ML15231A840: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 25: | Line 25: | ||
-U) System / JPM Title Type Code* | -U) System / JPM Title Type Code* | ||
Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion) | Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion) | ||
(JPM New) N, A, S 1 S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR (Alt Path - Cooler Outlet Valve Fails open | |||
) (JPM New) N, A, S, L 4P S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak | ) (JPM New) N, A, S, L 4P S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak | ||
) (JPM New) | ) (JPM New) | ||
| Line 40: | Line 40: | ||
*Type Codes Criteria for RO | *Type Codes Criteria for RO | ||
/ SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A) | / SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A) | ||
(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3 / / > 1 (control room system) | |||
(randomly selected)}} | |||
Revision as of 17:34, 27 April 2019
| ML15231A840 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 03/06/2015 |
| From: | NRC/RGN-III |
| To: | FirstEnergy Nuclear Operating Co |
| Reeser D W | |
| Shared Package | |
| ML15217A099 | List: |
| References | |
| Download: ML15231A840 (1) | |
Text
NUREG-1021, R9 Supplement 1 FENOC Facsimile Rev. 1 ES-301 Control Room/In
-Plant Systems Outline Form ES-301-2 Facility: Davis Besse Date of Examination:
__6/15/15 thru 6/26/15
__ Exam Level: RO SRO(I) SRO(U) Operating Test No.:
__DB NRC 2015__ Control Room Systems
-I); (2 or 3 for SRO
-U) System / JPM Title Type Code*
Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion)
(JPM New) N, A, S 1 S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR (Alt Path - Cooler Outlet Valve Fails open
) (JPM New) N, A, S, L 4P S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak
) (JPM New)
N, A, S, EN 5 In-Plant Systems
-I); (3 or 2 for SRO
-U) P1 - (004) / Perform Att
. 5 of Control Room Evacuation
DB-OP-02508, CTRM Evacuation (JPM 048) D, E, R 2 P2 - (0 64) / Restore EDG to supply 4160 Essential Bus
DB-OP-02538, Loss of D2P and DBP (JPM 079) D, E 6 @ All RO and SRO control room (and in
-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO
/ SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3 / / > 1 (control room system)
(randomly selected)