| title = | | title = Notification of Inspection (NRC Inspection Report 05000445/2013405 and 05000446/2013405) and Request for Information | ||
| author name = Gaddy V G | | author name = Gaddy V G | ||
| author affiliation = NRC/RGN-IV/DRS/OB | | author affiliation = NRC/RGN-IV/DRS/OB | ||
Revision as of 02:56, 8 February 2019
| ML13164A030 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 06/12/2013 |
| From: | Vincent Gaddy Operations Branch IV |
| To: | Flores R Luminant Generation Co |
| References | |
| IR-13-405 | |
| Download: ML13164A030 (4) | |
See also: IR 05000445/2013405
Text
June 12, 2013
Rafael Flores, Senior Vice President
and Chief Nuclear Officer
Luminant Generation Company, LLC Comanche Peak Nuclear Power Plant P.O. Box 1002
Glen Rose, TX 76043
SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT UNITS 1 AND 2 - NOTIFICATION OF INSPECTION (NRC INSPECTION
REPORT 05000445/2013405 AND 05000446/2013405) AND REQUEST FOR
INFORMATION
Dear Mr. Flores:
From July 30 to August 1, 2013, inspectors from the Nuclear Regulatory Commission's (NRC) Region IV office will perform the Temporary Instruction (TI)-186, "Inspection of Procedures and Processes for Responding to Potential Aircraft Threats." In order to minimize the impact to your
onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the
preparation and/or the onsite portions of the inspection. Also, in order to demonstrate
compliance with TI-186, we ask that you have the necessary staff members available to the
inspection team to assist in any plant walk-throughs, interviews, and simulator demonstrations.
We have discussed the schedule for these inspection activities with your staff and understand that our point of contact for this inspection will be Mr. Robert Kidwell, Manager, Emergency
Preparedness. If there are any questions about this inspection or the material requested,
please contact Steve Garchow, lead inspector, at (817) 200-1216 (steve.garchow@nrc.gov) or Kelly Clayton at (817) 200-1570 (kelly.clayton@nrc.gov
). This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control
number.
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
R. Flores - 2 -
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide
Documents Access and Management
is accessible from the NRC
Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Vincent G. Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket: 50-445, 50-446, License: NPF-87, NPF-89,
Enclosure:
TI-186 Inspection Document Request
cc: Electronic Distribution for Comanche Peak Nuclear Power Plant
ML13164A030 ADAMS: No Yes SUNSI Review Complete Reviewer Initials:
SMG Publicly Available Non-Sensitive Category A. Non-publicly Available Sensitive KEYWORD: SUNSI Review Complete
OE:OB C:OB SGarchow VGaddy /RA/ /RA/ 6/12/2013 6/12/2013
- 1 - Enclosure TI-186 INSPECTION DOCUMENT REQUEST
FROM: Steve Garchow Senior Operations Engineer, NRC RIV
817-200-1426
TO: Robert Kidwell Manager, Emergency Preparedness, Comanche Peak Nuclear Power Plant
254-897-5310
SUBJECT: Information Request to Support July 30 - August 1, 2013, TI-186 Inspection, "Inspection of Procedures and Processes for Responding to Potential Aircraft Threats."
A. The following information is requested in order to support inspection preparation activities. Requested materials should be available upon the inspectors arriving on-site on July 30, 2013.
Document Request:
- Procedure(s) that describe actions taken to address potential aircraft threat notifications onsite. This may include procedures that operations, security, emergency preparedness, and health physics staff use.
- Plant specific analyses and/or basis documents prepared to support the designed actions you have taken to address this issue in your procedures. Such analyses were described for support of site actions in the topical Regulatory Guide 1.214 (dated January 2009).
- Training materials used to train the various affected groups on-site when contacted with a potential aircraft threat (licensed operators, operators in training for a license, non-licensed operators, security, EP, HP, fire brigade, and other support staff, as
examples).
- Training materials used to train the various affected groups off-site when contacted with a potential aircraft threat (County Sheriffs as an example)
- If the site has conducted exercises or drills to evaluate the ability of staff to implement these procedures in the past, provide any documentation summarizing the results of these events. If any condition reports came out of the exercises/drills, provide those as well.