ML073100372: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML073100372
| number = ML073100372
| issue date = 10/16/2007
| issue date = 10/16/2007
| title = Salem, Units 1 & 2 - License Amendment Request S07-05 - Revision to Licensing Basis NPSH Methodology for ECCS Pumps
| title = License Amendment Request S07-05 - Revision to Licensing Basis NPSH Methodology for ECCS Pumps
| author name = Mulligan P
| author name = Mulligan P
| author affiliation = State of NJ, Dept of Environmental Protection, Bureau of Nuclear Engineering
| author affiliation = State of NJ, Dept of Environmental Protection, Bureau of Nuclear Engineering
Line 12: Line 12:
| document type = Letter
| document type = Letter
| page count = 2
| page count = 2
| project =
| stage = Other
}}
}}



Revision as of 06:26, 10 February 2019

License Amendment Request S07-05 - Revision to Licensing Basis NPSH Methodology for ECCS Pumps
ML073100372
Person / Time
Site: Salem  PSEG icon.png
Issue date: 10/16/2007
From: Mulligan P
State of NJ, Dept of Environmental Protection, Bureau of Nuclear Engineering
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML073100372 (2)


Text

JON S. CORZINE Governor§Rtate of New DEPARTMENT OF ENVIRONMENTAL PROTECTION Division of Environmental Safety and Health Radiation Protection and Release Prevention Element Bureau of Nuclear Engineering P. O. Box 415 Trenton, New Jersey 08625-0415 Tel (609) 984-7700 Fax (609) 984-7513 LiSA P. JACKSON Commissioner October 16, 2007 United States Nuclear Regulatory Commission Document Control Desk Washington, DC'20555

Dear Sir:

Subject:

Salem Generating Station Units 1 and 2 Docket Nos. 50-272 and 50-311 License Amendment Request S07-05 Revision to Licensing Basis NPSH Methodology for ECCS Pumps PSEG Nuclear LLC submitted the proposed change to the Salem Licensing Basis by letter to the NRC dated August 15, 2007. The proposed change would revise the licensing basis for the Net Positive Suction Head (NPHS) available for Efietgehcyý Core Cooling System (ECCS) and Containment Heat Removal System Pumps, as described in-Appendix 3A of the Salem Updated Final Safety Analysis Report.The BNE has no comments on the proposed change. If you need to discuss this subject further, please contact Elliot Rosenfeld at (609) 984-7548.Sinee Patrick Mulligan,'

Acting. ager-. "."Burteau of-NucleaEngineering 2;':" .," i';" .:.,- ..,.. .... .,.. ..,.. ..._;Z ; i 2:.:dz ig g.;!:i, .:2 " ': !- 5 .L : ?' ., AwO2-New Jersey Is An Equal Opportunity Employer 0 Printed on Recycled Paper and Recyclable Ditribution Dr. Jill Lipoti, DEP Paul Baldauf, DEP Richard Pinney, DEP Elliot. Rosenfeld, DEP Nancy McNamara, NRC Region 1 Marjorie McLaughlin, NRC Region 1 Rick Ennis, NRC Licensing Project Manager Daniel Schroeder, Sr. Resident Inspector Christine Neely, Director -Regulatory Affairs, PSEG Nuclear LLC Jeffrey Keenan, Manager -Licensing, PSEG Nuclear LLC