ML18038B723: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 3: | Line 3: | ||
| issue date = 07/19/1996 | | issue date = 07/19/1996 | ||
| title = Responds to NRC 960619 Ltr Re Violations Noted in Insp Rept 50-259/96-05,50-260/96-05 & 50-296/96-05.Corrective Actions: Counseled Personnel on Mgt Expectations Re Site Specific Procedure Overtime Restrictions | | title = Responds to NRC 960619 Ltr Re Violations Noted in Insp Rept 50-259/96-05,50-260/96-05 & 50-296/96-05.Corrective Actions: Counseled Personnel on Mgt Expectations Re Site Specific Procedure Overtime Restrictions | ||
| author name = | | author name = Machon R | ||
| author affiliation = TENNESSEE VALLEY AUTHORITY | | author affiliation = TENNESSEE VALLEY AUTHORITY | ||
| addressee name = | | addressee name = | ||
| Line 14: | Line 14: | ||
| page count = 12 | | page count = 12 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000259/1996005]] | ||
=Text= | =Text= | ||
Revision as of 23:26, 17 June 2019
| ML18038B723 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 07/19/1996 |
| From: | Machon R TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9607240174 | |
| Download: ML18038B723 (12) | |
See also: IR 05000259/1996005
Text
CATEGORY 1 REGULATORY
INFORMATION
DISTRIBUTION
SYSTEM'RZDS)
ACCESSION NBR:,9607240174
DOC.DATE: 96/07/19 NOTARIZED:
NO ACIL:50-259
Browns Ferry Nuclear Power Station, Unit 1, Tennessee 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 50-296 Browns Ferry Nuclear Power Station,.Unit 3, Tennessee AUTH.NAME AUTHOR AFFILIATION
MACHONiR.DE
Tennessee Valley Authority RECIP.NAME
RECIPIENT AFFILIATION
Document Control Branch (Document Control Desk)DOCKET 05000259 05000260 05000296 SUBJECT: Responds to NRC 960619 ltr re violations
noted in insp rept 50-259/96-05,50-260/96-05
&.50-296/96-05.Corrective
actions: counseled personnel on mgt expectations
re Site Specific Procedure overtime'estrictions.
DISTRIBUTION
CODE: ZEOlD'COPIES RECEIVED:LTR
ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice
of Violation Response NOTES: RECIPIENT ID CODE/NAME:
PD2-3-PD INTERNAL: ACRS FILE CE NRR/DRCH/HHFB
NRR/DRPM/PERB
OE DZR RGN2 FILE 01 EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME WILLIAMSiJ.
AEOD/SPD/RAB
DEDRO NRR/DISP/PIPB
NRR/DRPM/PECB
NUDOCS-ABSTRACT
OGC/HDS3 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1.1 1 1 1 1 D 0 C U N NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, t ROOM OWFN 5D-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED(TOTAL NUMBER OF COP1ES REQUIRED:'TTR'9
ENCL 19
k
TenneSSee Valley Autncrity.
POSt OffCe BOX 2000, DeCatur.Aabarna 35609r2000
R.D.(Rick)Machon Vice President, Browns Ferry Mucfear Ptant July 19, 1996 U.S.Nuclear Regulatory
Commission
ATTN: Document Control Desk Washington, D.C.20555 Dear Sir: 10 CFR 2 201 BROWNS FERRY NUCLEAR PLANT (BFN)-NRC INSPECTION
REPORT 50-259'0-260~
50-296/96-05
-REPLY TO NOTICE OF VIOLATION (NOV)This letter provides our reply to the subject NOV transmitted
by letter from Mark S.Lesser, NRC, to Oliver D.Kingsley, TVA, dated June 19, 1996.Th'is NOV involved a failure to implement the requirements
for overtime restrictions
during maintenance
activities
on safety-related
equipment.
TVA admits the violation.
Enclosure 1 to this letter provides TVA's"Reply to the Notice of Violation," as required'y
10 CFR 2.201.Enclosure 2 contains a commitment
made in this reply.If you have any questions.
regarding this reply, please contact Pedro Salas at (205)729-2636.Sincerely, R'.D.on Enclosures
cc: See page 2 9607240174
960719 PDR ADQCK 0500025'P 6 PDR;j ED(
0 0 cl
U.S.Nuclear Regulatory
Commission
Page 2 July 19, 1996 Enclosures
cc (Enclosures):
Mr..Mark S.Lesser, Branch Chief U.S.Nuclear Regulatory
Commission
Region ZZ 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Xnspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611 Mr.J.F.Williams, Project Manager U.S.Nuclear Regulatory
Commission
- One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852
~Ci 4 t II
ENCLOSURE 1TENNESSEE VALLEY AUTHORZTY BROWNS FERRY NUCLEAR PLANT (BFN)UNZTS Lp'2g AND 3 ZNSPECTZON
REPORT NUMBER 50-259~50-260~50-296/96-05
REPLY TO NOTZCE OF VZOLATZON (NOV).RESTATEMENT
OF VIOLATION"Technical Specification 6.8.1.1(b)
requires that written procedures
shall be established, implemented, and maintained
which limit the amount of overtime worked by individuals
performing
safety-related
functions.
Site Specific Procedure (SSP)-1.7, Overtime Restrictions (Regulatory), Revision 3, is the implementing
procedure for overtime controls.SSP-1.7 states that an employee may work no more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24-hour period, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any, 48-hour period, or 72-hours in any 7-day time period, excluding shift turnover time, without an approved exemption.
Contrary to the above, from March 26 to March 28, 1996, written procedures
were not implemented
when Customer Group workers performed safety related functions in excess of the SSP-1.7 limitations
without approved exemptions.
During diesel generator circuit testing, a test.performer worked approximately
31.hours out of the previous 48.hours without an approved exemption.
Additionally, during March 29 to April 18, several additional
examples of workers exceeding limits without an approved exemption, were identified.
This is a Severity Level IV violation (Supplement
I)." 1.Reason For The Viol'ation
This violation resulted from a personnel error.The Customer Group (CG)Supervisor
failed to adequately
communicate
the Site Standard Practice (SSP)overtime restrictions
to CG workers for ensuring the SSP overtime requirements
were not exceeded without an approved exemption.
Specifically, on March 28, 1996., the backshift work crew was scheduled to return to dayshift.However, this shift change did not allow an adequate rest period and resulted in the backshift work crew, working 31 hours3.587963e-4 days <br />0.00861 hours <br />5.125661e-5 weeks <br />1.17955e-5 months <br /> in a 48-hour period without obtaining an approved exemption.
Additionally, as noted in the violation, this work crew was assigned to work on.safety-related
equipment.
l 0 0
'2.Corrective
Actions Taken And Results Achieved To prevent recurrence
of this event, BFN CG supervision
and personnel were.counseled on management
expectations
concerning, SSP overtime restrictions.
This counseling
session heightened
the CG personnel's
awareness of the SSP requirements, and defined their responsibility
for monitoring
their overtime individually
to ensure that an approved exemption is obtained if the SSP overtime restrictions
are to be exceeded.Also, TVA CG management
reemphasized
to the BFN CG supervisor
the need for planning, scheduling, and monitoring
employee work hours to avoid violations
of SSP overtime restrictions
and to ensure appropriate
overtime exemptions
are obtained when necessary.
To assess the extent of the condition described in the NOV, TVA performed a self-assessment
of plant staff who perform safety-related
functions as described in NRC Generic Letter 82-12,"Nuclear Power Plant Staff Working Hours." TVA's review included Operations, Engineering, Maintenance, and Radcon group's compliance
with SSP-1.7.To date, TVA's assessment
has identified
additional
examples of a failure to follow procedure in the Maintenance
group.TVA has documented
this condition in accordance
with the.corrective
action program.3'Corrective
Ste s That[Have Been Or)Will Be Taken To Avoid Further violations
TVA is performing
a review of other sections for compliance
with overtime restrictions.
Where additional
examples are identified, appropriate
corrective
actions will be taken.4~Date When Full Co liance Will Be Achieved TVA will be in full compliance
by September 18, 1996, upon the completion
of the review and implementation
of any corrective
actions.El-2
0 Cl
ENCLOSURE 2 TENNESSEE VALLEY AUTHORZTY BROWNS FERRY NUCLEAR PLANT (BFN), UNITS 1~2~AND 3 INSPECTION
REPORT NUMBER 50-259'0-260'0-296/96-05
REPLY TO NOTICE OF VZOLATZON (NOV)'TVA will perform a review of other sections for compli'ance
with overtime restrictions.
Where additional
examples are identified
appropriate
corrective
actions will be taken.This review and implementation
of any corrective
actions will be complete by September 18, 1996..