RS-13-021, County Station, Units 1 and 2 - Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[RS-13-021, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)]]
| number = ML13060A421
| issue date = 02/28/2013
| title = County Station, Units 1 and 2 - Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
| author name = Kaegi G T
| author affiliation = Exelon Generation Co, LLC
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000373, 05000374
| license number = NPF-011, NPF-018
| contact person =
| case reference number = EA-12-049, RS-13-021
| document type = Letter type:RS, Operating Plan
| page count = 74
| project =
| stage = Other
}}
 
=Text=
{{#Wiki_filter:R606B)
 
Provide a general description strategies using on-site portable equipment including modifications that are proposed to maintain core cooling.
methods strategy(ies) utilized to achieve this coping time.
 
how the connection is protected
 
to maintain
 
I I
 
strategies using installed equipment ncluding station ies)utilized
 
Strategy
 
(potential diverse uses I e ui ment
 
diverse uses Maintenance e ui ment (potential diverse uses Criteria Maintenance List portable
/ e ui ment(6) 5.5
 
Maintenance
/ ui ment
 
e ui ment
 