{{#Wiki_filter: | {{#Wiki_filter:October 21, 2013 | ||
SUBJECT: R.E. GINNA NUCLEAR POWER PLANT, LLC NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE INSPECTION REPORT NO. 05000244/2013503 | SUBJECT: R.E. GINNA NUCLEAR POWER PLANT, LLC NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE INSPECTION REPORT NO. 05000244/2013503 | ||
| Line 26: | Line 26: | ||
Sincerely, | Sincerely, | ||
/RA/ Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-244 License No. DPR-18 Enclosure: NRC Inspection Report No. 05000244/2013503 cc w/encl: Distribution via ListServ R. Thomson, RAC Chair, FEMA Region II Mr. Joseph E. Pacher, Vice President R.E. Ginna Nuclear Power Plant, LLC Constellation Energy Nuclear Group, LLC 1503 Lake Road Ontario, NY 14519 | /RA/ Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-244 License No. DPR-18 Enclosure: NRC Inspection Report No. 05000244/2013503 cc w/encl: Distribution via ListServ R. Thomson, RAC Chair, FEMA Region II Mr. Joseph E. Pacher, Vice President R.E. Ginna Nuclear Power Plant, LLC Constellation Energy Nuclear Group, LLC 1503 Lake Road Ontario, NY 14519 SUBJECT: R.E. GINNA NUCLEAR POWER PLANT, LLC NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE INSPECTION REPORT NO. 05000244/2013503 | ||
SUBJECT: R.E. GINNA NUCLEAR POWER PLANT, LLC NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE INSPECTION REPORT NO. 05000244/2013503 | |||
==Dear Mr. Pacher:== | ==Dear Mr. Pacher:== | ||
Revision as of 13:22, 18 May 2019
| ML13295A398 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 10/21/2013 |
| From: | Anthony Dimitriadis Plant Support Branch 1 |
| To: | Pacher J E Constellation Energy Nuclear Group |
| Dimitriadis A | |
| References | |
| IR-13-503 | |
| Download: ML13295A398 (11) | |
Text
October 21, 2013
SUBJECT: R.E. GINNA NUCLEAR POWER PLANT, LLC NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE INSPECTION REPORT NO. 05000244/2013503
Dear Mr. Pacher:
On September 19, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the September 17, 2013, evaluated emergency preparedness exercise at your R.E. Ginna Nuclear Power Plant, LLC (Ginna). The enclosed inspection report documents the inspection results, which were discussed on September 19, 2013, with you and other members of your staff. The inspection examined activities conducted under your license as they relate to safety and The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings were identified. In accordance with Title 10 of the Code of Federal Regulation (10 CFR) available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) componeDocuments Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/ Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-244 License No. DPR-18 Enclosure: NRC Inspection Report No. 05000244/2013503 cc w/encl: Distribution via ListServ R. Thomson, RAC Chair, FEMA Region II Mr. Joseph E. Pacher, Vice President R.E. Ginna Nuclear Power Plant, LLC Constellation Energy Nuclear Group, LLC 1503 Lake Road Ontario, NY 14519 SUBJECT: R.E. GINNA NUCLEAR POWER PLANT, LLC NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE INSPECTION REPORT NO. 05000244/2013503
Dear Mr. Pacher:
On September 19, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the September 17, 2013, evaluated emergency preparedness exercise at your R.E. Ginna Nuclear Power Plant, LLC (Ginna). The enclosed inspection report documents the inspection results, which were discussed on September 19, 2013, with you and other members of your staff. The inspection examined activities conducted under your license as they relate to safety and license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings were identified. In accordance with Title 10 of the Code of Federal Regulation (10 CFR) available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of tDocuments Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/ Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-244 License No. DPR-18 Enclosure: NRC Inspection Report No. 05000244/2013503 cc w/encl: Distribution via ListServ R. Thomson, RAC Chair, FEMA Region II
ML13295A398 SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS RI/DRP RI/DRS NAME SBarr/SB DSchroeder/DS ADimitriadis/AD DATE 10/18/2013 10/18/2013 10/21/2013 i Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION I Docket No: 50-244 License No: DPR-18 Report No: 05000244/2013503 Licensee: Constellation Energy Nuclear Group, LLC (CENG) Facility: R.E. Ginna Nuclear Power Plant, LLC Location: Ontario, NY Dates: September 16-19, 2013 Inspectors: S. Barr, Sr. Emergency Preparedness Inspector, DRS, Region I (Lead) E. Burket, Emergency Preparedness Inspector, DRS, Region I P. Presby, Senior Operations Inspector, DRS, Region I D. Everhart, Physical Security Inspector, DRS, Region I E. Miller, Resident Inspector, DRP, Region I S. LaVie, Sr. Emergency Preparedness Specialist, DPR, NSIR Approved By: Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety ii Enclosure
SUMMARY OF FINDINGS
IR 05000244/2013503; 9/16/2013-9/19/2013; Constellation Energy Nuclear Group, LLC; R.E. Ginna Nuclear Power Plant, LLC; Exercise Evaluation Hostile Action (HA) Event; Exercise Evaluation Scenario Review; Performance Indicator Verification. This was an announced inspection conducted by four Region I-based inspectors, one Region I resident inspector, and one Headquarters-based inspector. No findings were identified during the inspection. The nuclear power reactors is described in NUREG-December 2006.
Cornerstone: Emergency Preparedness
A. NRC-Identified and Self-Revealing Findings
No findings were identified. B. Licensee-Identified Findings None.
REPORT DETAILS
REACTOR SAFETY
===Cornerstone: Emergency Preparedness (EP) 1EP7 Exercise Evaluation Hostile Action (HA) Event (71114.07 1 Sample)
a. Inspection Scope
Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix E,Section IV.F.2.j, requires in part that nuclear power reactor licensees, in each eight calendar year exercise cycle, provide the opportunity for their emergency response organization (ERO) to demonstrate proficiency in the key skills necessary to respond to a hostile action (HA) directed at the plant site. Constellation Energy Nuclear Group (CENG) designed the September 17, 2013, Ginna EP exercise to satisfy that requirement, and the NRC inspected the Ginna HA event exercise to assess CENGeffectively implement the Ginna Emergency Plan during a HA event and adequately protect public health and safety. This overall exercise inspection activity represented the completion of one sample on a biennial cycle. The exercise evaluation consisted of the following review and assessment: The adequacy of CENGs performance in the biennial full-participation exercise regarding the implementation of the planning standards described in 10 CFR 50.47(b) (4), (5), (9), and (10), which are: emergency classification; offsite notification; radiological assessment; onsite protective actions, and public protective action recommendations, respectively.===
The overall adequacy of CENGEmergency Plan commitments. The facilities assessed were the Control Room Simulator, the Technical Support Center (TSC), the Incident Command Post (ICP), and the Emergency Operations Facility (EOF).
A review of other performance areas, such as the Ginna ERO: recognition of abnormal plant conditions; command and control, including interactions with site security staff; intra- and inter-facility communications; prioritization of mitigating activities; utilization of repair and field monitoring teams; interface with offsite agencies, including local law enforcement agencies; staffing and procedure adequacy; and the overall implementation of the Emergency Plan and its implementing procedures.
A review of past performance issues from the last NRC Ginna exercise inspection report and recent CENG Ginna EP drill reports, to determine the effectiveness of licensee corrective actions as demonstrated during the September 17, 2013, exercise and to ensure compliance with 10 CFR 50.47(b)(14).
-exercise critiques, to evaluate CENGs self-assessment of its Ginna ERO performance during the September 17, 2013, exercise and to ensure compliance with 10 CFR Part 50, Appendix E, Section IV.F.2.g. The inspectors reviewed the documents listed in the attachment to this report.
b. Findings
No findings were identified. 1EP8 Exercise Evaluation Scenario Review (71114.08 1 Sample)
a. Inspection Scope
Prior to the September 17, 2013, emergency preparedness exercise, the NRC inspectors conducted an in-office review of the exercise objectives and scenario, which CENG had submitted to the NRC, to determine if the exercise would test major elements of the Ginna Emergency Plan as required by 10 CFR 50.47(b)(14). This overall exercise inspection activity represented the completion of one sample on a biennial cycle. The inspectors reviewed the documents listed in the attachment to this report.
b. Findings
No findings were identified.
OTHER ACTIVITIES (OA)
4OA1 Performance Indicator (PI) Verification (71151
3 Samples)
a. Inspection Scope
The inspectors reviewed data for the Ginna EP PIs, which are:
- (1) Drill and Exercise Performance (DEP) (EP01);
- (2) Emergency Response Organization (ERO) Drill Participation (EP02); and,
- (3) Alert and Notification System (ANS) Reliability (EP03). The last EP inspection at Ginna was conducted in the third calendar quarter of 2012, so the inspectors reviewed supporting documentation from EP drills and tests from the third calendar quarter of 2012 through the second calendar quarter of 2013, to verify the accuracy of the reported PI data. The review of these PIs was conducted in accordance with NRC Inspection Procedure 71151, using the acceptance criteria documented in NEI 99- This inspection activity represented the completion of three samples.
b. Findings
No findings were identified.
4OA6 Meetings, including Exit
On September 19, 2013, the inspectors presented the results of this inspection to Mr. J. Pacher, Ginna Site Vice President, and other members of the CENG staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report.
ATTACHMENT
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- J. Pacher, Site Vice President
- R. Freeman, CENG Corporate Emergency Planning Manager
- J. Scalzo, Ginna Emergency Planning Manager
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
None.
LIST OF DOCUMENTS REVIEWED
Section 1EP1: Exercise Evaluation
- Hostile Action (HA) Event Ginna Station Nuclear Emergency Response Plan (Revision 03400) Ginna Station September 17, 2013, Emergency Exercise Scenario Package Ginna Station Emergency Plan Implementing Procedures
- CNG-EP-1.01-1002, Control of Emergency Preparedness Program Activities (Revision 00100)
- CNG-EP-1.01-1005, EP Performance Objectives and Demonstration Criteria (Revision 00300)
- CNG-EP-1.01-1007, Evaluation and Documentation of Drills, Exercises and Classified Events (Revision 00100)
- ER-SEC.2, Response to Intrusion by Adversary (Revision 00604) Ginna Station Emergency Preparedness Drill Reports, January 2012 - August 2013 Condition Reports generated as a result of the September 17, 2013, exercise (As documented in Ginna Drill Report GIN-EP-EX-13-07)
Section 1EP8: Exercise Evaluation
- Scenario Review Ginna Station Nuclear Emergency Response Plan (Revision 03400) Ginna Station September 17, 2013, Emergency Exercise Scenario Package
- CNG-EP-1.01-1006, Drill and Exercise Scheduling and Preparation (Revision 00300)
- EPG-8, Emergency Preparedness Scenario Development Guideline (Revision 00100)
- EPG-9, Emergency Preparedness Drill Preparation Guideline (Revision 00100)
Section 4OA1: Performance Indicator (PI) Verification
- CNG-NL-1.01-1010, NRC and INPO Performance Indicator Reporting (Revision 00600) DEP PI data, July 2012
- June 2013
- Attachment