245 0 lit I I~~
13:44:36-13-92 CLASS I WORK-H ANICAL HAINTENANCE 1991 PAGE33 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W194773 W194774 M194 776 W194779 M194781 W194784 W194785 M194787 RDS-2RDS4HCU 2607 RDS-2RDS4 HCU 2219 ROS-2RDSAHCU 3015 GSN-2GSNOV73 8 RDS-2ROS4V11 1(1415)RDS-2RDSAV11 1(2623)RDS-2RDSeV11 1(2223)RDS-2RDSAV11 1(1027)Vill LEAKS ON HCU L708 V111 LEAKS ON HCU L503 V111 LEAKS ON HCU L613 VALVE PACKING IS LEAKING NITROGEN AS SEEN WHEN SNOOPED.PACKING IS ALREADY ADJUSTED TOO TIGHT SO VALVE IS NOT TURNED EASILY LOCATED IN NITROGEN TANK FARH TAG 36097 HUNG ON VALVE Vill ON HCU 1415 L609 LEAKS ACCUHULATOR L515 CARTRIDGE VALVE 111 LEAKS BY IN CLOSED POSITION ACCUHULATOR L514 CARTRIDGE VALVE 111 LEAKS BY IN CLOSED POSITION V111 LEAKS ON HCUL406 HCU 1027 INSTALLED NE'M VALVE INSTALLED NEW VALVE INSTALLED NEW VALVE VALVE TO BE REBUILT UNDER WR 190245 REHOVED OLD PACKING CLEANED AND INSTALLED NFW PACKING REPLACED VALVE WITH REBUILT 111 VALVE VALVE TO BE REBUILT UNDER WR 190245 INSTALLED NEW VALVE.VALVE WILL BE REBUILT UNDER WR 190245 INSTALLED NEW REBUILT VALVE.VALVE WILL BE REBUILT UNDER WR 190248 REPLACED 111 VALVE WITH NE'M REBUILT VALVE VALVE WILL BE REBUILT UNDER'MR 190245 W194788 RDS-2RDSAV11 V111 LEAKS ON HCUL510 HCU 0623 1(0623)REPLACED VALVE WITH NEW REBUILT 111 VALVE.VALVE TO BE REBUILT UNDER WR 190245 W194790 W1 94791 W194794 M194795 M19 4796 RDS-2RDSAV11 1(1031)RDS-2ROS4'V11 1(1431)RDS-2ROS4V11 1(1839)RDS-2RDSCHCU 1843 ROS-2RDSAHCU 1043 V111 LEAKS ON HCUL411 HCU 1031 Vill LEAKS ON HCU L412 HCU 1431 ABOVE HCU CARTRIDGE VALVE WILL NOT ISOLATE INSTRUHENT BLOCK WHEN CLOSED VALVE SHAFT SEAL LEAKS ABOVE VALVE PACKING LEAKS PROFUSELY INSTALLED NEW VALVE VALVE WILL BE REBUILT UNDER WR 190245 INSTALLED NE'M VALVE VALVE TO BE REBUILT UNDER WR'190245 REPLACED VALVE INSTALLED NEW ONE VALVE TO BE REBUILT UNDER'MR 190245 INSTALLED NEW VALVE VALVE MILL BE REBUILT UNDER WR 190245 INSTALLED NEW VALVE VALVE WILL BE REBUILT UNDER WR 190245 I'
13:44.36 13-92 CLASS I WORK-NICAL HAINTENANCE 1991 PAGE34 WR NUHBER EPN NUMBER FAILURE DESC CORRECTIVE ACTION'LI194797 W194944 W195 056 W195057'LI195086 W195150 W195403 W1 96038 W196058'M196060 RDS-2RDS(L(HCU 0639 CSH-2CSHAHCV 133 RDS-2RDS4 HCU 3039 RDS-2RDS4HCU 3039 EGS"2EGS4'EG3 SMP-2SMPeV1F F'LIS-2FWS"PSS H223A1 CMS-2CMSOSOV 26A MSS-2MSSeMOV 108 CSH-2CSH4(AOV 10,8 ABOVE VALVE PACKING LEAKS TORQUE ARH IS BENT THE STEH CONNECTOR IS OUT OF ADJUSTHENT (SHOULD BE LOWER ON THE'OPERATOR STEM)CURRENTLY THE BACKSEAT OCCURS AFTER THE TORQUE ARH LIHITS OUT ALLOWING FURTHER HANDWHEEL HOVEMENT TO BEND TORQUE ARH (SEE ATTACHED)HYDRAULIC CONTROL UNIT 2RDSAHCU3039 NITROGEN SECTION HAS REQUIRED REPEAT CHARGINGS RECENTLY INVESTIGATE AND REPAIR SOURCE OF NITROGEN LEAK TAG HUNG ON HCU V111 VALVE RX BLDG 261 NORTH HCU BANK THE NITROGEN SECTION OF THIS HYDRAULIC, CONTROL UNIT REQUIRES REPEAT CHARGINGS AT LEAST DAILY INDICATIVE OF A LEAK PLEASE INVESTIGATE AND REPAIR SOURCE OF LEAK TAG HUNG ON V111 VALVE HANDMHEEL RX BLDG 261 NORTH HCU BANK BOLT IS MISSING FROH BOTTOH OF STAIRS GROUT IN THE EXISTING HOLE PERFORH VALVE INSPECTION PER ENG INSTRUCTION IF REQD.STAKE DOWEL PIN PER EDC-2F00293 TAG LOCATED SCREEN'LIELL 226 ELV RELOCATE INDICATOR FROM POSITION 8 TO POSITION ON THE ABOVE CONSTANT SUPPORT VALVE FAILS LLRT CYCLING VALVE GETS PROPER LIGHT INDICATIONS IN CR SUSPECT VALVE NOT SEALING AS LEAKAGE IS VERY HIGH SDC SC2-0287-91 VALVE LEAKING 1/2 GPH FROH PACKING.PLEASE TIGHTEN PACKING OR REPLACE AS NECESSARY VALVE IS LEAKING APPROXIMATELY 1 GPH FROM PACKING REPLACE OR TIGHTEN PACKING AS NECESSARY TO CORRECT PROBLEH INSTALLED NEW VALVE REPLACED BENT TORQUE ARH AND RETAINING RINGS 3 IN.STROKE WAS CHECKED AND VALVE ADJUSTED~VALVE REQUIRES 48 CRANKS FROH FULLY CLOSED TO FULL OPEN POSITION I8C TIGHTEN UP ON PRESSURE SMITCH NUT TO STOP LEAK REPLACE V111 WITH NELI VALVE FROM STORES PER DISCUSSION WITH SITE ENGINEERINGISTAIR HILTI BOLT IS NOT REQD BOLT IS NOT SHOMN ON ANY ENGR DOCUHENTS ABANDON IN PLACE DRILL ON 1/2 AND C 3/8 HILTI BOLT FILLED IN HOLE AS DIRECTED BY S-HI-5.3-001 INSPECTED DOWEL PINS TO BE IN PLACE AND STAKED PER EDC 2F00293 AND INTERNAL CORRESPONDENCE SH2-M91-0283 ADJUSTED POSITION FROH 8 TO POSITION 6 WE TOOK THE VALVE APART AND FOUND IT WAS DIRTY AGAIN AND THERE WAS WATER IN IT.SO WE CLEANED AND DRIED IT TORQUED PACKING TO 30 FT LBS INE'M PACKING INSTALLED PER HI 5 3-001 PACKING TIGHTENED LEAKAGE STOPPED VALVE STROKED TWICE
~I'll 0 I' 13:44:36-13-92 CLASS I WORK-ANICAL HAINTENANCE 1991 PAGE35 MR NUHBER EPN NUMBER FAILURE DESC CORRECTIVE ACTION W1 96061 W1 96074 M196075 CSL-2CSL¹AOV 101 CSL-2CSL¹HOV 112 RHS-2RHS¹HOV 2A VALVE MAS IDENTIFIED AS PACKING LEAKING DURING RPV 600 HYDRO ADJUSTING PACKING OR REPACK IF NO ADJUSTHENT IS REHAINING RELOCK MIRE HOV TO TRANSITION PIECE IT IS MIRED WRONG LOCATION SECONDARY CONTA I NHENT 195 RELOCK WIRE HOV AND TRANSITION PIECE TO VALVE IT IS LOCK MIRED'MRONG.LOCATION AUX BAY NORTH 183 E 11 REHOVED AND REPLACED PACKING BOLTS MERE TIGHT ALL BOLTS MERE TIE MIRED TOGETHER BY TWO'S REHOVED OLD LOCK'MIRE CHECKED BOLT TIGHTNESS'WHICH MAS FOUND TO BE TIGHT REWIRED BOLTS WITH SAFETY'MIRE ON INSIDE AND OUTSIDE ACTUATOR TO VALVE M196076 RHS-2RHS¹HOV RELOCK'MIRE HOV TO TRANSITION PIECE IT IS WIRED 28 MRONG LOCATION SECONDARY CONTAINHENT 197 REWIRED OUTER BOLTS'WITH SAFETY WIRE ALL BOLTS INNER AND OUTER WERE T I GHT INNER BOLTS ARE WIRED~BUT NOT CORRECT.CANNOT GET TO BECAUSE OF VALVE PROXIHITY AND INSULATION W196077'M196078'M196079'M196081 W196082 M196083 RHS-2RHS¹HOV 8B SWP-2SWP¹HOV 50A SWP-2SWP¹HOV 599 SMP-2SMP¹HOV 74A SMP-2SWP¹HOV 74B SWP-25'MP¹HOV 74C LOCK'MIRE HISSING ON BOLTING TO HOV AND TRANSITION PIECE PLEASE LOCK MIRE LOCATION AUX BAY SOUTH 184 PULL INSPECTION COVER FROH FIRE BARRIER AND INSPECT HOV AND TRANSITION PIECE TO SEE IF THEY ARE LOCK'MIRED.BREECH PERHIT REQUIRED LOCK'MIRE AS NEEDED LOCATION SERVICE MATER AREA ELEVATION 265 HOV TO TRANSITION PIECE IS NOT LOCK'MIRED LOCK MIRE THE BOLTS LOCATION PIPE TUNNEL ELEVATION 255 HOV TO TRANSITION PIECE IS NOT LOCK MIRED LOCK'MIRE THE BOLTS.LOCATION SERVICE MATER AREA ELEVATION 265 HOV TANSITION PIECE AND TRANSITION PIECE TO VALVE IS NOT LOC WIRED.PLEASE LOCK WIRE LOCATION SERVICE MATER AREA ELEVATION 263 HOV TO TRANSITION PIECE IS NOT LOCK MIRED PLEASE LOCK MIRE BOLTS LOCATION SERVICE'MATER AREA ELEVATION 264 CHECKED BOLTS FOR TIGHTNESS WHICH WERE FOUND TIGHT WIRED BOLTS'MITH SAFETY'WIRE INSIDE AND OUTSIDE BOLTS FROH ACTUATOR TO VALVE ARE MIRE NOT ABLE TO CHECK DO TO SEALED BOOT BETWEEN OPERATOR AND VALVE HAD OPS STROKE VALVE DETECTED NO HOVEHENT AT ALL LOCKWIRE NUT INSIDE AND OUT NUTS ARE TIGHT BOLTS'MERE NOT LOOSE SO LOCKMIRED BOLTS BACK UP NO LOOSE BOLTS FOUND UPON INSPECTION AND LOCKWIRED HOV TO TRANSITION PIECE LOCK'WIRED HOV TO TRANSITION PIECE UPON INSPECTION FOUND NO LOOSE BOLTS LOCKWIRED HOV TO TRANSITION PIECE k;I 13:44 36 13-92 CLASS I WORK-NICAL HAINTENANCE 1991 PAGE36 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION M196084 W1 96085 W1 96086 M196087 W196088'196123 W196153 W196167 W196224 SMP-2SMP0HOV 74D SWP-2SMP4HOV 74E SWP-2SMPAHOV 74F GTS-2GTS4HOV lA GTS-2GTSAHOV 1B I CS-2 I CS4 HYV 151 ICS-2ICS<AOV 156 HVR-2HVRAAOD 10B ICS-2ICSAHYV 151 HOV TO TRANSITION PIECE AND TRANSITION PIECE TO VALVE NOT LOCK'MIRED PLEASE LOCK WIRE BOLTS LOCATION SERVICE WATER AREA ELEVATION 264 HOV TO TRANSITION PIECE IS NOT LOCK WIRED LOCK WIRE BOLTS.SERVICE WATER BUILDING ELEVATION 264 HOV TO TRANSITION PIECE AND TRANSITION PIECE TO, VALVE NOT LOCK WIRED LOCK WIRE BOLTS SW BUILDING ELEVATION 265 HOV TO TRANSITION PIECE IS NOT LOCK WIRED AND TRANSITION PIECE TO VALVE IS NOT LOCK WIRED CORRECTLY LOCK WIRE BOLTS SEE CONT ELEV 319 LOCK WIRE IS NOT DONE CORRECTLY ON TRANSITION PIECE TO HOV AND VALVE.REDO LOCKWIRE ICSAHYV151 IS IN HID POSITION (DUAL INDICATION).
SUSPECT BINDING PROBLEH PLEASE INVESTIGATE ICSAHYV151 IS LOCATED IN RB 175 IN THE RCIC ROOH TAG HUNG ON VALVE ICSAAOV156 DOES NOT INDICATE FULL CLOSED (NO GREEN LIGHT)IN THE CONTROL ROOM AT CECAPNL601 TROUBLESHOOT REPAIR AS NECESSARY.
TAG ON PNL601 BY ICS4AOV156 CONTROL SWITCH HVRAAOV108 FAILS TO CLOSE WITHIN THE ALLOTTED AHOUNT OF TIME WHEN STROKED.IT APPEARS TO BE BINDING IN HID-STROKE TROUBLESHOOT REPAIR AS NECESSARY TAG HUNG BY HVR4AOV10B CONTROL SWITCH ON CEC4PNL871 DURING RCIC TUNING COULD NOT REDUCE.TURBINE SPEED TO LESS THAN 3225 RPH ADJUST RCIC GOVERNOR VALVE LINKAGE AS NECESSARY FOR FULL CONTROL OF RCIC SPEED CONTROLLER SETTING OF APPROXIHATELY 60 AND LOSS NO EFFECT TAG AT FC101 ON P601 LOCK'MIRED HOV TO TRANSITION PIECE LOCKWIRED HOV TO TRANSITION BOLTS LOCKWIRED HOV TO TRANSITION PIECE ALL BOLTS MERE TIGHTENED AND TIE'MIRED TOGETHER BY TWO'S BOLTS WERE TIGHT AND TIE WIRED TOGETHER BY T'MO'S VALVE STEH HAD SOHE CORROSION AND DIRT ON IT CAUSING IT TO BIND UP STEH)CLEANED VALVE NOW STROKE 100 PERCENT N2-HPH-ICS-V452 QUARTERLY FOV VALVE LINKAGE INSPECTION REDONE SAT TOOK THE VALVE PACKING OUT ADJUSTED THE INDICATOR SHAFT PUT BACK TOGETHER.VALVE WAS OUT OF ADJUSTHENT LOOKED FOR LEAKS REPLACED WASHER SEALS INSPECTED FOR LEAKS AFTER REPLACING WASHER NO LEAKS ADJUSTED GOVENOR.LINKAGE MITH COMPANY REP AS STATED IN HI l II 0 I 13:44 36 13-92 CLASS I MORK-NICAL HAINTENANCE 1991 PAGE37 MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION'M196242 W196334 M196345 M1 96406 M196409 M196412 M196413 M196414 M196415 M196416'M196417 SWP-2SWPAFV5 4A RHS-2RHS4HOV 40B PCB-2PCB4DRA 5 ICS-2ICS4AOV 157 HVC-2HVC0AOD 117 HVC-2HVC4AOD 169 HVC-2HVC4AOD 177 HVR-2HVRAAOD 6A HVR-2HVRCAOD 98 HVC-2HVCAAOD 148 HVC-2HVCAAOD 145 2SWP4 FV54A HYDRAULIC PUHP IS RUNNING CONTINUOUSLY AND IS BRINGING IN CONTROL ROOH ANNUNCIATOR 601103.TAG HUNG AT ANNUNCIATOR 601103 VALVE HANDWHEEL IS NOT ATTACHED TO HOTOR OPERATOR IT IS LYING ON THE GRATING IN THE VALVE ROOH ON RX BLDG EL 240 NOTED DURING NRC RIT MALKDO'MN DRYMELL PERSONNEL HATCH OUTER DOOR EQUALIZING VALVE'MILL NOT SEAL HACHINE NEM CAH HECHANISH PER EDC 2F-00372 TO FACILITATE VALVE CLOSURE MHEN ACTIVATED.
RETURN TO STORES FOR FUTURE USE SDC SC2-0274-91 PERFORH OPERABILITY TEST PER HI ATTACHED PERFORH OPERABILITY TEST PER THE HI ATTACHED PERFORH OPERABILITY TEST PER HI ATTACHED PERFORH OPERABILITY TEST PER THE HI ATTACHED PERFORH OPERABILITY TEST PER HI ATTACHED THIS TEST IS TO BE PERFORHED WITH OPS SURVEILLANCE PROCEDURE PERFORH OPERABILITY TEST PER HI ATTACHED PERFORH OPERABILITY TEST PER HI ATTACHED REBUILT 2 AND 3 GAL ACTUATORS REPLACED BOTH 7 GAL ACTUATORS BEFORE COHPLETE CLOSE OUT OF PACKAGE HAKE NOTE THAT THE 2 AND 3 GAL ACTUATORS NEED TO BE PAINTED WHERE HAIN'AD TO FLAP PAINT FORM ENDS OF ACTUATORS NOTE PLEASE HAKE NOTE OF PRESENT HI FOR FUTURE Hl ISSUENCE WE SHOULD REVIE'M CURRENT PROCEDURE FOR COHPLETE OVER HAUL'MHICH IS CIHING DUE REPLACED SET SCREWS IN HANDMHEEL (95-72-821)
USED SEALANT PST580 ON SET SCREWS PER-ENGINEERING OUT OF HECHANICAL ADJUSTHENT VALVE MAS ADJUSTED SO THAT IT WOULD SEAT PROPERLY ALL PARTS HACHINED PER EDC 2F00372 RETURNED TO STORES FOR LATER USE HATERIAL RETURN 046391 STROKED AOD 7IHES PER ATTACHED HECH INST-WORK FINE VALVES STROKE 5 TIHES PER ATTACHED HI WORKS FINE VALVE STROKED 5 TIHES PER ATTAHCED HI DAHPER WORKS FINE VALVE STROKED 5 TINES PER ATTACHED HI WORKS FINE VALVE STTOKED 5 TIHES PER ATTAHCED HI WORKS FINE STROKED AOD 5 TIHES PER ATTACHED HECH INST STROKED AOD 5 TINES PER ATTACHED HECH INST-'WORKS FINE I t.
13:44-36-13-92 CLASS I WORK-ANICAL HAINTENANCE 1991 PAGE38 WR NUMBER EPN NUHBER FAILURE DESC CORRECT I VE ACTION M196474 M196491 M196615 M196676 W196782 W197634 M197663 M197664 SWP-2SMP4 STR 4F ICS-2ICSAT1 SWP-2SMPNFV5 48 EGF-2EGF4FEl 3A ICS-2-ICS-75 0-140-2 GTS-2GTSAFLT lA SLS-2SLSAP1A SLS-2SLSAP1B REPACK STRAINER:NEXT TINE THE STRAINER IS SCHED DOWN FOR HPH-SA513 LOCATED 261 ELVISCREENWELL BLDG.MHILE REPLACING PACKING FOUND BOTH DRIVE PINS CONNECTING THE SHAFT TO THE BACKWASH ARH~HISS INGI D ISASSEHBLE BACKWASH ARH~INSPECT AND REPAIR SEE ATTACHED SHEET CHANGE VENT COCK ON STRAINER COVER ADDED 911129 1800 HRS BY G PROSSER AND VIA PHONE CONVERSATION WITH T DOHERTY FOR QA CHECK RETORQUE RCIC TURBINE COUPLING (PUHP TO TURBINE COUPLING)OIL LEAKING FROH VARIOUS CONNECTIONS'TAG AT VALVE TB 250 SW 250 EL 2EGFAFE13A FLOW ELEHENT HAS A SLIGHT FUEL LEAK 261 DIESEL DG 1 EAST WALL RCIC TURBINE NOT DRAINING PROPERLYIDRAIN POT CHECKED OUT OKiAPPEARS DRAIN LINES TO DRAIN POT HAY NOT BE PLUGGED TURBINE DRAIN POOL NEEDS TO BE REHOVED ANO CHECKED FOR BLOCKAGE FLT1A DEHISTER DELTA P IS HIGHISUSPECT PARTICULATE UPSTREAH OF DEHI STER TO BE CAUSE OPEN AND DETERHINE CAUSE.TAG EL 261 RBN HUNG ON-A-GTS TRAIN PLEXIGLASS COVER ON PUHP HAS PIECE OF IT HISSING ALONG THE EDGE CANNOT DETERHINE IF LEAKAGE HIGHT OCCUR AS PUHP IS IN STANDBY.REPLACE IF NECESSARY PUHP LOCATED ON ELEVATION 289 REACTOR BLDG.SEE TAG 33262 LARGE PORTION ON PLEXIGLASS.
PLEXIGLASS COVER ON PUHP IS CRACKED AT EDGES DID NOT LEAK DURING PUHP RUN REPLACE AS NECESSARY PUHP LOCATED ON 289 ELEVATION REACTOR BLDG SEE TAG 33236 LARGE PORTION ON PLEXIGLASS WE INSTALLED NEW PACKINGJA NEM BACKWASH ARH AND A NEW VENT LOCK A VISUAL CHECK MAS HADE ONLY TO COUPLING PER SSS AND WIP SHEET INSTRUCTIONS EVERYTHING IS OK INSTALLED (2>7 GAL ACT REHOVED AND REBUILT 2 AND 3 GAL ACT NEED TO PAINT ENDS OF 2 AND 3 GAL,.ACT A NEW HOTOR WAS INSTALLED BY.ELECT TIGHTENED FLANGE BOLTS USING AP 5~4'2 TROUBLESHOOT ING I ME CHECKED DRAIN LINES FOR BLOCKAGE HOISTURE SEPARATOR FILTERS WERE CHANGED OUT ME REPLACED THE PLEXIGLASS COVER WITH A NE'M PLEXIGLASS COVER WE REPLACED THE PLEXIGLASS COVER MITH NEW PLEXIGLASS COVER I r 13:44:36-13"92 CLASS I WORK-HECHANICAL HAINTENANCE 1991 PAGE39 WR NUHBER EPN NUHBER FAILURE OESC CORRECTIVE ACTION W197722 W197794 HVK-2HVK4CHL 1B ICS-2ICSNP2 N2-OSP-SWP-Q003 FAILED SURVEILLANCE
~REHOVE BELLS AND CLEAN SERVICE WATER SIDE TUBES ON CHILLER.CONTACT DICK GREEN 343-8499'WHEN CHILLER IS OPEN PUHP BEARING IS LEAKING OIL TROUBLESHOOT AND REPAIR TAG HUNG ON PUHP LOCATED ON RB 175 IN THE RCIC ROOH.REBUILD PUHP USING NEW BEARINGS)SEALSeAND HECH SEAL REHOVED END COVERS FOR INSPECTION TUBES PARTIALLY BLOCKED BY ZEBRA HUSSELS CLEANED TUBES INSTALLED NE'PIPING GASKETS USED EXISTING HEAD GASKETS REASSEMBLED HEADS AND PIPING REPLACE OIL SEALSIHECH SEAL)PUHP BEARINGS ALL GASKETS AND 0-RING READJUSTS OIL LEVEL FROH 285 AS FOUND TO 590 UNDERCUT HOTOR HOLD DOWN BOLTS TO BE ABLE TO ACHIEVE ALIGNMENT W197841 RHS-2RHSCFV3
'WHILE PERFORMING EPH-R520 ON VALVE FOUND 2 OF 8A HOUNTING BOLTS THAT HOLD YOKE TO BONNET BROKE REMOVED T'WO SNAPPED OFF CAP SCREWS AND TWO BENT CAP SCRE'WS AND~REPLACED WITH 4 NEW ONES'W197888 W19 7895 W197981 RDS-2RDSCSOV 120(0231)RHS-2RHS4MOV 1B SWP-2SWPAV24 OA NEEDLE VALVE ADJUSTHENT STEM COVER IS HISSING REPLACE WITH NEW LOCATED ON HCU 02-31 RX 261 ELEVATION IN SOUTH BANK OF HCU'5 L IHI7 TORQUE ACTUATOR HOVES'ItHEN VALVE I 5 STROKED OPEN RX BLDG ELEV 196 SOUTH PIT AREA (AROUND 1 IN)TAG HUNG ON VLV TORQUE ACTUATOR BOLTING VALVE FAILEO REVERSE FLOW CHECK'WHILE PERFORHING SURVEILANCE N2-OSP-SWP-2001 DEF TAG LOCATED AT 2SWPAV240A CB 261 DIV 1 CHILLER ROON REPLACED STEH COVER'WITH NE'W COVER TORQUED COVER TO 115 IN/LBS 8 BOLTS TORQUED TO 600 FT LBS)2 HOVED 3 FLATS THE OTHER 6 HOVED 2FLATS EACH OPENED VALVE TO INSPECT INTERNALS FOR DAHAGE OR VALVE BEING STUCK OPENIDID NOT FIND ANY DAHAGE VALVE'WAS CLOSED NO ACTION'WAS REQD W199529 PHS-SA262-1 SPOT WELDS ARE BROKEN ON LOCKSET HOUNTING TABS REQUIRE REWELDING ALSO LOWER HOUNTING TAB IS STRIPPED SA 262 REPAIRED DOOR PER WELD HI)WELDED BACK IN PLACE DOOR TABS 391 RECORDS LISTED.
13:13:22 01-09-92 CLASS I WORK-ELECTRICAL MAINTENANCE 1991 PAGE:1 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACT ION W113648 W12 2418'W124864 W131165 DMS-2DHS>HCC A1 HSS-2HSS4MOV 189 ENS-2ENS4'SWG 103 SWP-2SWP-W-1 32 RCIC PUHP SUCT FROM SUPP POOL HOV CIRCUIT BREAKER RCIC PUMP SUCT FROH SUPP POOL HOV CIRCUIT BREAK)BREAKER SIZED TOO SMALL REPLACE THE BREAKER AT 2DMSNMCCA1 COHPT 38 WITH HE28030 BREAKER-OR THE RECOHHENDED EQUIVALENT AS DETERHINED FROH ENGINEERINGS RESPONSE TO PR 5472 THIS OOC CLOSES OR 17311 VALVE DISCOVERED TO LEAK BY EXCESSIVELY DURING PERFORMANCE OF LLRT PROCEDURE ON 2HSS-HOV111-112 LKG 11 SCFH BACK TO RX VESSEL AND DOES NOT ALLOW LLRT TO BE PERFORHEO REPAIR AS NECESSARY CAUTION LABELS NEED TO BE INSTALLED ON CUBICLE DOORS OF THE ABOVE REFERENCED SWITCHGEARS PER DER 2-91-Q-0317.
THE LABEL INFORMATION AND INSTALLATION REQUIREHENTS ARE CONTAINED IN SPEC E061A AND THE ATTACHED HEHO CABLE 2SWP-W132 HAS BADLY NICKED WIRES ON T83-91 92 OF 2CEC-PNL828 CABLE 2SWP-W132 HAS BADLY NICKED WIRES ON TB3 91~92 OF 2CEC PNL828)SERVICE H20 TO CWS I SOL VLV CONTROL (288 RELAY RM)LCR IL25'WP-120 REPLACED BREAKER VALVE OPERATOR REHOVED STROKED VALVE TESTED OK CAUTION SIGNS PLACED ON EACH CUBICLE DOOR OF 2ENSASWG101 2ENS4SWG102 AND 2ENS4SWG103 CUT BACK CABLE AND ADDED NE'STA-KONS TO WIRES AND USED BUTT TO EXTEND SHIELD WIRE W136483 HCS-2HCSAMOV 6A WHILE PERFORMING N2-EPH-GEN-V582 WHILE PERFORHING N2-EPH-GEN"V582 SECONDARY BREAKER FAILED CONTACT RESISTANCE TEST (7 2 7)ON POLES A AND C REPLACE IAW SECTION 7.2.7 1 REPLACED CIRCUIT BREAKER IN CUBICLE (SECONDARY BREAKER)BREAKER REHOVED AND TESTED FROH 2EHS4'HCC102-B-A PER WR 154467 W136677 W138777 HVK-2HVKAH18 GTS-2GTSNHOV 4A FOUND HOTOR LEAD CONNECTION JUNCTION BOX COVER GASKET TORN WHILE PERFORHING N2"EPH-GEN-R580 REWORK REPLACE THE 10-32 X 1 1/2" LG MACHINE SCREWS USED FOR HOUNTING THE HARATHON 1512 NUC TERMINAL BLOCKS ON HOD PN2Y88HX101
'WITH NE'W 10-32 X 1/4" SYHBOL 93-17-857 REF ECDCR H10485A NCR 2-89-0043 INSTALL NE'W GASKET ON 2HVK-M18 HOTOR CONNECTION BOX JB 24JB0338 REPLACE TB MOUNTING SCRE'WS JB 24J80337 REPLACED TB HOUNTING SCREWS 0 4 i4 UI 13-13-22 01-09-92 CLASS I WORK-ELECTRICAL HAINTENANCE 1991 PAGE:2 MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION M147548'M148658 I CS-2 ICSAHOV 122 HHR-2HHRACRN 1 FIELD CABLE LUGS ARE TOO WIDE FOR TERHINAL BLOCK SLOTS CAUSING THE TB FINS TO BREAK REFER TO PR 8390 FOR CORRECTIVE ACTION RUBBER INSULATORS ON CRANE CONTROL BUTTONS ARE DAHAGED OR HISSING LOCATION RX 353 CRANE CAB REPLACED BROKEN TERHINAL BLOCK ON POWER MIRES IN ICS HOV 122 REPLACED ALL RUBBER BOOTS OVER ALL SMITCH BUTTONS ON CRANE CONTROL CONSOLE OF POLAR CRANE HARD COPY OF DEF TAG=DESTROYED ON REFUEL FLOOR M149318 DHS-2OHSAHCC SPARE BREAKER 2DHS-HCCA1-68 Al SPARE BREAKER 2DHS-HCCA1-68)REPLACE CONTACTOR THAT WAS REHOVED FOR USE IN 2DHS-HCCA1-5D 2ICS"HCC159 SEE MR 149346 REINSTALLEO BUCKET IN HCC PER EDC 2E10410 AND SIGNED OFF WR BUCKET HISSING.STARTER (REVERSING).
ASSEHBLY OVERLOAD RELAYS AND BLOCK M154467 EHS-2EHSCHCC 102-8A REHOVE BREAKER FROH CUBICLE AND TEST HOLDED CASE BREAKER (EF38030)PER N2-EPH-GEN-V582 FOR USE ON 2EHSCHCC102A-5C REFER MR 136483 REPLACE BREAKER'MHEN REPLACEHENT IS AVAILABLE BREAKER TESTED UNDER N2J-EPH-GEN-V582 AND PASSED CUBICLE 8A NEEDS BREAKER BREAKER ON OFF ASSEMBLY BREAKER HOUNTING HARDWARE AND THREE POWER LEADS M154468 EHS-2EHS4HCC REHOVE BREAKER FROM CUBICLE AND TEST HOLDED CASE 303-4D BREAKER EF38030 PER N2-EPH-GEN-V582 FOR USE ON 2EHS4HCC303-58 REFER WR 192936 REPLACE BREAKER WHEN REPLACEHENT IS AVAILABLE TESTED BREAKER PER V582.REHOVED CIRCUIT BREAKER AND ASSOCIATED
'MIRING ANO HARDWARE INSTALLED BREAKER IN 2EHS4HCC303-58 PER'MR 182836 SEALEO HOLE IN CUBICLE DOOR WITH CONDUIT BOX SEAL REMOVED HARDWARE TO SHOP M1 54469 EHS-2EHSAHCC 303-4C REHOVE BREAKER FROH CUBICLE AND TESTED MOLDED CASE BREAKER (EF38030)PER N2-EPH-GEN-V582 FOR USE ON 2EHSCHCC303-10C.
REFER'MR 182860 REPLACE BREAKER MHEN REPLACEHENT IS AVAILABLE TESTED BREAKER PER V582 REHOVED CIRCUIT BREAKER AND ASSOCIATED
'MIRING AND'HARD'MARE INSTALLED CIRCUIT BREAKER IN 2EHSeHCC303-10C PFR MR 182860 SEALED HOLE IN CUBICLE DOOR'MITH CONDUIT BOX SEAL REHOVED HARDWARE TO SHOP P ll P;I%4 13:13 22 01-09-92 CLASS I WORK-ELECTRICAL MAINTENANCE 1991 PAGE:3 WR NUHBER EPN NUMBER FAILURE DESC CORRECTIVE ACTION W154485 W154500 W154501 W154630 W154656'W154697 W157018 W158042 W1 58193 IAS-2IASASOV Y 186 ENS-2ENSoSWG 101 ENS-2ENS4SWG 103 ENS-2ENSASWG 103-2 GTS-2GTS4FLT 1A HTS-2HTSNPNL 003 ICS-2ICS4RCP Tl ICS-2ICSAMOV 120 ENS-2ENSCSWG 103-14 ADS-8-NITROGEN HEADER EXHIBITS AN INCREASE IN PRESSURE BEYOND HIGH ALARH SETPOINT EVEN WHEN LO AND HIGH FLOW PRESSURE CONTROL VALVES ARE SHUT COULD BE PROBLEH WITH LO'W FLOW VALVE 2IAS4SOVY186 INTERNAL LEAKAGE~PLEASE REPAIR OR REPLACE VALVE AS NECESSARY WORK WITH WRS 154484 154483 INITIATED AGAINST PRESSURE CONTROL VALVES TAG HUNG ON VALVE SC 289 NORTH END INTERFERENCE STOP PLATE EITHER BENT OR NOT BOLTED IN WHICH COULD ALLOW A 2000 AHP BKR TO BE INSTALLED IN A 1200 AHP CUBICLE STRAIGHTEN AND BOLT IN AS REQD BOLTS TO LOWER LEFT FRAHE ANGLE INTERFERENCE STOP PLATE BENT (103"4)OR HISSING (103-11)WHICH COULD PERHIT A 2000 AHP BKR TO BE INSTALLED IN A 1200 AHP CUBICLE STRAIGHTEN OR INSTALL A STOP PLATE AS REQD BOLTS TO LOWER LEFT FRAHE ANGLE CUBICLE DOOR WILL NOT OPEN WITHOUT A GREAT DEAL OF FORCE (EXCESSIVE FORCE AS DOOR HAS SENSITIVE RELAYS ON IT)OR CLOSE 2GTSA06-Fl IS BLO'WN REPLACE FUSE (120VAC 3 AHPS)DOOR HANDLE IS SHEARED OFF DIV II HEAT TRACE PANEL-2HTSAPNL003 LOCATED SOUTH AUX BAY EL 240 TAG HUNG ON 2HTS4PNL003 DOOR QUICK DISCONNECT RECEPTACLE PLUG AT REFUELING BULKHEAD-OPEN ITEH 503226-01 WALKDOWN DISASSEMBLE
-AND INSPECT THE CONNECTOR WITH EQ ENG PRESENT-PHOTOGRAPHS ARE REQD-REPAIR REPLACE AS REQD (NHP2 IR 88-08)LOC PC3278 011 00 W IP RCIC STEAH SUPPLY VLV TO TURBINE-LIMITER PLATE IS THE'WRONG SIZE-REPLACE WITH ONE-THAT IS A THREE AND ONE FOURTH HOVING CONTACTS ON BREAKER ARE WORN)NEED TO BE REPLACED FOUND WHILE PERFORMING N2-EPM"GEN-R550 REMOVED COIL REPLACED COIL ANO TESTED PER GEN 513 REPLACED CONTROL FUSE IN PNL 861 INSTALLED BREAKER STOP PLATES REPAIRED BENT INTERFERENCE'TOP PLATE ON SWG103 CUBICLE 4 WR198705 WRITTEN TO REPLACE MISSING STOP PLATE IN CUBICLE 11.STOP PLATE ON 11 REPLACED FROH ONE REMOVED FROM CUBICLE 6 WR198705 CUBICLE DOOR WAS ALIGNED AND CAUTION LABELS INSTALLED PER DER 2-91-Q-0317.
NOTE LABELS INSTALLED ON WR 124864-SEE QCIR 2-91-0448 REPLACE CONTROL FUSE IN 2GTS-A06-Fl CIRCUIT REPLACED BROKEN DOOR HANDLE AND ADJUSTED ROLLERS PERFORHED EQ INSPECTION OF PLUG DISCONNECTED AND-'RECONNECTED PLUGS PER PR 9546 THE CURRENT LIHITER PLATE INSTALLED IS ACCEPTABLE AND IS NOT REQUIRED TO BE CHANGED INSTALLED ON ALL THREE PHASES NEW MOVABLE HAIN CONTACTS f~1 13:13'2 01-09-92 CLASS I WORK-ELECTRICAL HAINTENANCE 1991 PAGE 4 WR NUMBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W159176 W159202 W159212 W159282 W1 59340 W1 59341 W159342 W1 59343'W159344 W159345 W159346'W159348 ENS-2ENS4SWG 101 RHS-2RHSoMOV 1C RHS-2RHSeMOV 8B SWP"2SWP4MOV 338 SWP-2SWPAHOV 17A SWP-2SWPAHOV 178 SWP-2SWPAMOV 18A SWP-2SWPCMOV 18B SWP-2SWP4 MOV 74A SWP-2SWPAHOV 748 SWP-2SWPCMOV 74C SWP-2SWPAHOV 74E RELAY 27CC FOR CIRCUIT NO.2ENSA24 FAILED TO ACTUATE ON A TOTAL LOSS OF VOLTAGE TO THE BUS THE OTHER TWO PHASE UNDERVOLTAGE RELAYS DID ACTUATE.PLEASE TROUBLESHOOT AND REPAIR TAG ON 2ENSQSWG101 TORQUE SWITCH LIMITER PLATE IS THE WRONG ONE FOR VALVE PER EP-110 REPLACE LIMITER PLATE HRD 40362 PART NUHBER 9327343 LIHITING PLATE ON TS IS C/2 AND 2 1/4 SHOULD BE 2 1/2 C AND 2 1/2 0 PLEASE REPLACE LIHIT PLATE WHEN AVAILABLE (EP-410)2SWPeMOV338 DOES NOT APPEAR TO BE TORQUING OUT WHEN GOING CLOSED TROUBLESHOOT REPLACE HOTOR PINION KEY WITH ONE FABRICATED FROH 1018 STEEL REFERENCE IN 88-84 AND NHP64495 REPLACE HOTOR PINION KEY WITH ONE FABRICATED FROH 1018 STEEL REFERENCE IN 88-84 AND NMP 64495 REPLACE HOTOR PINION KEY WITH ONE FABRICATED FROH 1018 STEEL REFERENCE IN 88-84 AND NHP 64495 REPLACE HOTOR PINION KEY'WITH ONE FABRICATED FROM 1018 STEEL REFERENCE IN 88-84 AND NHP 64495 REPLACE HOTOR PINION KEY'WITH ONE FABRICATED FROM 1018 STEEL REFERENCE IN 88-84 AND NHP 64495 REPLACE MOTOR PINION KEY WITH ONE FABRICATED FROH 1018 STEEL.REFERENCE IN 88-84 AND NHP 64495 REPLACE MOTOR PINION KEY WITH ONE FABRICATED FROM 1018 STEEL REFERENCE IN 88-84 AND NMP 64495 REPLACE HOTOR PINION KEY WITH ONE FABRICATED FROH 1018 STEEL REFERENCE IN 88-84 AND NHP 64495 TROUBLESHOOTING STEPS ALLOWED TARGET TO OPERATE PROPERLY REPLACED ORIGINAL LIHITER PLATE PER EP-410 REQUIREMENTS REPLACED OLD L IHI TER PLATE WITH NE'2 1/2 PLATE INSTALLED CORRECT SIZE LIMITER PLATE PER EP 410 OPERATOR NE'W HAS ABILITY TO GO TO 2 1/2 AND 2 1/2 ON TORQUE SWITCH SETTINGS REPLACED SUSPECT BAD PINION KEY WITH HEll REPLACED HOTOR PINION KEY REPLACED HOTOR PINION KEY PER IN-88-84 AND NHP64495l REPLACED LIHITER PLATE ON TORQUE 5'WITCH PER EP-410-PLATE CHANGE FROH 1 1/2 TO 2 REPLACED HOTOR PINION KEY REPLACED KEY IN HOTOR SHAFT AND LIHIT SWITCH COHPARTHENT GASKET CALLED JEFF DEAN ON REPLACING GASKET NO INSPECTION REQUIRED REPLACED HOTOR SHAFT TO PINION KEY PER NRC NOTICE 88-84 REPLACED KEY FOR MOTOR PINION REPLACED MOTOR PINION GEAR KEY l'
13:13:22 01-09-92 CLASS I WORK-ELECTRICAL HAINTENANCE 1991 PAGE:5 WR NUMBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W1 59350 W159351 W1 59352 W1 59353 ICS-2 I CS4HOV 122 RHS"2RHS0HOV 1C RHS-2RHSCHOV 115 RHS-2RHSAMOV 116 REPLACE HOTOR PINION KEY WITH ONE FABRICATED FROH 1018 STEEL.REFERENCE IN 88-84 AND NHP 64495 REPLACE HOTOR PINION KEY WITH ONE FABRICATED FROH 1018 STEEL REFERENCE IN 88-84 AND NHP 64495 REPLACE MOTOR PINION KEY WITH ONE FABRICATED FROH 1018 STEEL REFERENCE IN 88-84 AND NHP 64495 REPLACE HOTOR P INION KEY WITH ONE FABRICATED FROM 1018 STEEL REFERENCE IN 88-84 AND NHP 64495 INSTALLED NEW HOTOR PINION AS PER IN 88"84 REPLACED HOTOR PINION.KEY WITH ONE OF 1018 STEEL REPLACED KEY STOCK WITH NE'W PC CUT FROH CAT I STOCK REPLACED HOTOR PINION KEY WITH NEW 1018 FROH INTERH STORAGE NRC IE NOTICE 88-84 W161381 HTS-2HTS4PNL REPLACE BURNED OUT FAN IN 2HTS4'PNL001 001 W161734 EHS-2EHSAHCC AUX CONTACTS'WIRED 13 AND 14 FAIL TO HAKEUP WHEN 303-17D TESTED PER R520-REPLACE CONTACT AUX BLOCK REPLACED COOLING FAN IN PANEL 2HTSQ PNL001 AUX CONTACT 13 AND 14 ARE SPARE CONTACTS 2EHSAHCC303-12D PASSED ACCEPTANCE CRITERIA OF N2-EPH-GEN-R520 PERFORHED AND COHPLETE 901121 NO CORRECTIVE ACTION REQUIRED PER STEP 7 3 9 W161750 W161761 W162316 EJS-2EJSx PNL 104A BYS-2BYSABAT 2B EGS-2EGSoEG3 2 SCREWS NEEDED ON PNL COVER 2 ARE STRIPES AND NEED TO BE RETAPED TO A SIZE LARGER PNL LOCATE IN RX BUILDING EL 240 ABN PLEASE REPLACE FLASH ARRESTOR ON 59-REPLACE FLASH ARRESTER CAP/LID ON 45 AS A RESULT OF THE PROBLEMS FOUND IN THE DIV I EHERG DIESEL CONTROL RELAYS (HIGH CONTACT'ESISTANCE)
PERFORH TROUBLESHOOTING OF THE DIV II DIESELS GOVERNOR SPFED CONTROL CIRCUITS FOR POTENTIAL ADJUSTMENTS OR RELAY REPLACEHENTS REPLACED BOLTS REPLACE FLASH ARRESTER ON CELL 59 AND THE FLASH ARRESTER LID ON CELL 45 NO RELAYS)ADJUSTED OR REPLACED RELAYS RETURNED TO STORES REF.HATL RETURN 056098'W162358 EGS-2EGS4EG1 PERFORM CHECKS OF RELAYS REHOVED FROM 2EGSOEG1 PER WR W184827 (SEE DAN LEHAY-KEENO LAHPHAN)ACCORDING TO THE ATTACHED GUIDE.(4EX3 4LSYN1 4LSYN2)TESTED RELAYS 4EX3 4LSYN1 TESTED GOODs SEE ATTACHED SHEET W1 62376 HVR-2HVR4'HST 401C INSTALL MISSING FUSE F2 2HVRC11 IN HST401C.VERIFY NO GROUNDS PRIOR TO INSTALLATION VERIFY FUSE CONTINUITY AFTER INSTALLATION REF DER 2-91-Q-0722 CONTACT HIKE DOWNS PRIOR TO WORK INSTALL FUSE
13:13:22 01-09-92 CLASS I WORK-ELECTRICAL HAINTENANCE 1991 PAGE:6 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W16 5334 W165487 BYS-28YSIBAT 2C HVR 28YS4BAT2C WAS A 10V.GROUND ON POSITIVE BUS AND A 40V GROUND ON THE NEGATIVE BUS (THIS HAS BEEN DETERHINED NOT TO BE ON BATTERY)TROUBLESHOOT INVESTIGATE WHERE GROUNDS ARE CONNECTED TROUBLESHOOT ONLY HVR-32A SAHPLE PUMP IS HAKING AN EXCESSIVE AMOUNT OF NOISE (RX 289)AS OF 910123 NO GROUND DETECTED AT PNL 852 DETERH/RETERH TO SUPPORT TECH REPLACEHENT OF PUHP HOTOR W168601 RHS-2HVR4 CAB 32A CHS-2CMS4TE1 01 BISCO LOCASEAL SEALANT TO ENVIRONHENTALLY SEAL THE RTD ENCLOSURE AROUND THE PROBE PER EDC2E10365 AND SDC NUMBER SC2-0042-90 INSTALLED BISCO SEALANT ABOVE AS PER EDC W168602'W168603 W168604 W168605'W168606 W168607'W168608 W168609 CHS-2CHS4TE1 02 CHS"2CHS0TE1 03 CMS-2CHS4TE1 04 CHS-2CHS4TE1 05 CHS-2CMS4TE1 06 CHS-2CHSoTE1 07 CHS-2CHSNTE1 08 C HS-2 C M 5 4'E 1 09 BISCO LOCASEAL SEALANT TO ENVIRONHENTALLY SEAL THE RTD ENCLOSURE AROUND THE PROBE PER SDC NUMBER SC2-0042-90 BISCO LOCASEAL SEALANT TO ENVIRONMENTALLY SEAL THE RTD ENCLOSURE AROUND THE PROBE PER SDC NUMBER SC2-0042-90 8ISCO LOCASEAL SEALANT TO ENVIRONHENTALLY SEAL THE RTD ENCLOSURE AROUND THE PROBE PER SDC NUHBER SC2-0042-90.
BISCO LOCASEAL SEALANT TO ENVIRONHENTALLY SEAL THE RTD ENCLOSURE AROUND THE PROBE PER SDC NUHBER SC2-0042-90.
BISCO LOCASEAL SEALANT TO ENVIRONHENTALLY SEAL THE RTD ENCLOSURE AROUND THE PROBE PER SDC NUMBER SC2-0042-90.
BISCO LOCASEAL SEALANT TO ENVIRONHENTALLY SEAL THE RTD ENCLOSURE AROUND THE PROBE PER SDC NUMBER SC2-0042-90 BISCO LOCASEAL SEALANT TO ENVIRONMENTALLY SEAL THE RTD ENCLOSURE AROUND THE PROBE PER SDC NUMBER SC2-0042-90 BISCO LOCASEAL SEALANT TO ENVIRONMENTALLY SEAL THE RTD ENCLOSURE AROUND THE PROBE PER SDC NUMBER SC2-0042-90 INSTALLED BISCO SEALANT AS PER EDC ABOVE INSTALLED BISCO SEALANT AS PER EDC ABOVE INSTALLED 8 ISCO SEALANT AS PER EDC ABOVE INSTALLED BISCO SEALANT AS PER EDC ABOVE INSTALLED BISCO SEALANT AS PER EDC ABOVE 8ISCO SEAL PER EDC 2E10365 8ISCO SEAL PER EDC 2E10365 BISCO SEAL CONDULET PER EDC 2E10365
13:13:22 01-09-92 CLASS I WORK-ELECTRICAL HAINTENANCE 1991 PAGE:7 WR NUMBER EPN NUMBER FAILURE DESC CORRECTIVE ACTION W168610 W168611 W168612 W168613'W168614 W168615 W168616 W168617'W168618 W168647 W168648 W168650 CHS-2CHSe TE1 16 CHS-2CMSATE1 17 CMS-2CMS<TE1 18 CHS-2CMSATE1 19 CMS-2CHSeTE1 20 CMS-2CMSATE1 21 CHS-2CMS<TE1 22 CHS-2CMSATE1 23 CMS-2CMSNTE1 24 ENS-2ENSNSWG 103-14 ENS-2ENS4'SWG 103-15 CCP-2CCP4MOV 188 BISCO LOCASEAL SEALANT TO ENVIRONHENTALLY SEAL THE RTD ENCLOSURE AROUND THE PROBE PER SDC NUHBER SC2-0042-90.
BISCO LOCASEAL SEALANT TO ENVIRONMENTALLY SEAL THE RTD ENCLOSURE AROUND THE PROBE PER SDC NUMBER SC2-0042-90.
BISCO LOCASEAL SEALANT TO ENVIRONHENTALLY SEAL THE RTD ENCLOSURE AROUND THE PROBE SDC NUMBER SC2-0042-90.
BISCO LOCASEAL SEALANT TO ENVIRONHENTALLY SEAL THE RTD ENCLOSURE AROUND THE PROBE PER SDC NUHBER SC2-0042-90 DISCO LOCASEAL SEALANT TO ENVIRONHENTALLY SEAL THE RTD ENCLOSURE AROUND THE PROBE PER SDC NUMBER SC2"0042-90.
BISCO LOCASEAL SEALANT TO ENVIRONHENTALLY SEAL THE RTD ENCLOSURE AROUND THE PROBE PER SDC NUHBER SC2-0042-90 BISCO LOCASEAL SEALANT TO ENVIRONHENTALLY SEAL THE RTD ENCLOSURE AROUND THE PROBE PER SDC NUHBER SC2-0042-90 8ISCO LOCASEAL SEALANT TO ENVIRONHENTALLY SEAL THE RTD ENCLOSURE AROUND THE PROBE PER SDC NUMBER SC2-0042-90.
BISCO LOCASEAL SEALANT TO ENVIRONHENTALLY SEAL THE RTD ENCLOSURE AROUND THE PROBE PER SDC NUMBER SC2-0042-90 WE FOUND WHEN DOING PH 2 DAHAGED UT AND UL FUSE BLOCKS IN 2ENSASWG103-14 CUB PLEASE REPLACE PULL OUTS ONLY TO BE REPLACED FUSE-BLOCK IS DAMAGED PLEASE REPLACE BAD PART LOCATION 2ENSSWG103-15 UT FUSE BLOCK PULLOUT SECTION INSPECT TORQUE SWITCH AND ADJUST IF NECESSARY PER SPEC'S ON EP-4108 REPLACE LIHITER PLATE IF APPLICABLE INSTALLED BISCO SEALANT AS PER EDC ABOVE INSTALLED BISCO SEALANT AS PER EDC ABOVE INSTALLED BISCO SEALANT AS PER EDC ABOVE INSTALLED BISCO SEALANT AS PER EDC ABOVE ALSO INSTALLED NEW COVER ON TEHP ELEMENT BODY INSTALLED 8 ISCO-SEALANT AS PER EDC ABOVE INSTALLED BISCO SEALANT AS PER EDC ABOVE.BISCO SEAL CONDULET PER EDC 2E10365 8ISCO SEAL PER EDC 2E10365 BISCO SEALED CONDULET PER EDC 2E10365 REPLACED CRACKED FUSE HOLDER WITH NEW REPLACED UT FUSEBLOCK WITH NEW ONE FROM STORES TORQUE SWITCH WAS ADJUSTED TO AGREE WTIH EP-410 OPEN 2 CLOSE 2 r
13:13:22 01-09-92 CLASS I MORK-ELECTRICAL HAINTENANCE 1991 PAGE:8 MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION'M168652'W168681 W168682'M174810 M1 74814 M174817 W174818'W174823 M174824 W174825 SWP-2SWPAHOV 77A HCS-2HCSAPNL 22A HISC-NOCOHP I D ICS-2ICSNHOV 120 MHR-2HHRNCRN 1 ICS-2ICS4HOV 148 CSH-2CSHAHOV 101 CSH-2CSH4HOV ill CSH-2CSH4HOV 112 CSH-2CSHNHOV 118 IDENTIFY CORRECT LIHITER PLATE AND SETTINGS PER EP 410 FOR TORQUE SWITCH AND REPAIR REPLACE AS NECESSARY PERFORH INSPECTIONS ON 2HCSAPNL22A PER ATTACHED SHI-5.3-001 REPLACE RELAY FACE GLASS THAT MAS REHOVED AND USED FOR CORRECTIVE ACTION ON WR 189685 RELAY FACE ORDERED ON HSRF E043197.RELAY HAS BEEN RETURNED TO STORES ON HATERIAL RETURN NO 055516.ORIG HATERIAL ISSUE NO 136809 PLEASE INCREASE THE TORQUE VALVES UP TO 3 0 ON THE OPEN AND CLOSED SIDE" OF THE TORQUE SMITCH ON VALVE 21CSAHOV120 PER LETTER AS CORRECTED SH2-H91-0260 INEL DIAGNOSTIC TEST RESULT REPORT WESTINGHOUSE RELAYS LOCATED ON THE RX BLDG CRANE POLAR NEED TO BE CHANGED OUT PER INFORHATION NOTICE 91-45 ATTACHED PLEASE INCREASE THE TORQUE TO 1 1/2 ON THE OPEN AND CLOSED SIDE OF THE TORQUE SWITCH FOR VALVE 2ICS4HOV148 PER LETTER AS CORRECTED SH2-H91-0260 INEL DIAGNOSTIC TEST RESULT REPORT PLEASE INCREASE TORQUE S'MITCH ON VALVE 2CSH4HOV101 TO 2 AND ONE-HALF PER LETTER AS CORRECTED SH2-H91-0260 INEL DIAGNOSTIC TEST RESULT REPORT PLEASE INCREASE TORQUE SWITCH ON VALVE 2CSHc(HOV111 TO 2 AND THREE"QUARTERS PER LETTER AS CORRECTED SH2-H91-0260 INEL DIAGNOSTIC TEST RESULT REPORT PLEASE INCREASE TORQUE 5'MITCH ON VALVE 2CSHeHOV112 TO 2 AND QUARTER PER LETTER AS CORRECTED SH2-H91-0260 INEL DIAGNOSTIC TEST RESULT REPORT PLEASE INCREASE TORQUE SMITCH ON VALVE 2CSHHOV118 TO 2.0 PER LETTER AS CORRECTED SH2-H91-0260 INEL DIAGNOSTIC TEST RESULT REPORT READJUST.FOUND CLOSE SIDE OF TORQUE SMITCH SET AT 1 RESET TO 1 1/4 PERFORHED INSPECTION
'CHANGED RELAY COVER WITH NEM-RETURNED RELAY TO STORE REF HATL RETURN 054103 REPLACED LIHITER PLATE AND.-ADJUSTED TORQUE SMITCH SETTING NO RELAYS NOTED IN NOTICE 91-45 MERE FOUND REPLACED TORQUE S'MITCH LIHITER PLATE AND ADJUSTED TO 1 1/2 AND 1 1/2 TORQUE S'MITCH RESET 2CSHoHOV101 TORQUE SMITCH TO 2 1/2 OPEN AND CLOSED PER ATTACHED LETTER)AND ATTACHED HAINT INSTRUCTION ADJUSTED TORQUE SWITCH AS DIRECTED BY MR.STROKED OPERATOR AND'MORKING SAT INCREASED TORQUE S'WITCH ON 2CSHeHOV112 TO 2 1/4 IN PER ATTACHED LETTER AND HAINT INSTRUCTION INCREASED TORQUE SMITCH TO 2 OPEN AND CLOSED PER ATTACHED LETTER AND HAINT INSTRUCTION J1 h 4 13:13'2 01-09-92 CLASS I WORK-ELECTRICAL HAINTENANCE 1991 PAGE:9'MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION'M174827 M1 74829 W176139'M1 7622 2'M176231 W1 76233 W1 76236 W1 76237 M176243 W176293 M1 76354 CSH"2CSH4HOV 105 CSH-2CSHeHOV 110 ENS-2ENS4SMG 103-7 ENS-2ENSASMG 102-2 EHS-2EHSoHCC 302 EHS-2EHS4HCC 102 EPS-2EPS4'SWG 001 EPS-2EPSASMG 002 CES-2CES4(RAK 011 GTS-2GTS4PNL 30A I CS-2 I CS4 HOV 124 PLEASE INCREASE TORQUE S'MITCH ON VALVE 2CSHOHOV105 TO 2 PER LETTER AS CORRECTED SH2-H91-0260 INEL DIAGNOSTIC TEST RESULT REPORT PLEASE INCREASE TORQUE SWITCH ON VALVE 2CSH4HOV110 TO 2 ANO ONE-QUARTER PER LETTER AS CORRECTED SH2-H91-0260 INEL DIAGNOSTIC TEST RESULT REPORT UPPER DOOR LATCH IS HISSING PARTS UPPER CENTER AND LOWER DOOR LATCH ARE LOOSE AND NEED ADJUSTMENT UPPER AND CENTER DOOR LATCH HECHANISH NEED ADJUSTHENT AND LOWER LATCH IS HISSING PARTS CIRCUIT BREAKER PANEL 6C HAS A HISSING LATCH HECHANISH SO IT WILL NOT STAY SECURELY SHUT LOCATED RB 240 SOUTH AUX BAY CIRCUIT BREAKER PANEL 190 HAS A HISSING LATCH HECHANISH SO IT WILL NOT STAY SECURELY SHUT LOCATED RB 240 NORTH AUX BAY CUBICLE DOOR THUHBSCREW IS HISSING NUT AND MILL NOT ENGAGE.W IP TMO CUBICLE DOOR THUHB SCRE'MS ARE HISSING NUTS AND'MILL NOT ENGAGE W IP PANEL COVER IS HISSING ONE HOLDOWN CLIP.PLEASE REPLACE LOCATED ON INSTRUMENT RACK 2CESCRAK011 RB ELFVATION 289'PANEL COVER HISSING 5 OF 11 HOLD DOWN CLIPS PLEASE REPLACE LOCATION SBGT-A ROOH SOUTHMALL WHEN ICSeHOV124 REACHES FULL OPEN IT CAUSES AN INSTANTANEOUS GROUND ON DIVISION I BATTERY BUS 002A ANNUNCIATOR 852108 INVESTIGATE RESET TORQUE SWITCH ON 2CSHAHOV105 TO 2 OPEN AND CLOSED PER ATTACHED LETTER AND ATTACHED HAINT.INSTRUCTION RESET TORQUE S'MITCH AT 2CSH4HOV110 TO 2 1/4 OPEN AND CLOSED PER ATTACHED HAINT INST AND LETTER REPLACED BLOWN CONTROL FUSE AT 2EHS4 HCC201-6B REPLACED THE UPPER LATCH AND ADJUSTED THE CENTER AND LOWER.LATCHES REPLACED UPPER AND LO'WER DOOR LATCHES ON 102-2 DOOR REPLACED LATCH HECHANISH REPLACED BROKEN LATCH HECHANISH REPLACED HISSING HOLD DOMN NUTS IN S'MITCH GEAR REPLACED HISSING HOLD DOWN NUTS IN S'MITCH GEAR REPLACED HISSING COVER CLIP REPLACED HISSING CLIPS WITH NEW TEST RAN HOVe NO GROUND OCCURED ON BAT2A S
13-13-22 01-09-92 CLASS I WORK-ELECTRICAL HAINTENANCE 1991 PAGE10 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W176391 W176565 W176899'M177071 M177072 W177073 W177074'M177266'M177302'W177605 RHS-2RHS¹HOV 4A ENS-2ENS¹SWG 101-10 SLS-2SLS¹HCV ill CCP-2CCP¹HOV 14A CCP-2CCP¹HOV 148 CCP-2CCP¹HOV 188 CCP-2CCP¹HOV 188 SWP RHS-2SWP¹CAB 1468 GTS-2GTS¹PNL 308 SWP-2SWP¹HOV 398 2RHS¹HOV4A HAS SHALL OIL LEAK FROH GEAR BOX P1A RECIRC ISOLATION VALVE ELEVATION 196 SOUTH VALVE PIT DOES NOT AFFECT VALVE OPERABILITY UPPER AND LOWER DOOR LATCH NOT WORKING PROPERLY UNABLE TO OPEN DOOR 261 CONTROL BLDG DIV 1 SWG ROOH VALVE INDICATES NOT FULL OPEN WHEN VALVE IS OPEN (DUEL INDICATION)
TROUBLESHOOT AS NEEDED VALVE LOCATED RX BLDG 289 EAST W IP REPLACE HOTOR PINION KEY WITH ONE FABRICATED FROH 1018 STEEL REFERENCE IN 88-84 AND NHP 64495 REPLACE HOTOR PINION KEY MITH ONE FABRICATED FROM 1018 STEEL.REFERENCE IN 88-84 AND NHP 64495 REPLACE HOTOR PINION KEY WITH ONE FABRICATED FROH 1018 STEEL REFERENCE IN 88-84 AND NHP 64495 REPLACE HOTOR PINION KEY WITH ONE FABRICATED FROH 1018 STEEL REFERENCE IN 88-84 AND NHP 64495 SAHPLE PUHP IS RUNNING HOT-REPLACE BEARINGS AS NECESSARY TAG LOCATED ON SKID TB 250 SOUTHWEST SERVICE WATER BAY (ALSO TROUBLESHOOT FLOW SWITCH)PANEL COVER IS HISSING SEVERAL HOLD DOWN CLIPS.SPGT 8 ROOH 268 OIL LEAKING FROH LIHITORQUE HOTOR HOUSING FOR VALVE 2SWP¹HOV398.
LOCATION RB 261 APPROX AZ 90 DEG.TAG HUNG ON SMP¹HOV398 CLEANED AND TIGHTENED GEARED LIHIT COVER SCREWS WHILE PERFORHING N2-EPH-GEN-R520.
DID NOT USE N2-EHP-GEN-510 REPLACED THE UPPER AND LOWER DOOR LATCH ADJUSTED ACTUATOR ARH ON OPEN END LIHIT SWITCH TO PROPER POSITION AND STROKED VALVE OPEN AND CLOSED I INSTALLED NEW KEY ONTO HOTOR PINION GEAR PER REFERENCE 88"84 REPLACED KEY WAY AND SAFETY WIRE REPLACED OLD HTR PINION'KEY WITH NEW ONE HADE OF 1018 STEEL AS PER IN 88-84 ABOVE.REPLACED PARTS PUHP CHANGED OUT UNDER HOD 90-044 REPLACED HISSING CLIPS WITH NE'M ONES REPLACED ALL SEALS DEGREASED AND REGREASED AND REINSTALLED W1 78816 W1 78891 VBA-2VBA¹UPS 2A GTS-3XS-2GTS A06 STATUS BOARD AT THE UPS IS SHOWING A BLO'MN FUSE REPLACE FUSE AND REPAIR AS NECESSARY REPLACED BLOWN FUSE DURING OSP-GTS-R001 THE HFA RELAY 3 X 5 ESK 7GTS01 REPLACED HFA RELAY 3 X 5 2GTSA06 SHEET 1 PICKED UP ON INITIATION BUT RESET WITHOUT A RESET SIGNAL PRESENT TAG ON PNL 870
13:13:22 01-09-92 CLASS I WORK-ELECTRICAL HAINTENANCE 1991 PAGE11 MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION M179010 M179012 M179013 M179022'M179027'M179050 W179051'M179065 L AC-2L A CO'P NL 300B BYS-ZBYSABAT 2C E JA-2E JAN PNL 3018 SLS-ZEHSAHCC 102-16D S'MP-NOCOHPID VBS-ZVBS4 PNL 102A EGA-ZEGAeH1B ENS WHILE PERFORHING PH ON THIS PANEL USING PROC A584 FOUND 1/4 INCH CAPTIVE NUT MISSING ON LEFT SIDE OF OUTSIDE PANEL COVER PLEASE REPLACE FLASH ARRESTORS ARE BROKEN REQUIRE REPLACEHENT AT CELLS 3I 18I 34 WHILE PERFORHING PH ON ABOVE COHPONENT USING PROC A584 FOUND HISSING BOLT IN BOTTOM LEFT CORNER OF OUTSIDE PANEL COVER.PLEASE REPLACE ON ZEHSNHCC102-16D THE OPERATING HANDLE HAS A DEFECTIVE INTERLOCK ASSEHBLY PLEASE REPLACE SHAFT ROTATES HARD SUSPECT BAD BEARING REPAIR AS NECESSARY.
LOCATION L-6B HP 3/4 HAIN WAREHOUSE FOUND DURING PROC.S-EPH-GEN-V061 WHILE PREFORHING PH ON PNL USING PROC A584 FOUND HISSING INSIDE PNL NAHE TAG PLEASE REPLACE WITH NEM ONE DEF TAG 19838 HAVE J NOBLE CARVE NEW TAG.SHORTEN AND RETRAIN HOTOR LEADS TO REHOVE EXCESSIVE MIRE AT ZEHS4HCC303-12E DEF TAG 14640 DISCOVERED WHILE PERFORMING N2-EPH-GEN-R580 WHILE INSTALLING HOD N2-89-065 FOUND THAT RELAY 52X"1-2SMPB01
'MAS INCORRECTLY LABELED 52X-2SWPB01 E AND OCR P40675 AND 5 AND M PRING 1 320-907-271J CARD 16 STATE THAT RELAY NAHE PLATE SHOULD BE 52X-1-2SMPB01 PLEASE INSTALL NEM NAHE PLATE INSTALL NEW CAPTIVE NUT REPLACED FLASH ARRESTORS ON CELLS 3 18 34 AND 59 REPLACE SCREMS REPAIRED EXISTING INTERLOCK ASSEHBLY HSRF E 043288 MRITTEN TO HAVE FLIHITORQUE VENDOR REPLACE BEARINGS HATERIAL RETURN 052427 RETURN TO STACK REPLACED TAG SHORTENED AND RETRAINED HOTOR LEADS INSTALLED CORRECT NAHEPLATE M179072 M1 79103 SMP-ZENSSMG 103-11 EHS-ZEHSAHCC 303-28 EHS-ZEHSoHCC 201-9C RFHOVE RELAY'RA'ROH REAR OF CUBICLE SO CONTACT REPLACED RELAY BLOCK CAN BE USED FOR REPAIR ON MR 169981 (74-ZGTSB01)
~REPLACE RELAY WHEN PARTS ARE AVAILABLE.
261 CONTROL BLDG DIV II I EHERGENCY SMITCH GEAR.HI 154881 SYH NUHBER 93-95-416 REPLACE HANUAL.RESET HECHANISH ON DOOR OF CUBICLE REPLACED RESET 9C OF HCC 201 I 1g t: tV I 4I 4 13:13:22 01-09-92 CLASS I WORK-ELECTRICAL HAINTENANCE 1991 PAGE12 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W179118 W179133 W1 79138 SWP-2SWP4 HOV 778 E JS-2E JS4 US1-5D RPS-K58"2RPS N01 THERE IS NO TORQUE S'WITCH LIHITER PLATE INSTALLED ON TORQUE SWITCH LIHITER PLATE SHOULD BE (1 1/2 OPEN 1 1/2 CLOSED)PER EP 410.INTERNAL LOCK OUT BRACKET IS MISSING RELAY C72A-K58 LOCATED IN 2CECCPNL609 BAY A IS INCORRECTLY LABELED C729-K58 RELABEL RELAY USING KROY HARKERS INSTALLED LIMITER PLATE INSTALLED NEll BRACKET REPLACE LABEL C729-K58 WITH LABEL C72A-K58 W179159-RHS-2RHSAP1C REPLACE THE OIL RESERVOIR GLASS 0-RINGS AT THE FIRST MAINTENANCE OPPORTUNITY FOR THE RESIDUAL HEAT REMOVAL PUMP HOTORS (GE SIL 484)CHANGED OIL AND REPLACED ORINGS ON THE OIL RESERVOIR GLASS AND DRAIN PLUG PER RECOMHENDED ACTION SIL 484 W179162'W179179 W1 79191 W1 79192 W1 79197 W179370 W179425 CSH-2CSHAM1 ENS-2ENS4'SWG 101-N1 HTS-2HTSAPNL 003 HTS-2HTSCPNL 003 HTS-2HTS4PNL 001 RHS-2RHSAAOV 16C CEC-NOCOMP ID REPLACE THE OIL RESERVOIR SIGHT GLASS 0-RINGS AT THE FIRST HAINTENANCE OPPORTUNITY FOR THE HIGH PRESSURE CORE SPRAY PUMP HOTOR (GE SIL 484)IN 2ENSASWG101 CUB N1 FOUND WIRE'WITH SCRAPED INSULATION GOING BETWEEN TB CC PT 12 AND TB STBG PT 3 REPLACE WIRE AS IDENTIFIED BY PROCEDURE N2-EPH-GEN-A784 CIRCUIT POWER REQUIREHENTS FELL OUTSIDE ACCEPTANCE CRITERIA.DESIRED TEHP OF LINE WAS HOWEVER ACCEPTABLE (310 DEGREES F)INVESTIGATE AND REPAIR HEAT TRACE FROH PNL 2HTS4'PNL003 FAILED THE CALCULATED
~CHANGE IN POWER CRITERIA PER NZ-EPHOGENOA784.
WHILE PERFORHING N2-EPH-GEN-A784 HEAT TAPE PH CKT 14 DID NOT HEET THE ACCEPTANCE CRITERIA FOR HEGOHHS VALUE OF GREATER THAN OR EQUAL TO 20 HR HEGGER READING IS.5HR TROUBLESHOOT W IP PACKING IS LEAKING TAKE UP ON PACKING VERTICAL LOCKING BARS HISSING FROM CONTROL AND RELAY ROOM CABINET DOORS FOR 2CEC4PNL631 2CECQPNL899 AND 2SVV4 IPNL140.REPLACED UPPER AND LOWER RESERVOIR SIGHT GLASS 0-RINGS AND DRAIN PLUG 0-RINGS INSTALLED NEW LOWER DRAIN PLUG REPLACED WIRE IN CUBICLE REPLACED FAILED HEAT TRACE WITH NEW PASSES ACCEPT CRIT.PER N2-EPH-GEN-A784 REPLACED HEAT TRACEr'NEW TRACE MEETS ACCEPT CRIT OF N2-EPH-GEN-A784 REPLACED HEAT TRACE ON 2HTS-PNL001 CK114 ADJUSTED LIHIT SWITCHES INSTALLED OPERATING RODS AND BRACKETS ON PNL631)899-NEW'WR WRITTEN FOR PNL 140
13:13 22 01-09-92 CLASS I'WORK-ELECTRICAL HAINTENANCE 1991 PAGE13 MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W180695'W182836 M182845 M182860 M1 82889.CEC-2CECAPNL 629 EHS-2EHS4HCC 303-58 EHS-2EHSNHCC 201-6A EHS-2EHS4HCC 303-10C ENS-2ENSCSMG 101 TRIP UNIT B22-N692A ON H13-P629 IS LABELED B22-672A TAG HUNG ON PNL 629 PLEASE RELABEL PRIHARY HOLDED CASE BKR FAILS D.L R.O OF SURVEILLANCE PROCEDURE.
REPLACE BKR.TAG LOCATED AT CUBICLE CSB 261 REPLACE HISSING SCRE'M ON OVERLOAD RELAY-SCRE'W THAT HOLDS HEATER IN PLACE SCREM REHOVED ON WR 182841 BREAKER DID NOT PASS 0 L R 0 READINGS REPLACE BREAKER AS REQUIRED.BREAKER IS TOP BREAKER INSIDE OF DUAL BREAKER ENCLOSURE REPLACE OT ELEVATOR FUSES'WITH TR10R FUSES PER PR 09192-EDC 2E102084 REPLACED LABEL ON PNL P629 REPLACED BREAKER WITH SPARE FROH 2EHSCHCC303-4D W154468~BREAKER'WAS TESTED ON'MR 154468 RAN VALVE FOR PROPER OPERATION REPLACED OVERLOAD HEATER BOTTOH SCREW REPLACED BREAKER WITH SPARE FROM 2EHS4'HCC303-4C
'WR 154469 RAN VALVE FOR PROPER OPERATION CIRCUIT BREAKER FROH 4C WAS TESTON ON'WR 154469 CHANGED FUSES PER EDC LE10284 ON 2ENS4SMG101 CHANGED ALL ELEVATOR FUSES TO TR10R TYPE.CUBICLE 101-2 ALREADY HAD TYPE TR10R CHECKED CONTINUITY ON ALL FUSES PRIOR TO INSTALLING
'M182890 ENS REPLACE WIRING FROH DEVICE LC TO LB-PREVIOUS RAYCHEH REPAIRS TO'MIRING HAVE HADE REHOVAL INSTALLATION OF ELEV HTR DIFFICULT ALSO REPLACE BLOWN ELEVATE FUSE.TAG PLACED AT CUBICLE DOOR HANDLE REPLACED MIRE FROH LC TO LB REPLACED FUSES W182891 SMP-2ENSoSWG 103-7 EHS-2EHS+HCC 303-11D REPLACE HOLOED CASE CKT BKR-EF3-B070-BKR REHOVED REPLACED 70 AHP ITE BREAKER TO REPLACE DEFECTIVE BKR AT 2EHS4HCC303-9C REF WR 191102.TAG AT HCC M182894 ENS-2ENS4SMG 103-14 THE SPACE HEATERS IN 103-14-15 AND N1 ARE NOT'WORKING.PLEASE REPAIR OR REPLACE THEH.CUB I CLES 103-14 AND 103-Nl ARE THE FEED FROH THE DIESFL AND 103-15 IS A SPARE REPLACED BLOWN FUSE s+/~I 4 F 13:13:22 01-09-92 CLASS I WORK-ELECTRICAL HAINTENANCE 1991 PAGE14 MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION M183057 M183159 CEC-2CEC4 PNL 870 EJS-CA-2EJSA 17 AS REQUIRED BY NCR NO 2-90-0004-HOD NO 88-053 REPLACE EXISTING NUHBER 20 AWG'MIRE INSTALLED IN PANELS 870 AND 871'WITH NUHBER 14 AWG WIRE PNL 870 REHOVE N.20 AWG WIRE BETWEEN TERHINAL BLOCK KK TERH POINT 108 ANO DEVICE 2G1-2HVRA90 TERH 4 REPLACE(INSTALL)
NO.14 AWG WIRE GREEN GE PN 00272A7917P014K005 AND ASSOC LUGS AS REQD~REFERENCE-EOC 2E00084 PAGE 6 (HATERIALS)
ALSO 2E00084 PAGE 5-EDC 2E00084A PAGES 18 AND 19 (CONNECTION)-
EOC 2E00084 PAGES 13 AND 14 AND NCR 2-90-0004 PAGE 4 (MIRING CHANGES REQD)PNL 871 REHOVE NO~20 AWG WIRE BETWEEN TERHINAL BLOCK NN TERH POINT 106 ANO DEVICE SB 1-2HVRB90 TERN 3 REPLACE (INSTALL)NO 14 AWG WIRE YELLOW GE PN DD272A7917P014K004 AND ASSOC LUGS AS REQO REFERENCE EDC 2E00084A PAGE 6 FOR HATERIALS PAGE 5 FOR HATERIALS-PAGES 22 AND 23 FOR CONNECTIONS-PAGES 17 AND 18 FOR CONNECTIONS-NCR 2-90-0004 PAGE 4 (WIRING CHANGES REQD)ATTACHHENTS FOR REFERENCE NCR 2-90-0004 EDC 2E00084 AND EOC 2E00084A CURRENT TRANSDUCER CA-2EJSA17 92CEC4PNL852 FAILED BECAUSE IT DID NOT NEET REQUIRED OUTPUT DURING PROC S"EPH-GEN-2Y071 REPLACE WITH NEM TRANSDUCER REPLACED INCORRECT MIRE SIZE (20 A'MG)MI TH CORRECT SIZE (14 AWG)PER EDC 2E00084 AND 2E00084A REWIRED FROHPOINT NN(106)TO SB-1-2HVRB90 (3)TO RR22 TO SB-1-2HVRB90(4)
IN PNL871 PNL 870 IS FROM PT KK106 TO LG-1-2HVRA90(3)
AND KK(108)TO 2G-1-2HVRA90(4)
REPLACED TRANSDUCER AND VERIFIEO CIRCUITRY FROH TO-2-2EJSA17 TO ERF COHPUTER POINT EJSIA100 M184559 RCS-2RCS4HYV
'LEASE INCREASE THE FCV HINIHUH POSITION INTERLOCK 17A LIHIT SWITCH SETTING AS PER ATTACHED EOC NO 2E10362 OF SDC SC2-0005-91 (REFER TO RESOLUTION OF PR 07751)RECALI BRATED-AD JUST CALIBRATED TO 1.56V TO FOURTEEN PERCENT FOR LIHIT SWITCH OF FCV SWITCH HEASURED IN INCHES PER STEP 2 OF EOC IS ONE AND THREE FOURTHS INCHES M184560 RCS-2RCS4'HYV 178 PLEASE INCREASE THE FCV HINIHUH POSITION INTERLOCK LIHIT SWITCH SETTING AS PER ATTACHED EDC NO.2E10362 OF SOC NO.SC2-0005-91 (REFER TO PR 07751 RESOLUTION)
THE LIHIT S'MITCH.ACTUATED AT 1 54V HEASURED AT TERN 45 46 OF 2CES-PNL 634 RACK 2 BAY 8 THE POSITION FEEDBACK OF 1 54V CORRESPONDING TO FOURTEEN PERCENT VALVE POSITION PER 1L2RCS-099 RVDT CALIBRATION 1 52-1 60V ABOVE WORK CORRESPONDS TO ONE AND ELEVEN SIXTEENTHS INCHES HEASUREO AT LIHIT SMITCH PER EOC-STOP 2 PI t kg 0 13:13=22 01-09-92 CLASS I MORK-ELECTRICAL'AINTENANCE 1991 PAGE 15 WR NUMBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W184819 W184826 W184827 M184865 ICS-2ICS4HOV 150 VBA-2VBANUPS 2A EGS-2EGSof Gl RPH-2RPHoACB 18 2ICS>HOV150 SHOWS DUAL INDICATION FOR VALVE POSITION AT PNL 601 FUSE F81 BLE'W DURING UPS TRANSFER ON LOSS OF LINE 5.REPLACE FUSE.LOCATED CB 261 EL DIV I SMITCHGEAR RH ON LOSS OF OFF SITE POWER (NO 5 LINE)EGS AND EG2 AUTO STARTED AND ENERGIZED DIV I AT 58 8 H2 (LOAD'WAS 900KW)PLEASE ADJUST GOVERNOR SETPOINT TAG LOCATED AT PNL851 AT GOVERNOR CONTROL AEG2 2RPHCAC818 HAS SPURIOUS TRIPS BOTH AC818 AND ACB28 EPA'S MERE FOUND TRIPPED.AC818 SUSPECTED TAG AT P603 TIGHTEN LOCKING NUTS THAT HOLD LIHIT SMITCH ACTUATOR TO VALVE STEH REPLACED FUSE F81 REPLACED RELAY 4EX3 4LSYN1 4LSYN2 TROUBLESHOOT PER ATTACHED TROUBLESHOOT PLAN'M184911 M184912 M1 84987'M187264 M187502 M187511 HCS-2HCS4PNL 228 ENS-2ENS4 SMG 101-1 SWP-2SWPAHOV 158 CHS RHS-2CHSCCAB 108 I CS-2 ICSAAOV 156 HSS-532-2HSS N25 PERFORH INSPECTIONS ON 2HCSIPNL228 PER ATTACHED S-HI-5 3-001 MHILE PERFORHING N2-EPH-GEN-R550 ON 2EWS4SWG101-1 FOUND THAT PIN ON THE DISCHARGE CRANK ARH IS BENT AND CRACKED'WHERE IT IS WELDED TO ARNE ALSO THAT 1/2 IN LOCKWASHER ON BOLT FOR PRIHARY STUB CONNECTOR IS BROKEN.PLEASE REPLACE BOTH PARTS REPLACE DEFECTIVE 0"RING ON LIHIT SMITCH BAYONET ASSEHBLY.GREASE LEAKING FROH BAYONET ASSEMBLY FOUND DURING PERFORHANCE OF N2-EPH"GEN-R520 ERF COHPUTER POINT CHS RU101 DID NOT FAIL WITHIN REQUIRED LIHITS DURING SPDS HOD TEST USING PROC N2-RSP-RHS-R111 QUESTIONS-RP CALS EXT 2594 DURING PERFORHANCE OF N2-OSP-ICS-Q002 AOV 156 FAILED TO INDICATE FULL SHUT.TROUBLESHOOT DESCRIPTIVE LABELS ON SWITCHES 822H-532 AND 822H-533 ARE IN ERROR SINCE THE SWITCHES DO NOT RESET GROUP 10 ISOLATIONS THE SWITCHES ARE LOCATED ON 2CEC0PNL602 INSPECTED 2HCSAPNL228 PER HI REPLACED DEFECTIVE PARTS PER ATTACHED PROCEDURE REPLACED 0-RING ON LIHIT SMITCH ASSEHBLY)LIHIT SMITCH COVER GASKETS (2)AND LIHITORQUE COVER GASKET PROVIDED I&C SUPPORT ADJUSTED LIHIT SWITCHES TO OBTAIN PROPER VALVE INDICATION NEM LABEL INSTALLED W187517 CHS-2CHSASOV 26A 2CHSOSOV26A INDICATES DUAL POSITION WHEN OPENED READJUST L IHIT SMITCH FOR RED LIGHT FOR TROUBLESHOOTING PLAN l
13:13:22 01-09"92 CLASS I WORK-ELECTRICAL HAINTENANCE 1991 PAGE16'MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION M187519 M187526'M187536 M187544 M187546 W187555 M187558 M1 87566 CHS-2CHSASOV 25C CES"2CES4PNL 405 FWS-2FWSAAOV 238 CHS-2CHSASOV 26C HVR-2HVRCSOV 236 SVVwADS 2SVV eNBE229 CES-2CES<PNL 405 EHS-2EHSNHCC 301 2CHSSSOV25C HAS DUAL INDICATION WHEN TAKEN TO SHUT POSITION TAG HUNG AT CEC0PNL873 CHECK CONTINUITY AND OR VOLTAGE DROP AS APPLICABLE CONTACTS OF SM10 2RSSN89 AND SW16-2RSSN95 SWITCHES WERE PLACED IN THE EHERGENCY POSITION AND THEN RETURNED TO NORHAL PER N2-OSP-ADS-R002 NEED TO CHECK TO DECLARE OPERABLE VALVE POSITION INDICATION SHOWS RED AND GREEN LIGHT ILLUHINATED WITH VALVE CLOSED (NO FLOW THRU VALVE)2CHS4SOV26C
-SURVEILLANCE TEST N2-OSP-CHS-R001 SUCT 7 3 109-IT'MOULD NOT HOLD ANY PRESSURE'WHEN CLOSED AND LINE ISOLATED DOWNSTREAH LOCATED RX BLDG EL 215 AZ 117 WHEN ORIGINALLY CLOSED THIS VALVE GAVE CLOSED INDICATION ABOUT 30 HIN LATER IT HAO A DUAL INDICATION.
CYCLING VALVE DID NOT CHANGE DUAL INDICATION 237 FT CONTROL BLDG VERIFY-REHOVE SHUTDOWN TRANSFER SMITCH CONTINUITY AS PER IRC PROCEDURE N2-ISP-SVV-R102 ATTACH 2 8 10 18 (SWITCH NOS SM-10-2RSSN89 AND 5'W-16-2RSSN95 AT REMOTE SHUTDOWN PNL 405)CONTINUITY CHECK TO BE DONE AFTER ICC COHPLETES TESTING PORTION OF PROCEDURE (STEP 7-5.5.2)PERFORH A CONTINUITY CHECK FOR NORHAL POSITION CONTACTS ON THE FOLLOWING SWITCHES AT REHOTE SHUTDOWN PANEL 2CESAPNL405 WHEN REQD BY OPS SURVEILLANCES:
SWITCH 1 2 3 4 5 6 7 8 11 12 13 14 15 BUCKET CONTACTOR 42-2SWRB36 HAIN CONTACTOR IS EXTREHELY HOT.REPLACE SCREENMELL BLDG 261 CONTACTOR HEATERS MERE OFF WHEN PROBLEH MAS FOUND READJUSTED LIHIT SWITCH FOR RED LIGHT FOR TROUBLESHOOT PLAN CHECKED CONTACTS ON ABOVE SWITCHES PER HI AND VERIFIED CONTACTS TO ESK-3K SH 3 OF 3 0007510980752E AND 0007510980766E ALL CONTACTS CHECKED OUT CORRECT ADJUSTED OPEN LIHIT SMITCH ARH TO GIVE PROPER LITE INDICATION IN CONTROL ROOH.MORKS FINE NOW VALVE COIL INSTALLED AND ADJUSTED IND LIGHTS ADJUSTED REED SW CHECKED CONTACT FOR PROPER CONFIGURATION PER ATTACHHENTS AND ESK 3K SHEET 3.PERFORHED CONTINUITY AND VOLTAGE CHECKS FOR NORHAL POSITION OF THE ABOVE SMITCHES IN SHUTDOWN PNL ALL CONTACTS VERIFIED GOOD BUCKET'MAS PULLED STARTER CONTACTOR WAS CHANGED OUT AS A COHPLETE UNIT AND BUCKET WAS THEN RE INSTALLED CONTACTOR WAS OBTAINED FROH SPARE BUCKET 4D MR 190030
~I I 13:13:22 01-09-92 CLASS I WORK-ELECTRICAL HAINTENANCE 1991 PAGE17 MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION'W187576'W189330 W189331 W189407'W189566'M189636 ICS-2ICSAHOV 150 EJS-2EJSAUS1
-98 ENS-2ENS4SWG 101-2 ICS-2ICSAAOV 157 EGT GTS"2EGTACH3 HVY-2HVYCUC2 C VALVE FAILS TO TRIP SHUT'MITH CONTROLS TRANSFER TO REHOTE SHUTDOWN PANEL.'MITH A TRIP SIGNAL IN N2-OSP"RSS-R001 ALSO VLV WILL NOT TRIP'WHEN TRIP PUSHBUTTON IS DEPRESSED AT REHOTE SHUTDO'MN~P'MR WAS VERIFIED TO JV7060 NOTE 3 ESK11R5511 TAG 2CES4PNL405 AND 2CEC4PNL601 BREAKER SPRINGS WOULD NOT DISCHARGE WHEN BREAKER WAS RACKED OUT LOCATED IN DIV I SWG ROOH TAG ON CSA 261 HETALIC SUPPORT CLIP SHEARED OFF TO ONE OF THE TRIP FUSES DURING INSERTION OF FUSES INTO BLOCK SEE ATTACHED PIECE.LOCATED IN DIV I SMG ROOH.VALVE POSITION INDICATOR IS NOT OPERATING CORRECTLY.
INDICATOR SHUT IN THE CONTROL ROOH NO HATTER WHAT POSITION 21CSAAOV157 IS ACTUALLY IN TAG AT CONTROL BUTTON ON 2CEC4PNL621 21CS4AOV157 LUBE OIL HEATER DOES NOT CYCLE ON AT LESS THAN 120 DEG.F'WHEN REQD TO HAINTAIN LUBE OIL TEHP'MITHIN SPECIFICATIONS 2HVYoUC2C'MENT INTO HOTOR OVERLOAD TROUBLESHOOT AND REPAIR OR REPLACE PARTS AS NECESSARY TAG ON 2CECNPNL870 NEXT TO CONTROL SWITCH REPLACE TRIP COIL REPLACED SOLENOID TRIP COIL FOR ABOVE VALVE BREAKER SPRINGS DISCHARGE AFTER BREAKER IS COMPLETELY RACKED OUT AND BREAKER IS BEING PULLED OUT OF CUBICLE SLOT FEEDER BREAKERS DIFFER FROH LOAD BREAKERS IN THIS ASPECTS BREAKER WORKER SAT.REPLACED HETALLIC SUPPORT CLIP STROKED VALVE AND FOUND NO, PROBLEHS'WORKS FINE AS MELL AS RED AND GREEN LIGHTS.NO WORK REQUIRED TROUBLESHOOTING FOUND TEHP CONTROL SWITCH 23Q OUT OF TOLERANCE IT IS OPEN AT 115 DEGREES F SHOULD MAINTAIN 120 DEGREES F SUPPORT TO I8C REPLACED HOTOR 1-19-91 TESTED HOTOR ROTATION AND ONE HOUR 1-20-91.'M189685 ENS-2ENSASWG
'ELAY FACE COVER HAS A CRACK COMPONENT IS LOCATED 101-15 IN DIV II SWITCHGEAR ROOH.INSPECT AND REPLACE AS NECESSARY REPLACED GLASS COVER'W189967 HSS RHS-K538-2HS SN24 INSTALL BANANA PLUGS AND PROVIDE SUITABLE JUHPER TO FUNCTIONALLY CONNECT CONTACTS-D TO E-SO THAT OPERATION CAN BE ACCOHPLISHED FROH BACK OF PNL P622.NECESSARY TO SUPPORT EOP REV 4 ATT 5 DELIVER JUHPERS TO L NARON.INSTALL TEST JACKS-ALSO IDENTIFY LEAD FROH CONTACT L OF RELAY K53B-2HSSN24 AT TB.INSTALLED TEST JACKS ON TB-BB41 AND RB60 FOR RELAY TEST POINTS.LABELED LEAD FROH POINT L ON RELAY AT 8862 0 iC I ll I hl%4 i4' 13-13-22 01"09-92 CLASS I WORK-ELECTRICAL HAINTENANCE 1991 PAGE18 WR NUHBER EPN NUHBER FAILURE DESC CORRECT I VE ACTION'W189972'lt190016 W190085'W190086 W190087'W190088 W190091'W190094 W190095 W190096 MSS RHS-K53A-2HS SN25 CEC-2CECAPNL 873 MHR-2HHR4 CRN 1 MHR-2MHR4CRN 1 HHR-2HHR0CRN 1 HHR"2HHRoCRN 1 SWP-2SWPoMOV 1A EHS-2EHS4HCC 101-3A HTS-2HTSAPNL 003 HTS-2HTSAPNL 003 INSTALL BANANA PLUGS AND PROVIDE SUITABLE JUHPER TO FUNCTIONALY CONNECT CONTACTS-0-TO-E-SO THAT OPERATION CAN BE ACCOHPLISHED FROH BACK OF PNL623 NECESSARY TO SUPPORT EOP REV4 ATT 6 DELIVER JUHPER TO L NARON REPLACE DEFECTIVE SPARE IND S'WITCH SP-873-01 WHICH WAS REPLACED (S'WAPPED OUT)ON'WR 191786 WITH 1H" 2CHSA04 DEVICE CODE IS GXE PART NO IS 145C3237P002 WHILE PERFORHING N2-EPH-GEN"A805 ON CRANE FOUND RUBBER BOOT OVER BRIDGE HOTOR 1 BRAKE SOLENOID TO BE RIPPED REPLACE RUBBER BOOT WHILE PERFORHING N2-EPH-GEN-A805 ON POLAR CRANE FOUND LIGHTING CONTACTOR TO BE BINDING ATTEMPTED TO LOCATE CAUSE UNABLE TO LOCATE.REPLACE CONTACTOR WESTING HOUSE 5 NOLE 230-480V SIZE 1 HOD A291K1EA STYLE 277A455G01 WITH 120V COIL WHILE PERFORMING N2-EPH-GEN-A805 FOUND EXCESSIVE ARCING INSIDE HOTOR COHHUTATOR AND PITTING OF COHHUTATOR STORE COHHUTATOR ADJUST BRUSH RIGGING AS REQUIRED WHILE PERFORMING N2-EPH-GEN-A805 FOUND CONTACTS ON HOIST 1 HIGH SPEED" CONTACTOR TO BE SEVERELY PITTED REPLACE CONTACTS'WHILE PERFORHING N2-EPH-GEN"R520 FOUND TORQUE SWITCH HAD NO LIMITER PLATE CONTROL TRANSFORHER HAS BROKEN FUSE CL IP (401DER)REPLACE WITH NEW ONE HEAT TRACE DOES NOT HEET ACCEPT.CRITERIA PER N2-EPH-GEN-A784 HEGGER READINGS OF 7HRS.ALSO NEEDS 0-RING SEAL ON COVER AT HEAT TRACE LINE.HEAT TRACE DOES NOT HEET ACCEPT CRIT PER N2-EPH-GEN-A784.
MEGGER READINGS OF ONLY 7MRS-ALSO NEEDS 0-RING SEAL ON COVER AT HEAT TRACE LINE 289 RB DIRECTLY OVER N STAIRWELL DOOR INSTALLED TEST JACKS ON BB49 AND AA72 OF 2CEC4PNL623 AND LAGELED LEAD FROH POINT L ON DEVICE BZ ON TB 58 INSTALLED NEW INDICATOR SWITCH AT POSITION SP-873-01 GXE IN PANEL 873 TO REPLACE DEFECTIVE SWITCH'WHICH'WAS INSTALLED ON WR 191786 REPLACED RUBBER BOOT ON BRAKE SOLENOID CAN REPLACE CONTACTOR WITH NE'EQUIVALENT CONTACTOR OF SAME SIZE AND SAHE HANUFACTURER STONED COMHUTATOR AND CLEANED ELIMINATING ALL BUT SLIGHT ARCHING OF EDGE OF BRUSH ADJUSTED BRUSH RIGGING FOR PROPER CLEARANCE FROM END TO COHHUTATOR REPLACE SEVERELY PITTED CONTACTS ON HOIST NO 1 HIGH SPEED CONTACTOR REPLACE PARTSI INSTALLED NE'W.LIHI TER PLATE PER EP-410 REPLACE BROKEN FUSE CLIP REPLACED OLD HEAT TRACE WITH NEW HEETS ACCEPT.CRIT OF N2-EPM"GEN-A784 REPLACED BAD HEAT TRACE WITH NEW Sl E l pr\I 13:13:22 01-09-92 CLASS I WORK-ELECTRICAL HAINTENANCE 1991 PAGE19'MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION N190098 N190099 N190103 N190109 N190111 N190112 W190131'N190139 N190144'W190145 HSS 2MSSNMOV 111 RHS-2RHS4HOV 104 ENS RHS-2ENSISNG 103-12 EPS"2EPSASMG 002 EHS-2EHS4MCC 103-18D EHS-2EHS4 HCC 103-18D RPS-K14N-2RP SA01 EJA-2EJA4PNL 101A VBS-2VBSAPNL 101A-27-SN VBS-2VBS4PNL 101A-26-5'W WHILE PERFORHING EPH-R520 FOUND TORQUE SMITCH SETTINGS OF 3 CLOSED AND 2 OPEN EP-410K SHOWS THAT TORQUE SNITCH SETTINGS OF 3 CLOSED AND 3 OPEN MHILE PERFORHING N2-EPH-GEN-R520 FOUND TORQUE IN WRONG POSITION PLEASE SET PER APPROVED DESIGN DOCUHENT OPEN SNITCH SET AT TMO AND ONE QUARTER SHOULD BE T'MO AND ONE HALF.THE FUSE HOLDING PULL OUT PORTION OF THE ELEVATE FUSE BLOCK IS BROKEN REPLACE WITH NEM PART DEFICIENCY TAG NO.14704 AT HANDLE DOOR OF 2ENSOSNG103-12 WHILE PERFORHING PH ON ABOVE SWG USING PROC 3Y554 FOUND PANEL KNOB FOR SLIDING DOOR USED FOR RACKING BKR ON EXTERIOR SNG DOOR HISSING.REPLACE KNOB PLEASE.DEF.TAG 14724.FOUND BOTTOH CONTACT CARRIER TO BE BROKEN.REPLACE WITH NEN DOES NOT AFFECT FUNCTION OF CONTACTOR.
STARTER SIZE NUMBER 2 FOUND DOOR INTERLOCK ON BREAKER OPERATING HECH IS NOT FUNCTIONING PROPERLY REPLACE OR REPAIR AS NECESSARY.
ON DE-ENERGIZATION OF RELAY C72A-K14N RELAY DID NOT DROP OUT CO'IPLETELY CAUSING RELAY TO CHATTER INVESTIGATE CONTROL CIRCUIT 2RPSB06.ALSO SHADING POLES ON RELAY ARE DEFECTIVE.
REPLACE RELAY WHILE PERFORHING N2-EPH"GEN-A584 ON 2EJAPNL101A IT WAS NOTICED 2 HEXHEAD SCRE'WS'MERE MISSING FROH THE INNER COVER UPPER FUSE HOLDERS MERE REHOVED TO REPAIR SM 24 ON NR 190141 PLEASE REPAIR SPARES 27 AND 28 DEF TAG NO 200686.REPAIR'WORK CAN BE DONE HOT IF NEED BE.UPPER FUSE HOLDERS WERE REMOVED TO REPAIR S'M 18 ON'NR 190140 PLEASE RFPAIR SPARES 25 AND 26 DEF TAG NO.20685 REPAIR WORK CAN BE DONE HOT IF NEED BE ADJUSTED TORQUE SNITCH OPEN SETTING FROM TWO TO THREE PER EP"410K DRAMING SET OPEN TORQUE S'MITCH SETTING FROH TNO ONE FOURTH TO TNO ONE HALF.REPLACE FUSE BLOCK PULL-OUT PORTION OF FUSE BLOCK REPLACED SLIDING DOOR KNOB REPLACED BOTTOH CONTACTOR'WITH NE'M REPLACED DOOR INTERLOCK HECHANISM VERIFIED OPERATION OF RELAY DURING 18C SURVEILLANCE RELAY DROPPED OUT WITH NO CHATTER REPLACED HISSING SCRE'NS REPLACED THE FUSIBLE SWITCHES REPLACED THE FUSIBLE SWITCHES 4
13:13.22 01-09-92 CLASS I WORK-ELECTRICAL HAINTENANCE 1991 PAGE20 WR NUHBER EPN NUMBER FAILURE DESC CORRECTIVE ACTION W19 0189 W190206 W190 214 W190227 W190229 W190230'W190231 W190232 W190237 W190239 RHS-2RHSMOV 15A BYS-28YS4BAT 2C HHR-2HHRCCRN 1 VBS-2VBS4ACB 2A EHS-2EHSAMCC 103-20A EHS"2EHS4 MCC 103 EHS-2EHS4HCC 103-23D SCM-2SCHoPNL 102A HVP-2HVPAMOD 78 BYS-2BYSACHG R2C1'NSTALL CORRECT TORQ SW LH PLATE PER HAX SETTING EP-410-DISCOVERED DURING PERFORMANCE OF N2-EPH-GEN-R520 BROKEN FLASH ARRESTORS WHILE PERFORHING N2-EPH-GEN-A666 FOUND BROKEN FLASH ARRESTORS ON CELL NUHBERS 31 56 AND 58 REPLACE AS PARTS BECOME AVAILABLE RB EL 390 TROLLEY IS NOISY WHEN OPERATING AND TRIPS THE BREAKER (BRAKE HAY NOT RELEASE COMPLETELY)
CRANE FAILS TO RESTART.TROUBLESHOOT'AG LOCATED AT BREAKER RB 289 NJS-U52 REPLACE BROKEN RED BREAKER OPEN INDICATING LGT ON EPA BREAKER.FOUND DURING PERFORHANCE OF N2-ESP-RPS-SAQ744 HECHANICAL INTERLOCK IS HANGING UP WHEN CONTACTOR IS DEPRESSED.
REPAIR OR REPLACE AS NECESSARY.
USE SPARE BREAKER 248 TO FIX PROBLEH REMOVE CONTACTOR ASSEMBLY AND REPLACE IT IN CUB 20A-2RHS4MOV1A N C.CONTACT APPEARS TO BE CLOSED BUT DOES NOT SHOW CONTINUITY WHILE USING FLUKE DRUING PM R520 REPLACE AUX CONT CAT NO F10NOCL THE SIDE PLATES ON ARE HISSING REPLACE BOLTS AND WASHERS-FLAT 8 LOCK-BOLTS 1 1/2 INCH LONG 7/16 HEX HEAD 1/4 20.HOD NEEDS TO BE REBUILT DUE TO OIL LEAKAGE AND FAILURE TO OPERATE LOC 280 DIESEL GENERATOR BLDG.BLDG LINE AA COLUHN 13.00 FOUND WHILE PERFORMING N2-EPH-HVP-A779 HOD FAILED TO OPERATE WHEN ENERGIZED HONITOR BATTERY CHARGER OUTPUT VOLTAGES AND ADJUST AS REQD 2 WK DAILY HONITORING FOR EVALUATION OF POSSIBLE FLOAT VOLTAGE DRIFT PROBLEM INSTALLED NEW TORQUE SWITCH LIHITER PLATE PER EDC 2H00186 AND SET TORQUE SWITCH TO 1 3/4 OPEN 1 3/4 CLOSED REPLACED BROKEN FLASH ARRESTORS WITH NEW RESET OVERLOAD;HECH HAINT TO ADJUST BRAKES REPLACED INDICATING LIGHT HOLDER REHOVED STARTER FROM 2EHSeMCC103-248 AND INSTALLED IN 2EHSAHCC103-20A PER ATTACHED PROCEDURE.
INSTALLED DEFECTIVE STARTER IN 2EHS4HCC103-248
'WHICH IS A SPARE CUBICLE WR 190230 WRITTEN TO REPAIR 2EHSAHCC103-248 RFPLACED CONTACTOR ASSEHBLY IN EHC MCC103248 REPLACED AUX CONTACT INSTALLED HISSING BOLTS REPLACE HISSING HOUNTING BOLT.REF WR 190235.REBUILT PER PROCEDURE HONITORED CHARGER VOLTAGEI SEE RESULTS ON ATTACHED DATA SHEETS
13-13-22 01-09-92 CLASS I'WORK-ELECTRICAL HAINTENANCE 1991 PAGE21'WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W190244'W190265'W190279 W190459 W190460 W190519 W190522 W190529'W190531 W190534 W1 90538 HVP-2HVPj¹HOD 1D ICS-2ICS<AOV 157 HHR-2HHR4 CRN 1 RHS-2RHSeMOV 37A RHS-2RHS4HOV 12A SWP-2SWPAMOV 74C ENS SWP-2ENSASWG 101-6 CCP-2CCPAMOV 18A SWP-2SWPeH1C CCP-2CCP4[HOV 14B ICS-21CSNHOV 124 REPLACE TB3 AND RELUG CAPACITOR LEAD LUG 18-22 A'WG¹8 HOLD TB3 ITEM 633 PG 2-31 OF VENDOR HANUAL INDICATOR ARH ON 2ICS4AOV157 DOES NOT HOVE DURING VALVE STROKING PLEASE REPAIR AS NECESSARYASDC SC2-0274-91 WHILE PERFORMING N2-EPH-GEN-A805 ON POLAR CRANE FOUND THAT HEGGER READINGS ON BOTH LEFT AND RIGHT BRIDGE DRIVE HOTORS RESISTOR BANKS ARE LOW INVESTIGATE EVALUATE WHILE PERFORHING N2-EPM-GEN-R520 ON VALVE FOUND THAT TERHINAL BLOCK FOR HOTOR LEADS HAD A CRACKED DEVIDER BETWEEN POINTS PLEASE REPLACE ALSO MOV ltILL NOT STAY IN HAND OPERATION DECLUTCH LEVER OUT OF ADJUSTHENT WHILE PERFORHING ON N2-EPH-GEN-R520 ON HOV FOUND THAT 2 SCRE'WS ON GEARED LIHIT SWITCH WERE HISSING PLEASE REPLACE SCREWS FOUND DAHAGED WIRE TO TORQUE SWITCH DURING PH.(R510)NEEDS TO BE REPAIRED ELEV 261 CONTROL BLDG (2ENSNSWG101-6)
BREAKER SPRING CHARGING HOTOR LOCKS UP SUSPECT STRIPPED OR BROKEN GEARS REPAIR OR REPLACE AS NECESSARY TORQUE SW.DOES NOT HEET SPEC'S ON EP-410B (2 PLUS2)PLEASE ADJUST PER EP410B AND REPLACE LIHITER PLATE REPAIR HOTOR CVR SCREENS PER EDC 2F00288 DISCOVERED DURING PERF OF N2"EPH-GEN-R550 WHILE PERFORHING PREVENTATIVE HAINT ON VALVE OPERATOR (N2-EPH-GEN-R520)
DISCOVERED LIHITER PLATE ON TORQUE S'WITCH TO HAVE SETTING OF 3 1/2'WHEREAS EP-410A REQUIRES-4-REPLACE WHILE PERFORHING N2-EPH-GEN-R521 FOUND THAT THE LOCK'WASHERS ON THE BOLTS HOLDING THE MOTOR END BELLS TOGETHER WERE CRACKED PLEASE REPLACE REHOVE TB3 FROH HOD BEING REBUILT IN SHOP REF WR 196243 911004~RELUGGED CAP LEAD COHPLETED ATTACH-A-WORK PLAN REHEGGED RESISTOR BANKS:FOUND READINGS TO BE GOOD ADJUSTED DECLUTCH LEVER AND'EPLACED TERH BLOCK REPLACED 2 SCREWS ON LIHIT SWITCH COVER REPLACED DAMAGED WIRE REPLACE CHARGING HOTOR'WITH HOTOR FROH 2ENS4SWG103-15'EF WR 196439 REPLACED LIHITER PLATE AND READJUSTED TORQUE PERFORHED EDC 2F00288 SCREENS ARE REINSTALLED REPLACED LIHITER PLATE NO ADJUSTHENT HADE TO TORQUE SWITCH PER DAN LEMAY 910725-REPLACED LOCK'WASHERS tg>Ji 1*r E 13:13:22 01-09-92 CLASS I WORK-ELECTRICAL HAINTENANCE 1991 PAGE22 MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION M190539 W190541 W190547 W190552 M190555 W190558 M190559'W190569 W190570'W190571 M190574 SWP-2SWPCHOV 67A SMP-2SWP4HOV 188 BYS-28YSBAT 2A EHS-2EHSoHCC 303-218 GTS-2GTSOHOV 1A VBA-2VBAAUPS 28 S WP-2SWP 4(F V4 7A LAC-2LACAPNL E03 HCS-2HCS<HOV 28 HCS-2HCS4HOV 258 EHS-2EHSCHCC 103-22C WHILE PERFORHING N2-EPH-GEN-R520 FOUND INCORRECT L IHI TER PLATE~DAHAGEO TERHINAL STRIP DAHAGED JUMPER FROH TQ.SMITCH TO FINGER BASE AND TQ.SMITCH NOT SET CORRECTLY WHILE PERFORHING N2-EPH-GEN"R520 IT MAS DISCOVERED THAT THE HOTOR TERMINAL BLOCK MAS BROKEN PLEASE REPLACE TAG HUNG ON THE ACTUATOR CORROSION ON BACK BENEATH CELL 48 CLEAN POINT AS REQUIRED ALSO CELL 48 HISSING ID DECAL PREVIOUSLY ADDRESSED REF MR 161799.MR DOC HISSING DEF TAG ON CABLE TRAY BEHIND CELL 48 TAG AT BREAKERS SEPARATION BARRIERS BETWEEN PHASES OF BREAKER NEEDS TO BE REGLUED ON TO BREAKER ON LOAD SIDE.DISCOVERED WORKING N2-EPH-GEN-R580 WHILE PERFORHING N2-EPH-GEN-R520 ON 2GTS4HOVlA FOUND THAT TORQUE SWITCH LIHITER PLATE MAS INCORRECT PER EP-410 PLATE MAS AT 2 3/4 AND NOT AT 3 1/4 PLEASE REPLACE WHEN PARTS ARE AVAILABLE RIGHT FRONT VENT FAN HAS A SQUEAK IN THE FAN BEARINGS NEEDS TO BE REPLACED REPLACE FUSE WITH CORRECT FUSE PER PGCC FUSE LIST FUSE IS LOCATED IN PNL859.EL 288 CB SINGLE POLE 20 AHP CKT BREAKER IN 2LAC4'PNLE03 IS BAD AND NEEDS TO BE REPLACED, THE BREAKER IS FOR 2 LIGHTS IN DIV 3 CONTROL ROOM MHILE PERFORHING N2-EPH-GEN-R520
'ME FOUND UPPER FINGER BASE CRACKED AND RETAINING SPRING OFF ON HANDMHEEL KEY WAY ON 2HCSoHOV258 DECLUTCH LEVER IS SPLIT IN HALF AND SHOULD BE REPLACEDt ALSO L'IHIT TORQUE COVER BOLT HISSINGI ALL THIS WAS FOUND DURING N2-EPH-GFN-R520 WHILE PERFORHING N2-EPH-GEN-580 IT MAS DISCOVERED THAT THE STARTER WAS CHIPPED IN TWO PLACES PLEASE REPLACE THE STARTER REPAIRED BY REPLACING JUHPERJ REPLACED TORQUE SMITCHI REPLACED TERMINAL BLOCK~TORQUE SMITCH DID NOT REQUIRE RESETTING VALVE POSITION AT ORIGINAL OBSERVATION HAD PARTIAL TENSION ON TORQUE REPLACED TB IN ELECT COHPARTHENT DECAL REPLACEDICLEANED PAINTED AS REQD I GLUED SEPARATION BARRIERS EDC 2H10356 CHANGES EP-410 TO 2 3/4 HAX SETTING NO CORRECTIVE ACTION REQD REPLACED DEFECTIVE FAN WITH NEM ONE REPLACED FUSE WITH CORRECT FUSE REPLACED BRANCH LIGHTING CKT BREAKER NO 19 IN 2LAC4PNLE03 REPLACED OLD FINGER BASE MITH NEM REPLACED KEY AND COVER BOLT REPLACED THE CONTACT CARRIER
13:13:22 01-09-92 CLASS I MORK-ELECTRICAL HAINTENANCE 1991 PAGE23 WR NUMBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W190575'W190578 W190 583'M190584 EHS-2EHSoHCC 103 SMP"49X-2SWP 808 EHS-2EHS4HCC 102-48 HVP-2HVPAFN1 8 CONTACTOR IS CHIPPED'LEASE REPLACE FOUND WHILE PERFORHING N2-EPH-GEN-R580 RELAY 49X-25'WPB08 IS HAKING LOUD VIBRATING SOUND)REPLACE RELAY LOCATE IN BACK OF 2EHSAHCC302 PANEL TAG AT PANEL DEFECTIVE OVERLOAD HEATER ON 02 IN CONTROL CUBICLE FOUND PROBLEH WHILE PERFORHING N2-EPH-GEN-R520 STEP 7.3 9 HCC LOCATED AT ABW 240RB HEATER SIZE T14 REF EDC 2E10363 STARTER COIL HAS CRACKS AND BARE CONDUCTOR SHOWING)REQUIRES REPLACEHENT REPLACED CONTACT CARRIER REPLACED RELAY BASE COIL ON 49X-2SWPBOB REPLACED ALL 30 HEATERSI TERHINAL BLOCK AND RELUGGED HOTOR LEAD STARTER COIL DEFECTIVE-HAS CRACKS M190629 HVK-2HVK4CHL 1A INDICATING LIGHT FOR THE AUX OIL PUMP IS HISSING ITS RETAINING RING THAT SECURELY FASTENS IT TO PANEL REPLACE RETAINING RING ONLY REPLACE RETAINING RING'W190799'W190904 W190905'W190991 W191436 W191438 W191439 SMP-2SWPOPSY 1004A ZZZ-NOCOHPID RHS-2RHS4 HOV 378 I CS-NOCOHP ID HCS-2HCS4RBN RH1A CEC-2CECoPNL 622 CEC-2CECoPNL 623 FUSE F6-2SWPA25 (ESK 7SWP08)IS BLOWN NEEDS REPLACING-FUSE IS IN PANEL 859 2HVP4HOD6A SPARE HAS LEAKING INTERNAL SEALS PLEASE REPLACE AND REBUILD.OPERATOR SS 83138272448-01-006 VALVE ACTUATION MILL NOT WORK IN HAND OPERATION WITHOUT HOLD ING DOMN DECLUTCH LEVER TAG HUNG AT POMERBOARD RCIC TURBINE EG"H CONTROL IS POSSIBLE CAUSE OF OSCILLATIONS DURING OPERATION REPLACE AS NEEDED TRICKLE HEATER LIGHT INDICATOR HOUSING IS BROKEN AND NEEDS REPLACEHENT.
RX 240.INVESTIGATE AND IDENTIFY WITH BRADEY HARKER OR EQUIVALENT 822H"K170 LEAD-8-AT THE POINT WHERE IT CONNECTS TO TB-88-AT 88-32 (NECESSARY TO IDENTIFY WHICH LEAD OF LIFT)REQUIRED FOR EOP-6 IDENTIFY WITH BRADY HARKER OR EQUIVALENT 822-KB LEAD-E-AT POINT WHERE IT CONNECTS TO TB 88-85 AND 822H-K171 LEAD-8-AT THE POINT WHERE IT CONNECTS TO TB 88.34 (NECESSARY TO IDENTIFY MHICH LEADS TO LIFT)EOP-6 REQD REPLACED CONTROL FUSE IN CIRCUIT REBUILD HOD REBUILT REPLACED TRIPPER LEVER ASSEHBLY SW11 CONTINUITY CHECKED FUNCTIONS AS DESIGNED INSTALLED NEW LIGHT INDICATOR ON HYDROGEN PER INVESTIGATED AND IDENTIFIED THE CORRECT WIRE AND LABELED THAT WIRE MITH BRADEY HARKERS INVESTIGATED AND IDENTIFIED THE CORRECT MIRE AND LABELED THAT WIRE WITH BRADEY HARKERS
~4 13-13-22 01-09-92 CLASS I WORK-ELECTRICAL HAINTENANCE 1991 PAGE24 MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION M191477'M191495'W191518 M191569 M191650 M191762 M191818'M191868 M191920 M191944 M191982 CEC-2CEC4PNL 601 CEC-2CEC4PNL 873 RHS-2RHSAAOV 16C CPS-2CPS4AOV 109 CES EGS-2CESCIPN L408 VBA-2VBAAUPS 2A ENS-2ENS+SWG 101-10 CEC-2CEC4PNL 629 EGS-2EGS4EG3 HVP>>2HVP4FN2 8 RPS-DS8A-2RP SA01 INOP STATUS LIGHT DOES NOT RETURN TO NORMAL POSITION WHEN PLACED IN P51.ANNUNCIATOR FAILS TO OPERATE WHEN SFC HANUALLY OUT OF SERVICE PUSHBUTTON IS OPERATED REPAIR AS REQUIRED.LOCATED IN PGCC.2RHSAAOV16C HAS DUAL INDICATION VALVE IS BELIEVED TO BE CLOSED DURING PERFORMANCE OF N2-OSP-CPS-Q001 2CPS4AOV109 FAILS TO INDICATE OPEN POSITION'WHEN SMITCH IS TAKEN TO OPEN WHILE CLOSED LIGHT EXTINGUISHES
~REPAIR AS REQUIRED ANN SILENCE PUSHBUTTON"APB-SMITCH COLLER IS BROKEN.REPLACE COLLER TAG LOCATED Ok ANN SILENCE P.B.ON PNL 408 C8261.THERE IS A FAN FAILURE ON PANEL ONE OF THE FANS ON TOP OF UNIT THAT IS NOT ROTATING.PLEASE REPAIR TAG LOCATED ON CONTROL BLDG 261 DIV I SMGR ON 2VBA4UPS2A WHEN RACKING DOMN BREAKER THE RACKING HOTOR STOPPED TOO SOON CAUSING THE BREAKER NOT TO CLEAR THE SUPPORT BARS NEEDED TO HAND CRANK DOWN TMO TO THREE HORE TURNS PLEASE REPAIR.TAG HUNG ON CUBICLE DOOR.REINSTALL-REHOVE TEHP HOD 90-068-EDC 2F00150 TURNING GEAR COVER ON EG1 AND 3 ARE HISSING BOLTS AND EG3 FLYWHEEL COVER BOLTS ARE HISSING.ALSO CONDUIT GROUND SCRE'M EG3 CONDUIT 2CK673NR REPLACE BOLTS AND SCREW 2HVP4FN28 FAILED TO START ON AUTOHATIC SIGNAL FROH A DIESEL START.COHP PTS HVPTC12 AND HVPUC06 ALARHED PLEASE TROUBLESHOOT.
TAG AT PNL 871 IN CONTROL ROOH WHILE PERFORHING N2-ISP-ISC-H002 RPS A HANUALLY OUT OF SERVICE-FAILED TO RESET TROUBLESHOOT STATUS LIGHT WORKS PER DESIGN REPAIRED SMITCH 1-2SFCA09 BY SNAPPING BACK TAB BACK INTO ALIGNHENT REPLACED FUSE F1-2SFCA10 ADJUSTED CAH12-31-90 TESTED SATISFACTORY REPLACE CONAX SEAL ON 2CPSAAOV109-C REPLACED ANNUNCIATOR BUTTON COLLAR REPLACED F-84 THAT SUPPLIES POWER TO REG SECTION FANS REPLACED COOLING FAN 853 AND FUSE TO FAN R-55 NONE NO ADJUSTHENT NECESSARY INSTALLED JUHPER EDC 2F00150 FOR SLS SYSTEH REPLACED SCREWS ON GROUND CLAMPS FOLLOWED TROUBLESHOOT GUIDE AND FOUND ALL CONTACTS TO BE IN PROPER ALIGNHENT RAN FN28'WITH AUTO START FUNCTION AND IT RAN PROPERLY RECONNECTED BACK HALF OF SMITCH NO PROCEDURE MAS USED
.Ja h 13:13-22 01-09-92 CLASS I WORK-ELECTRICAL MAINTENANCE 1991 PAGE25 WR NUMBER EPN NUHBER FAILURE OESC CORRECTIVE ACTION W192925'W192936 W192969 W192985 W192994 W193009 W193021 W193036 HVP-2HVPCHOD 6A HVR-2HVRAUC4 038 RPM-2RPH4ACB 28 ICS"2ICSAMOV 150.HVY-2HVYAUC2 B RHS-2RHS4SOV 73A HVP-2HVP4MOD 6A ENS RHS"2ENSASWG 101-3 2HVP4HOD6A DIESEL GENERATOR HOTOR OPERATED DAHPER HAS A BLOWN FUSE PLEASE TROUBLESHOOT AND REPAIR TAG HUNG ON PNL 870 BY DAHPER CONTROL SWITCH LOC DG 280 BLDG LINE AA COL 11 5 TROUBLESHOOT MOTOR OVERLOAD ALARH ON UNIT COOLER 871419 LOCATED RB 175 FEET, EPA 2RPMoACB2B SPURIOUSLY TRIPSI INVESTIGATE AND REPAIR THIS RESULTS IN A HALF SCRAM AT ANY GIVEN TIHE LOCATION OF EPA IS CONTROL BLDG 237 NE.TAG AT P603 (SCRAM SOLENOID LIGHTS)2ICSCMOV150 WOULD NOT TRIP SHUT USING THE TURBINE TRIP PUSH BUTTON AT PNL 601 2HVY4UC2B IN HOTOR OVERLOADI BREAKER ON 2EHS4HCC301 HCL TRIPPED: INVESTIGATE AND REPAIR UC28 IN DIV II SWP BAY TAG HUNG ON ANN WINDOW 871332 CONTROL ROOM 2RHS4SOV738 GROUND WIRE IS DISCONNECTED RECONNECT WIRE LOCATED RB 196 NORTH PIT BY LADDER 2HVPOMOV6A HAS A BLO'WN FUSE.LOCATED IN RELAY ROOH 2CEC4PNL859 TERHINAL STRIP J FOURTH FUSE DOWN FROH TOP CKT 2HVPA04 REPLACE FUSE TROUBLESHOOT AND REPAIR CAUSE FOR 2ENS4SWG101-3 NOT CHARGING WHEN BKR FULLY RACKED IN AND FUSES INSTALLED TAG LOCATED AT 101-3 AT 2RHSAP1A CONT.SW 2CEC4 PNL601 REPLACED OLD OPERATOR WITH NEW ONE ALSO REPLACED BLOWN FUSE REPLACED T37 HEATERS WITH T38'REPLACED DEFECTIVE 0 L RELAY M2 STARTER AND JUHPER WIRE IN CONTROL CABINET ON 2HVRAUC403B WR 196468'WRITTEN AGAINST 2RPM-HG1B TO REPLACED RHEOSTAT AND REGULATOR ON 910920 REPLACED CIRCUIT BOARDS IN 2RPHAACB18 AND 28 OBTAIN REPLACEHENT RELAY AND BEACH TESTED REHOVED DEFECTIVE RELAY AND INSTALLED NEW RELAY CHECKED SEATING OF RELAY FUNCTIONALLY TESTED RELAY WITH VALVE CLOSED THEN PERFORHED POST HAINT TEST WITH VALVE PARTIALLY OPEN PER OPS PROCEDURE TESTED FAN MOTOR AND NO PROBLEHS FOUND REPLACED GROUND WIRE ON FLEX GOING TO SOV INSTALLED NEW FUSE VERIFY BREAKER OPERATED AT TEST STATION AND CHECKED MECHANICAL INTERLOCKS 11 13:13 22 01"09-92 CLASS I WORK-ELECTRICAL HAINTENANCE 1991 PAGE26 MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION'M193058 CHS-2CHSASOV 25D MHILE PERFORHING N2-OSP-LOG-M001 THE VALVE MOULD NOT OPEN WHEN CHS PATH NO 4 WAS SELECTED PLEASE TROUBLESHOOT AND REPAIR.VALVE LOCATED D IV 215 AZ120.TAG PLACED ON 2CEC4PNL875 REPLACED ALL DEFECTIVE PARTS INCLUDING COIL CONAX SEAL ASSEHBLY RECTIFIER REED SWITCHES TESTED AND SETUP VALVE PER APPROPRIATE PROCEDURES W193090 BYS-28YSCBAT FOUND RIGHT SIDE POSITIVE FEED TO BAT2A LOOSE 2A RETORQUE PER HI RECALIBRATE TORQUED CONNECTION TO 150 LBS ON BOTH SIDES'ERIFIED CONNECTION RESISTANCE WITHIN ACCEPTANCE CRITERIA.CONNECTION RESISTANCE WAS 6 HICRO OHHS AT COHPLETION OF WORK M193131 M193222 W193244 W193293 W193343 M1933I 4 W193350 HDS-RR261-2 CEC-2CECAPNL 602 HVC-1Y-2HVCA 21 SWP-2SMPNHOV 1E ICS-2ICSAAOV 156 ICS-21CSAAOV 15'7 RHS-2RHSNHOV 142 RX TRACK BAY INNER DOOR INDICATING LIGHTS BOTH INSIDE RB AND INSIDE TRACK BAY FAIL TO INDICATE ALSO THE PERSONNEL ACCESS THROUGH THE INNER WILL UNLATCH MITH A KEY CARD'MHEN THE OUTER DOOR IS UNDOGGED NO INTERLOCK IN EFFECT PLEASE INVESTIGATE AND REPAIR LOCATED RB 261 165 DEGREES ANNUN 602120 IS FLASHING SPORADICALLY IN CONTROL ROOH.TAG ON PNL602 THIS HANUALLY OUT OF SERVICE PUSHBUTTON IS BROKE AND MILL NOT RESET.THIS CAUSES ANNUNCIATOR 870304 DIVISION 1 CONTROL BLDG SPCL FLT TR A INOPERABLE TO BE CONSTANTLY LIT TAG HANGING ON PNL870 HOV1E DOES NOT ENGAGE WITH OPERATORS HOTOR CONTINUOUSLY RUNS.BENTl REPLACE OECLUTCH SHAFTIDRIVE SLEEVE WORH GEAR GASKETS ANO SEALS DIV I SERVICE WATER PIT 261 SCREENMELL BLDG WITH THE SYSTEH SECURED 2ICSAAOV156 INDICATES FULL OPEN 2CEC-PNL601 AND SEE WR 194584 FOR PACKING LEAK DEF TAG LOCATED AT 2CEC4PNL601 AND RB289 AT VALVE'MITH THE SYSTEH RUNNING 2ICSOAOV157 INDICATED FULL SHUT SHOULD HAVE INDICATED HID POSITION ON FULL OPEN RHS>HOV142
'MILL NOT OPEN FROH P601 WHEN SMITCH TAKEN TO OPEN TROUBLESHOOT REPLACED BLOWN FUSE GLASS TYPE 2AG 250V 1 1/2 AHP INSTALLED JUHPER ON PANEL 630 T848-0127 TO TB48-0128 REINSTALLED SWITCH CONTACT BLOCK ONTO SWITCH ASSY REPLACED DECLUTCH SHAFT AND DRIVE SLEEVE WORN GEAR INSTALLED NE'M GREASE AND GASKET SET ADJUSTED ACTUATING CAH TO ALLOW SWITCHES TO HAKE PROPERLY STROKED AOV SEVERAL TIHES AND RECEIVED CORRFCT LIGHT INDICATION MORKS AS DESIGNED CLEANED CONTACTS 39C-39 ON SW12-2RSSN91 AT P405
13'3'2 01-09-92 CLASS I'WORK-ELECTRICAL HAINTENANCE 1991 PAGE27 WR NUHBER EPN NUHBER FAILURE DESC CORRECT I VE ACTION W193378 W193382'W193596'W193621 W193623 W193660 FWS-2FWSAAOV 23A HVR-2HVRAUC4 06 CEC-2CEC4PNL 852 I CS" 2 I CSAHOV 150 SWP-2SWPASTR 4E HVC-2HVCOPNL CH12A 2FWSAAOV23 INDICATES DUAL POSITION ON CONTROL ROOH PANEL 603 WITH 2FWSNHOV21A ANO 8 SHUT TAG AT 2FWS4AOV23 CONTROL SW ON 2CECAPNL603 IN CONTROL ROOM UVI 06 HETER OVERLOAD AS INDICATED BY COHPUTER POINT HVRTC33 TAG IN CONTROL ROOH AT ANNUM 871121 AHBER LIGHT TESTED AND THEN WENT OUT AS IF BULBS WERE BLOWN.BULBS WERE REPLACED BUT LIGHT WILL NOT COME ON WHEN DEPRESSED 2ICSCMOV150 DOES NOT CLOSE AND RESET REHOTELY AS REQD VALVE STROKE TINE TOO LONG AND INDICATION NOT ACCURATE TROUBLESHOOT AS NEEDED.TAG AT PNL 601 THE STRAINER HOTOR COUPLING IS NOT HADE UP TO THE STRAINER ROTOR COUPLINGI THEREFORE NO SELF CLEANING ACTION IS TAKING PLACE.LOCATED SCREE NWELL BLDG EL 261 IN THE DIV I 5'WP BAY PLEASE INVESTIGATE AND REPAIR.TAG ON PNL CESIPNL504 THE NORMAL OPERATION LIGHT IS CYCLING OFF AND ON PLEASE TROUBLESHOOT AND REPAIR 2HVCAPNLCH12A 15 LOCATED IN THE SPECIAL FILTER TRAIN ROOM ON CONTROL BLDG ELEV 288 ADJUSTED CAH FOR CLOSED END LIHIT SWITCH RED LIGHT TO GIVE PROPER INDICATION WHEN VALVE IS FULLY CLOSED SEE ATTACHED TROUBLESHOOTING PLAN REPLACE Fl-2EGAA05 RESET ELECTRICAL LOCKOUT LATCH CIRCUIT TO CORRECT CONFIGURATION DETERH RETERM TO N2-HPM-SWP-3A513.
RELUGGED MOTOR LEAD CONDITION DESCRIBED BY ORIGINATOR IS NORMAL OPERATION NO CORRECTIVE ACTION REQUIED PER SYSTEH ENGINEER H.DOWNS'IELD WALKSOllN INDICATES HEATER DOES CYCLE AN ADAFF TO SATISFY RELAY ROOH TEMP W193716 HTS-2HTSAPNL RX BLDG 240 SOUTH AUX BAY CIRCUIT 003-24 003 2HVRNRE14B"R-546 C2-10 UT LIGHT ON HTSAPNL003 PLANT IHPACT=HVRAGMPT 14B-SUPPLY W193881 HVR-2HVReAOD PERFORH WIRING CHANGES'N PANEL 2CECePNL870 PER 6A EDC 2F00361 AND SDC 522-0245-91 W193882 HVR-2HVR4AOD'ERFORH
'WIRING CHANGES IN PANEL 2CECePNL871 PER 68 EDC 2F00361 AND SDC SC2-0245-91 NO UT LIGHT NO'W 910523-TEMP IS 99 DEG THIS WR WAS WRITTEN Ik JANUARY WHEN THE AHBIENT.TEHP WAS LO'W THIS LINE HAS NO INSULATION ON IT INCONCURRENT WITH SYS.ENG AWR WILL BE INITIATED TO INSULATE THE LINE SEE EDC 2F00361IREFER TO EDC 2F00361 FOR WIRE CHANGES TO CIRCUIT TEST AND WORKING PER DESIGN ADDED WIRE PER EDC 2F00361
13:13-22 01-09-92 CLASS I WORK-ELECTRICAL HAINTENANCE 1991 PAGE28'WR NUMBER EPN NUMBER FAILURE DESC CORRECTIVE ACTION W193970 W193994 W194005 SWP-2SWPASTR 40 SWP-2SWPAFV4 78 ICS-2ICS4MOV 150 PACKING LEAK ON STRAINER NO ADJUSTHENT LEFT SCREENWELL 261 DIV I I.TAG HUNG ON STR ANNUN 601203 ALARHS FOR SWPAFV478 LOW PRESSURE BEFORE LOW PRESSURE START OF VALVE ACCUMULATOR PRESSURE PUHP TROUBLESHOOT VALVE IS IN PIPE TUNNEL SOUTHWEST OF CCS H/X ON TB 250 EL TAG ON 601203 2ICS4MOV150 VALVE WILL NOT CLOSE ELECTRICALLY FROH REHOTE OPERATOR;BUT'WILL OPEN FROH REHOTE OPERATOR WHEN V150 FULL OPEN.SOHETIHES CAUSES DIV I BATTERY GROUND TAG HUNG ON VALVE DETERH RETERM IN SUPPORT OF HECH HAITN REHOVED BROKEN PARTS OF COUPLING FOR TEMPORARY FIX PERHANENT FIX DONE BY LEAD REPLACED PICKUP COIL FOR CLOSED STARTED IN DC HOTOR CONTROL CNETER 2DMSAMCCA1-3D ALSO REPLACE AUX CONTACT BLOCK FOR DC COIL SWITCH OPERATE/HOV150 IN CONTROL ROOM SAT OPERATION'W194007 SLS-2SLSAHCV ill W194042 RDS-2RDSAHCU 3839 W194187 GTS-2GTSeHOV 2A'WHEN OPENING THE ABOVE VALVE FOR PERFORHANCE OF N2-OSP-SLS"9001 IT WAS FOUND TO BE INDICATING INTERHEDIATE POSITION ON 2CEC4PNL601 EVEN THOUGH VALVE WAS FULL OPEN PLEASE TROUBLESHOOT TAG HUNG ON 2CEC0PNL601 BROKEN CONDUIT OFF PS130 BROKEN PULL TO LOCK SWITCH FOR 2GTSAMOV2A HANGS UP PERIODICALLY AND WILL NOT ALLOW VALVE TO WORK DEF TAG NO.17333 LOCATED 2CECAPNL873 ADJUST LIHITS STRIPPED FLEX BACK AND REINSTALLED CONNECTOR REPLACED CONTROL SWITCH 1-2GTSA03'W194209 W194274 W194288 W194330'W194344 SFC-2SFCCAOV 153 HVK-2HVKACHL 1A CMS-2CHS4SOV 26A VBA-2VBAAUPS 2B ICS"2ICSAP2 WHEN PERFORMING N2-OSP-SFC-9001 STEPS 8 3.6 AND 8 3 7 COULD NOT BE PERFORHED DUE TO DUAL INDICATION WHEN VALVE IS CLOSED 2HVKACHL1A TRIPPED AND FAILED TO RESTART-TROUBLESHOOT VALVE'W I LL NOT OPENs TAG HUNG ON PNL 873 BLOWN FUSE PUHP HOTOR IS MAKING GROWLING NOISE.INVESTIGATE AND DETERHINE IF REPAIR IS REQUIRED ADJUSTED LIHIT SWITCH TIGHTEN AS NECESSARY ADJUSTED L IHIT SWITCHES AND STROKED VALVE.WORKING SAT REPLACED BLOWN FUSE WITH NEW LISTENED TO HOTOR NO ABNORHAL NOISE HEARD
/'
13:13:22 01-09-92 CLASS I WORK-ELECTRICAL HAINTENANCE 1991 PAGE29 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W194363 M194386 W194596'W194715 W194744 W194753 W194756 M19 4786 W194800 W194945 W194975 HVP-2HVPNFN2 A VBA-2VBA4 UPS 2A HVR-2HVR4UC4 158 ADS-NOCOHPIO HVR-2HVRAUC4 06 VBA-2VBAAUPS 2A CHS-2CHSNSOV 26A ICS"2ICSCAOV 157 CHS-2CHS4SOV 248 HVK-2HVK4PSL 1007A CES"24J80709 2HVPoFV2A WENT INTO HOTOR OVERLOAD ON AN AUTO START-TROUBLESHOOT AS NECESSARY TAG HUNG ON 2CEC0PNL871 FUSE BLOWN LED IS LIT ON UPS LOCATED CB 261 ELEVATION COLUHN 011.90 LINE AO INCORRECT FUSE CURRENTLY INSTALLED IN 2HVR4UC4158.
EQRH 2HST-1 REQUIRES FUSE TYPE ATH3 REPLACE FUSE REF 2-91-Q-1338 DIV II ADS AUTO INIT DISABLE SWITCH CONTACTS FOULED CLEAN AS NECESSARY 5/U RESTRAINT.
5'MITCH LOCATED IN CONTROL ROOH ELEVATION 306 2CEC4PNL601 HVRAUC406 HOTOR OVERLOAD ALARH ON MHEN RESET ALARH RETURNED SEVERAL-HINUTES LATER FAN IS RUNNING PLEASE TROUBLESHOOT'AG AT CONTROL SW ON PNL'WHEN ENERGIZING THE HAIN TRANSFORHERS TY BACKFEEDING A TRANSCIENT OCCURRED CAUSING THE UNIT TO GET A FUSE BLOWN LED ON THE ALARH PANEL PLEASE REPAIR TAG ON ANN 852116 AND 2VBA4UPS2A 2CHS4(SOV26A FAILED N2-OSP-CHS-R001.
IT WOULD NOT HOLD PRESSURE AND LEAKS BY EXCESSIVELY.
REPAIR VALVE.SDC SC2-0287-91 VALVE FAILS TO OPEN INDICATE OPEN AS REQUIRED FOR N2"OSP-ICS-R003.
PREVIOUSLY WORKED UNDER WR 193344 PHT UNSAT.TAG LOCATED IN CONTROL ROOH ON PANEL 601 AT VALVE LIGHTS LOSS OF CLOSED POSITION INDICATION AT 2CEC4PNL875 IN PGCC VALVE CONTROL 5'WITCH IN CLOSED POSITION TROUBLESHOOT AND CORRECT AS REQUIRED REPLACE LP PRESS SMITCH FAILS TO RESET INTERHITTENTLY-SDC SC2-0275"91 GROUNDING STRAP ABOVE BOX NOT CONNECTED TO CONDUIT OR JB REPLACED BREAKER REPLACED WITH A NEW FUSE REPLACED INCORRECT FUSE WITH SR ATH 3 SEE ATTACHED TROUBLESHOOTING SHEET FOR DESCRIPTION OF RESULTS CHECKED FAN OPERATION REPLACE FBliREPLACED FUSE DETERHED/RETERHED TESTED SOV T-SHOT-WORK COHPLETED TO WR 190265 CYCLED SOV SEVERAL TIMES~CLOSED INDICATION PRESENT EVERYTIHE NO'WORK PERFORHED REHOVED EXISTING TERHINAL BLOCK INSTALLED NEW ESL 91-509 TERHINAL BLOCK AND GROUND MIRE PROCESURES AND ENGINEERING PAPERMORK REHOVED PIECE OF BARE COPPER MIRE FROH OVERHEADJNO GROUNDING OF J 8 REQD
13:13:22 01-09-92 CLASS I'WORK-ELECTRICAL HAINTENANCE 1991 PAGE30 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W194988 W195 031 W195 140 W195916 W195917 W195922 W195936 W195940'W195947 CES-2CES-Z27 E SWP-2SWPAMOV 388 EJS-2EJS0US3
-78 HVR"2HVRAUC4 128 DFR-2DFRNHOV 120 ENS CSL-2ENS4SWG 101-7 SWP-2SWPCMOV 948 ICS-2ICSx HOV 164 DHS ICS-2DMS4 MCC A1-58 FAILURES OF THE INBOARD ENCLOSURE GASKET REPLACE AS NECESSARY VALVE 2SWPAHOV388 LIHITORQUE ACTUATOR LEAKS GREASE ONTO FLOOR THUS REQUIRING REPEAT CLEAN UP TO BE PERFORHED ACTUATOR IS ELECTRICALLY DISARHED PERHANENTLYI HOWEVER THE GREASE LEAKAGE ISSUE IS A CHRONIC HOUSEKEEPING CONCERN PLEASE REPAIR SOURCE OF LEAK.TAG HUNG ON MOV RX BLDG 261 APPROX 55 DEG AZ REHOVE SPARE BREAKER 2EJSAUS3-78 FROH PO'WERBOARD AND PERFORM N2-EPH-GEN-R551 SER BREAKER UP FOR USE AND INSTALL ON 2EJS4US1-5A (2LAR-PNL200)
WHILE BREAKER 2EJSoUS1-5A IS REMOVED FOR EPH.REINSTALL SPARE'WHEN EPH ON 5A IS COMPLETE REPLACE CONTROL FUSE FOUND WHILE PERFORMING N2-EPH-GEN-V781 FUSE TYPE ATH"3 WHILE PERFORHING N2-EPH-GEN-R520 FOUND ONE OF THE FINGER BASES TO HAVE A CRACK IN IT PLEASE REPLACE LOWER SIESHIC LATCH ALLEN SOCKET IS STRIPPED ON DOOR NEEDS TO BE REPLACED PLEASE CHECK THE TORQUE SWITCH SETTINGS AGAINST THE EP 410 STANDARD DIESEL GENERATOR BLDG ELEVATION 269 REQUIRE TORQUE SWITCH SETTING FOR THIS HOV IS 2 WHILE PERFORHING N2-EPH-GEN-R521 FOUND GREASE IN GEARED LIMIT 5'WITCHES TO BE SEPARATING CLEAN OUT OLD GREASE AND REPLACE MANUAL RESET BUTTON ON THE HCC IS BROKEN REPAIR OR REPLACE AS NECESSARY WAS FOUND WHILE DOING N2-EPM-GEN-R521 ON 2ICSeMOV116 GASKET WAS REPLACED AND 2F00383 WAS COHPLETED CLEANED OUTSIDE OF LIHITORQUE OPERATOR REHOVED BREAKER PH TESTEDI INSTALLED INTO 2EJSoUS1-5A (TEHPORARY)
DURING PH N2-EPM-GEN-V781 REPLACED BLOWN CONTROL FUSE REPLACED LOWER LIHIT SWITCH FINGER BASE REPLACED ALLEN LATCH WITH NE'W ONE ADJUSTED TORQUE SWITCH FROM 1 1/4 OPEN AND CLOSED TO 2 OPEN AND CLOSED REPACKED GEARED LIHIT SWITCHES AND REPLACED GASKETS REPLACED BROKEN SPACER FOR RESET BUTTON W195953 HVR-2HVReUC4 078 2HVR4'UC4078 AT 215 REACTOR BLDG CONTACT OR COVER CLIP BROKEN PREVENTING CONTACTOR FROM OPERATING REPLACE CONTACT CARRIER-SIZE 0.REPLACED CONTACT CARRIER WITH NEW PART
I 13:13-22 01-09-92 CLASS I WORK-ELECTRICAL MAINTENANCE 1991 PAGE31'WR NUHBER EPN NUHBER FAILURE DESC CORRECT I VE ACTION W195977 W195978'W195979 W195983'W195987 W195998 W1 96038 W196053'W196123 HVP-2HVPAMOD 28 EJS-2EJSAPNL 3018 ENS RHS-2ENSoSWG 103-5 RHS-2RHSAH1C RPH-2RPMNPNL A100 EHS-2EHSeMCC 301-5D CMS-2CHSNSOV 26A EHS-2EHSCMCC 302-9A I CS-21CSAHYV 151 HOD NEEDS TO BE REBUILT DUE TO OIL LEAKAGE LOCATION 279 DIESEL GENERATOR BLDGLINE AA BLDG COL 13 OOI FOUND WHILE PERFORHING N2-EPH-HVP-A779 WHILE PERFORHING N2-EPH-GEN-A584 ON 2EJSOPNL3018 DISCOVERED COVER TO BE HISSING ONE SCREW AND HAS ONE OTHER HOLE (2ND DOWN ON RIGHT)IS STRIPPED OUT REPAIR AND REPLACE HISSING PARTS WHILE PERFORMING N2"EPH-GEN-R550 FOUND LOWER ELEVATE LIHIT SWITCH TO BE NOT WORKING WILL NOT STOP HOTOR'WHEN LOWERING BREAKER ELEVATOR REPLACE LOWER ELEVATE LIHIT S'WITCH TAG AT 2ENSASWG103-5
'WHILE PERFORHI NG N2-EPH-GEN-R550 FOUND INSULATING TAPE ON MOTOR LEADS PHASES (1)AND (2)TO BE SPLIT OPEN ON OUTER COVERING.REPAIR TAPED CONNECTIONS.
CLEANING BREAKERS COVERED'WITH A LAYER OD OUST METAL/CHIPS IN PANEL BOTTOH TOP LEFT AND BOTTOH RIGHT PANEL COVER-SCREW HOLES STRIPPED NEED TO BE RETAPPED TO LARGER SIZE PER VISUAL EPH-GEN A584 AUX CONTACTS ON BREAKER NEED REPLACING VALVE FAILS LLRT CYCLING VALVE GETS PROPER LIGHT INDICATIONS IN CR SUSPECT VALVE NOT SEALING AS LEAKAGE IS VERY HIGH.SDC SC2-0287-91 DURING PLANT TRANSIENT ON 910813 DIV I I PUMP TRIPPEO 2CHS-P28 FOR NO OBVIOUS REASON DIV I CHS AND ALL OTHER DIV I I CHS SOV'S WERE FOUND IN NORHAL POSITIONS PLEASE CHECK THE BREAKERS FOR 2CMS4 P28 ICS4'HYV151 IS IN HID POSITION (DUAL INDI CATION)SUSPECT BINDING PROBLEM.PLEASE INVESTIGATE ICSOHYV151 IS LOCATED IN,RB 175 IN THE RCIC ROON TAG HUNG ON VALVE REHOVED REBUILT AND REINSTALLED HYDROHOTORITESTED WORKING SAT REPLACED BOLTS REPLACE DEFECTIVE HERCURY LIHIT S'WITCH FOR BREAKER ELEVATE CONTROL CIRCUIT LOWER END LIHIT TESTED PER SECTION 7 14 OF GEN 500 PROCEDURE'WORKS SAT REHOVED LOCKING BOW STRAIGHTENED AND REINSTALLED RETAPED HOTOR LEADS PER HI, INSTALLED 2 T IHERHAN 1/4-20 SCRE'WS AND NUTS TO PNL ALSO CLEANED PNL AS NESS REPLACED THE AUXILIARY CONTACT RETERMED AND ADJUSTED LIMITS CHECKED BREAKER FOR PROPER OPERATIONS ADJUSTED LIMIT SWITCHES TO OBTAIN PROPER LIGHT INDICATION t'
13:13:22 01-09-'92 CLASS I'WORK-ELECTRICAL HAINTENANCE 1991 PAGE32'WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W196133'M196151 W196153 W196243 W196272 ICS-21CSAHOV 148 VBA-2VBA4UPS 28 I CS-2 I CSAAOV 156 HVP-2HVPAHOD 10 RDS-2RDSAHCU 2231 WHEN ICSeHOV148 IS STROKED OPEN)IT CAUSES A HOHENTARY GROUND ON BYS4S'MG0028 WHEN IT INITIALLY REACHES THE FULL OPEN POSITION TROUBLESHOOT AND REPAIR TAG AT ICSCHOV148 CONTROL 5'WITCH ON PNL 601 BLOWN FUSE~LED IS LIT INVESTIGATE AND REPAIR TAG LOCATED LOCALLY ON 2VBAOUPS28 ICSAAOV156 DOES NOT INDICATE FULL CLOSED (NO GREEN LIGHT)IN THE CONTROL ROOH AT CECAPNL601 TROUBLESHOOT REPAIR AS NECESSARY TAG ON PNL601 BY ICSeAOV156 CONTROL SWITCH DAHPER WAS FOUND OPEN NOT OVERRIDDEN WITH HOTOR RUNNING CONTINUOUSLY SCRAH LIGHTS COHE ON WHEN HALF SCRAH IS IN ON 8 SIDE SUSPECT BLOMN FUSE ON"A" SIDE MORK TO BE DONE VIA PCR 2-0349-91 PER D FLOOD IN ANSWER TO DER 2-91-Q-0919 REPLACED FUSE 81 ON NEUTRAL LEG ADJUSTED LIHITS AFTER HECH ADJUSTED PACKING)STROKED TO VERIFY LIHIT SWITCH OPERATION DAMPER MAS NO OPERATIONAL AND REPLACED WITH SPARE INSTALL NE'W FUSE ON"A" 2RDSAHCU2231 LOCATION 2RDS-.L414 CHECKED VOLTAGE'W196295 SWP-2SWPAAOV 978 AT 2CEC4PNL871 2SWPAAOV978 LIGHTS FOR VALVE POSITION INDICATION WILL NOT ILLUHINATE BULBS ItERE CHECKED TAG AT PNL871 FOLLOWED TROUBLESHOOTING PLAN AND VERIFIED PROPER OPERATION OF LIGHTS AND VALVE POSITION IN FIELD FOR 2SMPAAOV978 NO APPARENT PROBLEH VALVE WORKED AS DESIGNED LIHIT SWITCHES WORKED AS DESIGNED W196327 W196332 W196336 SWP-2SWPASSR 3A ENS-2ENSCSWG 101-1 ICS-21CSCAOV 157 WHILE COHPLETING EPH ELECTRICIAN REQUESTED THAT CONTROL SWITCH ON 2CECAPNL601 BE PLACED TO THE ON POSITION.HEATERS DID NOT ENERGIZE GREEN LIGHT REHAINED ILLUHINATED WHILE RED LIGHT REHAINED EXTINGUISHED ACCORDING TO PRINTS HEATERS SHOULD HAVE ENERGIZED TROUBLESHOOT S'WITCH CONTACTS ETS AND REPAIR AS NECESSARY NOTE THAT BHU 2-91-50934 FOR EPH IS STILL IN EFFECT SEE SHALL PORTION OF TAG ON CONTROL SWITCH (DIV I BAR RACK HEATERS TUNNEL 1)ON 2CECAPNL601 2ENSASWG101-1 DIV I DSL OUTPUT BREAKER ELEVATE FUSES BLO'WN.REQUEST REPLACEHENTS LOCATION CB 261 DIV I SWITCHGEAR ROOH THE POSITION INDICATING CAH ON ICSCAOV157 IS LOOSE AND DOES NOT INDICATE PROPER VALVE POSITION'WHEN STROKED.RESET OR ADJUST POSITION INDICATOR AS NECESSARY.
SDC SC2-0274-91 HANUALLY CYCLED AUX CONTACT AND REINSERTED INTO CUBICLE)CIRCUIT FUNCTIONING PROPERLY BOTH FUSES REPLACED ADJUSTED L IHI T SWITCH CAH AND TESTED LIGHT INDICATION CONNECT AND'WORKING SAT IP 13:13:22 01-09-92 CLASS I WORK-ELECTRICAL HAINTENANCE 1991 PAGE33'MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W196343 W196487 W196615 W197812 W197818 M198002 W198011 CEC-2CEC¹PNL 851 SCV-2SCV¹XD3 018 SWP-2SWP¹FV5 48 HTS-2HTS¹PNL 001 HSS-NOCOHPID DHS-2DHS¹HCC 81 CES LIGHT FIXTURE BROKEN TAG AT CEC¹PNLP851 2 BOLTS HISSING FROH FRONT COVER TOP APPEARS TO BE 318 IN~BOTTOH BOLT 5/16 HEX HEAD BOLTS EL 215 ABS OIL LEAKING FROH VARIOUS CONNECTIONS)
TAG AT VALVE TB 250 SW 250 EL DOOR HANDLE BROKE.RX BUILDING 240 AUX BAY NORTH DEF TAG ON DOOR AT 100 PERCENT POWER WHILE PERFORHING N2-OSP-HSS-H001 HSIV6C TRIP TEST PUSHBUTTON DID NOT RELEASE CAUSING HSIV6C TO CONTINUE STROKING CLOSED UNTIL STOPPED BY RETURNING 6C CONTROL SWITCH TO AUTO POTENTIAL FOR FULL SCRAH EXISTS.TROUBLESHOOT AND REPAIR.OUT OF SPEC HIGH HOTOR CONTROL CENTER OUTPUT VOLTAGE AT 138 VOLTS PER LOCAL INDICATOR RFQUIRED OUTPUT 115-135V.INVESTIGATE AND REPAIR AS NEEDED OEF TAG ON HCCB1 RB 240 SAB DIV 3 DG CONTROL PANEL 413 CABINET HAS A 2 INCH HOLE AT TOP OF NW CORNER COVERED BY TAPE~ROUND COVER PLATE IS H ISSING PLEASE REPLACE COVER PLATE REPLACED INDICATING LIGHT REPLACED HISSING SCREWS REPLACED HOTOR ON VALVE REPLACED PART AT 2HTS-PNL001 DOOR HANDLE REPLACED REPLACE PART)REPLACE SWITCH REPLACED S'MITCH WITH NEM TESTED DEENERGIZED
~MORKING SAT INSTALLED NEW HETER INSTALLED COVERPLATE OVER CUT-OUT IN PANEL WALL EGS-2CES¹IPN L413 W198041 I CS-21CS¹AOV 156 THE OPEN (RED LIGHT)POSITION INDICATION AT P601 IN CONTROL ROOH IS INOPERABLE.
TROUBLESHOOT LIGHT HALFUNCTION (LIGHT BULB WAS REPLACED)TAG AT P601 NEAR LIGHT ADJUSTED 2ICS-AOV156)CAH AND LIHIT SWITCHES W198429 EHS WHILE CLEARING HARKUP FOR 2GTS¹HOV2A THE VOLTAGE DID NOT GET TO THE VALVE AFTER THE BREAKER WAS CLOSED INSTALLED NEW CONTROL FUSE GTS"2EHS¹HCC 102-120'W198459 HVR-F1-2HVRA 90 FUSE CURRENTLY INSTALLED IN CIRCUIT F1-2HVRA90 IN 2CEC¹PNL859 WAS ISSUED FOR INSTALLATION
'MHILE ON QC HOLD.FUSES INSTALLED CANNOT BE VERIFIED TO HAVE BEEN CHANGED OUT SUBSEQUENT TO THIS ISSUE INSTALLATION REPLACED FUSE MITH VERIFIED FUSE CIRCUIT WORKING SAT
13:13-22 01-09-92 CLASS I WORK-ELECTRICAL MAINTENANCE 1991 PAGE34'MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W198460 W198583 W198715'M198717'W198718 W198719 HVR-Fl-2HVRB 90 RPS-F37-2RPS C01 EJS-2EJS4US3
-58 HHR-2HHROCRN 1 CES" 24J80162 EHS-2EHSoHCC 303-20C FUSE CURRENTLY INSTALLED IN CIRCUIT Fi-2HVR890 IN 2CECAPNL860 WAS ISSUED FOR INSTALLATION
'WHILE ON QC HOLD.FUSES INSTALLED CANNOT BE VERIFIED TO HAVE BEEN CHANGED OUT SUBSEQUENT TO THIS ISSUE INSTALLATION CURRENTLY INSTALLED FUSE NEEDS TO BE REPLACED PER HATERIAL ENG HCTE USED TO TEST BATCH FROM WHICH FUSE'WAS ISSUED FAILEO CALIBRATION THIS FUSE WAS INSTALLED ON'W191497.REPLACE WITH NE'W BUSS HON 5 FUSE SYH NO.93-03-320 PHASE-A-WILL NOT TRIP THROUGH SOLID STATE TRIP DEVICE PROBLEH FOUND WHILE PERFORHING N2-EPH-GEN-R551.
TAG ON BREAKER ELECTRIC BRAKE ON BRIDGE NOT OPERATING PROPERLY.TROUBLESHOOT AND REPAIR AS NECESSARY'MHILE'WORKING WR 179197 FOUND SCREWS HOLDING TERH BLOCK INTO JB WERE STRIPPED OUT.NO NE'W JB'S PRESENTLY ON HAND ORDER PART (JB)AND REPLACE'MHEN PARTS ARE AVAILABLEI ORDER SYHBOL 92-38-676 OR RETAP SCREW HOLES AND REPLACED SCREWS WHILE PERFORHING N2-EPH-GEN-R520 02 OVERLOAD RELAY WAS FOUND'WITH A DEFECTIVE SCREW THREADS REPLACE RELAY REPLACED WRONG FUSE MITH FUSE OF SANE TYPE AND RATING ALSO WITH CORRECT PAPER'WORK REPLACED F37-2RPSC01 C72A-F37 REPLACED DEFECTIVE SOLID STATE TRIP DEVICE AND RETAINER CLAHP FOR ARC SHUT BRAKE SELECTOR S'W IN CRANE WAS IN ELEC BRAKE POSITIONINO WORK PERFORHED RAN CLEANOUT TAP THRU HOLES AND USED SAFETY RELATED SCREWS TO SECURE TB IN JB REPLACED OVERLOAD RELAY 328 RECORDS LISTED.
)1 14:18:0-14-92 CLASS I MORK RUHENT 8 CONTROL 1991 PAGE:1 MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION M101676 SMP-2SMP4PDT 1F ROSEHOUNT 1153 TRANSHITTER NON-STANDARD SOLID CORE VICE HANUFACTURERS SUPPLIED HOLLOW CORE SCREW ON POSITIVE TEST SIDE OF TRANSHITTER TERHINAL BOARD QCIR 2-86-3901 REPLACED TEST PT TERHINAL SCREM'MI TH HANUFACTURER SUPPLIED SCREW PART NO 01153-0330-0001 SYH NO.93-16"116 W128075 GSN-2GSN0RV3 2A W1 08061 ZZZ-NOCOHP ID VALVE MAS CANNIBALIZED PER NCR 5-88-0077 VALVE IN STOCK SEC NUHBER 1221198 NEEDS SOLENOID ELECTRICAL BOX REPLACED.REPLACEHENT PARTS IN STOCK 93"30-724 CONTACT ERIC PARR EXTENSION 7610 REHOVE TEHPORARY FLANGES AT LOCATIONS 4RV32A/8 AND RV34A/8 AND INSTALL NEW RELIEF VALVES PER E AND DCR C95017 (FPO 28196)HSRF NO 033896 ORDERED 910729IALL FOUR SPARE ACTUATORS IN WAREHOUSE ARE BEING RETURNED TO GE FOR REPAIR AND TESTING FLANGES TO REHAIN IN PLAICE PER EDC 2H10135)NO
'WORK REQD M129050 M130150 M131165 M138284 M138725 W138784 SMP-2SWP4(CAB 146A CBC-NOCOHPID S'WP-2SMP-M-1 32 HSS-NOCOHPID CEC-2CECoPNL 838 SMP RHS-2SMPACAB 23A CLEAN AND INSPECT THE WETTED PORTIONS OF THE FIS LOCATED ON 2SMPeCA8164A.THIS DEVICE STICKS FROH TINE TO TINE AND FAILS TO ACTUATE ON LOM SAMPLE FLOM.TROUBLESHOOT.
ROSEHOUNT CALIBRATION UNIT PRESS TO CAL DISPLAY KNOBS NEED TO BE INSPECTED FOR DAHAGE CONTROL ROOH PANEL 2CEC4IPNL618 629 609 611 625 TROUBLESHOOT CABLE 2SWP-M132 HAS BADLY NICKED'WIRES ON T83-91 92 OF 2CEC-PNL828 CABLE 2SWP-W132 HAS BADLY NICKED MIRES ON T83 91~92 OF 2CEC PNL 828 r'ERVICE H20 TO CMS I SOL VLV CONTROL (288 RELAY RH)LCR IL25'MP-120 REPLACE SOLENOID/ELECTRICAL BOX ASSEHBLY MHEN REPAIRED NEM PARTS ARRIVE FROH GE ABOVE OPTO ISOLATOR PAIR HAS NO OUTPUT END CAP ON NUPRO VALVE LEAKS PLEASE REHOVE CAP CLEAN THREADS'EDOPE AND REINSTALL CAP CHECK FOR LEAKS.LOCATED ELEV 215 IN CONCRETE BLDG NORTH SIDE OF RXB SCOPE OF WORK EXPANDED TO INCLUDE HAINT PER EDC 2E00414 REV A.CLEANED FLO'W SWITCH.WORK COHPLETED BY HOD 90-044 NEW TYPE OF FLOW S'WITCH WAS INSTALLED ALL ROSEHOUNT CALIBRATION KNOBS INSPECTED 911115 AND FOUND TO BE INTACT AND GOOD CONDITION OPS COHPLETED LOOP BY INPUTTING TO THE VALVE MITH THE THUHBWHEEL CONTROLLER IN THE CONTROL ROOH ALL FOUR SPARE ACTUATORS ARE BEING RETURNED TO GE FOR REPAIR AND TESTING REPLACED SPARE OPTO ISOLATOR INPUT OUTPUT CARDS REMOVED CAP;APPLIED SEALANT-REPLACED CAP I
14:18'14-92 CLASS I WORK RUHENT 8 CONTROL 1991 PAGE:2 IIR NUMBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION'It138790 M146413 HSS-NOCOHPID IAS-2IASCPT1 86 PLEASE INSTALL ELECTRICAL BOX ASSEMBLY TO FACILITATE REPLACEMENT OF IDENTICAL ASSEHBLY REHOVED UNDER WR 138283 FOR 2HSSCAOV6A PRIOR TO CLOSING NCR 5-88-0077.
ITEH LOCATED ERV ROOH AT THE IIAREHOUSE TEST CONNECTION VALVE IS LEAKING BY REPAIR OR REPLACE 2IAS4'PT186 IS LOCATED AT 289 RX BLDG NORTHWEST SIDE ALL FOUR ACTUATORS IN WAREHOUSE ARE BEING RETURNED TO GE FOR REPAIR ANO TESTING NO PROBLEH FOUND DURING PERFORHANCE OF N2-ISP-ADS-R106 901121 W146440 M146441 HTS-2HTSePNL 003 HTS-2HTSePNL 001 REPAIR FAULTY INDICATION PROBLEH AND REINSTALL IN SPARE SLOT IN HTS PANELIREHOVED UNDER MR NO 146697 REPAIR FAULTY INDICATION PROBLEM AND REINSTALL IN SPARE SLOT IN HTS PANEL.REHOVE UNDER MR NO 146697 CARD IS NOT IN SPARE SLQTI CLOSE OUT WR-NO ACTION TAKEA;CARD FOUND IN VIDHAR-RETURNED TO VENDOR FOR REPAIR AND RETURN TO WAREHOUSE SPARES CARD IS NOT IN PNL REHOVED EARLIER BY SOHEONE ELSE-NO ACTION-FOUND CARD IN VIDHARI RETURNED TO VENDOR FOR REPAIR AND RETURN TO WAREHOUSE SPARES M146523 CMS-2CMSePNL 66A HYDROGEN REAGENT DIV I GAS BOTTLES AT EL 215 RX BLDG NEED TO BE PIPED WITH FLEXIBLE TUBING (ALSO OIV I I CAL GAS)REPLACED SOLID STAINLESS STEEL TUBING WITH BRAIDED SS HOSE ON DIV I H2 REAGENT GAS BOTTLE ONLY DIV 11 CAL GAS DONE PREVIOUSLY.
NO HOSE NEEDED W149499 W154COC'It154408 NHS-C51-K605 CCP-2CCP4RV6 4A EGA-2EGAoSV3 A PLEASE INVESTIGATE THE METER FUNCTION SWITCH'MHILE PERFORHlttG N2-ISP-NHS-WoI007 CHANGE THE HETER FUNCTION SWITCH FROM AVERAGE TO FLOW GAVE YOU A SPURIOUS TRIP TO FULFILL THE NHP2 IST PUMP AND VALVE PROGRAH PLAN REHOVE VALVE 2CCPARV64A FOR TESTING CALIBRATION AND REINSTALL WHEN NOTIFIED BY THE 18C DEPARTHENT LOCATED RB SC ELEVATION 227 LINE 64 COLUMN 092 00 REF SEI-712 AND ASHE ANSI OH-1 1981 TO FULTILL THE ttHP2 FIRST PUMP AND VALVE PROGRAH PLAN REMOVE VALVE 2EGAeSV3A FOR TESTING CALIBRATION AND REINSTALL'MHEN NOTIFIED BY THE 18C DEPARTMENT.
LOCATED DIESEL GEN ELEVATION 261 LINE A COLUMN 011 50.REF SEI-712 AND ASME ANSI OH-1 1981 PROCEDURE HAS BEEN RUN MANY TIHES SINCE AND NO PROBLEMS HAVE BEEN SEEN NO'WORK PERFORHED CALIBRATED RELIEF VALVE CONTACTED NORH ELLIS ABOUT INSTALLATION CALIBRATED 2EGAASV3A PER N2-IMP-GENQ038 1
'~14: 18': 0-14-92 CLASS I WORK RUMENT&CONTROL 1991 PAGE:3'MR NUHILER EPN NUMBER FAILURE DESC CORRECTIVE ACTION'LI154477 W154522 M154533'M154588'LI154606 Lll 5464 4'M154645 W1 54660 W154903'M157234 IAS-2IAS4V36 7 HVK"2HVK4CHL 18 SWP-2SWP4TV3 5A SWP-2-SWP-00 1-65P-3 DFH IHA-2DFHLSl 36 EGO-2EG04TS3 0018 CEC-2CEC4 PNL 608 HVR RMS-2HVRCCAB 148 CSH-2CSHoHOV 101 HVC-2HVCoCAB 188 DRAIN VALVE 2IASeV367 IS LEAKING ANO COHING 2IASATKSA TO BLO'MN DO'MN AT ON EXCESSIVE VALVE HOT GAS BYPASS VALVE IS NOT OPERATING PROPERLY.TROUBLESHOOT-REPAIR YORK VENDOR TO ASSIST'WITH TROUBLESHOOTING CALL M DOWNS FOR FURTHER INFO 7538 2SWPATV35A OSCILLATES FROH FULL OPEN TO FULL CLOSED ON A CONTINUOUS BASIS IT SMOULD BE STEADY STATE TROUBLESHOOT-REPAIR REPLACE SUPPLY AND DISCHARGE PIPING TO 2SWP4CAB238 PER EDC 2F00308 AND SIHPLE DESIGN CHANGE SC2-0126-91.
LOCATION ELEC TUNNEL ELEVATION 215 LS136 BADLY CURRODED AND HANGS UP DURING LOOP CAL REPLACE S'MITCH COMPUTER PT EGSTC02 LIAS IN ALARH WITH LUBE OIL TEHP NORMAL (165 DEG F)DURING PERFORHANCE OF N2-OSP-EGS-H001 TAG LOCATED AT CONTROL ROOH ANNUM 852242 TROUBLESHOOT TO CLEAR CONDITION AND ANNUN WINDOM R'MH AND 3D HONI CORE SEE SELF TEST-STATUS WORD NOT RECEIVED-OR NON-CRITICAL TEST FAULT MESSAGE THIS BRINGS IN ANNUNCIATOR 603307;ALARH INSTANTLY CLEARS PLEASE TROUBLESHOOT AND REPAIR (TAG 26341 ON PNL 603)REPLACE THE CHECKSOURCE SOLENOID.FAULTY SOLENOID FOUND DURING WORK BEING PERFORHED VIA'LIR 165756 CSHeHOV101 CAUSED ANNUNCIATOR 601729 RIPCS PRGSS PHP2 VALVES NOT OVERLOAD TO ANNUNCIATE WHEN ITS BREAKER'MAS OPENED ABOUT 1/2 HOUR LATER THE ANNUNCIATOR CLEARED.LIITH THE BREAKER STILL OPEN SUSPECT AN OPTICAL ISOLATOR FAILURE PLEASE TROUBLESHOOT ANNUN CHECKSOURCE WAS NOT GREATHER THAN ONE DECADE ABOVE BACKGROUND
-TROUBLESHOOT PERFORHED LEAK TEST OF 2IASCV367e VALVE HEET REQ.OF T~S I.5 1 E 2 VENDOR ADJUSTED PERHISSIVE SMITCH NO PARTS REPLACED ADJUSTED CONTROLLER TO PREVENT OVERSHOOT OSCILLATIONS REMOVED FLOW SWITCH FROM'PIPE REPLACED FLOW SWITCH REPLACED AND RECALIBRATED LS 136 PERFORHED LCR AND CALIBRATED TEHP SWITCHES REPLACED ANALOG HODULE A10 REPLACED SOLENOID COIL FOR CHECK SOURCE CHECKED ANN AND COHP PT AT KNIFE S'M AND OPTICAL ISO.BOTH WORKING FINE REPLACED SOLENOID ON CHECK SOURCE OF 2HVC4CA8188 PER S-HI-5.3-001 4
14.18-0 14-92 CLASS I WORK RUHENT 8 CONTROL 1991 PAGE:4 W1 58192 DFR" 2DFR4 HOV 121 WR NUHBER EPN NUHBER FAILURE DESC'WHILE PERFORHING N2-EPH"GEN-R520 FOUND WATER IN LIHITORQUE OPERATOR LIMIT SWITCH COHPARTHENT TORQUE AND LIHIT SWITCH HAVE CORROSION PLEASE REPAIR AS NECESSARY.
LOCATION SUPP POOL~CORRECTIVE ACTION LLRT (PHT)ON 2DFR4HOV121 COHPLETED SAT.HET ACCEPTANCE CRITERIA W158607 W159104 W159144 W159153 W159154 W1 59503 W160790 W1 60791 HVC-2HVCOCAB
'8A SWP-2SWPAPT7 98 CES EGS-2CES4IPN L408 RRS-C22-P002 RRS-NOCOHPID EGF-2EGFALS1 28 HTS-2HTSePNL 003 HTS-2HTSQPNL 003 2HVC-CA818A CONTROL ROOH VENT HONITOR SKID CK SOURCE UNIT IS HISSING TWO SCREWS REPLACE PER R DEAN.LOCATED DIV I I CB CHILLER ROOM CB 261)2SWPAPT798 IS PROVIDING AN ERRONIOUSLY LOW READING TO THE PROCESS COHPUTER.SHOULD BE READING AROUND 45 PSI AND IS CURRENTLY READING 3 45PSI TAG HUNG AT 2SWPc(PT798 ALARH WILL NOT LIGHT'WHILE TESTING ANNUNC IATORS REPAIR AS NECESSARY TAG AT 2CESAIPNL408 DIV I I DIESEL RH CB 261 INVESTIGATE TEST FAULT ON DIV II PANEL (C22-P002)
TROUBLESHOOT T68T FAULT ON DIV II RRCS PER THE FOLLOWING DISPLAYED HESSAGE-2C1613 HPI I/01 INTER-DIV TST02 CARD INPUT PATH FAILED-INT TEST-C22-P002 RANGE LOCATED 288 CONTROL BLDG RELAY ROOM TAG LOCATED ON P603 IN CONTROL ROOH 0 ISPLAY WHILE PERFORHING LOOP CAL FOUND BROKEN TERMINAL BLOCK ON LOWER S'WITCH-DOES NOT EFFECT OPERATION 2HTS-PNL003 CARD C3-9 SPARE INSTALLED CARO DOES NOT READ WHEN PLACED IN ACTIVE CARD SLOT REPAIR SPARE BOARD 2HTS-PNL003 CARO C3-9 SPARE INSTALLED CARD DOES NOT READ'WHEN PLACED IN ACTIVE CARD SLOT REPAIR BOARD INSTALLED HISSING SCREWS.LOCK WASHERS AND TORQUED TO 5 2 IN LBS USING M8TE E0115 CAL DUE 911214 REPLACED INPUT AND OUTPUT OPTICAL ISOLATORS PERFORH N2"I,CP-GEN-001 ON LOOP SAT PERFORMED N2-IHP-GEN-V005 ON OPTIC)L ISOLATORS-SAT RESEATED CARD INTO ITS SLOT AND REPLACED LIGHT BULBS WITH BULBS FROM SPARE ANNUNCIATOR REPLACED I SOLAT ION PA I'R C-A16-A13-REHOVED HPI I SER NO.1V1306)REHOVED HPOI NO TADBT9-73)
INSTALLED HPI I NO 30V1305-HPOI NO TADST7252 I FOUND SPARE HPO I INSTALLED BAD-REMOVED NO TADST7252 AND REINSTALLED ORIG TADBT9-73 REPLACED HPOI C-A16-A05 NEW HPOI SER NO.TADST9-10 REPLACED TERMINAL BLOCK WITH NEW ONE FROM HI 136761 FINISHED LOOP WORKS SAT REHOVED CARO CARD TO BE RETURNED TO VENDOR FOR REPAIR AND RETURN TO SPARES MR 56031 MSRF 35476 REMOVED CARD.CARD TO BE RETURNED TO VENDOR FOR REPAIR AND RETURN TO SPARES MR 56031 AND HSRF 35476 T'
'4:18:0-14-92 CLASS I WORK RUHENT 8 CONTROL 1991 PAGE:5 WR NUHBER EPN NUHBER FAILURE DESC CORRECT I VE ACTION'M160792 W160793 HTS-2HTSCPNL 003 HTS-2HTS4 PNL 003 2HTS-PNL003 CARD C3-10 SPARE INSTALLED CARD DOEN NOT READ'WHEN PLACED IN ACTIVE CARD SLOT REPAIR SPARE BOARD 2HTS-PNL003 CARD C3-12 SPARE INSTALLED CARO DOES NOT INDICATE'WHEN PLACED IN ACTIVE SLOT REPAIR SPARE CARO.REHOVED CARD CARD TO BE RETURNED TO VENDOR FOR REPAIR AND RETURN TO SPARES HR 56031 HSRF 35476 REHOVED CARD CARD TO BE RETURNED TO VENDOR FOR REPAIR AND RETURN TO SPARES HR 56031 HSRF 35476 W1 60795 HTS-2HTS4PNL 003'M161136 EGS-2EGS4EG3 2HTS-PNL003 CARO C3-1I SPARE INSTALLED CARD DOES NOT READ WHEN PLACED IN ACTIVE CARO SLOT.REPAIR SPARE BOARD.TURBO OIL PRESSURE REGULATOR CONTROLLING PRESSURE TOO LO'M TURBO PRESSURE 33.5 IN/HG AND OIL PRESSURE ONLY 28 LBS TROUBLESHOOT.
REHOVED CARD.CARD TO BE RETURNED TO VENDOR FOR REPAIR AND RETURN TO SPARES HR 56031 HSRF 354e76 CHECKED RATION RELAY 2EGS4PY6001B CAL'ED GOOD ALSO SHUTTLElVALVE PY-24 CHECKED SAT PER DER 2-91-90183 AND VENDOR LETTER TURBO PRESSURE CANNOT GET ANY HIGHER THAN 30PSI HINUS 2 POUNDS THAT IS USED UP BY RATIO RELAY SO 28 PSI IS OK W161663 W162032 W162393 W163935 W164029 HVC-2HVCAACU 1A SWP"2SWP4RR2 38 HVC-2HVCNUC1 08A~CSH-2CSH4 PDT 109 HVC-2HVC4 FN1 1A PERFORH AIR BALANCE ON EQUIPHENT LISTED IN EDC 2H00243 PER PROCEDURE N2-ICP-GEN-9004
-RESULTS TO BE ATTACHED TO HOD PACKAGE 87-208 BY BOB CRANDALL DIV II SWP FROH RHR HEAT EXCHANGER 8 RAD RECORDER-THE CHART DRUH DRIVEN SPROCKET HAS SPLIT RESULTING IN THE CHART PAPER COHING OFF THE CHART DRIVE AND BEING HISALIGNED
-REPLACE REPERFORH WORK TO SUPPORT DER 2-91-9-706 FLOW BALANCE OF UNIT COOLER 5'WP SIDE AS DIRECTED BY SYSTEH ENGINEERING R GREEN FLOW BALANCE TO INCLUDE FLOW AND DELTA P DATA HEASURE THE DELTA P ACCROSS 2CSHCPDT109 AT OR ABOUT 100 PERCENT POWER RECORD PERCENT POMER AND DELTA P READING BELOW REFERENCE LCR IL2CSH-008 TO REFLECT THE OPERATING DELTA P SETPOINT SHOULD BE 3.8 PSID BELOW OPERATING DELTA P FANS 11A OR 118 WILL AUTO RESTART WHEN PLACED IN THE STANDBY NODE-NO LOW ALARHS ARE IN TROUBLESHOOT AUTO RESTART PERFORHED AIR BALANCES 900410 AND 900423 INSTALLED CHART DRUH KIT AND WATCHED PAPER TAKE UP SAT.TOOK FLOW READ INGS DELTA P AT 100 PERCENT MAS 4 2 PSID NO CHANGE WAS HADE ON THE LCR SINCE THE 4.2 IS THE HEAD CORRECTION REPLACED AND CALIBRATED FLO'W SWITCH CIRCUIT CARO
14:18:0 14-92 CLASS I WORK RUHENT 8 CONTROL 1991 PAGE:6 MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION M16 4046 CSH-2CSH4 P1 HPCS PUHP MOTOR LONER THERHOCOUPLE HAS A HINOR OIL LEAK PLEASE REPAIR ELEC HAINT DRAINED RESERVOIR~PULLED THERHOCOUPLE:CLEANED THREADSIPIPE DOPED FITTINGS AND REASSEHBLED M164343 GTS-2GTSA HOV-LEAKS FROH VALVE ACTUATOR 28A TIGHTENED TMO LOOSE FITTINGS W164360 M164943 W164944 M165052 M165457 HSS"2HSS4FT1 5A HVC-2HVC4 FS5 6C HVC-2HVCAFS5 6D RPS"2CECNPNL 632 CHS RHS-2CHSARIC 108 LO'M SIDE INSTRUHENT VALVE HANDLE IS HISSING HOLD DOWNS NUT PLEASE REPLACE RX 215 AZ 340 RACK 2CEC4'15 LOM FLOW CAUSMES AUTO START OF HVSSF118 LO'M FLOW SIGNAL CAUSES AUTO START OF HCUCF11A ANN-UN'EPLACE THE RILEY TEHP SWITCH IN 2CECNPNL632 GEHPL E31-N6006.
GE PART NO.1645687P002 REF GE DWG 807E154TY SHEETS 3 4 AND 8 AND EDC 2E00438 CHS108 RIC 15 LOCKED UP AND WON'T RESPOND DEFICIENCY TAG NO 14079 IS ATTACHED TO RIC OF CHS108 INSTALLED NEM NUT ON LOM SIDE INSTRUHENT VALVE HANDLEI ISSUE NO 149104 FOR NEM NUT E RECALIBRATE RECALI BRATE REPLACED SPARE RILEY SMITCH INTO SLOT E31-N600C R1C FOR 2CHS4(CAB108 WAS OPERATIONAL ON 910213 WAS NOT LOCKED UP AND DID RESPOND TO COHHANDS M165468 HVR CONTINUOUS FILTER HECHANISH STEP FAILURES RHS-2HVR4 CAB 14A TIGHTENED TAKE UP REEL HOLD DOWN NUT FOUND LOOSE WHICH CAUSED FAILURE M16 5471 CHS HONITOR PULLING LOOP DO'MN LOOP 8 WHEN Sl S'MITCH IS WORK PERFORHED BY SUPPORT DEPT I8C IN THE ON POSITION CHECKED POWER SUPPLY VOLTAGES SAT RHS-2CHS4CAB 10B M165479 CHS HOVING FILTER MILL NOT STEP RX 284 NORTH RHS-2CHS4CAB 10B ORDERED NEM FUSE F2.REPLACED 5 AHP FUSE AND STEPPED FILTER OK
-14:18:i07 92 CLASS I WORK-TRUHENT 8 CONTROL 1991 PAGE:7 MR NUHBE EPN NUHBER FAILURE DESC CORRECTIVE ACTION'M165485 HVC UNIT DROPS OFF LINE BY ITSELF (BOTH A AND 8 PORTS)FOUND BAD POWER SUPPLY-REPLACED NEW POMER SUPPLY NO GOOD REPLACED POWER SUPPLY AGAIN NEW POWER SUPPLY OK W165487 RHS-2HVCoCAB 188 HVR RHS-2HVR4CAB 32A HVR-32A SAHPLE PUHP IS HAKING AN EXCESSIVE AHOUNT OF NOISE~(RX 289)HAD MECHANICAL HAINTENANCE REPLACE PUHP HOTOR W165492 S'WP PUHP KEEPS TRIPPING OFF WHEN STARTED RHS-2SWP4(CAB 146A PERFORHED'WR 177143 SAT'~, PROBLEH FIXED BY'MR 177143 W165495 M165682 CHS CHS108 HAS LOW FLOM ALARH SUSPECT AND FLOW CONTROL REPLACED PAPAR AND FILTERS ALSO VALVE IS STUCK CLEANED AND DRIED HOVING FILTER ASSEHBLY RHS-2CHS0CAB 108 SMP CONTROL BUILDING AT SKID 238 INLET SIDE TO HCU 07 REPLACED VALVE HANDLE AND TIGHTENED LEAKS AROUND THREADED NIPPLE ALSO HANDLE IS FITTING BROKEN ON HCU 017 LEAK OCCURS WHEN TRYING TO OBTAIN SAHPLE FOR RTP-130 RHS"2SWPCCAB 238'M165739 W165740 CHS LOM FLOW ALARHS-PLEASE INVESTIGATE REPAIR AS REQD RX BLDG 289 RHS-2CHS4 CAB 108 SWP PUHP KEEPS TRIPPING OFF WHEN STARTED RHS-2SWP4CAB 146A CALLED UP MONITOR ON CONSOLE NO LOW FLOW PRESENT NONE IN PAST 24 HOURS CALLED HONITOR ON CONSOLE STILL NO PROBLEH FOUND FOUND IF PUHP STARTED IT TAKES 7 SECONDS TO RESET LOW FLO'M ALARH BUT PUHP TRIPS AFTER 5 SECOND DELAY WILL BE SOLVED BY PR 09604 WR AS WRITTEN TO HECH HAINT TO CHANGE BUT PIPING 0
14:18:0 14-92 CLASS I WORK RUHENT&CONTROL 1991 PAGE:8'WR NUHBER EPN NUMBER FAILURE DESC CORRECTIVE ACTION W165746 SWP RHS-2SWP4CAB 238 UPON POWERING UP (Sl)HICROCOHPUTER
'MITH HOTOR STARTER SWITCH IN AUTO THE PUHP STARTED WITHOUT ACTUATION FROH L1C OR R1C FAIL CODE 16 ON R1C AND NUHEROUS UPLOAD REQUESTS ELECT TUNNEL 214 SOUTH HONITOR IS WORKING CORRECTLY PUMP ON COHHAND IS KEPT IN HEHORY'MHEN S1 IS OFF SO PUHP MILL TURN ON WHEN S1 3 TURNED ON FAILURE CODE 16 WAS BROUGHT IN WHEN 51 WAS TURNED ON~UPLOAD REQUEST COHES IN BECAUSE OF ALARH W165 747 M165756'M165759 SWP PUHP DOES NOT STAY RUNNING WHEN TURNED ON AT R1C IN CONTROL ROOH.PLEASE INVESTIGATE AND REPAIR TAG HUNG AT R1C.SDC SC2-0121-91 RHS-2SMP4RE2 38 HVR HONITOR SPIKED OUT RECEIVING INTERHITTENT SATURATION HIGH AND ALERT LEVEL ALARHS PLEASE INVESTIGATE AND REPAIR RHS-2HVRACAB 148 5'WP PUHP FOR SAP41468 TRIPS OFF ON LOM FLOW ATTEHPTS TO RESTART FROH R1C ARE UNSUCCESSFUL PLEASE INVESTIGATE AND REPAIR SAHPLE PUHP LOCATED IN SKID ON 245 EL IN SERVICE'WATER PIPE TUNNEL TAG HUNG AT R1C AND RP DRHS RHS-2SWP4CAB 1468 CHANGED SWITCH 2SMPNFS2QB SETPOINT PER EDC 2E10397r'ET AT l135HV AROUND 6GPH INVESTIGATED LOSS OF FLOW FOUND AFTER ALERT AND HIGH ALARHS-CAUSE RB VENT ISOLATION.FOUND BLOWN FUSE REPLACED FUSE PER S-HI-5 3-0041 AND 5 4-001 HONITORED FLOW FOR CORRECT VALUE RECALIBRATE FLOW SWITCH LCR-154 (SWP)W165763 W165769 SWP RHS-2SMP4 CAB 1468 CHS RHS-2CHSACAB 108 PUHP STARTED FROH RIC/LIC USING ALTERNATE HETHOD PUHP WILL START BUT WILL NOT STAY RUNNING ONCE YOU SHUT OFF FLUSH MATER PUHP STOPS RUNNING LOW FLO'M ALARH PRESENT.SM1468 HAS SHUT ITSELF DO'WN R IC TEST LIGHT BUTTON IS BROKEN)PUSHED IN'WARD.UNABLE TO TEST R1C LIGHTS R1C IS IN CONTROL ROOH ON PANEL 2CEC4PNLBBOC PLEASE REPAIR.TAG HUNG AT R1C-NOTIFY RP PRIOR TO RETURN TO SERVICE ADJUSTED SETPOINT ON FLO'W SWITCH PUT 5'W I TCH BACK TOGETHER I BROKE WI RE WHILE UNDER REPAIR-SOLDERED SWITCH WIRE BACK ON
F 14:18 07-14-92 CLASS I WORK-RUMENT&CONTROL 1991 PAGE:9 WR NUMBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W165773 SWP RHS-2SWP4CAB 146A SAHPLE PUHP TRIPS OFF AND WILL NOT RESTART FROH R1C OR HANUALLY.TAG LOCATED AT R1C CLEANED FLOW SWITCH'W165788 S'WP PUHP FOR SWPe1468 TRIPS OFF ON LO'W FLO'WI CANNOT STARTED PUHP IN MANUAL 12IMVI START FROH R1C.ALTERNATE HETHOD FOR COAXING PUHP FLUSHED STANDPIPEISTARTED PUMP IN TO STARTS ONLY KEEPS PUHP RUNNING FOR AROUND 2 AUTO-58HU HOURS RHS-2SWP4CAB 1468 W165789 S'WP SAMPLE PUMP TRIPS OFF AND WILL NOT RESTART FROH RIC TAG LOCATED AT RIC RHS-2SWP0CAB 146A DRAINED STAND PIPE AND'8LEANED SAHPLE CHAHBER W165790 W165791 SWP PUMP FOR SWP<1468 TRIPS OFF ON LOW FLO'WI ATTEMPTS CLEANED FLO'W ELEHENT TO RESTART FROH R1C ARE UNSUCCESSFUL'LEASE INVESTIGATE AND REPAIR RHS-2SWP0CAB 1468 SWP PUHP SHUT OFF BY ITSELF AND WILL NOT RESTART FROH BACKFLUSHED SPOOLPIECEI
'WATER WAS R1C TAG LOCATED ON R1C r'ART OF ONGOING PROBLEM BRO'WN WITH CLUHPS OF D I RT RUST I SINCE COHPLET ION OF.FLO'W 5'WITCH HOD PUMP REMAINED RUNNING 36 HRS LATER RMS-2SWP4'CAB 146A'W165798 SWP PUMP WILL NOT STAY RUNNING.KEEPS SHUTTING ITSELF DOWN.TAG ON LIC AT SWP4 CA8238 RMS-2SWP4CAB 238 SAHPLE PIPING I SAHPLE FLOW INCREASED WELL BELOW TRIP SETPOINT LOCALLY STARTED PUMP AROUND 10 TIHES WITHOUT PUHP TRIPPING OFF LINE W165800 ZZZ-NOCOHPID MONITOR KEEPS GOING IN AND OUT OF FILTER STEP ALARHS RAD PROTECTION REPLACED PAPER AND CHECKED FOR PROPER PAPER ORENTATION ALARHS CLEARED W166605 HVC LIC DISPLAY HISSING HINUS SIGN PLEASE REPAIR AS NECESSARY CONTACT D MACDONALD AT 2594 OR 2815 WITH QUESTIONS RHS-2HVCoCAB 18A INSTALLED DISPLAY BOARD I
14:18:0 14-92 CLASS I WORK RUHENT&CONTROL 1991 PAGE10 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W167081 W167090 W167091 W168466 NHS-2NMS-GEC 51-J008 PCB-2PCBADRA 4A PCB"2PCB4(DRA 48 GTS-2GTSoHOV 2A REHOVE UNDER VESSEL TIP TUBING INSURE EACH PIECE IS TAGGED STORE IN AREA DESIGNATED BY RAD PROTECTION.
UPON COHPLETION OF UNDER VESSEL WORK REINSTALL TIP TUBING OPEN NORTH SUPPRESSION POOL HATCH DURING AUGUST OUTAGE AND RECLOSE AND RETORQUE AS REQUIRED 71"87 FT LBS PER N2-HHP-PCB-003 NOTIFY I AND C TO DO LLRT'WHEN COHPLETE REHOVE SOUTH SUPPRESSION POOL HATCH DURING AUGUST AND RECLOSE AND RETORQUE-AS REQUIRED 71-87 FT LBS PER N2-HHP-PCB-003 NOTIFY I AND C TO DO LLRT WHEN COHPLETE TROUBLESHOOT VALVE ACTUATOR TO VERIFY PROPER DESIGN OPERATION REHOVED-STORED AND REINSTALLED TIP TUBING PER BLOCK 10 AS FOUND LLRT PERFORMED 900907 AS LEFT LLRT PERFORMED 910114 E AS FOUND LLRT PERFORMED'4 AS LEFT LLRT PERFORHED 910115 E&DCR 2E-10392 TEHP HOD 91-018 INSTALLED TO CLEAR PROBLEH UNDER WR 168472 COPY ATTACHED W168467 GTS-2GTSAMOV TROUBLESHOOT VALVE ACTUATOR TO VERIFY PROPER 3A DESIGN OPERATION TEMP MOD 91-018 EDC 2E-10392 INSTALLED TO CLEAR PROBLEH UNDER WR 168472 COPY ATTACHED W168468 W168472'W168473 W168694 W169284 HVK-2HVKALS1 68 GTS-2GTSCHOV 28A GTS-2GTSCMOV 288 EGA-2EGAASV1 11 HVK-2MVKCTV2 18 INSTALL TEHP MOD 91-012 EOC 2F00295 SER 91-018 SEE MIKE DOWNSX 7538 FOR FURTHER INFO.THIS IS A NUISANCE ANNUN TEHP HOD INSTALL TEHP MOD 91-018'DC 2E10392 INSTALL TEHP HOD 91-019 EDC 2E10393 TO FULFILL THE NHP2 IST PUHP AND VALVE PROGRAM PLANe REHOVE VALVE 2EGANSV111 FOR TESTING CALIBRATION AND REINSTALL WHEN NOTIFIED BY THE I&C DEPARTHENT LOCATED DIESEL GENERATOR ELEV 261 REF SEI 712 AND ASME 1 ANSI OH-1 1981 VALVE ACTUATOR LEAKING HYDRAULIC FLUID INSTALLED JUHPERS AS DIRECTED PER EDC NUMBER 2F00295 DIO WORK PER ATTACHED S-HI-5 3-001 PERFORHED S-HI-5 3-001 FOR EACH VALVE TORQUE WRENCH NO 9311 DUE 910402 CALIBRATED NEW RELIEF VALVE CHECKED FOR OIL LEAKS'OUND NO LEAKS f'i p C~1 A e "14:18:0-14-92 CLASS I WORK RUHENT 8 CONTROL 1991 PAGE11 WR NUHBER EPN NUMBER FAILURE OESC CORRECTIVE ACT ION W169516 SVVrAOS-2SVV eNBE237 REHOVE AND COIL BACK TO CONDUIT ALL ACCELEROMETER CABLES FOR ALL EIGHTEEN SAFETY RELIEF VALVES REHOVED CABLES FROH ACCELERHOETERS REHOVED ACCELEROHETERS AND REMOVED ACCELEROHETER BANDS FROH ALL 2HSS-PSVS IN ORY'WELL BANDS AND ACCELERHOETERS ARE BEING STORED IN DIRTY SHOP ON SHELF AT NORTH END'W169518 MSS-2HSS4SOV THE HAIN STEAM SOLENOIDS REQUIRE REPLACEHENT PER 6D-1 EQRH 2SV-1 REPLACED DAHAGED CONDUIT HUB FOR SOV-7A1 SYHBOL NO 93-20-847 HI NO~128920 REPLACED DAMAGED CONDUIT HUB FOR SOV6A SYMBOL 93.20-847 HI 128993 REPLACED DAMAGES CONDUIT HUB FOR SOV6D SYHBOL 93-20-847 HI 137431 REPLACED OAHAGEDSCONDUIT HUB FOR SOV6D TOOK TWO FROH SOV6B TO BE REPLACED BY ONE FROM WAREHOUSE.
TOOK T'WO NIPPLES FROH SOV68 REPLACED TWO NIPPLES,ON SOV68 WITH TWO FROH SPARE ASSEHBLY IN WAREHOUSE 93-,30-724 HI 137451'WR 190847 WRITTEN TO REPLACE NIPPLES ON SPARE SOV ASSEHBLY REPLACE ALL SOV'S LISTED IN LINE 9 COHPLETED N2-IHP-SOV-9003 W169724 W169749 W169795'W16997 5 RPS LDS-N600F-2R PSB01 EGA-2EGAA PS1 OA EGF-2EGF4LS1 2A EGS-2EGSQPS4 0018 REPLACE SPARE TS USED AS REPLACEHENT FOR E31-N615A 2CECAPNL632 2EGA4PS10A AND 2EGA4V7A ARE LABELED INCORRECTLYI THEY ARE LABELED 2EGA4PS9A AND 2EGAAV9A TAGS SHOULD BE SWAPPED WHILE CALIBRATING NOTICED TERHINAL BLOCK IS CRACKED DURING A SHART TOUR ONE OF THE OBSERVERS NOTED THAT THE JACKET WATER LOW PRESSURE CIRC PUHP ALARH FOR DG 3 TOOK 10 HINUTES TO CLEAR WITH THE ENGINE RUNNING AND THE JACKET WATER PRESSURE AT 32 PSI IT IS BELIEVED THAT THE WATER TEHPERATURE REACHED 130 DEGREES F WHICH BYPASSES THE ALARH PLEASE CALIBRATE AND INVESTIGATE INSTALLED NEW SPARE TEHPERATURE SWITCH SWAPPED SWITCH ISOLATION VALVE TAGS TO PROPER CONFIGURATION PER CONTROLLED LOOP OIAGRAHS TLEGA-003 AND 005 REPLACE BROKEN TERHINAL BLOCK RECALIBRATED LOOP FOR EGS4PS40018 PFR NEW SETPOINT DATA SHEET 0
14:18:0 14-92 CLASS I WORK RUHENT 8 CONTROL 1991 PAGE12 WR NUMBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W170466'W170567 W1 70770 W175746 CHS-2CHS¹ASH X71A SWP-2SWP¹FV4 7A CMS-2CHS¹TTX 105 RDS-NOCOHPID DIGITAL COHPUTER PT CHSAC03 APPEARS TO ALARH RANDOHLY I.E.WHEN COHPARED TO ANALOG COHPUTER PT CHSAA02 THERE APPEARS TO BE NO CORRELATION BETWEEN THE ALARH AND OP"82 PG 23 SETPOINT OF 3 5PERCENT THIS CAUSES ANN 873309 TO BE A NUISANCE ALARH INVESTIGATE AND CORRECT CMSAC03 SETPT ANNUN/ANN¹UN/ANN"UN WITH ANNUNCIATOR 601103 IN ALARH FOR FV47A LOCAL INSPECTION OF VALVE INDICATED LOCAL LEAKS BUT PUHP WAS NOT RUNNING FIND CAUSE OF ALARHIANNUN/ANN-UN REPLACE CUSTOH TERHINAT ION HODULE ON CHS¹TTX105 288 PGCC PANEL 890 NEST 5 SLOT 7 INDICATOR LIGHT COVERS ARE BROKE AND FALLING OFF REPAIR AND REPLACE INDICATOR LIGHT COVERS ON CEC¹PNL603 VERTICAL BOARD AS NEEDED NO WORK PERFORMED AS FOUND AS LEFT SAT ON 0 N2-ISP-CHS-9110 PERFORHED ON 910114 ALARH NOT IN 910206 ANNUNCIATOR 601103 IS FO'8 2SWP¹FV4$A AND 2SWP¹FV54A WR 154708 ON, 2SWP¹FV54A ACCUHULATOR INSTALLED A NEW CUSTOH TERMINATION MODULE REPLACED 15 LIGHT COVERSI ORDERED HORE COVERS-REPLACED LAHPS AND COLLERS THROUGH ROW NO~16 FROM BOTTOH ON VERTICAL (PANEL 60 COLLARS)REPLACEMENT OF ALL LIGHT COVER COHPLETED'W176241 HVK-2HVK¹TV2 2HVK¹TV22A IS LEAKING HYDRAULIC FLUID.PLEASE 2A INSPECT REHOVED UPPER RETAINER FROM ACTUATOR ASSEHBLYI REPLACED DUST NIPER RING OIL SEALIORING AND BACKUP R ING I REFILLED ACTUATOR TESTED FOR LEAKS NONE FOUND FIRST OIL SEAL HI 136981:SPLIT UPON INSTALLATION SO A SECOND ONE WAS ORDERED HI 135793 AND INSTALLED NO PROBLEHS W176292 W176298 W17 6497 GTS-2GTS¹PV5 A HVK-2HVK¹RV4 3B S'WP-2SWP¹PDS H1A INSPECTION COVER ON NORTH SIDE MISSING 2 THUHBSCREWS.
PLEASE REPLACE LOCATION SBCT A ROOH UPPER ELEVATION W IP VALVE LEAKING WATER OUT OF GAG SCREW HOLE" REPAIR ABOVE HENTIONED ALARH CARO IN 2CEC¹PNL896 NEST 2 SLOT 2 HAS THE COMHON TEST PROBE CONNECTOR BROKEN AND HISSING REPAIR OR REPLACE CARD.288 RELAY ROON TAG 14920 ON 2CEC¹PNL896 W IP HSRF 35172 REPLACED 3 SCRE'WS AND WASHERS RELIEF VALVE CALIBRATED PER SPDS NO 2HVK¹43-N2-IHP-GEN-9036 REPLACED 25'WP¹PDSH(HH) 1A
+i 14:18:0 14-92 CLASS I WORK RUHENT&CONTROL 1991 PAGE13 WR NUMBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W176601 EGS-2EGS¹EG3 CONTROL BLDG ELEVATION 261 SOUTH INDICATED JACKET'WATER TEHP 137 DEGREES F (7 DEGREES F HIGH 005)WITH J.W.HEATER AND CIRCULATING PUHP ENERGIZED RUNNING INDICATIONS AT 2CES¹IPNL408.
CHECK 23J'W TEHP CONTROLLER LO'W CHECKED CAL ON 2EGS¹T510338 SWITCH WAS FOUND SAT AND IN SPEC HEAT TRANSFER GREASE WAS VERY SPARSE IN TEMP WELL AND ON TEHP SW PROBE.REAPPLIED HEAT TRANSFER GREASE W1 76668 W176722 W176730 W176849 W177115 W17 7129 CMS-2CHS¹TRZ 1I 0 CEC-2CEC¹PNL 603 ICS-2ICS¹P1 RCS-2RCS¹HYV 17A PCB-2PCB¹Z67 5'WP RHS-2SWP¹CAB 146A PAPER DOES NOT ADVANCE DRIVE GEARS TEETH DO NOT REHAIN HESHED REPAIR AS NECESSARY RECORDER IS LOCATED ON 2CEC¹PNL875 IN HAIN CONTROL ROOH ANNUUNCIATOR 603211 AND 603430 KEEPS REFLASHING BUT WILL NOT ACKNO'WLEDGE WITHOUT TAKING PANEL 603 ANNUNCIATORS TO TEST FIRST OUT BOARD SEAL IS LEAKING APPOX 80 DRIPS PER HINUTE REPAIR AS NECESSARY ALSO DO INBOARD SEAL HETER INDICATION ON P602 FOR VALVE POSITION INDICATOR I PERCENT HIGHER THAN GETARS DEF TAG ON P602 HETER INDICATOR 73 PERCENT-GETARS INDICATOR 69 PERCENT PERFORM AS FOUND LOCAL LEAK RATE TEST AT PA IAW APP J.WELD PLUGS PERFORH AS LEFT LEAK RATE TEST AT PA TEST HUST BE PERFORMED AT PA TO ENSURE NO TYPE A TEST IS REQUIRED REF PR 4596 E&DCR C93655 ADJUST FLOW ON 25WP¹CAB146A USING FCV01 AS PER TROUBLESHOOTING PLAN.ADJUSTED MOTOR ASSEHBLY 50 GEARS HESHED PROPERLY REF VOIDED WR 164816 FOQ 603430 AND'76727 ACKNOWLEDGE FUNGI ON PROBLEH COPIES ATTACHED TESTED 5 T ON 910215 NO OTHER ACTIONS AKEN REHOVED VIBRATION PROBES ON RCIC PUMP REHADE CONNECTION AND REINSTALLED TO PROBE.RECALIBRATED INDICATOR 2RCS-ZI1621 NONE FLOW SET PER TS PLAN.ADJUSTED FLOW PER SPDS 4 5 GPH AND 1 0 GPH PUHP TR IP'W177130 SWP ADJUST FLO'W IN 25'WP¹CA81468 USING FCV01 AS PER TROUBLESHOOTING PLAN TB250 5'W"SERVICE WATER RHS-25'WP¹CAB 1468 FLOW SET PER TS FLOW CALIBRATED FLOR 5'WITCH PER SPDS 4 5 GPH AND 1 0 GPH PUHP TRIP W177139 5'WP RHS-25WP¹CAB 1468 TROUBLESHOOT FLOW 5'WITCH 25WP¹F51468 LO'W FLOW CONDITIONS
~TB 250 SW CONNECTED CONTROLOTRON CHART RECORDER AS PER TROUBLESHOOT PLAN I 1~l I't I+4 7 14:18-0 14-92 CLASS I WORK RUHENT 8 CONTROL 1991 PAGE14 WR NUMBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W177143 W177153 W177169 W1 77244 W177245 W177246 SWP RHS-2SWP4 F51 46A HVC-2HVCAUC1 02 CEC-NOCOHPID HVR-2HVR4 AOD 10A CSH-2CSHOLS3 A CSH-'2CSH4 LS3 8 INSTALL FH71D 3 PRONG MONITOR CALIBRATOR ON 2SWPCFS146A AND RECORD HV OUTPUTS ON A CHART RECORDER SEE TROUBLESHOOTING GUIDELINE PER TEMP HOD 91-04 TB250 SW UC102 FAILED TO ACHIEVE RATED FLOW I8C TO TROUBLESHOOT FLOW PROBLEM CONTACT C BURNSWORTH X 4626 FOR TROUBLESHOOTING INFO REPLACE TRANSISTOR 98 WITH A CODE DATE OF 8052 OR LOWER)PRESENTLY IN WAREHOUSE SPARES.INSTALLED IN HODEL 510 DU TRIP UNITS THIS IS TO SATISFY GE S1L NO 520 AND HAY 5 1990 10CFR21 NOTIFICATION AIR IS LEAKING FROH THE BODIES OF BOTH ACTUATORS ON THIS DAHPER.CHANGE INDICATOR SCALE ON HASTER TRIP UNIT PER E AND DCR C47762.CLOSE TEHP HOD 88"39 W IP CHANGE INDICATOR SCALE ON MASTER TRIP UNIT PER E AND DCR C47762 CLOSE TEHP MOD 88-39 INSTALLED FM710 AND CONTROLOTRON AND HONITORED AND RECORDED PER N2-ICP-GEN-001 AND IL 2SWP-153 FLOW READING TAKEN BY I8C REPLACED 08 IN NUMEROUS~)OSEMOUNT TRIP UNITS (SEE ATTACHED SHEET FOR S/N'S OF COHPLETED TRIP 3NITS)IN WAREHOUSE AS SPARES REPLACE SOV BLOCKS AND REBUILT AIR REGULATORS NEW HOTOR FACE INSTALLED AND CAL PROCEDURE PERFORMED SAT INSTALLED NEW HETER FACE AND CAL PROCEDURE N2"ISP-CSH-R105 PERFORHED SATISFACTORY'LSO CLEARED TEMP HOD 88-39 W177263 RHS-NOCOHPID EVALUATE GROUNDING ON TEST SKID LOCATED IN THE ENVIRONHENTAL ROOH AT THE UNIT 2 WAREHOUSE TOOK OHM READING AS VARIOUS POINTS OF THE SKID AND RICK SCHAMP TOOK THE DATA W178802 W1 78803 RDS-2RDSALS1 25 GTS-2GTSAPDT 58 DURING THE PERFORHANCE OF N2-ISP-RDS"H106 COHPUTER POINT RDSLC103 DID NOT COHE IN UPON INVESTIGATION THE HICRO SWITCH WAS FOUND TO BE BAD REPLACE COHPUTER POINT OUT OF TOLERANCE FOR LCR GTS 049 CALIBRATED LOOP FROH PDTSB COMPUTER POINT OUT OF TOLERANCE WITH PROPER CURRENT INPUTS TO GTS PWRS58 REPLACED HICRO SWITCH IN 2RDSALS125 REPLACED ISOLATOR POWER SUPPLY PS ZE-2 IN PNL 838 ELEVATION 288 RELAY ROOH REPLACED INPUT AND OUTPUT ISOLATOR CARDS ZE 41/42 IPNL 838 W178806 HSS-2HSSeAOV HSIV 7C LS33-2 CONNECTIONS H-G FAlL TO PROVIDE 7C INPUT TO GETARS (FOR 10 PERCENT OPEN INDICATION)
THE OTHER 2 LS33-2 OUTPUTS DO WORK (ERF COMPUTER PT AND P602 INDICATION).
REF GE 807E152TY SH 10.CHECKED HUX05 CARD 5 SAT TEN PERCENT OPEN INPUT DOES FUNCTION.WHEN VALVE REACHES TEN PERCENT OPEN SWITCH PROVIDES INPUT SATISFACTORILLY TO GETARS.
lit C J'/g+~4~"
14-18=0 14-92 CLASS I WORK RUHENT 8 CONTROL 1991 PAGE15 WR NUHBER EPN.NUHBER FAILURE DESC CORRECTIVE ACTION'W1 78812'W178845 W178855 W178859 W1 78875 W178883 W1 78888 W178892 HVR RHS-2HVRoCAB 32A NHS" C51-K601 F CHS-2CHS4LI1 1B HVP-2HVPAFN1 C HSS RPS LDS-2HSSCTS1 069A NHS-C 51-K601 H CHS-2CHSoTE5 48 HVR-2HVRUC4 138 WHILE PERFORMING N2-ISP"RMS-R101 STEP 8 4 3 FAILURE CODE 6 DID NOT COHE IN FLOW WAS AT 1.4 SCFM THROUGH THE SKID SHOULD BE APPROXIHATELY 0 00 WHEN INLET VALVE IS SHUT IRH F INTERHITTENTLY FAILS DOWNSCALE WHEN RANGE SWITCH POSITION IS CHANGED AND RETURNED TO THE ORIGINAL POSITION IRH F COHES BACK ON SCALE~TROUBLESHOOT AND REPAIR 2CHSALI118 ON 2CECAPNL601 HAS EXCESSIVELY HIGH DEVIATION FROH ALL OTHER SUPP POOL LEVEL INDICATIONS (AROUND 1/2 FOOT HIGHER)RECALIBRATE 2CHS4LI11R TAG AT HETER.2CHSNLI11R ON 2CEC4'PNL601 EXHAUST FAN IS TRIPPED ON LOll AIR FLOW POSSIBLE FLOW SWITCH TROUBLE.PLEASE INVESTIGATE AND REPAIR BURN OUT CIRCUIT ALARHS ARE NOT CONSISTENT NEED TO REPLACE IRH H FAILED SRH/IRH OVERLAP PROCEDURE DURING START UP NEVER SHOWED ANY CHANGE IN PO'WER AT ALL 2CHSOTES4B IS AT LIMIT FOR DEVIATION FROM TE54A ON N2-OSP-LOG-D001 NEEDS TO BE RECALIBRATED DEF TAG STUB HUNG ON 2CECAPNL601 AT 2CHSATI172 SELECTOR SWITCH DURING PERFORHANCE OF OSP-CNT"H003 HVR4VC413B WAS GIVEN AN AUTO START SIGNAL.HVR4VC4138 STARTED THEN TRIPPED.VC RAN FOR 38 SECONDS REPLACED RUBBER GASKET PERFORMED APPLICABLE STEPS OF N2-I SP-NHS-Q109 VENTED-8-SIDE INSTRUMENT LEG NO PARTS REQD CHSLA103 EQUALS 200 59 ST VERSES CHSLA102 EQUALS 200 49 FT SAT RECALIBRATED FLOW SWITCH TO, THE FLOW VALVE'WHICH CORRESPONDS TO DISCHARGE DHP OPEN RECIRC CLOSED SINCE THE CPNFIGURATION HAD THE LOWER FLOW VALVE REPLACED WITH NO 164C5687P301 SERIAL NO 6749 PERFORHED N2-ISP-NHS-Q109 IRH H DRAWER AND PRE-AHP OPERABLE PROBLEH APPEARS TO OR FROM PRE-AMP TO IRH H DETECTOR UNDER POT RAN TDR TRACE ON CABLE TO DETECTOR OPEN AT CONNECTOR UNDER VESSEL NONE-2CHSAT1172 AND 171 POINTS 5 FOR TE54A AND TE54B-CHECKED ON 910202 READINGS'ARE 80 DEG F AND 79 DEG F HAX DIFFERENTIAL PER N2-OSP-LOG-D001 IS 6 DEG F RECALIBRATED FLOW SWITCH PER N2-IPM-GENQ003
14-18:0 14-92 CLASS I WORK RUHENT 8 CONTROL 1991 PAGE16'WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W1 78897 NHS-C51-K605 SUHHER CARD Z6 HAS BLOWN FUSE F4-REPAIR REPLACED SUHHER CARD ISSUE 126431 (835-K607A)
W178899 CES COHPUTER POINT EGSPC16 IS IN ALARH CANNOT DETERMINE ANY PROBLEHS WITH DIESEL COHPONENT~TROUBLESHOOT AS NEEDED TAG ON PNL 852 CONT RM CALIBRATED PRESSURE SWITCH 2EGS4'PS4005B TO SPEC ADJUSTED LIMIT SWITCH POSITION BRACKET W1 79175 W179290'W180509 EGS-2CES4IPN L408 EGF-2EGFAP3 ICS-2ICSAHYV 151 GTS-2GTSAHOV 3A WHILE PERFORHING N2-EPH-EGS-R655 DISCOVERED THAT 2EGF-P3 WAS INCORRECTLY LABELED 2EGFAP5 PLEASE CORRECTLY LABEL FUEL OIL PUHP GENERAL OVERHAUL OF GOVERNOR VALVE FOR NEXT REFUEL OUTAGE NEED TO REPLACE THE RESERVOIR PISTON OIL SEAL-DUE TO LEAKAGE P/N=7238006 SYH 93-61-026 REPLACED LABELS SEE ATTACHEHENT 4 REPLACED OIL SEAL ON RESERVOIR PISTON AND ORING AT THE BOTTOM OF THE RESERVOIR'W180527 SWP-2SWP4PSY ANNUNCIATOR 601103 AND COHP PT SWPBC18 DID NOT 1004A CLEAR WHEN ACCUHULATORS 1-4 WERE CHARGED'WITH NITROGEN COHPUTER POINT NORMAL 910204 NO PROBLEH WITH ANNUNCIATION FOUND WHEN PERFORHING WR'S 191588 AND 191576 HOWEVER WR 191576 FOUND A LEAKING ACCUMULATOR WR 154708'W180554 W180556 W180626 W1 80633 CEC-2CECOP00 2 ZZZ-NOCOHPID CSL-2CSL4'HOV 104-ACT HVC RHS-2HVC4RUZ 18D WHILE PERFORMING N2-ISP" ISC-H008 ATT 3 AND 4 AFTER FIRST RX LEVEL CHANNEL'WAS DISPLAYED SECOND RX LEVEL CHANNEL WAS SKIPPED AFTER NO KEY WAS DEPRESSED DISPLAYING SLICK TANK LEVEL TROUBLESHOOT PERFORH N2-IHP-GEN-9037 TO CORRECT JUMPER LOCATION ON RILEY TEHP SWITCH SN 5620 HOVE JUHPER FROH (Jll)TO (2NC)LPCS INJECTION VALVE HAS TEHPORARY OPERATOR AND POSTED TO INFORH OPERATOR DECLUTCH'LEVER MUST BE CONTINUOUSLY DEPRESSED TO HANUALLY OPERATE VALVE PERHANENT SIGN IS REQD R IC DISPLAY SECOND DIGIT OF PARAMETER AND E ARE HISSING AT 2HVCNRUZ18D N2-ISP"ISC-H008 ATT 3 AND 4 HAVE BEEN SUCCESSFULLY PERFORHED 900513 900630 900801 AND 900901 AND 910114-WITHOUT REOCCURRANCE OF FAILURE PLEASE CLOSE THIS WR AS NO PROBLEH FOUND NONEISWITCH SENT BACK TO HANUFACTURER FOR REPAIR ATTACHED TAG TO VALVE REPLACED DISPLAY BOARD
14:18:0 14-92 CLASS I WORK RUHENT 8 CONTROL 1991 PAGE17'WR NUHBER EPN NUMBER FAILURE DESC CORRECTIVE ACTION'W180773 W18 0819'W180838 HVC-2HVCoACU 3A SWP-2SWPAFT2 00E CMS-2CHS0AE6 8 PERFORH ON A IR BALANCE ON 2HVC4ACV3A REPLACE SUSPECT TRANSHITTER S/N 407984'WITH NE'W ONE WHILE PERFORHING N2-ISP-CHS-Q110.
COHPUTER POINT (ERF)CHSYA101 WAS FOUND TO BE OUT OF SPEC.W182089 HVR LIC DISPLAY IS MISSING THE HINUS SIGN REPAIR AS NECESSARY.
HICRO CABINET IS LOCATED CONTROL BLDG 214 SOUTH SIDE.DEF TAG PLACED AT HICRO 2HVRARU328 RHS-2HVR4 RUW 32B'W180856 RHS-2RHSAFT6 REPLACE SUSPECT TRANSHITTER S/N 410844 WITH NEW 48 ONE AIR BALANCE 2HVC4ACU3A AS PER N2-ICP-GENQ004 REPL'ACED TRANSMITTER (PER N2-IHP-EQHQ005)
NO PARTS WERE REPLACED OPTICAL ISOLATOR CHECKED GOOD USING SPECS IN UPDATED N2-ISP-CHS-Q110 SEE'ROUBLESHOOTING PLAN REPLACED AND CALIBRATED.l2RHSWFT648 AS DIRECTED A NE'W L IC DISPLAY BOARD WAS INSTALLED INTO 2HVRARUW32B USING S"HI-5 3-001 AND N2-IHP-GENa037.
PMT WAS TO DEPRESS TEST LIGHT BUTTON ALL LIC LIGHTS LIGHT AND DISPLAY SHOW ALL EIGHTS AND A H.INUS SIGN PHT SQT'W182098'W182099 W182922 W182925 HVC RMS-2HVCACAB 18D HVC RHS"2HVCOCAB 188 I SC" 2 ISCCLS1 684A RHS-E12A-Z8-1 L IC'S LED SHO'WS A 2 IN THE FIRST DIGIT OF THE EXPONENT OUT OF SPEC HONITOR SPIKES IN ALERT AND HIGH RADIATION THEN SLOWLY DROPS BACK TO NORHAL HAPPENS ALOT AFTER 51 IS TURNED OFF THEN ON AND THE NUMBER OF OCCURENCES INCREASES WITH TIME IF NOT TOUCHED.ALSO GIVES LOW PRESSURE ALARM REPLACE TRIP UNIT TO SATISFY 10CRF PART 21 NOTIFICATION-ROSEHOUNT LETTER DECEHBER 7 NINETEEN EIGHTY NINE-HODEL 710DU SERIAL NUHBER 66561 LOCATED 2CECAPNL609 ELEV 306 CR PRESS TO CAL KNOB OUTER CASE IS BROKEN GIVING NO INDICATING POINTER POSITION.REPAIR OR REPLACE AS NEEDED LOCATED IN 2CECAPNL618 306 CONTROL ROOH E12A-24-1 REPLACED CARD SURVEILLANCE N2-RSP-RMS-H109 WAS SUCCESSFULLY COHPLETED ON 910108 AND THIS PROBLEH WAS NOT OBSERVED REPLACED 822-N684A AND TESTED PER N2-ISP-ISC-R105 SAT REPLACED BROKEN PRESS TO CAL KNOB FROH E12A-Z8-1 CALIBRATION UNIT ON 2CECPNL618
'f 14:18:0 14-92 CLASS I WORK RUHENT 8 CONTROL 1991 PAGE18'MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION M18 2926 M182936'M183173'W183370 M184455 HSS-2HSSoSOV 6A-2 RHS-2RHSX(PT3 A RCS-2RCSAP1A SFC-2SFCAP18 GTS-2GTSoHOV 28'MHILE PERFORHING N2-IHP-SOV-9003 REHOVE TERHINAL STRIPS ON SOV AIR CIRCUIT-2HSS4AOV6A AND D-AND INSTALL RING LUGS PER ATTACHED PROCEDURE S-HI-5.3-001 ATTACHED.WORK NECESSARY TO COHPLY MITH FDDR KG1-0797.ROSEHOUNT TRANSMITTER SERIAL NUHBER 412964 IDENTIFIED BY 10CRF PART 21 NOTIFICATION ROSEHOUNT LETTER DATED 10-31-90 OIL LOSS SUSPECT LOT LOCATION RX 175 REVISE VIBRATION ALERT SET POINT IN ACCORDANCE WITH 2H10279 SDC NUHBER SC2-0007-91 THE OUTBOARD BEARING OF 2SFCCP18 IS OPERATING APPROX'0 DEG.HOTTER THAN OP1A OUTBOARD BEARINGS INSPECT 0P18 PUHP OUTBOARD BEARING AND CHECK FOR'WEAR AND PROPER CLEARANCE OIL IS LEAKING FROH ACTUATOR TO THE FLOOR TAG HUNG ON GTSA'HOV28.
LOCATION RX BLDG ELEV 261 IN 8 GTS RH REHOVED TERHINAL STRIP AND INSTALLED RING LUGS PER S-HI-5 3-001 PERFORHED N2-IHP-SOV-9003 SAT N2"OSP-HSS-R001 ATTACHED AS ELECT FUNCTIONAL CHECK REPLACED OLD TRANSMITTER NO 412964 WITH NEM TRANSHITTER SN 419928A RECAL'D LOOP-SAT CALIBRATE ALERT NODE LEVEL TO 13 5 HILS FOR 2RCS-NBI86A AND 8 REHOVED 2SLSAP18 INBOARD AND OUTBOARD VIBRATION AND TEHPERATURE PROBES 910222.REINSTALLED-VIBRATING TEHP PROBES REHOVED COVER)CLEANED F ILH OF OIL OFF VALVE PARTSI TIGHTENED FITTINGS-HAO VALVE STROKED AND FOUND NO NEM LEAKS'M184484 CEC-2CEC4PNL WHILE PERFORHING N2-ISP-ISC-P899 COHPUTER POINT 899 ISCLA104 MAS FOUND OUT OF SPEC HIGH SIHULATED 0-10 VDC INPUT TO ISOLATOR 2CEC4899 ZJJ-C (BQ)TB3-13 AND 12.OBSERVED 0-160 H VDC OUTPUT OF ISOLATOR.(ISOLATOR OK)REINSTALLED ORIG INDICATOR CAL'D LOOP COMPUTER, OUT OF SPEC STILL GAVE COHPUTER VALVES THEY MERE TO CALIBRATE COHP W184559 M184 560 M184571 RCS-2RCSAHYV 17A RCS-2RCSAHYV 178 HVC-2HVCAFLT 2A PLEASE INCREASE THE FCV HINIHUH POSITION INTERLOCK LIHIT SMITCH SETTING AS PER ATTACHED EDC NO.2E10362 OF SDC SC2-0005-91 (REFER TO RESOLUTION OF PR 07751)PLEASE INCREASE THE FCV HINIHUH POSITION INTERLOCK LIHIT 5'MITCH SETTING AS PER ATTACHED EDC NO 2E10362 OF SDC NO.SC2-0005-91 (REFER TO PR 07751 RESOLUTION)
PROVIDE INFO REQUESTED INTERIH RESPONSE TO PR 09184 RUN FILTER TRAIN A AS NECESSARY.
CONTACT HIKE DOWNS'OR INFORHATION AND RESULTS STROKED THE VALVE AS REQD STROKED VALVE AS REQD BY USING SBV NO NEED TO LIFT LEADS USING THIS HETHOD PROVIDED INFO REQUESTED ABOVE q Nll pl 1 4
'14:18:0 14-92 CLASS I'WORK RUHENT&CONTROL 1991 PAGE19 WR NUMBER EPN NUMBER FAILURE DESC CORRECTIVE ACTION W184675 ISC-2ISC<<LIS 1691F REPLACE ROSEHOUNT HODEL 710DU HASTER TRIP UNIT TO REPLACED HTU 822"N691F PER SATISFY 10CRF PART 21 NOTIFICATION DEFECTIVE TRIP'-HI-5 3"001 AND COMPLETED UNIT SERIAL 66732 ROSEHOUNT LETTER 12-07"89 TRIP N2-ISP-ISC-R014 SAT UNIT IS LOCATED 2CEC<<PNL618 ELEVATION 306 CR W184773 W184789 W184806 W184815 W184816 W1 84827 W184828 W184833 W184 834 CEC"2CEC<<PNL 736 CHS RHS-2CHS<<:CAB 108 GTS-2GTS<<HOV 2A GTS-2GTS<<'MOV 2A GTS-2GTS<<HOV 2B EGS-2EGS<<EG1 HVK-2HVK0CHL 1A SWP-2SWPAP1A SWP-2SWP<<P1E WORK ON EDC-RETURN THIS PANEL TO ORIGINAL DESIGN BY IHPLEHENTING EDC 2E10379A 2CMS<<'CAB10B PARTICULATE SAHPLE CHAMBER FAILED LEAK-54-RATE TEST.AT SHALL BOX BETWEEN DETECTOR AND HOUSING IN REAR OF, CHAHBER RX 289 BY ELEVATOR.SEE HIKE GARBUS-RICK KLEIN OR PAT FOTI FOR DETAILS EXCESSIVE OIL LEAKAGE FROM GTSAHOV2A ON RX BLDG EL 261-A-GTS TRAIN OIL IS LEAKING FROM ELECTRICAL PENETRATIONS ON HOV2A TAG AT 2GTS<<HOV2A IN DIV I GTS BLDG HOV 2A HAS A OIL LEAK FROH ACCUMULATOR BOX'OCATED ON 261 RX BLDG A GTS ROOM DIV LEAK FROH GTS<<HOV 2B ACCUHULATOR BOX 261 RX BLDG 8 STANDBY GAS TRAIN ROON ON LOSS OF OFF SITE POWER (NO 5 LINE)EGS AND EG2 AUTO.STARTED AND ENERGIZED 0 IV I AT 58 8 H2 (LOAD WAS 900KW)PLEASE ADJUST FOVERNOR SETPOINT TAG LOCATED AT PNL851 AT GOVERNOR CONTROL<<EG2 2HVK<<tCHL1A AUTO TRIPPEDI REASON UNKNOWN CHL1A WILL NOT RESTART 2SWP<P1A TRIPPED ON LOll FLOW FOLLOWING AN AUTO START SEQUENCE FOLLOWING THE LINE 5 TRANSIENT-VERIFY THE LO'W FLOW SETPOINT (TRIP SETPOINT)IS CORRECT 2SWP<<P1E TRIPPED ON LOW FLOW FOLLOWING AN AUTO START SEQUENCE FOLLOWING THE LINE 5 TRANSIENT.
VERIFY THE LOW FLO'W TRIP SETPOINT IS CORRECT PERFORHED S-HI-5 3-001 FOR EDC 2E10379A REPLACE SQUARE GASKET REPLACED DAMAGED ELBOW ON ACCUHULATOR HANIFOLD PART NO'237995 INVESTIGATED OIL LEAK'FOUND SHALL AHOUNT OF OIL RESIDUE LEFTOVER FROM LAST TIHE VALVE WAS WORKED'AD OPERATIONS STROKE=VALVE AND.OBSERVED NO ABNORMALITIES IN VALVE OPERATION RETIGHTENED LOOSE FITTINGS CHECKED R Dl AND R D2~SUPPORTED N2-STP-26 CALIBRATED 2MVK<<PSL-1007AI TIGHTENED LEAD 210 ON RELAY 4R CALIBRATED LOW FLOW TRIP LOOP FOR 2SWP<<P1A RECALIBRATE AS PER N2-ICP-5'WP-A101 I 1'
'l4:18:0'4-92 CLASS I'WORK RUMENT 8 CONTROL 1991 PAGE20'WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W184840 GTS-2GTS¹PV5 A 2GTS¹PV5A HAS SLIGHT OIL LEAKAGE FROM HOTOR HOUSING SEAL LOCATED IN STBY GAS BLDG LINE H COLUHN 33 70 PLEASE INVESTIGATE AND REPAIR TIGHTENED LOOSE FITTING DRAINED REFILLED AND BLED STROKED VALVE FROH CONTROL ROOH OBSERVED FULL TRAVEL INSTALLED COVER AND TORQUES ON 911017 W184851 W184871'W184886 W1 84887 HSS-2HSS¹PSV 135 SWP-2SWP¹FV5 4A CMS"2CHS¹TRY 170 HVC RHS-2MVC¹CAB 18D RELIEF VALVE TAILPIECE TEHPERATURE INDICATION ON PANEL 2CEC¹PNL614 IS ACTING ERRATICALLY WITH UNEXPLAINED INCRESES AND DECREASES PLEASE TROUBLESHOOT AND REPAIR SEE WR 194360 FV54A HYDRAULIC ACCUMULATOR PUHP IS RUNNING CONT INOUSLY INVESTIGATE AND REPAIR DEF TAG LOCATED ON SWP¹FV54A TB 244 SOUTH WEST AND ON ANNUNCIATOR 601103 IN CONTROL ROOH CB 306 DURING PERFORMANCE OF N2-ISP-CHS-M003 STEP 7 2 4 RECORDER FOUND TO BE OUT OF SPEC CALIBRATE RECORDER DETECTOR FAILEDI LOW COUNTS EVEN WITH SOURCE IN DRAWER POSSIBLE BAD DETECTOR ON CABLE TAG HUNG AT SKID-CONTROL RH VENT RH 306 PERFORHED LOOP CAL PRECHARGED ACCUHULATORSE.
DRAINED AND REFILLED RESERVOIR T(NK 4 PERFORHED N2-ISP-CHS-R115 ATT 4 AND ADJUST ZERO AND SPAN FOR 2CHS¹TRY170 RED PEN REPLACED DETECTOR W1 84894 HVC THIS HOV18 SHUTS ON A HIGH RAD SIGNAL FROH BOTH RAD HONITORS HVC188 AND HVC18D RIGHT NOW HVC18D IS IN THE TRIPPED CONDITION WITH A H/0.HOV18 KEEPS CLOSING WITH NO ALARHS NO TRIPS OF ANY KIND ON HVC188 AND NOT AUTO STARTS OF 2HVC¹FN28 TAG ON P871 IN CR INSTALLED NEll DIFF VACUUH S'WITCH RMS-2HVC¹CAB 188 W184909 ICS-2ICS¹FC1 01 AFTER SEVERAL HINUTES OF OPERATION DURING THE RCIC QUARTERLY SURVEILLANCE THE RCIC FLOW CONTROLLER IN AUTO BEGAN TO HUNT AT APPROXIHATELY PLUS OR MINUS'50 GRAH ABOUT ITS SETPOINT 600 GPH'EED CONTROL LOOP SETTING VERIFICATION PER ATTACHED AND TROUBLESHOOT AS NECESSARY CHECKED FUNCTION OF FC101 CONTROLLER CHECKED SAT.PERFORMED CAL ON FT101 SLIGHT ADJUSTMENTS HADE TO TRANSMITTER FLUSHED LINES TO TRANSHITTERiAIR AND BLACK WATER WERE FLUSHED FROM LINES
14:18'14-92 CLASS I WORK RUHENT 8 CONTROL 1991 PAGE21 MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION M184913 M184957'M184958 M184959 W184960 M186514 SWP RECALIBATE AND ADJUST AS NECESSARY FS 146A RHS-25WP4F51 46A SMP INVESTIGATE FLOW SWITCH DRIFT RMS-25WP4 FS1 46A SMP INVESTIGATE FLOW 5'MITCH DRIFT R HS-25 WP 4(F 51 I 6B 5'MP INVESTIGATE FLOW 5'MITCH DRIFT RMS"2SMP0F52 3A 5'WP INVESTIGATE FLO'M SWITCH DRIFT RHS-25WPoF52 38 CMS RIC DISPLAY 15 MISSING THE SECOND DIGIT IN THE PARAHETER THE"E" AND THE FIRST DIGIT IN THE EXPONENT TAG HUNG ON RIC IN CONTROL ROOH RHS-2CHS4 CAB 10A ADJUSTED FLOW IN SPECS ACCORDING TO SPDS 25WP4'F5146A NO FLOW VALUE 380HU PUHP TRIP 200 HU.TIHE DELAY HAY NOT BE LONG ENOUGH TO ESTABLISH PUHP RUNNING AFTER START PUMP MAS STARTED T'MICE SECOND TIHE BEFORE COHPLETE COAST DO'MN RECALIBRATEO FLOW SWITCII AT 80 DEG F FOR 1 0 GPHICLEA'N'ED FLOW 5'MITCH RECALIBRATEO FLOW SMITCH AT 80 DEG F FOR 1~0 GPH-VERY SLIGHT BUILDUP OF SCALE AND SILT CLEANED FLOW SWITCH RECALIBRATED FLO'M SMITCH AT 80 DEGREES F WATER RECALIBRATED FLOW SMITCH AT 80 DEGREES F'MATER INSTALLED A NEW RIC DISPLAY CIRCUIT BOARD'W1 87 23 7 HVR CHECK SOURCE DOES NOT EXCEED 1 DECADE ABOVE BKGD WHEN ACTIVATED DEF TAG NO 17924-HUNG ON HONITORS SKID RX 328 EL RHS-2HVRNCAB 14A REPLACED SOLENOID HOUSING WITH NEM HOUSING 0
I 1 14:18:0 14-92 CLASS I WORK RUMENT 8 CONTROL 1991 PAGE22 WR NUMBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W187238 W187249'W187251'W18725 2 W187253 W187260 SWP RHS-2SWPACAB 146A SLIP RHS-2SWP4 CAB 23B RHS-2RMSORE1 A RHS-2RHS4RE1 C RMS-2RMS4RE1 B CHS RMS-2CHSACAB 10A LIC DISPLAY AT THE SKID IS HISSING THE FIRST DIGIT OF THE PARAHETER AND THE FIRST DIGIT OF THE EXPONENT DEF TAG NO 17960'WAS HUNG AT THE SKID L1C DISPLAY IS HISSING THE HINUS SIGN TAG HUNG AT Llc" S ELECTRICAL TUNNEL 214 COHPUTER POINTS ARE OUT OF TOLERANCE FOR THE 1 OOE1 1 OOE3 AND 1 OOE4 RANGES COHPUTER POINT IS OUT OF TOLERANCE ON THE 1 00E01 1 OOE02 1.00E03 AND 1 OOE04 RANGES COHPUTER POINT RHSRU101 IS OUT ON THE 1E07 RANGE TAG HUNG AT RE18 Rlc DURING PERFORHANCE OF N2-RSP-RHS-Rill PARTIAL CAL FOR THE SPDS HOD THE AMPLIFIER OUTPUT COULD NOT BE SET TO THREE VOLTS.THE AHP-DISC BOARD IS USPECTED BAD REPLACED LIC DISPLAY BOARD PER S-HI-5 3-001 AND N2-IHP-GEN-9037 PERFORHED PHT PER WIP SHEET INSTALLED NEW LIC DISPLAY BOARD REPLACED AIHS HODULE REPLACED HODULE-AIHS.RECALIBRATED PER N2-IPM"RHS-V001 REHOVED OLD, BOARD REHOVED SW1 AND SW2 FROM OLD BOARD AND REPLACED ON NEW BOARD INSTALLED NE'W BOARD THIS DIO NOT SOLVE PROBLEM WITH'AD PROTECTION PROCEDURE REINSTALLEO ORIGINAL BOARD WITH SW1 ANO SW2 ,W187265 CHS BATTERY FAILED TO RETAIN SETPOINTS IN MEHORY FAILED HEMORY BACKUP TEST OF PROC.N2-RSP-RHS-R111-QUESTIONS 0 HACDONALD EXT 2594.RMS-2CHSCCAB 108 REPLACED BATTERY W187277 CHS LOCATION FOR 2CHSARU10B MICRO COHPUTER IS HISSING REPLACED LIC DISPLAY BOARD THE MINUS SIGN AND THE FIRST DIGIT OF THE EXPONENT.QUESTIONS D.HACDONALO AT 2394 VBS RHS-2CHS4RUW 10B'W187297 CMS COHPUTER POINT OUT OF TOLERANCE ON ALL RANGES RHS-2CMSNCAB 10A PERFORHED N21PHRHSV001
14:18:0 14-92 CLASS I WORK RUHENT 8 CONTROL 1991 PAGE23 WR NUHBER EPN NUMBER FAILURE DESC CORRECTIVE ACTION W187508 W187524 W187532 HSS REPLACE SPARE RILEY TEMP SWITCH RPS LDS-2MSS4(TS1 076A IAS 2 IAS4'PI235 READS 36 LB.WITH PT 235 VENTEO TO ATHOSPHERE ADS"2IASAPI2 35 CHS WHEN THE PUHP TO CHS410A SKID IS TURNED ON CHS410A-1 DETECTOR EXCEEDS THE ALERT AND HIGH RADIATION SETPOINTS REPAIR AS NECESSARY.
SKID IS LOCATED ON RX 289 SOUTHEAST RMS-2CMS4CAB 10A REPLACED SPARE WITH NEW SWITCH HI 136377 REPLACED HETER PRESS READING IS CONSISTANT WITH OTHER ADS TANK PRESSURE INDICATIONS AND COHPT PT I AS OA12 REHOVED BLOCKAGE FROH SAHPLE FLOW PATH'WHICH CORRECTED THE HIGH DIP FAILURE CAL'D DP SWITCH..W187544 CHS-2CHSOSOV 2CHSASOV26C
-SURVEILLANCE TEST N2-OSP-CHS-R001 26C SUCT 7 3 109-IT WOULD NOT HOLD ANY PRESSURE WHEN CLOSED AND L INE ISOLATED DOWNSTREAM LOCATED RX BLDG EL 215 AZ 117 PERFORHEO FOR INFO ONLY LRT SATISFACTORY.
PERFORHED SUCCESSFUL PHT N2-ISP-LRT-R9011 ON 2CHS4SOV26C
'W187557 HSS E31-N604A ON CECAPNL632 INDICATES 71 DEG F E31-N604C (ABOUT 2 FT.AWAY IN THE STEAH TUNNEL)INDICATES?5 DEG F AS DOES A HAND HELD PYROHETER INVESTIGATE ANO CALIBRATE AS NECESSARY RPS LDS-2MSSATS1 604A USING N2-I SP-LOS-R106 ADJUSTED READING UP 2 DEG.F'W187564 ADS-F1-2ADSA FRF COMPUTER PT DID NOT CHANGE WHEN PROCESS 03 COMPUTER DID WHILE PERFORMING N2-ISP"SVV-R102 W187565 AOS-1-3-2ADS 2CESCPNL405 POSITION LIGHT DOES NOT CHANGE STATE A01'WHILE PERFORMING N2-ISP-SVV-R102 ATT 2 REPLACED FUSE AS PER SHI 5 3-001 AND SHI 5 4-001 CHECKED VOLTAGE ON CIRCUIT SIDE OF FUSE CHECKED OK N2-I SP-SVV-R102 PERFORHED TIGHTENED LOOSE TB CONNECTION
~REPLACED ALARH CORD II,"C r(
~14:188)7-14-92 CLASS I'WORK-RUHENT 8 CONTROL 1991 PAGE24 WR NUMBER EPN NUHBER FAILURE OESC CORRECT I VE ACTION W187568 W187 577 M18 7579'M187588 W187 599 W189103'W189151 W189158 RHS LDS-ZRHSATS1 608C SMP-ZSWPCFV4 78 CHS-ZCHSOTRY 140 HVC-ZHVCTE3 7A CPS-ZCPSeAOV 104 NHS-C51-K605 RHS-ZRHSAFI1 4A CEC-ZCECAPNL 837 TRIP UNIT E31-N608C FAILED TO CAUSE GP 5/10 ISOLATION WHEN LEAD LIFTED PER N2-OSP-RSS"R005 FOR-DIV 1 TROUBLESHOOT TAG ON TRIP UNIT'MHEN HOVING VALVE FOR HAKEUP TO BASIN RECEIVED COHPUTER POINT S'MPBC21-FV478 ACCUH PRESS LOW.THE ALARH STAYED IN AND ACTUATOR HYDRAULIC PUMP CONTINUES TO RUN PLEASE TROUBLESHOOT.
TAG HUNG ON ALARH 601203 AT ZCECAPNL601 CHART DOES NOT ADVANCE DUE TO DRIVE GEARS NOT HESHING RECORDER IS ON PANEL ZCEC4PNL875 IN THE CONTROL ROOH TAG HUNG ON PNL875 RELAY ROOH TEHP ELEHENT ZHVC4'TE37A HAS FAILED HIGH CAUSING FULL COOLING IN RELAY ROOH TROUBLESHOOT AND REPAIR TAG HUNG AT ZCECAIPNL870 AT ZHVRATVZZA AND TE37A RELAY ROOH PSOITION INDICATOR AT VALVE SHOW THE VALVE TO BE SHUT'WHEN ITS OPEN AND OPEN WHEN THE VALVE IS SHUT.CORRECT POSITION INDICATOR PLATE TO READ CORRECT POSITION LOCATED RB 289 NE LRPH READS 28 ON APRH PANEL BUT HETER ON 603 PNL SHOWS DOWNSCALE.
TROUBLESHOOT PROBLEH WITH HETER READING ON 603 PNL~RHS4 F114A (E12-R603A)
ON CECA'PNL601 READS APPOX 100-200 GPH LOM.PLEASE RECALIBRATE RHSAFI14A TAG HUNG ON PNL601 BY F114A COHPUTER POINT SWPPAZ1 OUT OF SPEC LOW WHILE PERFORHING N2-ISP-SWP-R108 PERFORHED ATTACHHENT THREE OF N2" ISP-LDS"H007 E31-N608C FUNCTIONED SATISFACTORILY NO PROBLEH FOUND TRIP UNIT NOT REPLACED RECHARGED ACCUHULATORS 1 2 3 4 AND STROKED VALVE NO PROBLEHS (ANNUN 601203 REHAINED CLEAR)i ADJUSTED HOTOR ASSEMBLY SO GEARS PROPERLY HESHED CLEANED CONTACTS ON INPUT TO TEHPERATURE TRANSHITTERI RESULTED IN NORHAL READING CAL PER ILZHVK023 SAT.THERE IS NO WAY TO ADD POSITION INDICATORS AT THE VALVE)AT PRESENT TIHE OPERATION AID 91-012 IS ON VALVE SHOWING OPEN AND CLOSE THE WAY THE HANUAL SAYS TO TELL IF VALVE IS CLOSED IS TO LACK AT THE SHAFT HARKED'MITH S AND VALVE BODY REPLACED FIRST LEVEL HULTIPLEXER (Z10)PERFORHED CALIBRATION OF ZRHSCFI14A REPLACED ISOLATOR POWER SUPPLY SYHBOL 93-08-652 ISSUE NO 138502)REPLACED ANALOG OUTPUT ISOLATOR SYHBOL 93-57-957 ISSUE NO 138581'M189200 EGS-ZEGSAEG3 INTERLOCK VALVE IN LEAKING AIR OUT ACTUATES ROD.REPLACE SEE ATTA'CHED DRAWING REPLACED INTERLOCK VALVE PU-1 1
14:18-0 14-92 CLASS I WORK RUHENT&CONTROL 1991 PAGE25 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W189325 W189411'M18945 4 M189455 M189482 SMP-2S WP AP 18 HVC"2HVCPDR 50A ISC RPS-2 I SCA P I S 16508 CEC-2CECoPNL 899 S'MP OUTBOARD BEARING IS LEAKING OIL EXCESSIVELY LEAKING TO POSSIBLE PUHP BEARING DAHAGE PLEASE FIX AS SOON AS POSSIBLE 2HVC4FR10A/4PORSOA (CHART RECORDER FOR 2HVCoFN2A)
ON 2CEC4'PNL870 IS IN GENERAL STATE OF DISREPAIR NEEDS DOOR LATCH RECORDER LATCH HECHANISH AND TRACTOR FEED REPAIRED TAG HUNG AT 2HVC4 FN2A RECORDER ON 2CECAPNL870
'MHILE PERFORHING N2-ISP-ROS-R101 STEP 7 5 APPROXIHATELY 2 HINUTES ELAPSED BET'MEEN.CARD BEING PULLED AND ANNUNCIATOR 603418 ANO COHPUTER POINT RPS BC 28 ALARHED-TRIED IT TWICE-RESET IHHEDIATELY N2-ISP-CHS-R120 STEP 8.2 3 ERF COHPUTER POINTS OUT OF SPEC PLEASE TROUBLESHOOT AND CORRECT DIGITAL DISPLAY LED'S BURNED OUT LOCATED IN HAIN CONTROL ROOH 2CEC-PNL8808 TAG ON PNL 8808 REINSTALLED TE1558 DOOR LATCH SCREWS TIGHTENED LATCH HECH AND TRACTOR PAPER DRIVE REPAIRED UNDER WR 180630 AFTER NH ELECTRICIANS A/PLACED RELAY C72"K408'PHT WAS PERFORHED PER BLUE SHEET INITIATED PR POWER RETURNED TO CHANNEL A H2/02 ANALYZER REPLACED DISPLAY BOARD W 189516 RHS-2SWPARUZ 23A CHS-2CHSNTRX 130 RECORDER IS NOT ADVANCING RECORDERS GEAR TEETH WILL NOT REHAIN ENGAGED RECORDED IS LOCATEO ON 2CECNPNL873 IN HAIN CONTROL ROOH W189549 HTS-2HTS4PNL HTS4PNL001 Cl-14 OT LIGHT BLOWN.LIGHT IS PART OF 001 TEHP UNIT TAG ON CARD 14 FOUND RECORDER IN SERVICE WITH TRACES ON PAPER TIHING FOR PAPER APPEARS TO BE CORRECT CANNOT FIND ANYTHING LOOSE OR OUT OF ALIGNHENT SPARE CARO FROH C3-8 INSTALLED AND CALIBRATED PER N2-ICP-HTS-SA001 IN Cl-14 LED TEST PUSH BUTTON DEPRESS ALL LIGHTS LIT PHT SAT W18 9566 EGT LUBE OIL HEATER DOES NOT CYCLE ON AT LESS THAN 120 DEG.F.WHEN REQD TO HAINTAIN LUBE OIL TEMP WITHIN SPECIFICATIONS GTS-2EGT4CH3 PERFORHED LOOP-CALIBRATED SWITCH W189574 WCS LOS-2WCSATS1 6018 DURING 8 RPS EPA TESTING THE HONITOR FAILEO UPSCALE CAUSED BY DOWNPOWERING AND UPPOWERING THE CIRCUITS PER J KINSLEY TEST-REPLACE RILEY TRIP UNIT AS REQUIRED LOCATION 2CECAPNL642.
RELACED RILEY SWITCH S'l
.14:18:07-14-92 WR NUHBER EPN NUMBER FAILURE DESC CLASS I WORK-RUHENT 8 CONTROL 1991 CORRECTIVE ACTION PAGE26'W189782 CEC" 2CECAPNL 625'W189789 EGS-2EGS4PDS 1508 TAHPER BAR COMES OFF ON END OPPOSITE LOCK'WHEN TAHPER BAR IS LOCKED ANNUNCIATOR 413-22 ALARHED AFTER D/G WAS SHUTDOWN (NO DIFF PRESSURE)REPAIR LOOSEN TAMPER BAR STOP SCRE'WS SLIDE STOP OVER RET IGHTEN SCREWS RECALI BRATE 2EGSc PDS1508 CALIBRATION WAS SAT'W189849 W189944 W189947'W189954 W189980'W190265 W190437 SWP RMS-2SWP4CAB 238 ICS-2ICSCT1 CMS-2CMSeTRX 130 I CS-21CSAF T1 01 RCS-2RCSAP18 ICS-2ICSQAOV 157 PCB-2PCB4DRA 5 WORK REQUEST NO 165682'WAS WRITTEN TO REPLACE HANDLE ON HCU 017 ON INLET SIDE TO HCU07 VALVE IS LEAKING BY REPAIR OR REPLACE OF NECESSARY RCIC TURBINE SPEED EXHIBITS HUNTING DURING SURVEILLANCE TEST r'ERFORH APPL I CABLE PROCEDURE STEPS (N2-IHP-ICS-9010)
TO TUNE UP THE RCIC CONTROL SYSTEH TAG HUNG 306 CONTROL ROOH P601 RCIC CONTROLLER PEN SHOWING ELEVATION 307 TEHPERATURE ON DRYWELL TEMP RECORDER DID NOT HOVE DURING TEMP TRANSIENT IN DRYWELL COPY OF RECORDER PAPER DURING TRANSIENT INCLUDED WITH THIS WR.TAG HUNG AT RECORDER ON PANEL 873 HEASURE OUTPUT OF 2ICSAFT-101 WEEKLY OR AS DIRECTED BY TEST ENGINEER SYS SUPPORT THIS IS TO TREND LOOP PERFORHANCE.
SPECIFIC ATTENTION SHOULD BE PAID TO OSCILLATIONS.(REF WR 184909 COPY ATT).OUTAGE INVESTIGATION ISSUE 18C NOTED THAT PUHP SHAFT INDICATORS WERE GIVING A HIGH VIBRATION READING INVESTIGATE ANO RESOLVE AS REQUIRED CHECK HOUNTING BRACKET SOCKET HEAD CAPSCREW TO ENSURE THEY ARE TORQUED TO A HINIHUH OF 15 FT INDICATOR ARH ON 2ICS4AOV157 DOES NOT MOVE DURING VALVE STROKING PLEASE REPAIR AS NECESSARY SDC SC2-0274-91.
REHOVE TEST CLAMPS ON INNER DOOR TO GAIN ACCESS TO DRYWELL FOR INSPECTION HAINT REINSTALL WHEN'WORK IS COHPLETE AND INSPECTIONS ARE COHPLETE.REPLACED HCV07 PERFORHED STEPS 7.7 THR'7.8 OF N2-IHP-ICS-010 PER IRC SUPV AND ORIG-GE RECOHHENDAT ION REPLACED SERVO AHPLIFIER BOARD PROBLEMS WERE FOUND WITH ELECTRONIC GOVERNOR OSCILLATIONS ENDED WITH WORK ON GOVERNOR'WORK COHPLETED UNDER WR 190994 AS PER D FLOOD REQUESTED DATA OBTAINED AND GIVEN TO JAMES TING STROKE VALVE 21CSCAOV157 WI TH TEMP AIR PERFORHED LLRT SAT RESULTS WORK PERFORHED PER N2-ISP-CNT-9002 4 E I 14:18:0 14-92 CLASS I'WORK RUHENT 8 CONTROL 1991 PAGE27'WR NUMBER EPN NUHBER FAILURE DESC CORRECTIVE ACT ION W190657 W190658 W190695 W190700 W190717 W190718 W190726 W1 90729 W190742 W190745 CHS-2CMS~PNL 668 CMS-2CHS4 PNL 66A RHS-2RHSAPDT 188 HVR-2HVR4UC4 13A SXS-2SXS4HUX 01-01 SWP-2SWPAPT4 F CHS-2CHSoTE7 08 NHP-2NHPBGXO 29 CMS-2CHS4TE7 OA SVV ADS"2SVVCNBE 237 REGULATORS R1 THRU R4 AND CELL ORINGS HAY NEED REPLACEMENT DUE TO LOSS OF POWER DURING BUS OUTAGE TO ANALYZER HOT BOX.REPLACE ORINGS AS REQUIRED AND PERFORH PRESSURE TEST ON PANEL"REGULATORS R1 THRU R4 AND CELL ORINGS MAY NEED REPLACEMENT DUE TO LOSS OF POWER DURING BUS OUTAGE TO ANALYZER HOT BOX REPLACE ORINGS AS REQUIRED AND PERFORH PRESSURE TEST ON PANEL 175 FEET RB AZHI TH 240 DEGREES 2RHS4(PDT188 HIGH SIDE ISOLATION VALVE BEGAN LEAKING AROUND PACKING WHEN VALVE'WAS CHECKED DURING SURVEILLANCE TESTING UC 4438 AUTO TESTED AS DESIGNED BUT THEN 413A STARTED BEFORE IT SHOULD HAVE THEN THE UC TRIPPED TROUBLESHOOT CAUSE CONTACT 808 HAWHINNEY PRIOR TO WORK DURING THE PERFORHANCE OF N2-ICP-SXS"9005 FOUND HUX01 CH1 TO BE OUT OF SPEC-NEED TO REPLACE AND RECAL CARD WITH NEW ONE.CARO HOOEL NO DI338-Q2 DIGITAL ENCODER 2SWP4PI4F INDICATES ABNORHALLY LOW SUCTION PRESSURE TROUBLESHOOT COVER WAS BROKEN DURING REMOVAL OF COVER~WORK AFTER COMPLETION OF ILRT AND PROCEDURE N2-ISP"CNT-9005 REPLACE DURING RESTORATION SECTION OF N2-TSP-CNT-DI005 CABLE 2NHPBGX029 HAS BEEN OBSERVED TO BE HANGING LOOSE UNDER THE VESSEL REPAIR AS REQUIRED WHILE PERFORHING RETURN TO SERVICE FOR N2-TSP-CNT-9005.
COVER HISSING HARDWARE CABLE BROKE WHILE INSTALLING INSULATION.
CABLE CONNECTS TO ACCELEROHETER 2SVVoNBE237.NO TAG HUNG DUE TO RADIOLOGICAL CONDITIONS.SDC SC2-0008-91 REPLACED 0-RINGS ON H2 AND 02 CELLS AS REQD REPLACED ORINGS ON H2 AND 02'ELLS AS REQUIRED TIGHTENED PACKING NUT ifAG CONTAMINATED AND DISCARD)D COHPLETED N2-IPH"GEN-9003 FOR 2HVR4FS18A 8 C D FOR SETPOINT CAL INSTALLED NEW DI338 BOARD IN MUX01-01 CALIBRATED TRANSMITTER PER LCR IL2SWP-020 REPLACE WITH NEW COVFR RELACED NEW COVER PER N2-IHP-EQH"9017 FOR RESTORATION OF'2-TSP-CNT-9005 REPLACED LPRH CONNECTOR PER PROCEDURE N2-IMP-NHS-9006 REPLACED COVER PER N2-IHP-EQM-9017 SEE RESTORATION PROCEDURE OF N2-TSP-CNT-9005 REPLACE CABLES PER ECN 2F00264
14:18-0 14-92 CLASS I WORK RUHENT 8 CONTROL 1991 PAGE28 WR NUHBER EPN NUMBER FAILURE OESC CORRECTIVE ACTION W190746'W190749 W190750 W190753 W190754 W190761 W190769 SVV ADS-2SVV4NBE 220 CHS-2CMSAAE6 8 CMS-2CHSCP28 SVV ADS-2SVV4NBE 220 CMS-2CHSOPNL 668 CPS-2CPSAAOV 106 SXS-2SXS4MUX 03 HARD'WARE CABLE DISCOVERED BROKE WHILE PREFORHING N2-ISP-SVV-R102 CABLE NEEDS TO BE REPLACED NO TAG HUNG DUE TO RAGIOLOGICAL CONDITIONS SDC SC2-0008-91 WHILE PERFORMING N2-ISP-CHS-Q110 ATTACHHENT NO 2 THE 02 ANALYZER CELL WAS FOUND TO BE PEGGED LOW IN ALL RANGES.(SPAN-ZERO HODES).ANALYZER CELL FAILURE LIGHT IS LIT SUSPECT BAD 02 CELL OR WATER.PUMP FAILS TO DRAW ENOUGH VACUUH PUHP WILL ONLY DRAIN AROUND 10 IN HG VAC SHOULD DRA'W AROUND 28 IN HG VACUUH REPLACE PUHP FOUND ACCELEROMETER BROKEN DURING PERFORHANCE OF N2-ISP-SVV-R102 REPLACE PER EDC 2E00641 NO TAG DUE TO RADIOLOGICAL CONDITIONS WHILE PERFORHING N2-ISP"CHS-Q110 ATT 2 (TRAIN 8)H2/02 ANALYZER STEP 7.8.8 FOUND REGULATOR R1 NOT CONTROLLING PROPERLY REPLACE REGULATOR R1 2CPSAAOV106 FAILED QUARTERLY LLRT-N2-ISP-CPS-Q001-LEAKAGE EXCEEDING ACCEPTANCE CRITERIA TECH SPEC.PS294 FOR HUX 3 IS BAD.REPLACE POWER SUPPLY REPLACE'HE CABLE PER EOC 2F00264 REPLACED 02 CELL PER HI-5-3 REPLACED SOV FOR H2 REAGENT REPLACED 02 AHP BOARD.REPLACED FAULTY CELL WITH NEW OtjE PER HI 5 3*REPLACED PUMP 910114 PURCHASED NEW ACCELEROHETER.ANO INSTALLED REPLACED REGULATOR R1.REPLACED R2 R3 R4 REPLACED CELL FLOW ROTOHETERS (TUBE CUBES)BLEW OFF SEATS WITH 40 LBS AIR AND REPLEALEO TWICE LKG DROPPED TO ACCEPTABLE LIHITS REPLACED PS294 W190771 CES REPLACE SPARE ANNUNCIATOR CARD 408-2-8'WITH NEW CARD ORIGINAL CARD USED FOR WR 193581 NOTE CARD MODEL AN 1116C 6-3 REV G EGS-2CES4IPN L408 INSTALLED NEW BOARD FOR WINDOW W190788 CMS-2CHSILT1 A REVIEW OF PREVIOUS CALIBRATIONS INDICATE THAT 1A ZERO AND SPAN READINGS MAY BE DRIFTING INVESTIGATE AND PROVIDE AS FOUND CALIBRATION DATA TO G FLEURY EX 7381 TRANSHITTER AT ELEV 175 SC TOOK AS FOUND DATA FOUND TRANSHITTER OUT OF SPEC HIGH)REPLACED TRANSMITTER WITH NEW TRANSHITTER SERIAL NO.414764A ISSUE NO 154789
,I 14:18:0 14-92 CLASS I WORK RUHENT 8 CONTROL 1991 PAGE29 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W190790 NHS-C51-K605 LPRH SWITCH NOT ALWAYS HAKING GOOD CONTACT IN CALIBRATE POSITION CAUSING HETER FLUCTUATION WHEN NO ADJUSTHENT TO CAL IBRATION CURRENT HAS BEEN HADE.REPLACE CARD-LOCATED 2CEC4'PNL608 REPLACED LPRH 48-41D AHPLIFIER CARD PERFORHED N2-I SP-NHS-Q187 W190792 W190797 W190807 M190854 W190858 HSS RPS LDS-2HSSATS1 077C SWP RHS-2SMPNFS2 3A SLS-2SLSAPI4 8 SWP-2SMPAPNL 35A HVR RHS-2HVRACAB 32A REPLACE RILEY TEHPERATURE UNIT THAT WAS REHOVED FROH E31-N624C MITH A SPARE FROH STORES RELAY 1 CONTACTS N C~22 23 FROZEN CLOSED (BLOMED CONTACTS)REPLACE FLOW SMITCH CHANGEOUT HETER LEGEND:.FROH PS1 TO PSIG GE NUHBER C41-R660A B SEE TOH SULLIVAN FOR INFO AND PARTS VENTILATION FAN INSIDE CABINET IS SLOW RUNNING NEEDED A PUSH TO RUN AT ALL FAN REPLACEHENT WILL REQUIRE DISABLING PANEL.OUTLET LINE ON 2HVRACAB32A HAS A SWAG-LOK FITTING ON IT WITH STRIPPED THREADS THIS FITTING IS ATTACHED TO THE SKID LOCATION 289 INSTALLED RILEY TEHP SWITCH IN 2CECAPNL609 SPARE SLOT E31-N6246 REPLACE FLOW SWITCH INSTALLED NEW LEGENDS PSIG ON HETERS FAN IN VIDHAR A-6 REPLACED FAN AND ASSOCIATED SCREWS REPLACED OUTLET UNION W190861 HVR'WHILE PERFORHING N2-ISP-RHS"R101 STEP 8 3 AND 8 5 PURGE FLOW DID NOT HEET 3-5 SLFH READING WAS AROUND 2.3 SLFH REPLACED PURGE SOV AND PUHP PROTECTION SOV AND AIR REGULATOR ALSO CLEANED TRANSDUCER AND CALIBRATED PER N2-I SP-RHS-R101 ALSO PURGED OUT OUTLET LINE W190891 RHS-2HVR4 CAB 14A ICS-2ICSAHYV 151 RCIC TURBINE SPEED OR GOV VALVE HUNTING HAY BE CAUSED BY FRICTION IN THE REMOTE SERVO RECOHHEND REBUILD AS SOON AS POSSIBLE.NOTIFY SYSTEH ENGINEER OF ANY CORROSION OR CRUD FOUND DURING D ISASSEHBLY REPLACED REHOTE SERVO W190908 HVP-2HVPNHOD 6D WILL NOT CLOSE WHEN HVPAFAN1D OPENS ON AUTO SIGNAL FAILS PHT FROH N2-EPH-HVPA799 NO PROBLEM FOUND DAHPER WORKS PER LCR IL2HVP-003
~1 il4:18 0-14"92 CLASS I WORK RUHENT 8 CONTROL 1991 PAGE30 WR NUMBER EPN NUMBER FAILURE DESC CORRECTIVE ACTION W190918 RSS-2RSSALT1 14 W190919 SWP-2SWPAP I 2 3A REPLACE TRANSHITTER IDENTIFIED BY VENDOR (ROSEHOUNT) 10CFR21 NOTIFICATION LETTER 910703 AS BEING FROH SUSPECT LOT.RX BLDG 175 PRESSURE INDICATOR 2SWP4'P I23A CANNOT BE CALIBRATED REPLACED SUSPECT TRANSMITTER PER N2"IHP"EQH-9005 ANO CALIBRATED PER N2-I SP-CHS-R101 OBTAINED GAUGE PER MATERIAL ISSUE NO 145126'ALIBRATED PER LCR IL2SWP-9008 AND INSTALLED W190926 SWP FLUSH FLOW SWITCH STANDPIPE USING ATTACHED S-H I-5.3 RHS-2SWP0CAB 146A W190949 CHS-2CHS4AE6 WHILE PERFORHING N2-ISP-CHSQ001 H2 PORTION OF B ANALYZER CAL WOULD NOT CALIBRATE PROPERLY AS FOUND READING.3 80 GPH 97 HV FLUSHED STANDPIPE.
AS LEFT READINGS 2 85 GPH 81HV BYPASS FLOW ROTOHETER ADJUSTMENTS AND REGULATOR R1 ADJUSTMENTS WERE HADE USING N2-ISP-CHS-Q110 W190959 HSS ISOLATE AND FILL TRANSHITTERS FT 14A ANO 15A AS REQUIRED TO SUPPORT HECHANICAL MAINTENANCE WR 192826 RPS LOS-2HSS4FT1 4A TRANSMITTERS ISOLATED AND HIGH SIDE DRAIN LINE OPEN W190979 W190982 W190988 W190991 W190992 SLS-2SLSAPT4 A NHS-C51"K605 PCB-2PCB4 DRA 5 I CS-NOCOHP IO I CS-NOCOMP ID REPLACE PRESSURE TRANSHITTER.
S-HHI-5.2.2-001 ENHANCED SURVEILLANCE INSPECTION FOR ROSEMOUNT TRANSMITTER INDICATES POSSIBLE OIL LOSS RETURN TO ROSEHOUNT FOR.EVALUATION DURING PERFORHANCE OF N2" ISP-RHC-Q101 SECTION 7 16 COULD NOT HEET ACCEPTANCE CRITERIA THE ALARH REF OUTPUT TO THE RECORDER COULD NOT BE ADJUSTED FOR AS LEFT DATA SUSPECT DC AHP.REPAIR TEST FITTING FOR THE OUTER DOOR 10 LB TEST IS STRIPPED: SEE ATTACHED DRAWING RCIC TURBINE EG-M CONTROL IS POSSIBLE CAUSE OF OSCILLATIONS DURING OPERATION REPLACE AS NEEDEO RCIC TURBINE EG-R ACTUATOR IS POSSIBLE CAUSE OF OSCILLATIONS DURING OPERATION REPLACE AS NEEDED TRANSHITTER WAS REPLACED PER N2-IHP"EQH-9005 AND N2-ICP-GEN-9001 THEN CALIBRATED PER IL2SLS-004 REPLACED DC-AHP CARD NEW PLUG FITTING WAS INSTALLED SAT.LLRT SAT NO LEAKS REPLACED EG-M WITH NEW EG-H REPLACED EG-R ACTUATOR f I' 14:18:0 14-92 CLASS I WORK RUHENT 8 CONTROL 1991 PAGE31 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W19 0994 ICS-21CSAFC1 01 TROUBLESHOOT RCIC TURBINE FLOW CONTROL LOOP OSCILLATIONS PRESENT DURING OPERATION CHECKED HAGNETIC PICKUP CLEARANCE RECALIBRATEO NEW EG-H WING N2-IHP-ICS-010 READJUSTED FLOW CONTROLLER 2ICSCFC101 GAIN TO 2 DIAL SETTING PER DAVE FLOOD ADJUSTED NEEDLE VALVE ON EGR TO 1/8 TURN OPEN'W19114 4 GTS-2GTSAHOV 28A'W190996 ZZZ-NOCOHPID SPERIAS ALARHS CAUSED BY CRACKED CIRCUIT BOARD TRACE TO RETURN TO SPARE'WAREHOUSE WHEN FIXED VALVE WILL NOT OPEN WHEN CONTROL SWITCH IS TAKEN TO OPEN HAY BE A LIHIT S'WITCH PROBLEH HOTOR WAS RUNNING CONTINUOUSLY TAG HUNG AT CECNPNL870 BY CONTROL SWITCH FOR HOV28A.THIS PART IS NOT COST EFFECTIVE TO REPAIR TRASH BOARD REPLACED PS-2 SET SWITCH 830PSI AND 510 PSI RESET.TORQUCD COVER TO 25 IN LBS-GAGE 7973 DUE 910212 TORQUE WRENCH 9313 DUE 910402 W191181 HSS RPS LDS-2HSSATS1 0778 REPLACED TEMPERATURE TRANSHITTER SWITCH E31-N6208 WITH THE SPARE TEHPERATURE TRANSHITTER SWITCH E31-N6248 NEED NEW SPARE REPLACE SPARE TEHPERATURE S'WI.TCH W191444 EGS-2EGS4EG1 AIRLINE LEAKING AIR UNDERNEATH THE JACKING GEAR REPLACED PV-1 WITH A NEW VALVE MOTOR ON EAST LOWER FRONT OF DIESEL.APPEARS TO BE LEAKING FROM UNDERSIDE OF JAKING HOTOR CARRIAGE PLEASE REPAIR AS NECESSARY W191480 W191489 W191547 CMS-2CMS4L I9 A CEC"2CECCPNL 602 ANN-601402 HETER APPEARS TO READ LOW (198.5 FT)-NO CALIBRATION STICKER AFFIXED HETER IS LOCATED ON 2CFCQPNL601-RECALIBRATE IS REQD STARTUP RESTRAINT ANNUNCIATOR AND COHPUTER POINT LOS TC79 COMES IN SPURIOUSLY WITH E31-N615A AT SW AND TEHP INDICATION AT PNL632 INDICATING NO TEHPERATURE DIFFERENCE REF 807E154TY SHT 10 REPAIR AS REQU I RED.HIGH DRYWELL PRESS OIV I ANNUNCIATOR IS LIT DRYWELL PRESS IS WELL BELOW SETPOINT RELAYS 321A-K94 ANO E21A-K84 ARE NOT ENERGIZED THE ANN.SHOULD NOT BE IN.LOCATED AT CECAPNL601402 RECALIBRATED CHSALT9A AND CHSNLI9A PROBLEH ALSO IDENTIFIED ON WR 187539 CORRECTIVE ACTION TO BE COHPLETED ON WR 187539 REPLACED OPTICAL ISOLATOR PAIR E21A-AT3 Fg 14:18:0 14-92 CLASS I WORK RUHENT 8 CONTROL 1991 PAGE32'MR NUMBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION'M191576 SMP-2SWP4 FV5 4A DURING THE PERFORMANCE OF N2-OSP-SMP-R001 2SWPAFV54A MOULD NOT OPEN PLEASE TROUBLESHOOT FOUND ACCUHULATOR NUHBER 3 LO'M ON PRESSURE REPRESSURIZED TO 372 PSI AT 68 DEGREES VALVE PRESSURIZED AND OPERATED PROPERLY MR 154708 MAS WRITTEN TO ADDRESS LEAKING ACCUHULATOR PROBLEM W191586 M191588'M191592'M191598'M191600 SWP-2SWPARVB 48 S WP-2S'MP 4 F V5 4A CEC-2CECOPNL 608 HVK-2HVK4'TV2 28 WCS 2SWP0RV848 RELIEF VALVE IS LEAKING BY TO DRAIN OFF 2HVR4'UC4108 PLEASE INVESTIGATE AND REPAIR.RB EL 240.DURING THE PERFORHANCE OF N2-OSP-SMP"CS001 THE BEST STROKE TIHE ACHIEVED MAS 10.35 SEC VS 10 0 ACCEPTABLE ADDITIONALY THE CHG'G PUHP RAN AROUND 20 HIN AFTER OPENING ROD BLOCK HONITOR FAILS TO RESPOND TO DO'MNSCALE SIGNAL INPUT IE NO DOWNSCALE TRIP TROUBLESHOOT DISCOVERED MHILE PERFORHING N2-ISP-RHC"9101 HVR4'TV228 IS FULL SHUT<HAX BYPASS)WITH RELAY ROON TEHPERATURE ABOVE SETPOINT DURING THE PERFORHANCE OF N2-ISP-LDS-R104 REILEY TEHP SMITCH FAILED TO ACTUATE 2WCSAHOV112 PLEASE REPAIR OR REPLACE TEHP SMITCH WITH SPARE FROH E 31-N623A.RV MOULD NOT CAL PER N2-IHP-GEN-9036 LEAKED BY EXCESSIVELYJNO ADJUSTHENT CHARGED ACCUHULATOR NURSER 3 I REHOVED TRIP REF CARD AND RESEATEO BACK IN RBH TIGHTENED EDGE-CONNECTOR FOR TRIP REF CARD NO PROBLEH FOUND SHIFTED TO 2HVC-ACU28
'AINTAINS TEHPERATURE REPLACED RILEY TEMP SWITCH.E31-N601A MI TH A SPARE<E31-623A)
'M191654 W191668 LDS-2WCSCTS1 601A ISC-2ISCALR1 615 SLS-2SLSCRV2 8 RELIEF VALVE IS LEAKING FROH TOP OF PRESSURE SETTING SCREW TAG HUNG ON VALVE RB 289 LOCKWIRED CAP BACK ON TO VALVE PER HECH HAINT INSTRUCTIONS.
NO PHT BECAUSE VALVE NEVER REHOVED PERFORHED N2-IHP-GEN-9036 BY ESPOSITO AND FRALICK ON 2CEC<PNL601
-RX VESSEL LEVEL-FUEL ZONE CHART REHOVED AND REPLACED CHART HAGAZINE RECORDER IS NOT ADVANCING INST NUHBER 822-R615 M1 91774 HVC RRX18C IS GREATER THAN 15 PERCENT OF THE R1C 18C-THEREFORE OUT OF TOLERANCE.
ALSO NOTICED PRESSURE ON PAPER FROH PEN IS MORE THAN THAT FOR OTHER PER ON THIS RECORDER RHS-2HVC4RR1 8C CLEANED FEEDBACK SLIDE MIRE AND CARD EDGE CONNECTOR FOR PEN DRIVE CIRCUIIT NO 3.ALSO REALIGNED ALL THREE PEN TENSIONEERS FOR PROPER LATERAL CLEARANCE J
'14:18:0 14-92 CLASS I'WORK RUHENT 8 CONTROL 1991 PAGE33 WR NUHBER EPN NUHBER FAILURE OESC CORRECTIVE ACTION W191849 W191850 W191892 W191897 W191942 HTS-ZHTS0PNL 003 NHS"C51-K601 C CES EGS-ZCES4IPN L406 SWP-ZSWPAPDS H1E GTS-ZGTS0HOV 2A HTS4PNL003 CIRCUIT Cl-1 INDICATES 72 DEGREES F.HEATER SHOULD BE ENERGIZED THE SETPOINT IS 80 DEGREES F.TEHP WAS TAKEN LOCALLY WITH HAND HELD PRYOHETER AT 86 DEGREES F NO TAG REQUIRED WHILE PERFORHI NG NZ-I SP"NHS-9109 DO'WNSCALE INDICATION AT PANEL 603'WAS INCONSISTENT.
ZCESAIPNL406 ANNUNCIATOR 406-3-3 LUBE OIL LOW PRESSURE ENGINE ANNUN IS IN ALARH'WITH DIVISION I DIESEL IN STANDBY.TAG STUB ON ZCES4[IPNL406 AT ANNUN DELTA P HETER READS PLUS 2 (INSTEAD OF DOWNSCALE)
'WITH POWER TURNED OFF TO HASTER CHECK CALIBRATION LOCATED SCREENWELL BLDG ZCECAPNL896 HYDRAULIC FLUID FOUND IN AREA OF VALVE ACTUATOR HOUSING.LEAKING FROH.HOUSING COHPARED LOCAL READING WITH INSTRUHENT READING LOCAL READ 91 5 INST READ 91 REPLACED RELAY K31 IN TRIP AUX UNIT 22C WITH NEW ONE HATER IAL ISSUES 143153 PERJFORHED APPLICABLE PORTIONS OF NZ-ISP-NHS-9104 AS PHT REPLACED ANNUNCIATOR CA8D WITH NEW PART FROH SUPPLY SYM 93+9-933 RAN N2-ISP-5'WP-R103 ON 2SWP;PDI1E ADJUSTED PDI TIGHTENED CONNECTIONS ON ACTUATOR REINSPECTED ACTUATOR AFTER 1 HOUR NO LEAKS W192601 HVC RHS-ZHVC0CAB 18C DISPLAY IS HISSING THE FIRST DIGIT OF THE, EXPONENT REPLACED DISPLAY BOARD W192612 W192624 HVR L1C DISPLAY IS HISSING THE HINUS SIGN TAG HUNG AT REPLACED DISPLAY BOARD L1C RHS-ZHVR4CAB 14B S'WP L1C DISPLAY IS HISSING THE 2ND DIGIT OF THE VALVE.REPLACED BOARD SYHBOL 93-11-220 P/N THE-E-AND THE HINUS SIGN TAG HUNG AT THE HICRO-450-439-001 CB 214 RHS"ZSWPCAB 23A W192648 HVR THE TENS DIGIT IN THE EXPONENT DOES NOT SHOW AN EIGHT WHEN TEST BUTTON IS PUSHED TAG HUNG AT HICRO-ELECTRICAL TUNNEL 214 RHS-ZHVR4CAB 32B REPLACED'ZHVRACAB32B L I C DISPLAY BOARD
/
.14:18:0 14-92 CLASS I MORK RUHENT 8 CONTROL 1991 PAGE34'MR NUHBER EPN NUHBER M192649 HVR RHS-2HVRACAB 14B FAILURE DESC PUHP RED LIGHT ON DOES NOT WORK.NEEDS LIGHT SOCKET CORRECTIVE ACTION REPLACED ON LIGHT SOCKET 910818'M192663 M19 2666 M192667 SMP BATTERY BACKUP FAILED DURING.N2-RSP"RHS-SA105 RHS-2SWP4CAB 23A HVC RHS-2HVC4CAB 18C BATTERY BACKUP FAILED TO RETAIN HEHORY DURING PERFORHANCE OF N2-RSP-RHS-H019 HVC CHECKSOURCE RESPONSE WAS NOT GREATER THAN ONE DECADE ABOVE BACKGROUND RHS-2HVC4 CAB 18A REPLACED BACKUP BATTERY REPLACED SOLENOID ISSUE 151744 REPLACED OLD BATTERY PACK WITH NE'M W192673 SMP RHS-2SWPOCAB 1468 LIC DISPLAY AT SKID IS HISSING THE E IN THE VALUE REPLACED LIC DISPLAY BOARD DISPLAY'M192676 HVC RHS-2HVCCCAB 188 2HVCARU18B RAD HONITOR GOES INTO LOCAL JUST BY TOUCHING THE LIC REHOTE LOCAL KEYSMITCH OR BY INSERTING THE KEY REPAIR OR REPLACE KEY SMITCH AS NECESSARY TAG HUNG AT LIC REPLACED KEYSMITCH M192809 SWP RECALIBRATE LOM FLOW SETPOINT FROH 1 0 GPH TO 0 6-0 7 GPH DETERHINE FH71-D HV READINGS AT LOM FLOW SETPOINT.2 OGPH 3.0 GPH~ET 214N RHS-2SWPCFS2 3A PER SIHPLE DESIGN CHANGE SC2-0121-91 EDC 2E10397 OLD SMITCH READINGS: 3 0 GPH-055 HVI 2 0 GPH 080HUI lo0 GPH 093HV 0 65 GPH-103HV CANNOT VERIFY PIPE IS CLEAN-READINGS NOT ACCURATE.READINGS FOR CARSON STEEL PIPE NEW SMITCH-BUCKET TEST-SEE ATTACHED SHEET.SWITCH REPLACED ON'MR 190797
14:18:0 14-92 CLASS I'WORK RUHENT 8 CONTROL 1991 PAGE35 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W192810 W192826 W192831 W192923 W192943 W192960'W192969 HVC RHS-2HVCARE1 8A HSS-2-MSS-75 0-263-2 EGO-2EG04RV2 61 CHS-2CHSATTX 508 RHS RPS LDS-2RHS4TS8 4A SWP-2SWP)9'FV5 48 RPH-2RPH4 ACB 28 REPLACE KAPTON TAPE ON DETECTOR INSTALLED UNDER W 194151 PER EDC 2F00285 THIS TAPE'WAS DAHAGED PRIOR TO OR DURING THE HONTHLY FUNCTIONAL CHECK CB 306 BRAIDED FLEX HOSE HAS A BULGE IN IT~REPLACE EL 277 PC REMOVE CLEAN AND BENCH TEST DISCHARGE RELIEF VALVE REPAIR ADJUST AS NECESSARY (SETTING 50 PSIG)REINSTALL'WHEN TEST SAT LOCATED ON EGSAEG3 ON ELEV 261 IN DIESEL BLDG TAG ON VALVE WHILE PERFORHING N2" ISP-CHS-H003 ATT 1)FOUND INDICATOR 2CHSCTI172 OUT OF SPEC.RECORDER 2CHSQTRW170
'WAS LOW BUT IN SPEC~TAG ON 2CEC4PNL601 AT TI 172 SELECTOR TRIP UNIT FAILS TO RECOGNIZE A TRIP CONDITION DURING N2-ISP-LDS"H010 STEP 7 2 2 NOTE 2SWPAFV548 IS LEAKING HYDRAULIC FLUID FROH THE ACTUATOR.PLEASE REPAIR LEAK~VALVE LOCATED TB EL 250 PIPE TUNNEL.EPA 2RPM4ACB28 SPURIOUSLY TRIPS: INVESTIGATE AND REPAIR.THIS RESULTS IN A HALF SCRAH AT ANY GIVEN TIHE LOCATION OF EPA IS CONTROL BLDG 237 NE TAG AT P603 (SCRAM SOLENOID LIGHTS)REPLACED KAPTON TAPE WR 190959 WILL VENT AND FILL MSSAFT14A/15A ADJUSTED SETPOINT TO 58PSIG s REPERFORHED SURVEILLANCE
-NO PROBLEM FOUND-SEE ATTACHED SURV P REPLACED RILEY TEMP SWITCH WITH 320 ACTUATOR FITTINGS ARE ALLO'WED SLIGHT SEPAGE FLUID LOSS FROM ACTUATOR WELL-'WITHIN NORMAL LIMITS 910712-CONNECTED DRANETZ DISTURBANCE ANALYZED AND GOULD RECORDER TO TEMP LEADS INSTALLED UNDER TEHP HOD 91-036 AND EDC 2F00343 PRESENT VOLTAGE 119 BVAC 60 0HZ'11118-REMOVED DRANETZ DISTURBANCE ANALYZER AND RECORDER AND TEHP HOD 91-036 WAS CLEARED BY 808 CRANDALL W192977 CMS-2CMSCTRZ 140 PENS ON 2CHSNTRZ140 ARE NOT TRACKING PROPERLY (APPEAR TO STICK'WHEN SUPPRESSION CHAHBER IS COOLED AND DO NOT TRACK PROPERLY AS COMPARED WITH SPDS COMPUTER POINTS AS SUPP CHBR HEATS UP)TAG HUNG ON 2CHS0TRZ140 AT 2CEC0PNL875 CLEAN AND LUBRICATE SLIDE FOR PENS
'V 14:18:0 14-92 CLASS I WORK RUHENT 8 CONTROL 1991 PAGE36'MR NUMBER EPN NUHBER FAILURE OESC CORRECTIVE ACTION M1 92987 W192996 M1 92998 GTS-2GTS4PV5 8 NHS-C 51-K 60 5 HVK-2HVK4CHL 18 THE VALVE ACTUATOR HOUSING IS LEAKING OIL VALVE LOCATED IN STBY GAS-8" TRAIN BLDG ELEV 2751 S NICOLAOS AND P FOTI INVESTIGATEO-NOT AN URGENT PROBLEM DURING THE PERFORHANCE OF N2-ISP-NHS-WQ007 FOUND (HETER)INDICATOR TO BE READING HIGH TAG HUNG AT PNL 608 WHILE PERFORHING N2-OSP-SWP-Q001 ATT 88-2 AS PMT FOR WR 193053 VALVE 2SWPAV2408 FAILED TO PASS THE REQUIRED FLOW V2408 WAS OISASSEHBLED FOR'WR 193053 AND NO CAUSE FOR LOW FLOW COULD BE FOUND SUSPECT SERVICE MATER SIDE OF 2MVKACML18 IS FOULEO.TROUBLESHOOT LOW FLOW CONDITION)
CLEAN FLUSH CHL18 AS NECESSARY TAG HUNG ON CHL18 CONTROL BLDG 261 DIV I I CHILLER ROOH TIGHTENED FITTINGS AND CYCLED VALVE OBSERVED NO LEAKAGE REPLACED PANEL HETER H1 FOR APRH C HATERIAL ISSUES 143155 SYHBOL 93 05 273PHT PERFORMED SAT LIFTED ANO HOVED INSTRUMENTATION OUT OF HECH HAINT WAY'.%WHEN THEY WERE DONE ME REINSTALLE);WHAT WE LIFTED M192999 MVC-2MVCAPDR 508 W19303I E JS-2E JSAUS1 2HVCCPDR508 DOES NOT RESPOND CORRECTLY CLEAN AND RECALIBRATE (BLUE PEN)1 CONTROL ROOH PNL 871 THE WINDING TEHPERATURE INDICATOR (ON THE-8-SIDE)IS READING 25 DEG C AND SLOWLY DRIFTING SOWN.CHECK CAL OF TEHP INDICATOR TAG CB 261 DIV I SWITCHGEAR ON 2EJSAUS1 CLEAN SLIDE MIRE AND MIPER AND CALIBRATED RECORDER TIGHTENED TEHPERATURE INDICATING NEEDLE MHICH WAS LOOSE ON CENTER PORT W193037'M193042 SMP RHS-2SWPoCAB 146A RDS-2RDS4 LS1 25 RIC DISPLAY FOR 2SWP4146A IS HISSING THE HINUS SIGN QUESTIONS CALL RP CALS 2815 DURING THE PERFORHANCE OF N2-ISP-RDS-H106 COMPUTER POINT ROSLC103 FAILEO TO CHANGE STATE REPLACED LED BOARD VERIFIED COHPL RDSLC101 WORKS CORRECTLY FROH T-MOD (H101)WORK PERFORHFD ON WR 178802 W193100 EGS-2EGS4EG2 WHILE PERFORHING N2-OSP-EGS"H002 DIV I II 0/G FAILED TO HEET THE HAXIHUH 30 PERCENT DELTA P BET'WEEN AIRSTART BANKS DURING ENGINE STARTING CALIBRATED 2EGA-P 1119/124 READJUSTED 2EGAAPCV115 ANO 2EGAAPCV116 TO 200PSI W193109 CES EGS-2CESNIPN LI08 COHPUTER PT EGSTC04 IN ALARH CONDITION WITH JACKET MATER TEHP NORHAL (135 DEG F)LOCATED ON ANNUM 852242 IN CONTROL ROOM TROUBLESHOOT TO CLEAR ANNUN REPLACED RETRANSHIT RELAY 0ll'41 14:18:0 14-92 CLASS I MORK RUHENT 8 CONTROL 1991 PAGE37 MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION M193211 CEC-2CEC4PNL 608"A" ROD BLOCK HONITOR FAILURE TO NULLI TAG AT PNL603 SUSPECTED LOOSE'MIRE BEHIND PANEL HETER r'E HOVE D HETER FOUND NO LOOSE MIRESI ALSO CHECKED WIRING ON NULL AND SETUP S'MITCH ALSO LOOK GOOD PROBLEH CLEARED WHILE CHECKING WIRING'W193216 CES EGSPC01 EDG1 ENGINE LUBE OIL PRESS LOM AND CONTROL ROOM ANNUNCIATOR 852142 IN ALARH OIL PRESS NORHAL FOR STANDBY CONDITION AND LOCAL ANNUNCIATOR IS NOT IN ALARH.TROUBLESHOOT TO CLEAR CR ANNUNCIATOR OEF'AG 26340 AT CR ANNUNCIATOR 852142 EGS-2CE So IPN L406 REPLACED LAHP DRIVER CARD (HI 154598)M193222 CEC-2CEC4PNL ANNUN 602120 IS FLASHING SPORADICALLY IN CONTROL 602 ROOH.TAG ON PNL602 REPLACED LAHP DRIVER 93-51-041 JUHPER INSTALLED BY ELECT HAINT THRU SUPPORT PHT PERFORHED"SAT M193234 SWP-2SWPAPT4 D'WHEN IDLE SUCTION PRESSURE READS 6 79 PS IG (SMPPA04)MHICH IS LOWER THAN EXPECTED DISCH PRESSURE IS READING 7 52 PSIG (IDLE)N2-OSP-S'MP-Q002 REQUIRES IDLE SUCTION PRESSURE ABOVE 6.89PSIG RECALIBRATE REPAIR 2SWP4(PT4D AS REQD PERFORHED LOOP CAL LOOP FOUND LOM AND OUT OF SPEC INDICATION STILL LOWER THAN EXPECTED CONNECTED HEISE GAUGE IC 4431 TO V3 6 0 TO 6 1 PSI WAS OBSERVED SYSTEH NOM DETERHINED SAT PER SYSTEH ENGINEER DICK GREEN AND I8C SUPERVISOR GARNER M193236 ISC-2ISC4PT4 B22-N676D HIGH.READING 1018)INVESTIGATE AND D CORRECT.CHECK CALIBRATION.
2CECNPNL611 RECALIBRATED 822-N678D PER PROCEDURE N2-I SP-I SC-R101 APPLICABLE STEPS MERE DONE ONLY CALIBRATE INDICATOR M193250 IAS HETER READS AROUND 163 PSIG WITH-A-HEADER PRESSURE (21ASePI181)
READING 170 PSIG AND OTHER 2 TANKS IN-A-HEADER AT 168 PSIG COMPUTER POINT FOR TK 32 (IAS PA07)READS 168.52.SSS DAVIS WANTED DISCREPANCY BETWEEN HETER AND COHPUTER POINT VERIFIED AND REPAIREO AS NECESSARY SEE TAG ON HETER ADS-2 I ASAP I 2 30 RECALIBRATED 2IAS4PI230
~'
'14:18-0 14-92 CLASS I WORK RUMENT 8 CONTROL 1991 PAGE38'WR NUMBER EPN NUMBER FAILURE OESC CORRECTIVE ACTION'W193260'W193262'W193268 W1 93274 W193324 ICS LDS-2ICSAPDT 168 HVC RMS-2HVCACAB 18A RDS-2RDSc HCU 5835 SWP-2SWPNPT4 F RHS RPS LDS-2RHSATS8 18 2ICS4PDIS168JY (E31-N6848)
ON PNL618 IN CONT RH HAS A NEG OUTPUT REQUEST l8C TO TROUBLESHOOT DETECTOR.TAG HUNG ON E31-N6848~RIC DISPLAY IS MISSING THE FIRST DIGIT IN THE EXPONENT CONNECTION BETWEEN VALVE BLOCK V111 AT PRESSURE SWITCH HAS LEAK.LOCATION RX BLDG 261 NORTH HCU AREA 2SWPAPT4F READING 6 69 ISI ACCEPT=6 89-10 10 PSIG PER N2-OSP-SWP-Q002 SECTION 8 1 1 PLEASE.RECAL I BRATE TRANSMITTER 2RHSATS-818 FAILED TO ALARM WHEN LEADS WERE LIFTED AT PNL706 BAY F TH406 1 AND 2 NONE REQUIRED HEASURED ALL 4 INSTRUMENT CHANNELS 4 SEPERATE SENSING ELBOWS LINES TRANSMITTER LOOPS VOLTAGES WERE WITHIN 0 15 VDC OF EACH OTHER N6848 READS PLUS 2 86V ALL OTHERS READ APPROXIMATELY PLUS 3 00V REPLACED RIC DISPLAY BOARD ISSUE 147603 REPLACED BULKHEAD FITTING BLED AIR FROH 2SWP4IPT4F REHOVED AND REPLACED 2RHSATS818 (E31-N6388)
ALARM POINT CALIBRATED UNDER N2-ISP-LDS-H010 W193327 W193337 RHS WHILE PERFORHING N2-ISP-LDS-H010 TEHP SWITCH DID NOT ALARH'WHEN THERHOCOUPLE LEADS WERE L IFTEO REPLACE TEHP SWITCH RPS LDS-2RHS4 TS8 58 CES BOTH ANNUNCIATORS 408-1-4 EXCESSIVE VIBRATION ANO 408-1-6 JACKET WATER HIGH TEHP WILL'OT LIGHT WHEN TESTED BOTH ARE NECESSARY TO ENABLE DETERHINATION OF GAGING TRIP TAG LOCATED ON CES4'IPNL408 IN DIESEL BLDG EGS-2CES4IPN L408 REPLACED TEMP SWITCH ANO CALIBRATED NEW S'WITCH ALARHS CARDS AND KEY WAYS WHERE STRAIGHTEN FOR PROPER ALIGNHENT W193349 MSS-2MSSAAOV 2HSSOAOV60 INDICATED DUAL POSITION WHEN TAKEN TO 6D CLOSE FOR N2-OSP-MSS-CS001 HOVED LIHIT ARH BACK ON PLATE NO ADJUSTHENT NECESSARY
14:18: 0 14-92 CLASS I WORK RUHENT&CONTROL 1991 PAGE39 WR NUMBER EPN NUHBER FAILURE OESC CORRECT I VE ACTION W193399 W193515 W193521 W193522 W193525 W 193527 W193539 W193578'W193579 SWP RHS-2SWPCCAB 1468 ISC RPS-2ISC4ILIS 1680C CMS-2CHSAPNL 66A CEC-2CECAPNL 608 EGS-2EGS4EG3 RDS RPS-2RDSALIS X12A HVP-2HVPOTE1 18 CEC-2CEC4PNL 851 WCS LDS-2WCSNFT6 9X'AMPLE PUMP TRIPPED AND WILL NOT RESTART FROM ANY CONTROL POINT TAG IN CONTROL ROOH AT DRHS CONSOLE THE LEVEL SWITCH INDICATOR IS NOT WITHIN 4 INCHES OF THE 3 REHAINING LEVEL SWITCH INDICATORS CONTROL ROOH 306 BYPASS FLOW IS READING 15CFH'WITH SYSTEH SHUTDOWNS HETER BALL WAS FOUND STUCK TUBE NEEDS CLEANING WHILE PERFORMING N2-ISP-RCS-Haool STEP 8.1.9 FOUND RBM-A HETER READING OFF SCALE LESS THAN 125 SUSPECT OA12 ON SUMHER CARO Z6 DEFECTIVE LOCATED IN FLOW UNIT"A" TROUBLESHOOT CAUSE OF ANNUN 852225 EG3 OVERSPEED TEHP-SUSPECT OVERSPEED SWITCH E01/E02 PROBLEMS TAG LOCATED ON CONTROL BLDG 306 CONTROL ROOH PANEL 852'WHILE PERFORHING SHIFT CHECKS ON 2CEC0PNL632 LOCATED CCR 306I IT WAS NOTICED THAT C12"N601D LEVEL INDICATOR INDICATED 0 INCHES VICE DOWNSCALE (THE USUAL READING).I&C RECALIBRATE C12-N601D TAG STUB AT C12-N601D ON 2CEC4PNL611 2HVP0HOD68 AND D 2HVP4HOD18 AND D HODULATE AT A HIGHER THAN EXPECTED TEHPERATUREI CAUSES COOLING OF DIVII DIESEL TO BE INEFFICIENT TROUBLESHOOT HODULATING CIRCUIT P01D 57A/7 TAG ON CECAPNL871 ALARH 851129 FAILED TO ALARM WHEN 7 HILS ON BEARING NUHBER 2 WAS EXCEEDED THE HAIN TURBINE TRIPPED.REPAIR AS NECESSARY TRANSHITTER 2WCSOFT69X SUSPECT OUT OF CALIBRATION RECALIBRATE PER N2-ISP-WCS-R101 BACKFLUSHED 2SWP4FS1468 r'05 MU BEFORE BACKFLUSHI47 HU AFTER BACKFLUSH PERFORHED N2-IMP"GEN-9020 TO FILL INSTRUHENT LINE INDICATORS ARE NOW WITHIN DESIRED 4 INCHES PERFORHED N2-ISP-CMS-Qll)(NO PROBLEH FOUND REPLACED BLOWN FUSE F4 ON SUHHER CARD Z6 OF FLOW UNIT A REPOSITIONEP BUTTERFLY VALVE LEVER ACTUATOR ARH TRANSHITTER OUT OF ZERO USING N2-ISP-RDS-R101-WE RECALIBRATED TRANSHITTER AND RECHECKED TECH SPEC TRIP SETPOINT CALIBRATED COHPONENTS AND SHOT LOOP INSTALLED NEW RETRANSMITT RELAY TESTED CIRCUIT WORKED FINE TRANSHITTER WAS CALIBRATED PER N2-I SP-'WCS-R101
14 18 0 14-92 CLASS I WORK RUHENT 8 CONTROL 1991 PAGE40 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACT ION W193581 CES-NOCOHP ID ANNUNCIATOR 408-1-7 IS IN ALARH'MITH NO TRIP ON DIESEL OR REHOTE A ANNUNCIATOR IN PANEL 851.TROUBLESHOOT'OCATED IN DIV II DIESEL CONTROL ROOH ELEVATION 261 DIESEL GEN BLDG REPLACED ANNUNCIATOR CARD WITH ONE FROH SPARE SLOT NUHBER 2 TO 8'MR 190771 WILL REPLACE CARD IN SLOT NUHBER 2 TO 8 W1 93602 W193609 EGF-2EGF¹LSl 2A EGF-2EGF¹LS1 28 DIV I FUEL OIL STORAGE TANK LEVEL LOW ALARM LOCKED IN ON PROCESS COHPUTER AND ON SYSTEH TROUBLE ALARH IN CONTROL ROON BUT NOT ON DIESEL LOCAL PANEL OPS REPORTS LEVEL IN HIDDLE OF BAND AT 135 INCHES BY DAILY SOUNDING DO NOT VOID THIS WR T/S ATTACHED DIV I I FUSE OIL STORAGE TANK LEVEL LO'M LOCKED IN ON COHPUTER CONTROL ROOH SYSTEH TROUBLE AND ON LOCAL DIESEL PANEL LEVEL AS DAILY SOUNDED BY OPS IS 135 INCHES HIDDLE OF BAND DO NOT VOID THIS WR AS A TIS PLAN IS ATTACHED TO HELD ENGINEERING IF A PROBLEH EXISTS PERFORHED LOOP CALIBRATION ON SMITCH.ALSO PERFORHED N2-IHP-EQH-QO02 PERFORHED LOOP CALIBRATION ON SMITCH)FOUND S'MITCH 1 A)D 2 OUT OF SPEC.ADJUSTED SWITCH)PERFORHED N2-IHP-EQH-Q002 LOOP SAT W193619 I CS-2 I CS¹FC1 01'M193620 CHS-2CHS¹LR9 8 MHEN CONTROLLER IS OPERATED IN THE AUTO HODE SYSTEH FLUCTUATES IN FLOW PRESS AND TURB SPEED TROUBLESHOOT AND REPAIR AS NECESSARY RECORDER APPEARS TO INDICATE HIGHER LEVEL THAN OTHER SUP POOL LEVEL INSTRUHENTS (EG EHSLA02 COHPUTER POINT AND TRIP CSH UNITS)TROUBLESHOOT AND FIX OR RECAL IBRATE AS NECESSARY (RECORDER LOCATED IN CONTROL ROOH ON PANEL 2CEC¹PNL898)
CHANGED GAIN BACK TO 33 READING WHICH RELATES TO A GAIN OF 2 RAN CONTROLLER PP AND DOWN CONTROLLER WORKED FINE RCIC RUN AT 950PSI CONTROLLER DID.NOT FLUCTUATE REPAIRED PER N2-ISP-CHS-R104 NO QC REQD W1 93624 RHS WHILE PERFORHING N2-ISP-LDS-H010 ME FOUND THAT WHEN WE LIFTED THE THERHO-COUPLE LEADS THE RILEY TEHP SWITCH RED LAHP ILLUHINATED VERY DIH IT IS SUPPOSED TO ILLUHINATE BRIGHTLY-UPSCALE BURN-OUT RPS LDS-2RHS¹TSB 1A REPLACED MITH EQUIVALENT UNIT W193627 RHS RPS LDS-2RHS¹TS8 48 WHILE PERFORHING N2-ISP-LDS-H010 WE FOUND A BAD RILEY TEHP 5'MITCH E31-N6418 REPLACED BAD RELAY p 0 l',tl 14:18:0 14-92 CLASS I WORK RUHENT 8 CONTROL 1991 PAGE41 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W193654 W193656 W193671'W193676 W193681 W1 93698 W193706 W193717 W193725 HVR RHS-2MVRCAB 14A CMS-2CHS4 TE5 48 EGS-2EGSNPS4 007A HVC RHS-2HVCOCAB 18A CSH-99-31-2 I HSN18 (2wA)HVC"2HVCAACU 38 RDS-2RDSAHCU 5835 NHS-NOCOHPID CEC-2CEC4PNL 608 2HVR-RE14A-1 KEEPS INDICATING DETECTOR FAILURE FOLLOWED A FEW MINUTES LATER BY DETECTOR BACK IN OPERATION ON CONTROL RODH ORMS COHPUTER DETERMINE AND CORRECT PROBLEM WITH 2HVR"RE14A"1 TAG AT CONTROL DRHS CONSULT.BOTH TEMP ELEHENTS ARE IN ALARH AT 80 DEG F IN THE SUPPRESSION POOL.SETPOINT SHOULD BE 85 DEG F BRINGS IN ANNUN 601560 2EGSAPS4007A IS BLOWING AIR.A BODY BONNET BOLT IS HISSING A CAP NUT AND THE INTERNAL DIAPHRAH HAY BE BROKEN.TAG HUNG AT 2EGS-PS4007 (AT 2EGSoEG1)UNABLE TO REHOVE TUBING FROM DETECTIVE CHAHBER THIS IS TEST TUBING.WHILE PERFORHING N2-ISP-CSH"M002 THE COHPT PT CSHZC104 DID NOT CHANGE STATE WHEN WE BROUGHT IT INTO ALARH.TAG ON COHPT CONSOLE IN CONTROL ROOH ACU38 IS IN AUTO BUT FAILS TO START AT DESIGNATED SETPOINT ON TEHPERATURE INDICATOR IN REHOTE SHUTDOWN ROOH.CONTROL BLDG EL 261 ACCUHULATOR 2RDSAHCU5835 LOCATED AT 261 RX 8106 NORTH SIDE'WAS AT 980 PSIG'WITH NO ALARH IN AT CONTROL RH PANEL 603 SET POINT IS 1025 FOR ALARH RBH-A-GENERATED A ROD WITHDRAWAL BLOCK (INOP)THAT WILL NOT CLEAR-AS SOON AS IT AUTO-UNBYPASSED EDC 2F00277 ANNUNCIATOR WINDOW IS LIT WITH NO LPRH'S INDICATING DOWNSCALE COHPUTER POINT NHPBC28 INDICATES A DOWNSCALE ON LPRH GROUP A BUT ALL INDICATE GREATER THAN 10 PERCENT HETER SCALE REPOSITIONED DETECTOR.PERFORMED N2-RSP"RHS-H108 N2-ISP-CHS-H003 FOR TE548 PERFORHED SAT.N2-ISP-CHS H005 FNOR TE54A PERFORHED SAT REPLACED SWITCHICALIBRAT/D SWITCH REPLACED S'WAGELOCK FITTING NUT AND FERRULE RESET POWER SUPPLY TO COHPUTER WITH COHPUTER DEPARTHENT RECALIBRATED TO PROPER SETPOINT AS FOUND-852 3-AS LEFT-1024 5-RECEIVER LOGIC CARD REPLACED Q2 U15 U11 ON RCVR CARD NULL SEQUENCE CARD REPLACED K15 RELAY REPLACED LPRH CARD FOR 1A-32-49
14:18:0 14-92 CLASS I WORK RUHENT 8 CONTROL 1991 PAGE42 WR NUMBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION'W193742 W193790 W193834'W193851'W193871 W193904 W193911 W193918 W1 93928 RHS"2RHSAPI5 08 SWP-2SWP4VBO 08 RPS-F18-2RPS 801 N MS" C 51-K 60 5 HVP-2HVP4FS8 A HSS RPS-2MSS4IRT4 6C GTS-2GTSOHOV 3A ISC-2ISCALIS 16918 CES EGS-2CESAIPN L408 GAUGE READS 20 INCHE VACUUH~THIS IS AN UNEXPECTED READING DUE TO THE FACT THAT SUPPRESSION POOL LEVEL SUCTION SOURCE FOR PUHP WAS APPROXIHATELY ELEVATION 200 TROUBLESHOOT OR RECALIBRATE GAUGE AS NEEDED GAUGE LOCATED AT ELEVATION 175 ON RACK OUTSIDE 2PHSAP18 PUHP ROOH 2SWP4(V8008 FAILED N2-OSP-SWP-Q001 FORWARD FLO'W EXERCISE (OBTAINED 12 GPH-OSP-S'WP"Q001 CALLS FOR GREATER THAN 19 GPH)SEE SECTION 7 2 109 HALF SCRAH 8 LOGIC FROM RDS4LSY1A WHILE PERFORHING EQM'BLOWN C72A"E18 FUSE-REPALCE WHILE PERFORHING N2-ISP-NHS-WQ007 STEP 8.5.14 FOUND UPSCALE NEUTRON TRIP OUT OF SPECIFICATION DURING HONTHLY DIESEL RUN FAN AUTO STARTED ON DIESEL START AND TRIPPED ON LOW FLOW (PERHVR FC01)WAS RESTARTED AND TRIPPEO AGAIN LATER ALSO ON LOW FLOW.'WEATHER CONDITIONS WERE SNOW AND HIGH WIND TROUBLESHOOT AND REPAIR AS REQD HAIN STEAH RAD HONITOR C INTERHITTENT FAILURES ON LVPS HODULE FAULT-HOD A-15V CONTROL BLDG 306 ELEV WHILE RUNNING GTS TRAIN-A-DUAL VALVE INDICATION WAS NOTI CEO)ALSO TRAIN DISCHARGE FLOW AND DELTA P DROPPED GTSHOV3A NEVER COHPLETELY CLOSED BUT CYCLED BACK OPEN.TAG AT CEC-PNL870 THIS CHART RECORDER ON 2CECAPNL601 IN READING LOW OUT OF SPEC FOR N2-OSP-LOG-H001 CONTROL PANEL ANNUNCIATOR TEST FUNCTION IS NOT RESPONDING NO HORN NO ANNUNCIATOR FLASH CALIBRATED 2RHSAPISOB SUPPORTED HECH HAINT PERFORHED REQD SECTIONS OF N2-I SP-NHS-Q127 READJUSTED 2HVPeFSBA TO NEW SETPOINT REPLACED A AND 8 LVPSI CPU'OARD)DISPLAY CONTROL CARD AND I/O HODULE ECDCR 2E-103-92 TEHP HOD 91-018 WAS INSTALLED 910322 CLEARED PROBLEH.UNDER WR 168472 COPY ATTACHED PERFORHED CALIBRATION OF RECORDER PER N2-ISP-ISC"R104 EXERCISED SWITCH TEST AND RESET ON 2CES4'IPNL408 SWITCH IS INTERMITTENT.
WR 168641'WRITTEN TO ELECT TO REPLACE ANNUNCIATOR TEST AND RESET SWITCH ON 2CESAIPNL408
'14:18-0-14-92 CLASS I WORK RUHENT&CONTROL 1991 PAGE43 MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACT ION W193929 M193938 M193946 M193980 M193982'W193994 M193995 EGT-2EGT4CH5 SLS-2SLSARV2 A RHS-2RHS4 P I 7 C SLS-2SLS4(RV2 A NHS-C51-K605 SWP-2SWP4 FV4 78 CES EGS-2CES4IPN L408 JACKET MATER TEHP IS NOT CONTROLLING BETWEEN 120-130 DEG F ITS TEHP IS HIGHER THAN EXPECTED ACCORDING TO TEHP INDICATOR ON 2CESAIPNL408 TEHP IND HAY BE BROKEN HAINTAINING TEHP IN MANUAL CB 261 RELIEF VALVE BEGAN LIFTING AT APPROXIHATELY 1250 PSIG DURING PERFORMANCE OF N2-OSP-SLC-Q001~
ON SECOND ATTEHPT TO ACHIEVE DESIRED PRESSURE BAND STARTING LIFTING AT APPROXIHATELY 1150 PSIG REHOVE RECALIBRATE AND REINSTALL THIS HETER IS READING 160 LBS I THE LOCAL GAGE (SOHE INST TAP)IS READING 78 LBS THE P2 DISCH PRESSURE HETER READS 78 LB AND THE P18 DISCH PRESS HETER READS 70 LBS RECAL OR FIX AS NEEDED CALIBRATE RELIEF VALVE 2SLSARV2A THIS RELIEF VALVE'MAS FOUND LIFTING AT 1220 PSIG DURING THE PERFORHANCE OF N2-OSP-SLS-Q001 DURING N2-ISP-NHS-MQ007 STEP 8 4.3 8 4 5 LPRH OPERABLE COUNT MAS UNSAT AND RETURNING ONE LPRH TO OP DID NOT CLEAR INOP STATUS COUNT EQUALS 13 OP AND REQUIRED 2 OP TO RESET ANNUN 601203 ALARMS FOR SWPAFV478 LOM PRESSURE BEFORE LOM PRESSURE START OF VALVE ACCUHULATOR PRESSURE PUHP TROUBLESHOOT VALVE IS IN PIPE TUNNEL SOUTHMEST OF CCS H/X ON TB 250 EL TAG ON 601203 ANNUNCIATOR CAHE IN TEHP WAS NORHAL APPROXIHATELY 155 DEGREES F HIGH SETPOINT IS 190 DEGREES F MINDOW 408-3-7 IN PREHATURELY TROUBLESHOOT DIESEL GENERATOR BLDG 261 ELEVATION DIV II DIESEL CONTROL BLDG ROON HETER WAS REPLACED PER MR 178815 CHECKED RELIEF PRESSURE FOUND IN TOLERANCE BUT ADJUSTED VALVE CLOSER TO SETPOINT 1387 PSI PER I&C SUPERVISOR USING N2-IHP-GEN-9036 PLACED GAUGE ON TRANSHIT ER TEST TAP)READ 137 PSIG WHICH AGREED'MITH 2RHSNPI7C (ALSO READING 137 PSIG)GAUGE IC 9508 CAL DUE 911106"RECAL VALVE PRESSURE FOUND AT.1360 PSI ADJUSTED AUXILIARY CARD R3 FOR A 100 PERCENT INDICATION ON HETER (20 LPRHS IN OP X 5 PERCENT EA)ANNUN 601203 IS FED FROH RESERVOIR PRESSURE SMITCH PS4 HOTOR CONTROL PRESSURE SMITCH PS3 CONTROLS HOTOR OPERATION)
ACTIVATION OF PS4'MILL NOT START HOTOR HECH HA I NT PERFORHED REPAIR OF COUPLING UNDER SUPPORT'WR*BOTH HIGH TEHP SWITCH (26JWH)AND LOM TEHP SM (2GJMAL)MERE FOUND OUT OF SPEC RECALED AND ADDED HORE HEAT COUPLING GREASE TO TEHP'WELLS M194019 CHS-2CHSePNL 668 H202 ANALYZER H2 CALIBRATION IS FLUCTUATING LOM 7 CLEANED CORROSION FROH TERHINAL DAY LCO LUGS ON TB-9 4'
14:18:0 14-92 CLASS I WORK RUHENT&CONTROL 1991 PAGE44 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W194058 W194065 W194068 W194105 W19 4112'M194114 W194153 GTS-26TSePV5 8 RDS-2RDSAV11 1(3819)RDS-2RDSAV11 l(4203)HVR RHS-2HVR0CAB 14A CEC-2CECAPNL 899 CEC-2CEC4PNL 899 HVC RHS-2HVC4 RE1 BA OIL LEAKS FROH VALVE ACTUATOR HOUSING TROUBLESHOOT AND REPAIR 26TSAPV58 IS LOCATED IN THE STANDBY GAS 8 TRAIN ROOH UP ON HEZZANINE ELEVATION 275 OF THE STANDBY GAS BUILDiNG CARTRIDGE VALVE LEAKS LOCATION NORTH HCU'S REHOVE LEVEL SMITCH TO REHOVE 0-RING FROM V111 VALVE CARTRIDGE VALVE LEAKS LOCATION NORTH HCU'S REMOVE LEVEL SWITCH INSPECTED FOR CARTRIDGE VALVE 0-RING SEALING WASHERS HISSING ON THE TOP TWO LUGS ON LID OF HOVING FILTER HOUSING 289 ELEVATION CAB 14A FOUND IHPROPERLY INSTALLED CAPACITORS REF DER 2-91-Q-0259 AND GE SIL 527'EPLACE POWER SUPPLY CB 288 PNL 2CECAPNL899 FOUND IMPROPERLY INSTALLED CAPACITORS REF DER 2-91-Q-0259 AND GE SIL 527.REPLACE PO'MER SUPPLY.TAG ON POWER SUPPLY CB 288 PANEL 2CECAPNL899 CHANGE DETECTOR MIRING CONFIGURATION FOR 2HVC4RE18A AS REQUIRED BY EDC 2F00285 IHPLEHENT BY 910430 CONTROL BLDG 306 TIGHTEN SCHRADER VALVES TORQUED COVER DO'WN TORQUE'MRENCH 7222 CAL DUE 910501 REATTACHED LEVEL SWITCH AND TORQUED BOLTSLEVEL S'MITCH REHOVED LOST ORING FOUND)LEVEL SWITCH REINSTALLED PER S"HI-5 3 001 REHOVED LEVEL SWITCH LOCATED AND REHOVED LOST ORING RE I'ASTALLED LEVEL S'WITCH PER 5-HI'-5 S-.001 REPLACED HISSING SEAL'MASHERS ON 2HVRQCAB14A FILTER HOUSING POMER SUPPLY PS-ZQQ1 REPLACED AND OUTPUTS CHECKED REPLACED OPTICAL ISOLATOR POWER SUPPLY ZLL2 AS DIRECTED PERFORHED SDC EDC 2F00285 PER ATTACHED S-Hi-5 3-001 HOVED TAPE DO'MN DETECTOR HOUSING SO IT EXTENDED ON BOTH SIDES OF ORING NO CONTINUITY PRESENT AS ADDRESSED ON EDC 2F00285 PG 2 OF 14 S-HI-5 3-001 FINISHED NO DETECTOR PROBLEHS AND SOURCE CHECK SATISFACTORY
'M194154 HVC SDC SC2-0004-90 CHANGE DETECTOR WIRING CONFIGURATION FOR 2HVCARE188 AS REQUIRED BY EDC 2F00285 NCTS ITEH 502787-01/02 CONTROL BLDG 306 HVAC ROOH RHS-2HVC0RE1 8B'PERFORHED WIRING CHANGE PER EDC 2F00285 AND S-HI-5 3-001 AND GROUND ISOLATION WITH KAPTON TAPE.PERFORHED SOURCE SATISFACTORILY
,14-18:07-14-92 WR NUHBER EPN NUMBER FAILURE DESC CLASS I WORK-TRUHENT 8 CONTROL 1991 CORRECTIVE ACTION PAGE45 W194155 W194156 HVC RMS-2HVCARE1 8C-HVC RMS-2HVC4RE1 8D CHANGE DETECTOR WIRING CONFIGURATION FOR 2HVCARE18C AS REQUIRED BY EDC 2F00285 NCTS ITEH 502787-01/02 CONTROL BLDG ELEVATION 306 SDC SC2-0004-90 IMPLEHENT BY 910430 CHANGE DETECTOR WIRING CONFIGURATION FOR 2HVCIRE18D AS REQUIRED BY EDC 2F00285 NCTS ITEH 502787-01/02 CONTROL BLDG 306 HVAC ROOH SDC SC2-0004-90 IHPLEHENT BY 910430 PERFORHED EDC 2F00285 PERFORHED EDC 2F00285 W194159 HVR CHANGE WIRING CONFIGURATION OF THE DETECTOR PER EDC 2F00285 AND SIMPLE DESIGN CHANGE SC2-0004-90 HOD IS DONE BUT STEP 17 OF HI 5 3 CANNOT BE MET AT THIS TIHE 910820 PERFORHED HOD EDC 2F00285 AND SC 20004-90 SAT.NEW HI AND COHPLETED SATISFACTORILY
'W194160 RHS-2HVROREX 14A HVR-2HVRNREX 14B CHANGE DETECTOR WIRING CONFIGURATION PER EDC 2F00285 AND SIHPLE DESIGN CHANGE SC2-0004-90 RX 328 EAST SIDE EDC 2F00285 PERFROMED AND SC2-0004-90
'W194 161'W194162 W194163 W194184 HVR RMS-2HVRREX 32A HVR-2HVR4REX 32B WCS LDS-2WCSAFT6 7X GTS-2GTS4MOV 2B CHANGE DETECTOR WIRING CONFIGURATION PER EDC 2F00285 AND SIMPLE DESIGN CHANGE SC2-0004"90 RX 289 WEST CHANGE DETECTOR'WIRING CONFIGURATION PER EDC 2F00285 AND SIHPLE DESIGN CHANGE SC2-0004-90 TRANSHITTER OUTPUT READS HIGH.ELEVATION 215 RAD 010 TROUBLESHOOT ACTUATOR TO VERIFY PROPER DESIGN OPERATION PERFORHED EDC 2F00285 AND SC2-0004-90 EDC 2F00285 LOOP CALI BRAT ION TEHP HOD 91-019 EDC 2E10393 INSTALLED TO CLEAR PROBLEH,UNDER WR 168473 COPY ATTACHED W194185 GTS-2GTSAHOV TROUBLESHOOT ACTUATOR TO VERIFY PROPER DESIGN 3B OPERAT ION TEHP HOD 91-019 EDC 2E-10393 INSTALLED TO CLEAR PROBLEM (UNDER'WR 168473-COPY ATTACHED)
!IA
'14-18-b 14-92 CLASS I'WORK RUHENT 8 CONTROL 1991 PAGE46 WR NUMBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W194 188 W194191 CHS-2CHS4PNL 66A CEC-2CECoPNL 608 OXYGEN CELL FLOW ROTOHETER IS READING 150 SCCH WITH NO FLOW WHILE PERFORMING N2-ISP-RCS-Haool FOUND MODE SWITCH Sl KNOB BROKE-.ON HETER NODE C'ARD Z7 REPLACE BLACK KNOB REPALCED ROTORHETER WITH NEW ROTORHETER HI 136989 REPLACED SWITCH 51 KNOB W194202 NHP-2NHPNREO 825A HSS-2HSSCFT1 18 W194214 HAIN STEAH LINE FLO'W HETER READS 7 BY 10 TO THE 5TH LBH/HR STEAH FLO'W WHEN RX SHUTDOWN AND COLD INVESTIGATE CALIBRATE WHILE SHUTDOWN ADJUSTED XHITTER 2HSSAPT118 AND INDICATOR 2HSS4FI118 PEg.N2-ISP-RHC-R105 ATT 2 REPLACED LOW SWITCH PLATE ASSEMBLY)REPOSITIONED DISPLACERS AND'FERROUS SLEEVES FOR PROPER SET-RESET POINTS ON DISPLACERS CALIBRATED TRANSMITTER TRANSHITTER CALIBRATION WAS SAT W1 94234 EGF-2EGF>LS1 28 2EGFALS128 IS IN ALARH COMP PT EGFLC09 WITH SOTRAGE TANK LEVEL IN NORHAL BAND BRINGING IN NUISANCE ANNUNCIATOR IN CONTROL ROOH 852210 W194242 SWP-2SWP4PT4 F SERVICE WATER PUHP SUCTION PRESSURE INDICATES F APPROXIHATELY 3 5 PSIG WHICH IS 4 PSIG LO'WER THAN NORHAL VERIFY CALIBRATION OF 2SWPePT4F LOCATED IN SERVICE WATER DIV I I PUMP ROOH LPRH 08-25A READS ERRATICALLY SPIKES WHENEVER REPLACED LPRM CARO FOR LPRH BOARD IS TOUCHED LOCATED PANEL H13-P608 CABINET E W194263 CES ANNUNCIATOR BLOCK 408-1-7 OVERSPEED ENGINE ANNUNCIATOR WILL NOT ILLUHINATE ON TEST DEHAND.ANNUNCIATOR LOCATED AT 2CES-PNL408 CONTROL BLDG ELEVATION 261 DIV II DIESEL CONTROL PANEL INSTALLED NEW AN-1116C HODIFIED CARO INTO PANEL W194267'W194268 W194273 EGS-2CESoIPN L408 CPS-2CPS4 AOV 106 HVC RHS-2HVC4RE1 88 RDS-2RDSAHCU 2655 DURING N2-ISP-CPS-9001 LLRT AOV106 WAS FOUND TO HAVE LEAKAGE WHICH EXCEEDED TECH SPEC CRITERIA RAD HONITOR WENT UNREACHABLE AND WILL NOT RESTART FLOW SAHPLE PUHP OFF HONITOR SKID APPEARS TO BE OFF LINE PWR SUPPLIES VERIFIED ON CORRECT PROBLEH HONITOR ON C8306 IN HVAC ROOH 26" 55 LOST INDICATION WHEN 30-55 WAS INSERTED TO POSITION 46 LLRT PASSED N2-ISP-OPS"9001 REPLACED POWER SUPPLY 30-55 HOVED TO POSITION 46'6-55 DID NOT LOSE INDICATION
-NO PROBLEH P 1'(
14:18:07-14-92 CLASS I WORK" TRUHENT&CONTROL 1991 PAGF47'WR NUHBE EPN NUHBER FAILURE DESC CORRECTIVE ACTION W194274'W194290'W194313'W194314 W194332 W194359'W194382 W194 384 HVK-2HVK4 CHL 1A HVR-2HVR4FS3 7A EGA-2EGA4PS2 08 EGA-2EGACPS9 8 GTS-2GTSAPV5 A RSS-2RSSAPI1 02 SFC-2SFCoLT3 2A HVC-2HVCADMP F115 2HVKACHL1A TRIPPED AND FAILED TO RESTART-TROUBLESHOOT FLOW SWITCH FAILED LOWI INITIATIVE RX BLDG VENTILATION SYSTEM NORHAL ISOLATION TROUBLESHOOT AND REPAIR TAG LOCATED AT 2CECSPNL870 ANNUM 870112 IN CONTROL ROOH PRESSURE S'WITCH ACTUATES AT 236 PSIG REQUIRED TO ACTUATE AT 233 PSIG THIS WR WRITTEN IN CONJUNCTION WITH WR 194314 PRESSURE SWITCH ACTUATES TO START 2EGAOC18 AT 233 PSIG REQUIRED TO START AT 240 PSIG THIS WR'WRITTEN IN CONJUNCTION WITH WR 194313 THE ACTUATOR HAS AN OIL LEAK WHICH IS SEEPING THROUGH THE BOTTOH OF THE COVER PLEASE TROUBLESHOOT AND REPAIR 2RSSOPI102 DIV I INDICATES HIGHER APPROXIHATELY 1035 THAN OTHER PLANT RX VESSEL PRESSURE INDICATORS PLEASE RECALIBRATE.
ANNUNCIATOR 873322 COHING IN PERSISTENTLY AND GENERATING COMP PT SFCLC01 FOR SHORT DURATION ONLYBECOHI NG A NUISANCE SUSPECT LT OUT OF CAL TROUBLESHOOT AND REPAIR AS REQD.TAG AT PNL873 DID NOT CLOSE WHEN DOING N2-FSP-FPL-R001 THE REGULATOR HAY NEED ADJUSTING LOCATED DIV III 261 5'WGR NORTH'WALL WAS WITH ENGINEERING DURING TEST STARTUP NO FAULTS OR PROBLEHS FOUND 2HVKACHL1A RAN PERFECTLY PERFORHED N2-IPH-GEN-a003 ON FLOW SWITCH TO INPUT NEW SETPOINT CALIBRATED 5'WITCH CALIBRATED SWITCH REMOVED COVERI WIPED DOWN-REINSTALLED COVER ADJUSTED 2ROS4(PI102 TO HIDRANGE PER N2-ISP-I SC-R111 BROUGHT THE LOOP BACK INTO AN ACCEPTABLE CALIBRATION PINNED DAMPER IN CORRECT HANNER W194389 CES EGS-2CESeIPN L406 ALARH 406-4-1 JACKET'WATER HOW PRESSURE C IRCULATING PUHP WILL NOT TEST I CHANGED BULBS STILL WILL NOT TEST ADJUSTED RESEATED CARD FOR WINDOW 406-4-1 TESTED SATISFACTORY W194391 EGS-2EGS4E61 CONTROL ROOH ANNUNCIATOR 852134 EDG1 SHUTDO'WN MECHANICAL FAILURE IS IN'WITH COHUTER POINT EGSUC01 ED61 TURBO THRUST BRG IN ALARH AND OIV I DIESEL IS NOT RUNNING REPLACED RELAY ON RELAY CARD ABA6N24 IN PNL CEC859 I
'14:18:0 14-92 CLASS I WORK RUHENT 8 CONTROL 1991 PAGE48 WR NUMBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION'W194470 SWP RMS"2SWPFS1 46A TEHPORARY HODIF ICATION OF 2SWP4FS146A ATTACH FC1 MONITOR CRF 71D TO THE SWITCH MONITOR FH 71D OUTPUT AND EXTERNALLY HOUNTED FLOW HETER ON A CHART RECORDER CONNECTED TEST, EQUIP TO SERVICE WATER RAD SKI 0 2SWPA CA8146A PER TEHP MOD 91-042 W194 701 RHS AFTER PERFORHING N2-ISP-LDS-H007 RILEY TEHPERATURE SWITCH E31-N608C FAILED HIGH WHEN FIELD LEADS WERE LANDED W194580 HVK-2HVK4'CHL BASED ON N2-OSP-S'WP-Q003 P28 FAILED SURVEILLANCE 1A REMOVE END BELLS ANO CLEAN SERVICE WATER SIDE TUBES ON SHILLER BEFORE SURVEILLANCE ON P2A CONTACT DICK GREEN 343-8499 WHEN SHILLER IS OPEN REHOVED 2HVK-TE1011A REPLACED 2HVKATE1011A REPLACED S'WITCH E31-N6084 LOS-2RHS4 TS1 608C W194713 EGA-2EGA4'P59 8 W194778 GTS-2GTSoMOV 28 PRESSURE SWITCH IS ALLO'WING ITS RESPECTIVE COMPRESSOR TO PRESS UP THE RECEIVER TO ITS RELIEF SETPOINTQ PLEASE RECALIBRATE OR REPAIR IF NECESSARY VALVE ACTUATOR HOUSING IS LEAKING OIL TROUBLESHOOT REPAIR LOCATED IN STANDBY GAS ROOH 8 ELEVATION 261 RECALIBRATED 2EGAAP598 TO LO'WER ITS SETPT STILL'WITH IN SPEC!THEREFORE LOWERING ITS RESET PT PROBLEM WAS 2EGAAP598 RESET IS TOO CLOSE TO 2EGA-SV48 SETPT CAUSING SV48 TO LIFT BEFORE P598 RESET TO STOP COHPRESSOR RETIGHTENED BOLTS ON VALVE HANIFOLD HAD VALVE STROKED BY OPSI NO LEAKAGE DETECTED W194782 HSS ANNUNCIATOR 603133 COHPUTER POINT RHSRC01 DELAYED IN COMING INTO ALARH AND THEN RESET WITH A TRIP SIGNAL FROH RAD HONITOR A DRAINER.TROUBLESHOOT REPLACE RELAY K71 IN AUX TRIP UNIT A RPS-2HSSNRT4 6A W194789 HVC-2HVC0FR1 08 RECORDER PEN RED VIBRATES EXCESSIVELY APPEARS TO BE TO SENSITIVE TO INCOMING SIGNAL CHANGES LOCATION ELEVATION 306 CONTROL ROOH PNL 2CECAPNL871 ADJUSTED SLIDE WIRE AND CLEANED ITILUBRICATED GUIDE BAR~HONITORED INPUT'WITH OSCOPEIRAN LOOP PER N2-RSP-HVC-RQOOli RECORDER OPERATED PROPERLY INPUT WAS CHECKED AT OI 30PERCENT AND 60 PERCENT DURING LOOP RUN AND CORRESPONDING RECORDER OUTPUTS WERE SAT
14-18-0 14-92 CLASS I MORK RUHENT 8 CONTROL 1991 PAGE49 MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W194801 SWP RHS-25WPOCAB 23A SAHPLE PUHP WILL NOT STAY RUNNING WHEN STARTED FROH RIC IN CONTROL ROOH TAG ON RIC IN CR REHOVED FLOW SMITCH AND CALIBRATED TOOK ATTACHED TEST DATA M194802 SWP PUHP FAILS TO RESTART AFTER TRIPPING OFF BY ITSELF CLEANED AND FLUSHED SPOOLPIECE AND FLOW ELEMENT AFTER FLUSHING HV READING'MAS 87 AFTER CLEANING HV READING MAS 46HV RHS"25WP)0'CAB 146A M194815 SMP SAHPLE PUHP MILL NOT START FROH THE RIC OR LIC AFTER PERFORHING HANUAL FLUSH AND FLOW S'WITCH BLOW DOWN FLUSH PER N2"RTP-130 SAHPLE PUHP STARTS AND THEN KICKS OFF ET 215 RHS-25WPACAB 238 W194807 ZZZ-NOCOHPID RAD HONITOR HAS LOM FLOW ALARH LOCKED IN HONITOR SEEMS TO BE OPERATING PROPERLY RAD HONITOR WAS PUT BACK IN SERVICE ON 910823 AFTER WORK MAS PERFORMED BY 18C AND ALARH HAS BEEN IN SINCE CALIBRATED PURGE REGULAT(R AND RELIEF VALVE>>REPLACED FLOW ELEHENT AND TRANSDUCER BOARD REPAIRED LEAKY FITTING 107HU READING BEFORE SWITCH~CLEANINGI38 HU READING AFTER SMITCH CLEANED'LEANED FLOW SWITCH W194816 SWP PUHP SHUTS ITSELF OFF AND WILL NOT RESTART FROH THE R IC RHS-25WPeCAB 1468 FLOW SWITCH 1468 WAS CLEANED PLACED HON ON L INE AT 2100 HRS HON STILL ON LINE AT 2342 HRS'M194819 M194820 5'MP NORMAL FLOM INDICATOR LIGHT ON SAHPLE SK ID 146A IS PLAN CLEANED FLOW ELEHENT LIGHT NOT LIT FOR NORHAL PUHP OPS.(I E.'WHEN PUHP IS CANE ON DURING NORHAL FLOW PUMP ON RUNNING)LOC FOR TAG AT SKID~SKID LOC~IN PIPE AND TRIPPED OFF'WHEN PUHP OFF TUNNELS IN TB 250 RHS-2SWP4CAB 146A 5'MP FLOW INDICATOR LIGHT WAS NOT LIT DURING SHIFT CLEANED FS238 FLOW ELEHENTS PER AP CHECK TO INDICATE NORHAL FLOW>>.UNABLE TO ASCERTAIN 5 4 2 IF BULB IS BLOWN~PLEASE REPAIR TAG HUNG AT RIC IN CR 306 RHS-25WPACAB 238
14-18'14-92 CLASS I WORK RUHENT 8 CONTROL 1991 PAGE50 MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION'M194839 M194840 HVR RHS-2HVR4'CAB 14A SMP RHS-2SMPORE1 468 HONITOR HAS EXCESSIVE FILTER STEP FAILURE ALARHSIDISCOVERED DURING RETURN TO NORHAL AFTER FIXED FILTER CHANGEOUT (N2-RTP-123)
HONITOR LOCATED RB 328 EAST TAG HUNG ON SKID CONTACT RAD PROT PRIOR TO RETURNING HONITOR TO SERVICE RAD HONITOR NORHAL FLOW LIGHT'MILL NOT LIGHT BULB MAS CHANGED OUT AND STILL FAILED TO LIGHTS SKID APPEARS TO BE OPEARTING CORRECTLY SO LIGHT SHOULD BE ON TAG HUNG AT SKID REPLACED TRIGGER PHOTO STAR WHEEL CLEAN FLOW SENSOR AND RECAL'D M194843 CHS LOM FLOW ALARH)UNABLE TO CLEAR TROUBLESHOOT AND REPAIR REHOVED TAPE BLOCKING SUCTION TO HOVING FILTER AND CLEANED HOISTURE OUT OF ASSEHBLY RHS-2CHS4CAB 10A M194846 ABH-NOCOHP ID LOOP 2 UNREACHABLE PORT A.INVESTIGATE 8 REPAIR TAG 35991 RX 261 SOUTH TB 306 RP OFFICE RESEATED CPU AND SYSTEH BOARDS HAD HONITOR BROUGHT ON LINE AFTER FOUR HOURS HONITORIS ST.ILL ON LINE AND ALI.OTHER HONITORS IN LOOP ARE REACHABLE'M194926'W194927 SMP PERFORH PRESSURE AND FLOW TESTING AS DIRECTED BY SYS ENGINEERING (RICK SCHAHP)TB 250/SVP245 RHS-2SWPeCAB 146A SMP PERFORH PRESSURE AND FLOW TESTING AS DIRECTED BY SYS ENGINEERING (RICK SCHAHP)TB 250/SVP245 PERFORHED ENGS TESTING REPLACED SWP4'SOVFV01 AND PERFORHED FLO'M)PRESSURE TESTING AS PER TROUBLESHOOTING GUIDE'W194945'M194993 RHS-2SWP0CAB 1468 HVK-2HVKAPSL 1007A NHS-C51-K605 REPLACE LP PRESS SMITCH FAILS TO RESET INTERHITTENTLY SDC SC2-0275-91 DURING PERFORHANCE OF N2-ISP-RHC-9101 SECTION 7 16 COULD NOT MEET ACCEPTANCE CRITERIA THE ALARH REF OUTPUT TO THE RECORDER COULD NOT BE ADJUSTED FOR AS LEFT DATA.SUSPECT DC AHP REPAIR.TAG AT PANEL CEC-608 REPLACED SMITCH PSL1007A WITH NEW ONE.CALIBRATED PER IL2HVK-017 REPLACE DC AHP CORO-ISSUE NO.147686 SYHBOL 93-18-'766.
OLD SN TAHXM8-2)NE'M S/N 86Y353-3 1, t, i4 18 0 14-92 CLASS I WORK" RUHENT 8 CONTROL 1991 PAGE51 MR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION'M194997 CHS INVESTIGATE LABELING DEFICIENCY ON FLOW CONTROL SYSTEH FOR 2CHSACAB10B TAG AT 289 RX ON SKID TERMINAL BOARDS ARE NOT LABELED AND NOT CONTROLLED DRA'MING EXISTS TO SHOW NUHBERSIDER WILL BE WRITTEN W195043 W195056 W195082 M195605'M196136 W196159 W196160 M196162 RHS-2CHS4CAB 108 EGS-2EGSoPS4 0018 RDS-2RDSOHCU 3039 HVR-2HVRAFS3 78 CHS RHS-2CHSP'RIC 108 NHS-C51-K601 E CEC-2CECoPNL 873 CEC-2CECP NL 873 CHS-2CHSCTRY 130 RECALIBRATE PRESSURE SETPOINT PER EDC 2E10473 AND SIHPLE DESIGN CHANGE SC2-0301"91 HYDRAULIC CONTROL UNIT 2RDS4 HCU3039 NITROGEN SECTION HAS REQUIRED REPEAT CHARGINGS RECENTLY INVESTIGATE AND REPAIR SOURCE OF NITROGEN LEAK TAG HUNG ON HCU V111 VALVE RX BLDG 261 NORTH HCU BANK RECALIBRATE 2HVR4FS36A BI37A Bi IAW EDC 2E10489 AND SDC SC2-0234-91 RIC DISPLAY IN CONTROL ROOH IS HISSING-E-AND 1ST DIGIT OF EXPONENT.TAG WRITTEN AND HUNG AT Ric PANEL DURING PERFORHANCE OF N2-ISP-NHS-MQ009 ATTACHHENT 5 STEP 8 5 2 INOP INHIBIT SWITCH 54 DISPLAYED INTERHITTENT OPERATION TAG LOCATION 306 CONTROL RH 2CEC-PNL606 IRH DRAWER E DURING PERFORHANCE OF N2-ISP-DER-H001 COHPUTER POINT DERXC06 DID NOT ALARHI HODICON OUTPUT INDICATION AND ANNUNCIATOR 873110 FUNCTIONED PROPERLY TAG LOCATED AT 2CEC-PNL873 WHILE PERFORHING PROCEDURE N2-ISP-DER-H001 COHPUTER PT DFRXC09 FAILED TO ALARH.HODICON OUTPUT INDICATION AND ANNUNCIATOR 873115 OPERATED CORRECTLY TAG LOCATED AT 2CEC-PNL873 WHILE PERFORHING N2-ISP-CHS-R108 FOUND RECORDER NOT INDICATING FULL RANGE MHEN 10FDC WAS APPLIED TROUBLESHOOT-REPAIR RECORDER SETPOINT CHANGED TORQUED FITTING ON PS AND BLOCK TO 2 5 IN-LBS AND LEAK ST4PPED TORQUE.WRENCH 9231 RECALIBRATE AS PER N2-IPH-GENEQ003 REPLACED DISPLAY BOARD ON RIC 10B SYHBOL 93-40-609 REHOVED K43 RELAY THEN REINSTALLED IT BACK IN SLOT REPLACED DEFECTIVE RETRANSHIT RELAY REPLACED DEFECTIVE RETRANSHIT RELAY REHOVED CLEANED AND INSTALLED SLIDEWIRE FOR THE BLUE PEN ALLOWING FOR PROPER ELECTRICAL CONNECTION BETWEEN SLIDEWIRE AND'MIPER ARH
~4 C, C 14:18:0 14-92 CLASS I WORK RUHENT&CONTROL 1991 PAGE52'WR NUMBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W196227 W196228 W196229 ISC-2ISCALT1 OD NHS-C51-K605 HSS RPS LDS-2HSSeTS1 604C WHEN PERFORHING N2-OSP-LOG"SQALL IT WAS NOTICED THAT THE ABOVE TRIP UNIT IS READING 11 TO 12 INCHES BELOW THE OTHER THREE TRIP UNITS PLEASE TROUBLESHOOT AND REPAIR NOTE TRIP UNIT COMES OFF 2ISCALT10D TAG LOCATED ON 2CECAPNL625 ABOVE TRIP UNI T WHILE PERFORHING N2-ISP-NHS-WQ007 AT 6 THE FUNCTION TEST OF INOP TRIP CIRCUIT STEP 8 4 ONLY 13 LPRH WERE LEFT IN OPERATE IN ORDER TO GET THE INOP TRIP PROCEDURE REQUIRES 19 RECALIBRATE WHILE PERFORHING N2-ISP-LDS-H006 RILEY TEHP SWITCH E31604C WOUL'D NOT PERFORM AND BRING IN MSIV 1/2 ISOLATION REPLACE TRANSHITTER 2ISC4LT10D EXHIBITS ROSEHOUNT SYNDROHE TRANSHI TTER REPLACED PER N2-IHP-EQH"Q005 TIHE RESPONSE TESTED PER N2-ISP-CSH-R202 CALD PER N2-I SP-CSH-R107 PERFORMED N2-ISP"NHS-WQ007 NO PROBLEH FOUND'~i REPLACED OLD TS1604C WITH NEW ONE W196242 SWP-2SWPOFV5 2SWPOFV54A HYDRAULIC PUHP IS RUNNING CONTINUOUSLY 4A AND IS BRINGING IN CONTROL ROON ANNUNCIATOR 601103 TAG HUNG AT ANNUNCIATOR 601103 PRESSURIZED'CCUMULATORS AND FILLED OIL RESERVOIR AFTER HAINTENANCE DEPTIREPLACED ACCUHULATORS CALIBRATED PS3 AND PS4 DER NO WAS WRITTEN TO ADDRESS A PROBLEM CONCERNING THE LOW PRESS ANNC AND COHPT THAT CONSTANTLY COMES IN WHEN OPERATING VALVE W196250 W196293 W1 96297 W1 96299 CEC-2CECAPNL 880 HVR-2HVRAFS3 7B I CS-2 I CSAFE1 01 NHS" C51-K 601 F 2CEC4PNL880A KESIH POWER ON LIGHT PUSH BUTTON IS BROKEN TAG HUNG AT 2CECAPNL880A KESIH HODULE CONTROL ROOH 306 REACTOR BLDG VENT J SPURIOUS ISOLATION CONTACT BOB HAWHINNEY PRIOR TO TROUBLESHOOT SUSPECT AIR IN ABOVE FLOW ELEMENT SENSING LINES OR TRANSHITTERS 2ICSCFT104 AND 102 AND 2RSSAFT106 BLEED AND VENT AS NECESSARY PID 35 IRH F DID NOT RESPOND AS EXPECTED DURING PLANT STARTUP ON 910919 IRHF DID NOT RESPOND DURING CRITICALLY THE IRH LATER STARTED TO RESPOND BUT VERY ERRATICALLY TAG IN CONTROL ROOH PNL603 AT IRHF CHART RECORDER S-HI-5 3-001 PERFORHED APPLICABLE STEPS OF N2-IPH-GENQ003 TO FIND AS FOUND TRIP POINTS FOR ENG EVOLUTIONS FOR NEW SETPOTS BLEW DOWN AND VENTED TRANSHITTERS AS DIRECTED REPLACED DEFECTIVE CONNECTOR
<<t l'A.l l4:18-0 14-92 CLASS I WORK-RUHENT&CONTROL 1991 PAGE53 WR NUHBER EPN NUMBER FAILURE DESC CORRECTIVE ACTION W196314 W196315 W196373'W196375 W196430 VBA-2VBAAUPS 2A VBA-2VBAAUPS 28 ISC-2ISCARV3 4A HVR RHS"2HVR4CAB 32A RHS-NOCOHPID CHECK OR REPLACE INTERNAL BATTERIES AS REQUIRED CHECK OR REPLACE INTERNAL BATTERIES AS REQUIRED DRYWELL VACUUM BREAKER FAILED TO OPEN WHEN TEST PUSHBUTTON
'WAS DEPRESSEO DURING SURVEILLANCE TESTING.FIRST 8 OF EXPONENT FOR LIC DISPLAY IS HISSING THE-TOP HALF OF ITS DISPLAY REPAIR ORHS PRH TEST HICROCOMPUTER LOCATED IN THE TRAINING CENTER.UNIT FAILED DURING BOARD TESTING ALSO THE DRHS HICRO SIHULATOR FAILED DURING SAHE TEST NO BATTERIES IN THIS UPS NO BATTERIES IN THIS UPS STOKED VALVE AND VALVE OPERATED PROPERLY REPLACED DISPLAY BOARD OF LIC.SYMBOL 93-11-220 REPAIRED SI W196489 HVR-2HVRAFS3 6A DEFECTIVE CIRCUIT CARO PART FR 72-4R~REPLACE CARD" VERIFY ALL TERHINATIONS
'WITH CARO OUT REPAIRED SIHULATOR(LOOSE BOARD)e REPLACED PWR SUPPLY ON P12H TEST HICRO REPLACED ISOLATION BOARD ON PRH TEST MICRO REPLACED DETECTOR ALARH CARD W196530 IAS-2IASAPYX COHPUTER POINT IASPA11 FAILED IL2IAS-052 TAG AT 234(12w13)
CSO CONSOLE REPLACED INPUT PWR SUPPLY PS-2Y-2)CALIBRATED INPUT AND OUTPUT ISOLATOR CARDS'W196610 W196614 W196615 EGS-2EGSEG3 SWP-2SWP4 FV4 78 SWP-2SWPAFV5 48 PNEUHATIC RELAY PC-8 LEAKS AIR FROH EXHAUST PORT REPLACE.OIL LEAK FROM VARIOUS CONNECTORS TAG AT VALVE TB 250 ELEVATION SW OIL LEAKING FROM VARIOUS CONNECTIONS)TAG AT VALVE TB 250 SW 250 EL REPLACED PC-8 AS DIRECTED NO OIL LEAKS FOUND WIPED DOWN VALVE WATCH FOR 2 DAYS NO LEAK OR LOOSE CONNECTIONS FOUND NO PROBLEHS FOUND HECH MAINT REBUILT ACCUHULATORSI ELECT HAINT REPLACED HOTOR NEW PUMP WAS INSTALLED I&C CHARGED AND FILLED ACCUMULATORS UNDER FIELD SERVICE REP DIRECTION AND PER HANUAL N20337 CALIBRATED 2SWPA PSW1004A SAT
14:18:0 14-92 CLASS I'WORK RUHENT&CONTROL 1991 PAGE54 WR NUMBER EPN NUMBER FAILURE DESC CORRECTIVE ACTION W196619'W196627 W196628 W196634 W196780 NHS-C51-K605 CMS-2CHS4PNL 668 CEC"2CECAPOO 2 I AS-2 I ASS PYX 233(9s10)I CS-2 ICSCLS2 06 WHILE PERFORHING N2-ISP-NHS-WQ007 ATTACHMENT 1 STEP 8 6.1 DOWNSCALE WAS FOUND OF DESIRED TRIP REANGE BUT ABOVE TECH SPEC ACCOUNTABLE)
AS FOUND TRIP FOUND AT 3.5 (DESIRED 4-6)BOTH THE COHHON ALARH AND THE LOW REAGENT OR CALIB PRESSURE ALARH INDICATORS ARE ILLUHINATED PNL738 LOCATED ON RX 240 IN THE SOUTH AUX BAY TAG HUNG'AT PNL738 ANNUNCIATOR 603445 IS IN SOLID INDICATING RRCS TROUBLE OTHER LIGHTS INDICATE DIV 2 RRCS FAILURE PLEASE REPAIRS TAG LOCATED ON P603 CB 306 CONTROL ROON SHALL PORTION ONLY COHPUTER POINT FAILED'WHEN PERFORHING LOOP IL2IAS"051)ALL OTHER PORTIONS OF LOOP PASSED~TAG AT COHPUTER CONSOLE 2 IAS4PT233)POSSIBLE ISOLATOR PROBLEM PNL838 APPEARS NOT TO BE CONTROLLING 4AOV110 ADJUSTED DO'WNSCALE SETPOINT PER N2-ISP-NHS-9117 OXYGEN BOTTLE WAS REPLACED AND ALARHS CLEARED REPLACED HPOI C"25-01 A$D HP INPUT ISOLATOR C-25-09 NONE)PER TROUBLESHOOT GUIDE LEVEL SWITCH ICS4 LS206'WAS CALIBRATED PER N2-ICP-GEN-Q007 AND LOOP IL-215-016 N2-IHP-EQH-Q015 ALSO WAS PERFORHED W197608 EGS-2EGSAEG3 WHILE PERFORMING N2-OSP"EGS-H001 OUTPUT VOLTAGE AND SPEED DID NOT REACH THEIR DESIRED SETPOINTS WITHIN 10 SEC TAG'T PANEL 852 REPLACED THE FOLLOWING PNEUHATIC RELAYS IN START SYSTEH USCV-9 UCY-9 AND PV-2 SYS NOW SAT.RELAY PC-8 WAS FOUND TO LEAK-'WR 196610'WRITTEN'W197617 RHS-E12A-Z6-1 THE OUTER LARGER KNOB OF THE COMHAND AND CONTROL SWITCHES CHANNEL POINTER IS LOOSE AND ROTATES FREELY REPAIR OR REPLACE.LOCATED ON 306 CONTROL ROOH PANEL H13-P618 TOOK OFF BROKEN KNOB AND REPLACED'WITH NEll KNOB W197629 NMS-C51-K605 DURING PART OF N2-ISP-NHS-WQ002 STEP 8 4 5 RETURN OF LPRH TO SERVICE DID NOT RESET ON OPERATIONAL COHPUTER POINT NHP26108 ALARHING INTERHITTENTLY SUSPECT DIRTY RELAY REPLACED TRIP REFERENCE CARD 13683122AAG3
'l gi ,II'I I 14:18:0 14-92 CLASS I WORK RUHENT 8 CONTROL 1991 PAGE55 WR NUHBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W19 7636 W197639 W197674 CEC-2CEC4'PNL 608 HTS-2HTSOPNL 001 RDS-2RDSAHCU 3039 COHPUTER POINT NHP2A278 READS APPROX 3 ERCENT HIGHTER THAN THE APRH F HETER ON 2CECCP608 ALSO DURING APRH F GAIN ADJUSTMENT THE P608 HETER RESPONDED AS EXPECTED BUT THE COMPUTER POINT DID'OT'REACT AS EXPECTED.TAG AT 2CEC-DSPL609 IN CONTROL ROOH WHILE PERFORMING N2-ICP-HTS-SA001 FOUND CIRCUIT CARD C2-5 (PASS SYSTEH RETURN TO DRYWELL)TO BE OUT OF SPEC~CARD COULD NOT BE ADJUSTED IN SPEC CARD SHOWED VERY ABNORHAL CHARACTERISTICS RX BLDG 240 NAB HCU ACCUM NEEDS TO BE RECHARGED WITH N2 AROUND EVERY 8 12HRS)CHECK LDS129 PI 205 PS206 FOR N2 LEAKAGE LOCATED RX BLDG 261 TAG LOCATED AT HCU 30-39 PERFORHED N2-ISP-NMS-Q167 INSTALLED NEW BOARD 1)CHECKED FOR EXTERNAL.LEAKS ON COHPONENT CONNECTIONS AND FOUND NONE.2)CHECKED PS206 AND P I205 FOR LEAKS ON BOURDON TUBE AND FOUND NONE'W197686 GTS-2GTS4MOV 28 VALVE LEAKING OIL)INVESTIGATE AND REPAIR TIGHTENED FITTING AND CONNECTIONS ACTUATOR SEALS LEAK ING~'WROTE,'WR 196657 TO HECH HAINT TO REPAIR WR 196658 TO IRC TO HONITOR.2GTSAHOV28 CYCLES PROPERLY" W197700 W197724'W197730 W197732 EGS-2EGS4EG3 NMP-2NMP4RE3 233C CCP-2CCP4 AOV 37A.SWP-2SWPIAOV 228 DIV 11 DIESEL FAILED TO PASS MONTHLY START SURVEILLANCE N2-OSP-EGS-H001 OUTPUT VOLTAGE WAS LESS THAN 3'744 VAC AFTER 10 SEC FREQUENCY WAS GREATER THAN 63 HZ AFTER 10 SEC AND FREQUENCY WAS LESS THAN 58 8 HZ AFTER 13 SEC.PLEASE INVESTIGATE AND REPAIR LPRH 32-33C WHEN UNBYPASSED ALARHS DOWN SCALE.HOWEVER THE LPRH READS APPROXIHATELY 61 PERCENT AT 100 PERCENT PO'WER.TAG HUNG ON OUTSIDE OF PANEL 2CEC-PNL608 AND SMALL TAG PLACED ON FULL CORE DISPLAY P603 CONTROL ROOH 2CCPAAOV37A AIR REGULATOR OUTLET CONNECTION LEAKING AIR TROUBLESHOOT AS NEEDED)VLV LOCATED RX 175 RHR A PHP ROOH TAG AT SAHE LOCATION RX NAB 2SWPOAOV228 AIR REGULATOR LEAKING AIR UNDER PRESS REG ADJ KNOB TROUBLESHOOT AS NEEDED VLV LOCATION RX SAB175 RHR 8 PMP ROOH TAG SAHE LOCATION HECH HAINT'WIPED OFF FUEL RACK ACTUATOR WITH CLEAN DRY RAG PER CHIP BLUNT REPLACED LPRH CARD WITH SN-TG2-13 REPLACED AIR REGULATOR REPLACED AIR REGULATOR AND TUBING AS DIRECTED GET OUTPUT PRESSURE TO 80 PSIISYS NOW SECURE
0 14-18:0 14-92 CLASS I MORK-RUHENT 8 CONTROL 1991 PAGE56 MR NUMBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION W197733'W197742 W1 97761 M197765 SWP-2SWPeAOV 20B CEC-2CECIPOO 2 GTS-2GTS4HOV 2A NHS-C51-K605 2SWP4AOV208 AIR REGULATOR LEAKING AIR AT LVL INDICATOR TROUBLESHOOT AS NEEDED VLV LOCATED RX SAB175 RHR B PHP ROOH TAG SAHE LOCATION TEST FAULT ALARH OBSERVED ON PNL603 INVESTIGATION PER ANNUNCIATOR RESPONSIBLE THE FOLLOWING 2C2509 HPII/OI SYSTEH TST 03 CARD INPUT PATH FAILED SYSTEH TEST HAKE NECESSARY REPAIRS OIL IS LEAKING AT POINT WHERE CONDUIT PENETRATES VALVE ACTUATOR HOUSING LOCATED IN STANDBY GAS BLDG 261 TROUBLESHOOT REPAIR'MHILE PERFORHING N2-ISP"NHS-WQ007 SECTION 8 5 STEP 8.5 14 AND 8 5.21 UPSCALE NEUTRON AND UPSCALE THERHAL TRIPS MERE ABOVE GUIDE VALUES BUT BELOW TECH SPEC REPLACED REGULATOR SET PRESSURE TO 80 PSIG REPLACE HPI I A25 A09 BAY C AND HPOI A25A01 BAY C ISSUE NO 156963 PER HI 53-001 TIGHTENED FITTING ON PAP REPLACED.BOTH ELBO'M FITTINGS ON'QUHP.STROKED VALVE NO LEAKS'if REPLACE COVER TORQUED BOLTS 17 I8~H8TE 7959)PERFORHED SECTIONS OF N2-I SP-NHS-9157 W197817 W197860 NHS-NOCOHPID HVK-2HVK4 CHL 18 K15 RELAY IN APRHC PAGE IS HANGING UP HOLDS ANN 603211 IN ALARH.REPLACE K15 RELAY 2HVK4CH18 TRIPPING PREHATURELY ON LOM REFRIGERANT PRESS AT APPROX.17 IN HG RATHER THAN E13 3 HG REPLACED K1$RELAY IN APRH-C RECAL~D SWITCHeOP HAS OPERATING PERAHETERS FROH 10 IN HG TO 30PSI A TRIP POINT AT 17 IN GIVES THEH HORE ROOH TO OPERATE NOT LESS RECALIBRATE PER NEW SETPOINT M197869 CHS-2CHSIPNL ANALYZER FAILS SPAN PORTION OF CAL SUSPECT FLOW 66A PROBLEH WHEN SPAN IS SELECTED R1 ADJUSTED SAHPLE BYPASS FLOW ROTAHETER REPLACED PCURI AND PCVR2 PER S-HI-5 3-001.RECAL I BRATED IA'M N2-ISP-CHS-9110
'W197894 W197900 RHS-2RHSoPI5 OB CHS-2CHS4TE5 48 2RHSeP1508 IS INDICATING 150PSIG WITH THE 2RHS4P1B OFF PRESSURE INDICATION SHOULD BE 10-12 PSIG TAG HUNG AT 2RHSAPISOB RB 175 2CHSOTE548 INDICATES 62 DEGREES F AT 2CECAPNL601 ON 2CHS4TI172.
ALL OTHER SUPP POOL MATER TEHP ELEHENTS INDICATE 72 DEGREES F TO 76 DEGREES F TAG HUNG ON 2CECCPNL601 AT 2CHSTI172 RECALIBRATED GAUGE CLEANED SMITCH CONTACTS BY HOVING SELECTOR SMITCH THROUGH DIFFERENT CHANNELS APPLICABLE SURVEILLANCE N2"ISP-CHS-R115 PERFORHED NO FAILED COHPONENTS FOUND
'i g 14:18:0 14-92 CLASS I MORK-RUHENT 8 CONTROL 1991 PAGE57 MR NUMBER EPN NUHBER FAILURE DESC CORRECTIVE ACTION'M197948 W197949 M1 97968'M198053'M198075 CHS-2CHSPNL 66A CEC-2CEC4PNL 608 NHS-C51-K002 A CEC-2CECAPNL 603 HVC-2HVCAFS1 5A SAHPLING BYPASS FROH ROTOHETER HAS SIGNS OF HOISTURE BUILDUP (3/4 INCH IN BOTTOH OF ROTOHETER GLASS)ASSOCIATED HEAT TRACE CIRCUITS VERIFIED AT 300 DEGREES F INVESTIGATE CAUSE OF HOISTURE BUILDUP AND REHOVE ANY BUILDUP LOCATED RX BLDG 240 NAB DEF TAG ON ROTOHETER REPLACE BLOWN FUSE C518"F12 (Fl)MHICH IS CAUSING 1/2 SCRAH~TROUBLESHOOT AS NEEDED)REPAIR
~IRH A REO RANGE SELECTOR SMITCH PLASTIC KNOB ON PNL 603 SKIRT SFCTION IS BROKEN~REPLACE.RANGE SWITCH IS LOOSE THREE SCREWS UNDER BLUE RANGE SWITCH KNOB ARE HISSING.REPLACE SWITCHES 2HVC4FS15A APPEARS TO BE STUCK IN THE LOll FLOW CONDITION.LO'M FLOW LIGHT STAY LIT AT 2HVCAFN2P MITH FAN 2A OFF OR ON TROUBLESHOOT DEF TAG HUNG AT LOM FLOW LIGHT ON 2HVC-FN2A REPLACED Rl REGULATOR FUSE-C518"F12 AND P S INTERNAL FUSE BLOWN DURING PERFORHANCE OF N2" ISP"NHS-9167.REPLACE)
FUSES'ONF I RHEO WITH SARY k REPLACED RED RANGE SWITC)-KNOB REPLACED SCREMS IN RANGE SWITCH HOUSING HIGH AND LOM TUBES ON 2HVCAFS15A
'MERE FOUND t;0 BE SWITCHED.RETURNED TUBES TO PROPER POSITION FLOW IS BEING INDUCED BECAUSE NORHAL VENTILATION IS RUNNING~UNDER DESIGN CONDITIONS FOR SPEC FLT NORMAL VENTIALTION IS OFF AND SMITCH FUNCTIONS PROPERLY W198077 NHS" C51-K605 APRH A HAS GAIN ADJUSTHENT COHPARABLE WITH THE REMAINING APRHS YET IT CONTINUES TO ALARH ANNUNCIATORS 603208 AND 603442 TRIP SETPOINT HAY BE TOO LOM TROUBLESHOOT AND REPAIR TAG AT ANNUN 603208 PERFORHED SECTIONS OF N2-ISP"NHS-9117 483 RECORDS LISTED