Request for Additional Information Regarding Security Plan Review
ML121150619
Person / Time
Site: Beaver Valley
Issue date: 04/25/2012
From: Bamford P J
Plant Licensing Branch 1
To: Harden P A
FirstEnergy Nuclear Operating Co
Bamford, Peter J., NRR/DORL 415-2833
References
Download: ML121150619 (3)


Text

UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 April 25, 2012 Mr. Paul A. Harden Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077 BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 -REQUEST FOR ADDITIONAL INFORMATION REGARDING SECURITY PLAN REVIEW

Dear Mr. Harden:

By letter dated February 20, 2012 (Agencywide Documents Access and Management System Accession No. ML 12054A686), First Energy Nuclear Operating Company submitted the Beaver Valley's Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 10. The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The questions were sent via electronic transmission on April 20, 2012, to Mr. Phil Lashley, of your staff. The draft questions were sent to ensure that the questions were understandable, the regulatory basis was clear, and to determine if the information was previously docketed.

The draft questions were discussed in a teleconference with your staff on April 24, 2012. It was agreed that a response to this RAI would be submitted by May 31, 2012. Please contact me at 301-415-2833, if you have any questions.

Sincerely, Peter Bamford, P ject Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412

Enclosure:

As stated cc w/encl: Distribution via Listserv REQUEST FOR ADDITIONAL INFORMATION REGARDING 10 CFR 50.54(p)(2)

CHANGES TO THE SECURITY PLANS FIRST ENERGY NUCLEAR OPERATING COMPANY BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-334 & 50-412 By letter dated February 20,2012 (Agencywide Documents Access and Management System Accession No. ML 12054A686), First Energy Nuclear Operating Company submitted the Beaver Valley's Physical Security Plan (PSP), Training and Qualification Plan, and Safeguards Contingency Plan, Revision 10. The enclosure to the letter contained Safeguards Information and has been withheld from public disclosure.

The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing the submittal to ensure compliance with Title 10 of the Code of Federal Regulations (10 CFR), Section 50.54(p)(2).

The NRC staff has determined that the additional information requested below is needed to complete its review. In Section 15.1 and 15.3 of the PSP, the licensee describes the use of a thermal imaging system. Does this system display concurrently in at least two continuously staffed on-site alarm stations in accordance with 10 CFR 73.55(i)(2)? Describe how the thermal imaging system meets 10 CFR 73.55(i)(3)(iv).

Enclosure April 25, 2012 Mr. Paul A. Harden Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077 SUB...BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 -REQUEST FOR ADDITIONAL INFORMATION REGARDING SECURITY PLAN REVIEW

Dear Mr. Harden:

By letter dated February 20,2012 (Agencywide Documents Access and Management System Accession No. ML 12054A686), First Energy Nuclear Operating Company submitted the Beaver Valley's Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 10. The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review.

The specific questions are found in the enclosed request for additional information (RAI). The questions were sent via electronic transmission on April 20, 2012, to Mr. Phil Lashley, of your staff. The draft questions were sent to ensure that the questions were understandable, the regulatory basis was clear, and to determine if the information was previously docketed.

The draft questions were discussed in a teleconference with your staff on April 24, 2012. It was agreed that a response to this RAI would be submitted by May 31,2012. Please contact me at 301-415-2833, if you have any questions.

Sincerely, /ra/ Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412

Enclosure:

As stated cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsOgcRp Resource LPLI-2 R/F RidsAcrsAcnw_MailCTR Resource RidsNsirDspRsps Resource JCrockett, NSIR RidsRgn1 MailCenter Resource RidsNrrDoriDpr Resource RidsNrrDorlLpl1-2 Resouce RidsNrrPMBeaverValley Resource RidsNrrLAABaxter Resource BSchnetzler.

NSIR ARoundtree, NSIR ADAMS Accession Number: ML 121150619

  • via email OFFICE LPLI-2/LA NSIR/DSP/RSLB LPLI-2/BC NAME PBamford DATE 04/24/2012 A Baxter, SUttle f 04/25/20 MKhanna (JHughey for) 04/25/2012