4 TEST PROTOCOLS  
4 TEST PROTOCOLS 4.1 OVERALL TEST APPROACH 4.2 TEST APPARATUS 4.3 FIBER PREPARATION 4.4 TEST TANK PREPARATION * *   
 
===4.1 OVERALL===
TEST APPROACH 4.2 TEST APPARATUS 4.3 FIBER PREPARATION 4.4 TEST TANK PREPARATION * *   
*  
*  
*
*
* 4.5 HYDRAULIC TEST CONDITIONS 4.6 TEST CONTROL  
* 4.5 HYDRAULIC TEST CONDITIONS 4.6 TEST CONTROL  


===4.7 FILTER===
4.7 FILTER BAG PROCESSING 5 TEST ACCEPTANCE CRITERIA 6 TEST DOCUMENTATION AND RECORDS  
BAG PROCESSING 5 TEST ACCEPTANCE CRITERIA 6 TEST DOCUMENTATION AND RECORDS  


7 DEBRIS HANDLING REQUIREMENTS 8 QUALITY ASSURANCE REQUIREMENTS 9 REFERENCES}}
7 DEBRIS HANDLING REQUIREMENTS 8 QUALITY ASSURANCE REQUIREMENTS 9 REFERENCES}}

Revision as of 16:16, 11 May 2019

CCNPP-BPPlan-002, Rev 0E, Small Scale Debris Bypass-Penetration Test Plan for Calvert Cliffs Nuclear Power Plant.
ML13319A932
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 11/11/2013
From: Plont A, Zigler G
Constellation Energy Group
To:
Office of Nuclear Reactor Regulation
Morgan N S
Shared Package
ML13319A601 List:
References
CCNPP-BPPlan-002, Rev 0E
Download: ML13319A932 (18)


Text

SMALL SCALE DEBRIS BY-PASS/PENETRATION TEST PLAN FOR CALVERT CLIFFS NUCLEAR POWER PLANT

REVISION HISTORY LOG

Table of Contents

List of Figures List of Tables ACRONYMS & ABBREVIATIONS

1 PURPOSE 2 TEST OBJECTIVES 3 TECHNICAL APPROACH 3.1 TEST MODULE Dimension in mm3.2 TEST VARIABLES

  • * * * *
  • Run Fiber TypeWater ChemistryTemperature

0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 0123456Debris Fraction Transported to StrainerPool Turnovers

4 TEST PROTOCOLS 4.1 OVERALL TEST APPROACH 4.2 TEST APPARATUS 4.3 FIBER PREPARATION 4.4 TEST TANK PREPARATION * *

  • 4.5 HYDRAULIC TEST CONDITIONS 4.6 TEST CONTROL

4.7 FILTER BAG PROCESSING 5 TEST ACCEPTANCE CRITERIA 6 TEST DOCUMENTATION AND RECORDS

7 DEBRIS HANDLING REQUIREMENTS 8 QUALITY ASSURANCE REQUIREMENTS 9 REFERENCES