ML12129A430: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 2: | Line 2: | ||
| number = ML12129A430 | | number = ML12129A430 | ||
| issue date = 05/08/2012 | | issue date = 05/08/2012 | ||
| title = | | title = Investigative Synopsis, Office of Investigations Case Number 2-2011-049, Allegation No. RII-2011-A-0098 | ||
| author name = Rose S D | | author name = Rose S D | ||
| author affiliation = NRC/RGN-II/DRP/RPB3 | | author affiliation = NRC/RGN-II/DRP/RPB3 | ||
Revision as of 08:28, 12 April 2019
| ML12129A430 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 05/08/2012 |
| From: | Rose S D NRC/RGN-II/DRP/RPB3 |
| To: | Nazar M Florida Power & Light Co |
| References | |
| RII-2011-A-0098 | |
| Download: ML12129A430 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 8, 2012 Mr. Mano Nazar Executive Vice President Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
SUBJECT:
ST. LUCIE - INVESTIGATIVE SYNOPSIS, OFFICE OF INVESTIGATIONS CASE NUMBER 2-2011-049, ALLEGTION NO. RII-2011-A-0098
Dear Mr. Nazar:
Enclosed for your information is the synopsis of the Nuclear Regulatory Commission (NRC)
Office of Investigations (OI) completed report regarding discriminatory employment practices.
OI determined that there was insufficient evidence to substantiate the allegation that a former contractor general foreman was discriminated against by being laid off in June of 2009 in retaliation for cooperating with an NRC OI investigation in August of 2007. We plan no further action with regard to this matter. Should you have any questions concerning this letter, please contact us.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).
Sincerely, /RA/ Steven D. Rose, Acting Chief Reactor Projects Branch 3 Division of Reactor Projects
Enclosure:
Investigative Synopsis, OI Case No. 2-2011-049 May 8, 2012 Mr. Mano Nazar Executive Vice President Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
SUBJECT:
ST. LUCIE - INVESTIGATIVE SYNOPSIS, OFFICE OF INVESTIGATIONS CASE NUMBER 2-2011-049, ALLEGTION NO. RII-2011-A-0098
Dear Mr. Nazar:
Enclosed for your information is the synopsis of the Nuclear Regulatory Commission (NRC) Office of Investigations (OI) completed report regarding discriminatory employment practices.
OI determined that there was insufficient evidence to substantiate the allegation that a former contractor general foreman was discriminated against by being laid off in June of 2009 in retaliation for cooperating with an NRC OI investigation in August of 2007. We plan no further action with regard to this matter. Should you have any questions concerning this letter, please contact us.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).
Sincerely, /RA/
Steven D. Rose, Acting Chief Reactor Projects Branch 3 Division of Reactor Projects
Enclosure:
Investigative Synopsis, OI Case No. 2-2011-049
X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER:_ ML12129A430 ______________ X SUNSI REVIEW COMPLETE OFFICE ` RII: EICS RII: RPB3 SIGNATURE /RA/ /RA/ /RA/ NAME MDonithan ODeMiranda SRose DATE 5/8/2012 5/8/2012 5/8/2012 E-MAIL COPY? ( ) YES ( ) NO ( ) YES ( ) NO ( ) YES ( ) NO Official Use Only
- OI Investigation Information NOT FOR PUBLIC DISCLOSURE WITHOUT APPROVAL OF FIELD OFFICE DIRECTOR, OFFICE OF INVESTIGATIONS, REGION I I Official Use Only
- OI Investigation Information Case No.: 2-2011-049 Enclosure SYNOPSIS This investigation was initiated by the U. S. Nuclear Regulatory Commission (NRC), Office of Investigations (OI), Region II (RII), on July 29, 2011, to determine whether a Former Contracted General Foreman at the Saint Lucie Nuclear Plant (SLNP) was discriminated against for participating in a protected activity.
Based upon the evidence developed during this investigation, OI:RII did not substantiate that the former contracted General Foreman at the SLNP was discriminated against for participating in a protected activity.