Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Power Plant, Inc. Constellation Generation Group, LLC | Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Power Plant, Inc. Constellation Generation Group, LLC | ||
1650 Calvert Cliffs Parkway Lusby, Maryland 20657-4702 | 1650 Calvert Cliffs Parkway Lusby, Maryland 20657-4702 | ||
SUBJECT: ANNUAL ASSESSMENT LETTER FOR CALVERT CLIFFS NUCLEAR POWER PLANT UNITS 1 & 2 (REPORT 05000317/2012001 AND 05000318/2012001) | SUBJECT: ANNUAL ASSESSMENT LETTER FOR CALVERT CLIFFS NUCLEAR POWER PLANT UNITS 1 & 2 (REPORT 05000317/2012001 AND 05000318/2012001) | ||
Revision as of 18:33, 18 May 2019
| ML13060A272 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 03/04/2013 |
| From: | Roberts D J Division Reactor Projects I |
| To: | Gellrich G H Constellation Energy Nuclear Group |
| References | |
| IR-12-001 | |
| Download: ML13060A272 (5) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 March 4, 2013
Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Power Plant, Inc. Constellation Generation Group, LLC
1650 Calvert Cliffs Parkway Lusby, Maryland 20657-4702
SUBJECT: ANNUAL ASSESSMENT LETTER FOR CALVERT CLIFFS NUCLEAR POWER PLANT UNITS 1 & 2 (REPORT 05000317/2012001 AND 05000318/2012001)
Dear Mr. Gellrich,
On February 15, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Calvert Cliffs Nuclear Power Plant Units 1 & 2 (Calvert Cliffs). The NRC reviewed the most recent quarterly performance indicators, in addition to inspection results and enforcement actions, from January 1, 2012 through December 31, 2012. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Calvert Cliffs operated in a manner that preserved public health and safety and met all cornerstone objectives. Calvert Cliffs was in the Regulatory Response Column of the NRC's Reactor Oversight Process Action Matrix until the third quarter 2012, due to one or more greater-than-green security cornerstone inputs as described in inspection report 05000317/2011403 and 05000318/2011403 dated July 27, 2011. The NRC determined the performance at Calvert Cliffs during the third quarter 2012 was within the Licensee Response Column because all inspection findings had very low (i.e., green) safety significance, all performance indicators demonstrated that your performance was within the nominal, expected range (i.e., Green), and a supplemental inspection was successfully completed for the greater-than-green inputs on December 15, 2011.
Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be
revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 71003, "Post-Approval Site Inspection for License Renewal," and Temporary Instruction (TI) TI-182, "Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks."
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be av ailable electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Daniel Schroeder at (610) 337-5262 with any questions you have regarding this letter.
Sincerely,
/RA/ Darrell J. Roberts, Director
Division of Reactor Projects Docket Nos.: 50-317, 50-318 License Nos.: DPR-53, DPR-54
Enclosure: Inspection Plan cc w/encl: Distribution via ListServ
ML13060A272 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME SShaffer SKennedy/sws for * DSchroeder DRoberts DATE 02/26/13 02/26/13 02/26/13 03/04/13
Page 1 of 2 02/27/2013 15:51:30 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Calvert Cliffs Inspection / Activity Plan 01/01/2013
-06/30/2014 7111108P-U2 INSERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR 7111108P 02/25/2013 03/01/2013 71124-RADIATION SAFETY INSPECTION 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/25/2013 03/01/2013 1, 2 IP Occupational ALARA Planning and Controls 71124.02 02/25/2013 03/01/2013 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 02/25/2013 03/01/2013 1, 2 IP Occupational Dose Assessment 71124.04 02/25/2013 03/01/2013 71124.08-RADWASTE 1 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 04/08/2013 04/12/2013 71124-RADIATION SAFETY INSPECTION 1 1, 2 IP Radiological Environmental Monitoring Program 71124.07 05/06/2013 05/10/2013 1, 2 IP Performance Indicator Verification 71151 05/06/2013 05/10/2013 71124-RADIATION SAFETY INSPECTION 1 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 07/15/2013 07/19/2013 1, 2 IP Occupational Dose Assessment 71124.04 07/15/2013 07/19/2013 PI&R-PI&R 5 1, 2 IP Problem Identification and Resolution 71152B 09/09/2013 09/13/2013 1, 2 IP Problem Identification and Resolution 71152B 09/23/2013 09/27/2013 7111111B-CALVERT REQUAL INSP WITH P/F RESULTS 2 1, 2 IP Licensed Operator Requalification Program 7111111B 11/18/2013 11/22/2013 EP EXER-EP EXERCISE INSPECTION 2 1, 2 IP Exercise Evaluation 7111401 10/21/2013 10/25/2013 TRI FI-TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2 IP Fire Protection [Triennial]
7111105T 10/21/2013 10/25/2013 1, 2 IP Fire Protection [Triennial]
7111105T 11/04/2013 11/08/2013 71124-RADIATION SAFETY INSPECTION 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 12/09/2013 12/13/2013 1, 2 IP Occupational ALARA Planning and Controls 71124.02 12/09/2013 12/13/2013 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 12/09/2013 12/13/2013 1, 2 IP Occupational Dose Assessment 71124.04 12/09/2013 12/13/2013 1, 2 IP Performance Indicator Verification 71151 12/09/2013 12/13/2013 7111108P-U1 INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR 7111108P 02/17/2014 02/28/2014 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 02/27/2013 15:51:30 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Calvert Cliffs Inspection / Activity Plan 01/01/2013
-06/30/2014 71003-U1 LR COMMITMENTS PHASE 1 INSP - OUTAGE 1 1 IP Post-Approval Site Inspection for License Renewal 71003 02/24/2014 02/28/2014 71124-RADIATION SAFETY INSPECTION 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/24/2014 02/28/2014 1, 2 IP Occupational ALARA Planning and Controls 71124.02 02/24/2014 02/28/2014 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 02/24/2014 02/28/2014 1, 2 IP Occupational Dose Assessment 71124.04 02/24/2014 02/28/2014 1, 2 IP Performance Indicator Verification 71151 02/24/2014 02/28/2014 TI 182-DEGRAD UNDERGROUND PIPING - PHASE 2 1 1, 2 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 03/10/2014 03/14/2014 71124-RADIATION SAFETY RETS 1 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 05/05/2014 05/09/2014 1, 2 IP Performance Indicator Verification 71151 05/05/2014 05/09/2014 7111107T-TRIENNIAL HEAT SINK 1 1, 2 IP Heat Sink Performance 7111107T 05/19/2014 05/23/2014 71003-U1 LR COMMITMENTS PHASE 2 INSPEC 4 1 IP Post-Approval Site Inspection for License Renewal 71003 05/19/2014 05/23/2014 1 IP Post-Approval Site Inspection for License Renewal 71003 06/02/2014 06/06/2014 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.