ML14049A438: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 2: | Line 2: | ||
| number = ML14049A438 | | number = ML14049A438 | ||
| issue date = 02/14/2014 | | issue date = 02/14/2014 | ||
| title = | | title = Inspection Report Plan for 05000254-14-003 & 05000265-14-003 | ||
| author name = Bozga J V | | author name = Bozga J V | ||
| author affiliation = NRC/RGN-III | | author affiliation = NRC/RGN-III | ||
Revision as of 22:17, 3 April 2019
| ML14049A438 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 02/14/2014 |
| From: | Bozga J V NRC/RGN-III |
| To: | |
| John Bozga | |
| References | |
| IR-14-003 | |
| Download: ML14049A438 (1) | |
See also: IR 05000254/2014003
Text
Inspection Report : 05000254/2014003; 05000265/2014003
Inspection Dates
- April 7
th thru April 11
th 2014 Inspection Procedure
- Temporary Instruction 2515/189, "Inspection to Determine Compliance of Dynamic Restraint (Snubber) Program with 10 CFR 50.55a Regulatory Requirements for Inservice Examination
and Testing of Snubbers"
Lead Inspector
- John V. Bozga
(630) 829-9613
I. Information Requested for In-Office Preparation Week
The following information is requested by March 24, 2014 or sooner, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The
required information identified below should be provided on compact disc (CD). Please
provide a CD copy. The preferred file format is a searchable "pdf" file. The CDs should
be indexed and hyper-linked to facilitate ease of use, if possible. If you have any questions regarding this information, please call the inspector as soon as possible. (1) A copy of document(s) which contain(s) the current snubber Inservice Inspection (ISI) and Inservice Testing (IST) program. (The snubber program may be found in
the ISI program, the IST program, Technical Specifications, the Technical Requirements Manual, or any other licensee-controlled documents/procedures.) (2) A copy of any alternatives and/or relief requests approved by the NRC for the snubber ISI and/or IST program. (3) Copies of any corrective-action documents involving ISI and/or IST of snubbers for the current 10-year interval, including any actions taken to address Enforcement
Guidance Memorandum (EGM)10-001 and Regulatory Issue Summary (RIS) 2010-
06. (4) A copy of the snubber ISI and IST program based on the Technical Specification (TS) and/or Technical Requirements Manual (TRM) (if snubber ISI and IST program
governed through TS and/or TRM during any part of the 40 years of plant
operation).
.
(5) A copy of the snubber ISI and IST program based on American Society of Mechanical Engineers (ASME)Section XI and/or Subsection ISTD of the ASME
Operation and Maintenance (OM) Code (if snubber ISI and IST program controlled through ASME Section XI and/or ASME Section OM during any part of the 40 years of plant operation). (6) Licensing actions (50.59s, License Amendment Requests, Technical Specification Changes, Relief Requests or approved alternatives) that changed
snubber ISI and IST program from TS to TRM, TS to ASME Section XI, ASME
Section XI to ASME OM code, etc. (7) Copies of ISI and IST inspection records for the total snubber population (Unit 2) for the current 10-year interval. (8) List of the snubber ISI and IST activities scheduled for the Unit 2 refueling outage and timeline for when these activities will occur. The list should include type of snubber (mechanical or hydraulic), design function (seismic, waterhammer, etc.), Tag/Mark Number (ie. FWH-139), ASME class I, II or III, vendor, risk ranking, safety classification, plant system, building location and elevation, high radiation area and accessible/inaccessible. (9) Copy of Code of Record (ie. ASME Code Section XI or ASME OM Code) used for the current 10-year snubber ISI and IST program.
(10) Copy of record/s where snubber
inservice visual examination/s was extended beyond one refueling outage and the site evaluation of the inspection frequency
of the snubber visual examination/s to show compliance with the requirements
of the ASME Section XI code, ASME OM Code or other approved document. (11) Copies of records where snubber inservice visual examination/s were extended beyond two refueling outages and the site evaluation of the inspection frequency of the snubber visual examination/s to show compliance with the requirements of the ASME Section XI code, ASME OM Code or other approved
document. (12) Copies of testing records for selected snubbers which had inservice test failures during the current 10 year interval and the site evaluation whether an additional sample at least one-half the size of the initial sample was tested as required by the ASME OM Code or any other NRC-approved alternative(s). (13) Copy of ISI VT-3 visual inspection procedure used for snubber ISI examinations. (14) Copy of IST procedure used for snubber IST.
(15) Copy of site evaluation that was performed to address requirements of ASME OM Code Case 13, "Requirements for
Extending Snubber Inservice Visual Examination Interval at LWR Power Plants", if site is using code case to extend ISI examination interval. (16) Copy of NRC approval of OM Code Case OMN-15, "Requirement for Extending the Snubber Operational Readiness Testing Interval at LWR Power Plants," to
extend the snubber inservice testing interval, if applicable.
(17) Copy of documents that pertain to Service Life Monitoring of total snubber population (Unit 2). (18) Copy of records (i.e. repair, replacements, maintenance, corrective work, failures, etc.) for the total snubber population (Unit 2) that are recorded and included in the Service Life Monitoring program. (19) The most recent Quality Assurance Audit and/or Self-Assessment of the snubber ISI and IST program. (20) Electronic copy of the UFSAR, technical specifications and technical requirements manual if available. (21) Name(s) and phone numbers for the regulatory and technical contacts. (22) Current management and engineering organizational chart.
II. Information Requested to be provided throughout the inspection
(1) Copies of any corrective action documents generated as a result of the inspection team's questions or queries during this inspection. (2) Copies of the list of questions s
ubmitted by the inspection team members and the status/resolution of the information requested (provide daily during the inspection to
inspector). If you have any questions regarding the information requested, please contact the lead inspector, John V. Bozga (630)-829-9613