IR 05000461/2018004: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 2: | Line 2: | ||
| number = ML19043A826 | | number = ML19043A826 | ||
| issue date = 02/12/2019 | | issue date = 02/12/2019 | ||
| title = | | title = NRC Integrated Inspection Report 05000461/2018004; 07201046/2018001 | ||
| author name = Riemer K | | author name = Riemer K | ||
| author affiliation = NRC/RGN-III/DRP/B1 | | author affiliation = NRC/RGN-III/DRP/B1 | ||
Revision as of 13:51, 31 March 2019
| ML19043A826 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 02/12/2019 |
| From: | Kenneth Riemer NRC/RGN-III/DRP/B1 |
| To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
| References | |
| IR 2018001, IR2018004 | |
| Download: ML19043A826 (31) | |
Text
/RA/
OFFICIAL RECORD COPY